Category:Graphics incl Charts and Tables
MONTHYEARML18078A3012018-03-0505 March 2018 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML15240A3622015-09-28028 September 2015 Master Report - Tables 1 and 2 ML0629300912006-10-16016 October 2006 OOL-09, Attachment B - Data Quality Assessment Plots and Curves, List of Figures ML0629300932006-10-16016 October 2006 6279 Activity Forms, Portable Instrument Accountability Forms and Source Check Form ML0629700712006-10-0505 October 2006 Yankee Nuclear Power Station - Graphs and Charts, 6264 Activity ML0615304122006-01-25025 January 2006 Report for Analysis of Concrete Samples from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2005-002) (Rfta No. 06-001) ML0513301302005-02-23023 February 2005 Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) IR 05000029/20040022005-02-23023 February 2005 Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) ML0704004002005-02-21021 February 2005 YNPS-FSS-TBN01-00, Final Status Survey Report, TBN-01-13, Frequency Plot FSS Data Through Calculation of ALARA Action Level ML0704003942005-02-21021 February 2005 YNPS-FSS-TBN01-00, Final Status Survey Report, Volume 3 (Attachment B Through Appendix D) ML0513600812005-02-16016 February 2005 Confirmatory Survey Results for Class 3 Open Land Areas Outside the RCA, Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 04-007) ML0426801492004-08-0505 August 2004 Calculation for Contaminated Concrete for the License Termination Plan (Ltp) ML0426801462004-08-0505 August 2004 Calculation for Contaminated Concrete for the License Termination Plan (Ltp) ML0426801512004-07-31031 July 2004 Calculation for Contaminated Concrete for the License Termination Plan (Ltp) ML0634804411996-12-0404 December 1996 Attachment B - Data Quality Assessment Plots and Curves 2018-03-05
[Table view] Category:Inspection Report
MONTHYEARIR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 IR 07200031/20204012020-10-21021 October 2020 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report No. 07200031/2020401 IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) IR 05000029/20160012016-05-18018 May 2016 IR 07200031-16-001 and 05000029-16-001 on 4/20/16, Yankee Atomic Electric Company, Rowe, Ma Site IR 07200031/20140012014-05-0606 May 2014 IR 07200031-14-001, on 04/14-15/14, Independent Spent Fuel Storage Installation, Yankee Atomic Electric Company, Rowe, Ma Site ML1036300432010-12-28028 December 2010 IR 07200031-10-001, on 11/30/10, Yankee Atomic Electric Company, Rowe, Ma (Transmittal Letter) IR 07200031/20100012010-12-28028 December 2010 IR 07200031-10-001, on 11/30/10, Yankee Atomic Electric Company, Rowe, Ma IR 05000029/20060012007-07-0202 July 2007 Combined IR 05000029-06-001 and 05000029-07-001, in 2006-2007, Yankee Atomic Electric Company, Rowe, Massachusetts ML0717007532007-03-16016 March 2007 Yankee Nuclear Power Station, Site Closure Project, Phase IV Final Inspection Report IR 05000029/20050022006-06-13013 June 2006 IR 05000029-05-002; on 08/01/2005 to 05/15/2006; Yankee Nuclear Power Station ML0615304212006-03-13013 March 2006 In-Process Inspection Survey Results for the Remaining Spent Fuel Pool and Northeastern Upper RCA Yard Excavations and Concrete Structures within the Excavations at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No 50-29; Rft IR 05000029/20050012005-10-18018 October 2005 IR 05000029-05-001, on 02/01/2005 - 08/31/2005, Yankee Atomic Electric Company, Rowe, Massachusetts ML0615303792005-10-12012 October 2005 In-Process Inspection Cursory Survey Results for the Primary Auxiliary Building