ML22011A129

From kanterella
Jump to navigation Jump to search
Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan
ML22011A129
Person / Time
Site: Yankee Rowe
Issue date: 01/31/2022
From: Daniel Schroeder
Division of Nuclear Materials Safety I
To: Macdonald J
Yankee Atomic Electric Co
References
Download: ML22011A129 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 January 31, 2022 Mr. John Macdonald ISFSI Manager Yankee Atomic Electric Company 49 Yankee Road Rowe, Massachusetts 01367

SUBJECT:

YANKEE ATOMIC ELECTRIC COMPANY- INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Mr. Macdonald:

The enclosed inspection plan lists the security inspection scheduled through December 31, 2023. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5262 with any questions you may have regarding the inspection plan.

Sincerely, Daniel L. Digitally signed by Daniel L.

Schroeder Schroeder Date: 2022.01.31 07:21:39 -05'00' Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket No. 07200031 License No. SFGL-13

Enclosure:

Yankee Atomic Electric Company - Independant Spent Fuel Storage Installation Security Inspection Plan cc w/encl; J. Lenois, CY ISFSI Manager S. Hemingway, Asst. Director of Operations

ML22011A129 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/DRSS NAME TEck/te ADimitriadis/ad DSchroeder/dls DATE 01/11/2022 01/13/2022 01/31/2022