ML080440034
ML080440034 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 02/01/2008 |
From: | Susquehanna |
To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
028401, 2008-5408 | |
Download: ML080440034 (37) | |
Text
Feb. 01, 2008 Page 1 'of 3 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-5408 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 02/01/2008 LOCATION:
USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.TRM2 -TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/07/2008 ADD MANUAL TABLE OF CONTENTS DATE: 01/31/2008 CATEGORY:
DOCUMENTS TYPE: TRM2 Aco (
Feb. 01, 2008 Page 2 of 3 ID: TEXT 3.12.2 REMOVE: REV:2 ADD: REV: 3 CATEGORY:
DOCUMENTS ID: TEXT 3.7.7 ADD: REV: 1 REMOVE: REV:0 CATEGORY:
DOCUMENTS ID: TEXT B3.7.7 ADD: REV: 2 TYPE: TRM2 TYPE: TRM2 REMOVE: REV:I CATEGORY:
DOCUMENTS ID: TEXT LOES ADD: REV: 43 REMOVE: REV:42 TYPE: TRM2 CATEGORY: ID: TEXT REMOVE: DOCUMENTS TOC REV:12 TYPE: TRM2 ADD: REV: 13 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 0 Procedure Name TEXT LOES Title: LIST OF EF]1/31/2008 Rev 43 FECTIVE SECTIONS.Issue Date 01/31/2008 Change ID Change Number TEXT TOC Title: 13 01/31/2008 TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
, Title: USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005, Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 Title: 6 09'4/092007 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 3' 05/02/2007 Title: APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007 Title: REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0 11/19/2002 Title: REACTIVITY-CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 3 04/09/2007 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 7 04/19/2007 Title: CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)Page 1 of 15 Report Date: .01/31/08 Page I of .15 Report Date:.01/31/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002 Title: INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007 Title: INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 4 1,1/09/2007 Title: INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002 Title: INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 Title: INSTRUMENTATION 2 10/1'9/2005 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007 Title: INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 Title: INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 2 04/09/2007 Title: INSTRUMENTATION LPRM UPSCALE ALARM, INSTRUMENTATION TEXT 3.3.10 1 12/14/2004 Title: INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003 Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 1 .04/26/2006 Title: REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Page 2 of 15 Report Date: 01/31/08 Page 2 of I__5 Report Date: 01/31/08 Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2 Title: REACTOR TEXT 3.4.3 Title: REACTOR TEXT 3.4.4 Title: REACTOR TEXT 3.4.5 Title: REACTOR TEXT 3.5.1 0 11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 1 11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1 04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1 02/04/2005 Title: ECCS AND RCIC ADS MANUAL INHIBIT .-TEXT 3.5.2 1 11/09/2007 Title: ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002 Title: ECCS AND RCIC LONG TERN NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002 Title: CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002 Title: CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002 Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002 Title: CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002 Title: PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Page 3 of I15 Re-Dort Date: 01/31/08 MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.2 Title: PLANT TEXT 3.7.3.1 Title: PLANT TEXT 3.7.3.2 Title: PLANT TEXT 3.7.3.3 Title: PLANT TEXT 3.7.3.4 Title: PLANT TEXT 3.7.3.5 Title: PLANT TEXT 3.7.3.6 Title: PLANT TEXT 3.7.3.7 Title: PLANT TEXT 3.7.3.8 Title: PLANT TEXT 3. 7.4 Title: PLANT TEXT 3.7.5.1 Title: PLANT TEXT 3.7.5.2 Title: PLANT 0 11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL 1 04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2 04/26/2006 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 2 SYSTEMS C02 SYSTEMS 1 SYSTEMS HALON SYSTEMS 08/18/2005 04/26/2006 1 04/26/2006 SYSTEMS FIRE HOSE STATIONS 1 04/26/2006 SYSTEMS YARD FIRE HYDRANTS AND .HYDRANT HOSE HOUSES 1 04/26-/2006 SYSTEMS FIRE RATED.ASSEMBLIES 7 11/09/2007 SYSTEMS FIRE DETECTION INSTRUMENTATION
.1 04/26/.2006 SYSTEMS SOLID RADWASTE SYSTEM 0 11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0 11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page 4 of 15 Report Date: 01/31/08 Page 4 of .15 Report Date: 01/31/08