Remaining Walls at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) IR 05000029/20040022005-02-23023 February 2005 Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) ML0513600812005-02-16016 February 2005 Confirmatory Survey Results for Class 3 Open Land Areas Outside the RCA, Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 04-007) IR 05000029/20040012004-09-20020 September 2004 IR 05000029-04-001, on 01/22/2004 - 08/05/2004, Yankee Atomic Electric Company IR 05000029/20030022004-02-12012 February 2004 IR 05000029-03-002, on 06/28/03 to 01/21/04, Yankee Atomic Electric Company, Rowe, Massachuetts ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000029/20020022003-01-27027 January 2003 IR 05000029-02-002, on 07/08/2002 - 01/03/2003, Yankee Atomic Electric Co., Rowe, Massachusetts. Decommissioning Activities IR 05000029/20020012002-08-12012 August 2002 IR 05000029-02-001, on 07/07/02, Yankee Atomic Electric Company, to Determine Whether the Decommissioning Activities Carried Out at Yankee Rowe Facility Were Conducted Safely and in Accordance with NRC Requirements IR 05000029/20010032002-03-20020 March 2002 IR 05000029/2001-003, Yankee Atomic Electric Company IR 05000029/19990021999-08-0404 August 1999 Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts IR 05000029/19900141990-09-0707 September 1990 Rev 1 to Notification of Significant Licensee Meeting 90-110 on 900921 in Region I Ofc Re Insp Rept 50-029/90-14 IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19890801990-07-25025 July 1990 Ack Receipt of Re Violations Noted in Insp Rept 50-029/89-80 IR 05000029/19900061990-07-24024 July 1990 Exam Rept 50-029/90-06OL on 900619-21.Exam Results:All Three Candidates Passed Exams & Issued Licenses IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical 2023-10-04
[Table view] Category:Letter
MONTHYEARML23298A0532024-04-11011 April 2024 Exemption FA Cover Letter ML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton 05000029/LER-2021-001, Compensatory Measure Not Established for a Momentary I/O Board Communication Loss2021-01-12012 January 2021 Compensatory Measure Not Established for a Momentary I/O Board Communication Loss ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 2024-04-11
[Table view] |
Text
Yli O R I S E O A K R I D G E INSTITUTE F O R S C I E N C E AND E D U C A T I O N February 16, 2005 Mr. John Hickman Mail Stop: 7F27 Division of Waste Management U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rock\llle. blD 20852-2738
SUBJECT:
CONFIRMATORY SURVEY RESULTS FOR CLASS 3 OPES LAYD AREAS OUTSIDE THE RCA, YANKEE NUCLEAR POWER STATION, RO\\'E, MASSACHUSETTS [DOCKET NO. 50-29; RFTA NO. 04-007]
Dear Mr. Hickman:
The Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE) performed confimiatory survey activities of some of the Class 3 Open Land Areas at the Yankee Nuclear Power Station (YXPS) Plant in Rowe, Massachusetts on Ko\.ember 17, 2004. These survey activities were requested by the licensee and approved by the NRC site representative while ESSAP was on site performing other activities. A fomial confimiatory survey plan was not provided to the NRC for these confirmatory activities; instead, a plan used previously at the Connecticut Yankee site was used as the basis for the Open Land Areas Outside the RCA (OOL) survey activities at Yankee Rowe. The survey activities included gamma surface scans and soil sampling. Enclosed are the results documenting those survey activities.
If you have any questions or comments. please direct them to me at (865) 576-0065 or Timothy J.
Vitkus at (865) 576-5073.