.s~ ... 'S MAT\TEAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 1 04/26/2006 Title: PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1 03/01/2005 Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 1 01/31/2008 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6 06/21/2007 Title: PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC-TEXT 3.7.10 1 12/1i4/20'04 Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)TEXT 3.8.1 2 02/04/2005 Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATIONCONDUCTOR OVERCURRENT PROTECTIVE DEVICES-TEXT 3.8.2.1 2 11/09/2007 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTIf CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTI(AUTOMATIC TEXT 3.8.3 0 11/19/2002 Title: ELECTRICAL POWER DIESEL GENERATOR (DG)'MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005 Title: ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002 Title: ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION ON ON ON ON Page .5~ of 15 Rep9rt Date: 01/31/08 Page 5 of .15 Report Date: 01/31/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0 11/19/2002 Title: ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 0 12/14/2006 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002 Title: REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006 Title: MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007 Title: MISCELLANEOUS SHUTDOWN MARGIN TEST ,RPS- INSTRUMENTATION TEXT 3.10.3 1 04/26/2006 Title: MISCELLANEOUS INDEPENDENT ,SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT 3.10.4 1 ý08/28/2006 Title: MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)TEXT 3.11.1.1 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/2-6/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/2.6/2006 Title: RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Page 6 of .15 Report Date: 01/31/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4 Title: RADIOACTIVE TEXT 3.11.1.5 Title: RADIOACTIVE TEXT 3.11.2.1 Title: RADIOACTIVE TEXT 3.11.2.2 Title: RADIOACTIVE TEXT 3.11.2.3 Title: RADIOACTIVE FORM EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1 12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2 05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3 04/26/2006 DOSE RATE 1 04/26/,2006 DOSE -NOBLE GASES 1 04/26/2006 DOSE -IODINE,-TRITIUM, AND RADIONUCLIDES.IN PARTICULATE TEXT 3.11.2.4 Title: RADIOACTIVE
_EFFLUENTS 0 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 Title: RADIOACTIVE TEXT 3.11.2.6 Title: RADIOACTIVE TEXT 3.11.3 Title: RADIOACTIVE TEXT 3.11.4.1 Title: RADIOACTIVE TEXT 3.11.4.2 Title: RADIOACTIVE TEXT 3.11.4.3 Title: RADIOACTIVE EFFLUENTS EFFLUENTS 3 11/14/2006 VENTILATION EXHAUST 3 05/02/2007 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1 -04/26/2006 TOTAL DOSE 3 04/26/2006 MONITORING PROGRAM 2 04/26/2006 LAND USE CENSUS 1 04/26/2006 INTERLABORATORY COMPARISON PROGRAM Page 2 of 15 Report Date: 01/31/08 Page 7 of i__5 Report Date: 01/31/08 I; SSES .MANUKAL Manual Name: TRM2 0 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT, 2 TEXT 3.12.1 0 11/19/2002 Title: LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 3 01/31/2008 Title: LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 3 05/02/2007 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)APPLICABILITY TEXT B3.1.1 1 11/09/2007 Title: REACTIVITY CONTROL SYSTEM BASES-ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
--Title: REACTIVITY CONTROL 'SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 Title: CORE OPERATING LIMITS 0 11/19/2002 BASES CORE'OPERATINGLIMITS REPORT (COLR)TEXT B3.3.1 0 11/19/2002 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 Title: INSTRUMENTATION BASES 1 11/0,9/2007 SEISMIC MONITORING -INSTRUMENTATION TEXT B3.3.3 2 11/09/2007 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION Page 8 of 15 Report Date: 01/31/08 Page 8 of 15 Report Date: 01/31/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4 Title: INSTRUMENTATION TEXT B3.3.5 Title: INSTRUMENTATION TEXT B3.3.6 Title: INSTRUMENTATION TEXT B3.3.7 Title: INSTRUMENTATION TEXT B3.3.8 Title: INSTRUMENTATION TEXT B3.3.9 Title: INSTRUMENTATION TEXT B3.3.10 Title: INSTRUMENTATION TEXT B3.3.11 Title: INSTRUMENTATION 3 11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION 2 11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3 10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION' 1 11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1 10/22/2003 INSTRUMENTATION 2 04/10/2007 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0 11/19/2002 BASES-REACTOR RECIRCULATION'PUMP MGOSET STOPS 1 10/22/2003 BASES MVP ISOLATION INSTRUMENTATION TEXT B3.4.1 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 .11/19/2002 Title: REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007 Title: REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT Page2 of15 RportDate 01/1/0 Page 9 of 1_55 Report Date: 01/31/08 SSES=, MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.5 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS.
TEXT B3.5.1 0 11/19/2002 Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007 Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007 Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002 Title: CONTAINMENT BASES VENTING OR PURGING'TEXT B3.6.2 0 11/19/2002 Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION, INDICATION TEXT B3.6.3 1 04/19/2007 Title: CONTAINMENT BASES SUPPRESSION POOL.ALARM INSTRUMENTATION-TEXT B3.6.4 1 12/14/2004 Title: CONTAINMENT BASES-PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002 Title: PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002 Title: PLANT SYSTEMS BASES ULTIMATE HEAT-SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 2 01/07/2008 Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006 Title: PLANT'SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page i__0 of ia'Report Dat e: 0 1/3i}:
"SSES-MANUJAL Manual Niame: TRM2 WManual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3 Title: PLANT TEXT B3.7.3.4 Title: PLANT TEXT B3.7.3.5 Title: PLANT TEXT B3.7.3.6 Title: PLANT TEXT B3.7.3.7 Title: PLANT TEXT B3.7.3.8 Title: PLANT TEXT B3.7.4 Title: PLANT TEXT B3.7.5.1 Title: PLANT TEXT B3.7.5.2 Title: PLANT TEXT B3.7.5.3 Title: PLANT TEXT B3.7.6 Title: PLANT TEXT B3.7.7 Title: PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0 11/19/2002 C02 SYSTEMS 1 04/26/2006 HALON SYSTEMS 1 04/26/2006 FIRE HOSE STATIONS 1 04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0 11/19/2002 FIRE RATED ASSEMBLIES 1 01/1'2/2004 FIRE DETECTION'INSTRUMENTATION 0 1i'/19/2002 SOLID-RADWASTE SYSTEM 0 11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR, 0 11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0 11/19/2002 LIQUID HOLDUP TANKS 1 03/01/2005 ESSW PUMPHOUSE VENTILATION 2 01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 11 of 15 Report Date: 01/31/08 Page 11 of .15 Report Date: 01/31/08
-ýSSES- -1ANIAL Manual Narne: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 Title: PLANT SYSTEMS TEXT B3.7.9 Title: PLANT SYSTEMS 3 06/21/2007 BASES SNUBBERS 1 12/14/2004 BASES CONTROL STRUCTURE HVAC.TEXT B3.7.10 1 .12/14/2004 Title: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1 02/04/2005 Title: ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002 Title: ELECTRICAL ,POWER BASES MOTOR OPERATED VALVES (MOV) .THERMAL OVERLOAD PROTEC-TION
-CONTINUOUS TEXT B3.8.2.2 Title: ELECTRICAL AUTOMATIC TEXT B3.8.3 Title: ELECTRICAL 09/1'7/2004 POWER BASES MOTOR OPERATED VALVES (MOV). THERMAL OVERLOAD.