Wade C. Adams Health Physicist/Project Leader Enviroiimental Survey and Site Assessment Program c
Lt' A :k lp E nc 10sures Distribution approval and concurrence: Initials /
Technical Management Team Member Laboratory Manager -
Quality Manager c1 P 0 BOX 1 17, OAK RIDGE, TENNESSEE 3783 1-0117 Managed and operated by Oak Ridge Associated Universities for the US Department of Energy
CONFIRMATORY SURVEY RESULTS FOR CLASS 3 OPEN LAND AREAS YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS INTRODUCTION The U.S. Nuclear Regulatory Commissions (NRC) Headquarters and Region I Offices requested that the Oak Ridge Institute for Science and Educations (ORISE) Environmental and Survey Site Assessment Program (ESSAP) perform confirmatory surveys of the Class 3 surface soil survey units (SU) in the Open Land Areas Outside the RCA (OOL) of the Yankee Nuclear Power Station (YNPS) in Rowe, Massachusetts (Figure 1). Class 3 SUs included OOL-05, OOL-08, and OOL-15. Background surface soil samples were collected from the on-site Reference Area. SU OOL-05 is located along the west boundary of the Restricted Area; SU OOL-08 stretches from the western portion of the site, along the fence perimeter towards the south, and then east of the site; SU OOL-15 is north of the site; and the Reference Area is located towards the east. The confirmatory surveys of these SUs were performed on November 17, 2004.
PROCEDURES A formal site-specific survey plan was not prepared for these survey activities. While on site performing other confirmatory activities, the licensee requested that ESSAP perform confirmatory surveys of the available Class 3 SUs. After receiving approval from the NRC site representative, ESSAP agreed to this request. The confirmatory surveys were performed in accordance with a survey plan that had been submitted to and approved by the NRC for the Open Land Areas at the Connecticut Yankee site in Haddam Neck, Connecticut (ORISE 2003), and the ORISE/ESSAP Survey Procedures and Quality Assurance Manuals (ORISE 2004a and b).
Applicable procedures were documented in the site log book.
Gamma surface scans were performed over five percent of accessible portions of the survey units using NaI scintillation detectors coupled to ratemeters with audible indicators-some areas were inaccessible due to standing water or access restricted due to safety concerns. Five surface soil samples (0-15 cm) were collected from SU OOL-05 (Figure 2), five surface soil samples were collected from SU OOL-08 (Figure 3), four surface soil samples were collected from SU OOL-15 (Figure 4), and three surface soil samples were collected from the Reference Area (Figure 5).
SAMPLE ANALYSIS AND DATA INTERPRETATION Samples and data were returned to ESSAPs laboratory in Oak Ridge, TN for analysis and interpretation. Soil samples were analyzed by gamma spectroscopy for the primary gamma emitting radionuclide of concern Cs-137-the data were also reviewed for other fission and activation products, e.g. CO-60. Sample analyses were performed in accordance with the ESSAP Laboratory Procedures Manual (ORISE 2004~).Radionuclide concentrations were reported in picocuries per gram @Ci/g).
YNPS Survey Units OOL-05.08, and 15 projects/1621/2005-02-16 Land Area Results.doc
FINDINGS AND RESULTS Gamma surface scans identified several locations of elevated direct gamma radiation within the SUs, but the elevated readings were determined to be due to natural granite formations.
Concentrations of radionuclides in soil samples collected from these SUs are provided in Table 1. Backg-ound concentrations of CO-60 and Cs-137 from the Reference Area ranged from
-0.0 1 to 0.02 pCi/g and 0.28 to 1.69 pCi/g, respectively. Concentrations of CO-60 ranged from
-0.02 to 0.02 pCi/g in SU OOL-05, from -0.01 to 0.01 pCi/g in SU OOL-OS, and from -0.02 to 0.00 pCi/g in SU OOL-15. Concentrations of Cs-137 ranged from -0.01 to 0.74 pCi/g in SU OOL-05, from 0.08 to 1.71 pCi/g in SU OOL-08, and from 0.03 to 0.33 pCi/g i n SU OOL-15. A review of other gamma-emitting radionuclide concentrations did not note any significant findings. These results were not compared to site-specific guidelines since the license termination plan (LTP) for the Yankee Rowe site has not been finalized by the licensee and/or approved by the NRC.