PROTECTION
-0 POWER BASES DIESEL GENERATOR (DG) MAINTENANCEACTIVITIES,,-
TEXT B3.8.4 0 11/19/2002 Title: ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002 Title: ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005 Title: ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 0 12/14/2006 Title: BATTERY MAINTENANCE AND MONITORING-PROGRAM TEXT B3.9.1 0 11./19/2002 Title: REFUELING OPERATIONS, BASES DECAY TIME Page 12 of 15 Report Date: 01/31/08 Page 12 of 15 Report Date: 01/31/08 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2'TEXT B3.9.2 0 Title: REFUELING OPERATIONS BASES TEXT B3.9.3 0 Title: REFUELING OPERATIONS BASES 11/19/2002 COMMUNICATIONS 11/19/2002 REFUELING PLATFORM TEXT B3.10.1 Title: MISCELLANEOUS TEXT B3.10.2 Title: MISCELLANEOUS TEXT B3.10.3 Title: MISCELLANEOUS 0 11/19/2002 BASES SEALED SOURCE CONTAMINATION 1 04/10/2007 BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 0 11/19/2002 BASES'INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT B3.10.4 0 Title: MISCELLANEOUS BASES LEADING 11/19/2002 EDGE FLOW METER (LEFM)TEXT B3.11.1.1 Title: RADIOACTIVE TEXT B3.11.1.2 Title: RADIOACTIVE 0 11/19/2002 EFFLUENTS BASES LIQU-ID EFFLUENTS CONCENTRATION 0 11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE.TEXT B3.11.1.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 Title: RADIOACTIVE 0 1!1/19/2002 EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 I 0 Title: RADIOACTIVE EFFLUENTS BASESý'12/14/2004 DOSE RATE Page 13 of 15 Report Date: 01/31/08 Page 13 of 15 Report Date: 01/31/08 SSES. -MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2-TEXT B3.11.2.2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE -NOBLE GASES TEXT B3.11.2.3 Title: RADIOACTIVE EFFLUENTS PARTICULATES FORM 0 BASES 11/19/2002 DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN TEXT B3.11.2.4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006 Title: RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT-SYSTEM TEXT B3.11.2.6 Title: RADIOACTIVE EFFLUENTS, INSTRUMENTATION TEXT B3.11.3 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.4.1 Title: RADIOACTIVE EFFLUENTS 1 01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING, 0 11/119/2002 BASES :TOTAL DOSE.2 01/06/2006 BASES MONITORING-PROGRAM TEXT B3.11.4.2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007 Title: LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 Title: LOADS CONTROL PROGRAM TEXT B3.12.3 Title:' LOADS CONTROL PROGRAM 0 11/19/2002 BASES HEAVY LOADS REQUIREMENTS 0 11/19/2002 BASES LIGHT LOADS REQUIREMENTS Page 14 of 15 Report Date: 01/31/08 Page 14 of 15 Report Date: 01/31/08
,SSES MANUAL Manual Name: TRM2 W Manual Title: TECHN"ICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1 Title: TEXT 4.2 Title: TEXT 4.3 Title: TEXT 4.4 ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0 09/27/2003 CONTROLS ORGANIZATION 0 09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0 09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 0 09/27/2003 Title: ADMINISTRATIVE' CONTROLS PROCEDURES
& PROGRAMS TEXT 4.5 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27;/2003 Title: ADMINISTRATIVE CONTROLS TRAINING Page 13 of 15 Report Date: 01/31/08 Page 15 of .15 Report Date: 01/31/08 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE 1.0 U S E A N D A P P LIC A T IO N ............................................................................
1.0-1 1 .1 D e fin itio n s .....................................................................................
T R M /1 .0 -2 2 .0 P LA N T P R O G R A M S ...................................................................................
2 .0-1 2 .1 P la n t P ro g ra m s ......................................................................................
2 .0 -1 2.2 Instrum ent Trip Setpoint Table .....................................................
TRM/2.0-5 3 .0 A P P LIC A B ILITY .................................................................................
T R M /3 .0-1 3.0 (TRO) -TR for Operation (TRO) Applicability
......................
TRM/3.0-1 3.0 (TRS) -TR Surveillance (TRS) Applicability
..................
.-TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS .........................
...TRM/3.1-1 3.1.1 Alternate Rod Injection
......................................
... ...... TRM/3.1-1 3.1.2 CRD Housing Support ........................................
.... .....................
3.1-4 3.1.3 Control Rod Block Instrumentation 3..... ..... ..........
3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation/
and Check Valve .........................
/ ..... ... TRM/3.1-9 3.2 CORE OPERATING LIMITS 3.2-1 3.2.1 C ore O perating Lim its Report.(..
.. ................................................
3.2-1 3.3 INSTR UM ENTATIO N ........ ..............................................................
TR M /3.3-1 3.3.1 Radiation Monitoring
^l,'strumie-ntation
...........................................
TRM/3.3-1 3.3.2 Seismic Monitoring/
Instrumentation
..............................................
TRM/3.3-4 3.3.3 Meteorological'Monitoring Instrumentation
...................................
TRM/3.3-7 3.3.4 TRM Post-Accide Monitoring Instrumentation
..... ........ TRM/3.3-9 3.3.5 Section NotUsed ...............................
................................
TRM/3.3-12 3.3.6 TRM ContainmentlIsolation Instrumentation
.................................
TRM/3.3-13 3.3.7 Turbine-Overspeed Protection System .........................................
TRM/3.3-17 3.3.8 S ectionN ot U sed ..........................................................................
T R M /3.3-19 3.3.9 O IrRM ,,,Instr m entation .................................................................
TRM /3.3-21 3.3.10 ((Rea6ior Recirculation Pump MG Set Electrical and IM ecdhanical S tops ........................................................................
T R M /3.3-22 3.3.11 M VP Isolation Instrum entation ......................................................
TRM/3.3-24 3.4 REACTOR COOLANT SYSTEM ...................................
I .......................
TRM/3.4-1 3.4.1 Reactor Coolant System Chem istry ......................................................
3.4-1 3 .4 .2 S tructu ra l Integ rity ..................................................................................
3 .4 -6 3.4.3 High/Low Pressure Interface Leakage Monitors ....................................
3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ............................
TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program ..... .....................
TRM/3.4-13 3.5 EMERGENCY CORE COOLING AND RCIC ......................................
TRM/3.5-1 3.5.1 A D S M anual Inhibit .......................................................................
T R M /3 .5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation
............................
3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ......................................................
3.5-6 SUSQUEHANNA
-UNIT 2 TRM / TOC-1 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE 3 .6 C O N T A IN M E N T .........................................................................................
3 .6-1 3.6.1 VENTING or PURGING ........................................................................
3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n ..............................................................................................
3 .6 -3 3.6.3 Suppression Pool Alarm Instrumentation
...............................................
3.6-4 3.6.4 Primary Containment Closed System Boundaries
..... I ..................
TRM/3.6-7 3.7 PLANT SYSTEMS ..............................................................................
TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)
............................
TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level .........................................
3.7-3 3.7.3.1 Fire Suppression Water Supply System ......................................
TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems ......................................................
TRM/3.7-8 3.7.3.3 C02 systems ...............................................................................
TRM/3.7-12 3.7.3.4 Halon Systems ............................................................................
TRM/3.7-16 3.7.3.5 Fire Hose Stations .......................................................................
TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................
TRM/3.7-22 3.7.3.7 Fire Rated Assemblies
.................................................................
TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation
......................................................
TRM/3.7-26 3.7.4 Solid Radwaste System ................................................................
TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ...........................................
3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture .......................................
TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks .....................................................................
TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation
..............................................................
3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation
...........................................................
TRM/3.7-41 3.7.8 Snubbers .....................................................
TRM/3.7-43 3.7.9 Control Structure HVAC ................................................................
TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs) ..............................................
TRM/3.7-51 3.8 ELECTRICAL POWER .......................................................................
TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent P rotective D evices ........................................................................
T R M /3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection
-Continuous
......................................
TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection
-Automatic
.......................................
TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities
......................................
3.8-13 3.8.4 24VDC Electrical Power Subsystem
.............................................
TRM/3.8-15 3.8.5 Degraded Voltage Protection
.......................................................
TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling .................................................
3.8-24 3.8.7 Battery Monitoring and Maintenance Program ..............................
TRM/3.8-26 3.9 REFUELING OPERATIONS
.......................................................................
3.9-1 3.9.1 Decay Time .........................................
3.9-1 3 .9 .2 C om m unications
...................................................................................
3 .9-2 3 .9 .3 R efue ling P latfo rm .................................................................................
3 .9-3 SUSQUEHANNA
-UNIT 2 TRM / TOC-2 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE 3.10 M IS C E LLA N E O U S .............................................................................
TR M /3. 10-1 3.10.1 Sealed Source Contamination
......................................................
TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation
..........................
3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ....................
TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM) ................................................
TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS
..............................................................
TRM/3.11-1 3 .11.1 Liq uid E fflue nts .............................................................................
T R M /3 .11-1 3.11.1.1 Liquid Effluents Concentration
......................................................
TRM/3.11-1 3.11.1.2 Liquid Effluents D ose ...................................................................
TR M /3.11-4 3.11.1.3 Liquid Waste Treatment System ..................................................
TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation
............................