YNPS Survey Units OOL-05,08, and 15 projects/1621/2005-02-I6Open Land Area Resultsdoc 2
16.21-020 ( 1)
\ OOL-06 r
WATER NOT TO SCALE I
FIGURE 1: Plot Plan of Open Land Area at Yankee Atomic Power Company - Rowe, Massachusetts YNPS Survey Units OOL-05, OS, and 15 3 Open Land Area Results.doc projects/l621/2005-02-16
-~ ~-
1421421 (1) m 3 SAMPLING LOCATIONS 1 SURFACE SOIL r
NOT TO SCALE FIGURE 2: Survey Unit OOL-05 Unit 1 - Soil Sampling Locations YNPS Survey Units OOL-05,08, and 15 4 projects/1621/2005-02-16 Open Land Area Resultsdoc
1621-022 (1)
\
SAMPLING LOCATIONS m#SURFACE SOIL NOT TO SCALE FIGURE 3: Survey Unit OOL-08Unit 1 - Soil Sampling Locations YNPS Survey Units OOL-O5,08, and 15 5 projects/l621/2005-02-16Open Land Area Results.doc
~ ~.
1621-023 (1)
SAMPLING LOCATIONS
- . SURFACE SOIL NOT TO SCALE FIGURE 4: Survey Unit OOL Soil Sampling Locations YNPS Survey Units OOL-05, OS, and 15 6 projects/1621/2005-02-16 Open Land Area Results.doc
SAMPLING LOCATIONS H#SURFACE SOIL NOT TO SCALE FIGURE 5 : Background Reference Area - Soil Sampling Locations YNPS Survey Units OOL-05,08, and 15 7 projectsi162112005-02-16Open Land Area Results.doc
TABLE 1 CO-60AND Cs-137 CONCENTRATIONS IN SURFACE SOIL DETERMINED BY GAMMA SPECTROSCOPY SURVEY UNITS OOL-O5,08,15 AND REFERENCE AREA YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS 1 Sample Location' Radionuclide Concentration (pCi/g)
CO-60 CS-137 Survey Unit OOL-05 1 1 -0.02 f 0.03b 0.68 k 0.08
-3 0.01 f 0.03
- 0.06 0.03 5 0.02 f 0.03 -0.01 f 0.02 1 Survey Unit OOL-08 10 -0.01 f 0.03 0.94 f 0.09 11 0.00 f 0.03 0.08 f 0.03 12 -0.01 f 0.03
16 0.01 f 0.03 17 -0.01 f 0.04 0.15 k 0.06 It I/
6 -0.01 f 0.03 0.33 f 0.04 7 0.00 f 0.02
- 0.03 0.02 8 -0.02 f 0.03 0.08 f 0.03 9 0.00 f 0.02 0.06 f 0.02 1
Reference Area 13 0.02 f 0.04 0.62 2 0.08 14 -0.01 f 0.03 1.69 f 0.12 1 15 -0.01 f 0.04 0.25 f 0.04 1 YNPS Survey Units OOL-05.08, and 15 proJects/1621/200j-0?-Ib Open Land Area Resultsdoc 8
REFERENCES Oak Ridge Institute for Science and Education (ORISE). Proposed Confirmatory Survey Plan for the Open Land Area Survey Units, Connecticut Yankee Decommissioning Project, Haddam, Connecticut (Docket No. 50-02 13; RFTA No.03-008). Oak Ridge, TN; September 22, 2003.
Oak Ridge Institute for Science and Education. Survey Procedures Manual for the Environmental Survey and Site Assessment Program. Oak Ridge, TN; September 2,2004a.
Oak Ridge Institute for Science and Education. Quality Assurance Manual for the Environmental Survey and Site Assessment Program. Oak Ridge, TN; August 3 1, 2004b.
Oak Ridge Institute for Science and Education. Laboratory Procedures Manual for the Environmental Survey and Site Assessment Program. Oak Ridge, TN; August 3 1, 2004c.
YNPS Survey Units OOL-05,08, and 15 projectsll62112005-02-16 Open Land Area Results.doc 9