3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation
...............
TRM/3.11-13 3.11.2 G aseous Effluents
........................................................................
T R M /3.11-17 3.11.2.1 Dose Rate ............
................................
TRM/3.11-17 3.11.2.2 D ose -Noble G ases .....................................................................
TRM /3.11-20 3.11.2.3 Dose -Iodine, Tritium, and Radionuclides in P articulate Form ...........................................................................
T R M /3 .11-2 1 3.11.2.4 Gaseous Radwaste Treatment System ........................................
TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System.........................................
TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring In stru m e nta tio n ....................................................................................
3 .1 1-2 6 3 .11.3 T otal D ose ....................................................................................
T R M /3 .11-33 3.11.4 Radiological Environmental Monitoring
.........................................
TRM/3.11-35 3.11.4.1 Monitoring Program ................................
TRM/3.11-35 3.11.4.2 Land Use Census .......................................................................
TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program ....................
TRM/3.11-47 3.12 LOADS CONTROL PROGRAM ..........................
TRM/3.12-1 3.12.1 Crane Travel -Spent Fuel Storage Pool .......................................
TRM/3.12-1 3.12.2 Heavy Loads Requirements
.........................................................
TRM/3.12.3 3.12.3 Light Loads Requirements
............................................................
TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS .................................................................
4.0-1 4 .1 O rg a n iz a tio n ..........................................................................................
4 .0 -1 4 .2 R eportable E vent A ction .......................................................................
4.0-2 4 .3 S afety Lim it V io lation .............................................................................
4 .0-3 4.4 Procedures and Program s ....................................................................
4.0-4 4.5 R eporting R equirem ents .......................................................................
4.0-5 4.6 Radiation Protection Program 4...............................................................
4.0-7 4 .7 T ra in in g .............................................................................
.....................
4 .0 -8 SUSQUEHANNA
-UNIT 2 TRM / TOC-3 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA
-UNIT 2 TRM / TOC-3 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE B 3.0 (TRO) -TR for Operation (TRO) Applicability
..................................
B 3.0-1 B 3.0 (TRS) -TR Surveillance (TRS) Applicability
.........................................
B 3.0-9 B 3.1.1 Alternate Rod Injection
................................................................
TRM/B 3.1-1 B 3.1.2 C R D H ousing S upport .........................................................................
B 3.1-4 B 3.1.3 Control Rod Block Instrumentation
..............................................
TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve ........................................................................
T R M /B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) .................................................
B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation
..........................................
TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation
.............................................
TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation
..................................
TRM/B 3.3-3 B 3,3.4 TRM Post-Accident Monitoring Instrumentation
...........................
TRM/B 3.3-4 B 3.3.5 Section Not Used .........................................................................
TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation
.......................................
B 3.3-10 B 3.3.7 Turbine Overspeed Protection System ........................................
TRM/B 3.3-14 B 3.3.8 Section Not Used .........................................................................
TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation
................................................................
TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ........................................................................
TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation
.....................................................
TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry
....................................................
B 3.4-1 B 3.4 .2 S tructural Integrity
.................................................................................
B 3 .4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors ..........................
TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ...........................
TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program ..................................
B 3.4-6 B 3.5.1 A D S M anual Inhibit ..............................................................................
B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation
..................
TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS ........................
B [ 3.5-4 B 3.6.1 VENTING or PURGING ...............................................................
TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n .............................................................................................
B 3 .6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation
.... ........................................
B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries
.......................
TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)
...................................
B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level .......................................
B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ......................................
TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems ......................................................
TRM/B 3.7-5 B 3.7.3.3 C 0 2 S ystem s ..............................................................................
T R M /B 3.7-7 SUSQUEHANNA
-UNIT 2 TRM / TOC-4 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)SECTION TITLE PAGE B 3.7.3.4 H alon S ystem s ............................................................................
T R M /B 3.7-8 B 3.7.3.5 Fire H ose Stations .......................................................................
TR M /B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................
TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assem blies .................................................................
TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation
.....................................................
TRM/B 3.7-14 B 3.7.4 Solid Radw aste System ...............................................................
TRM/B,3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor .........................................
B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture ..............................................
B 3.7-19 B 3.7.5.3 Liquid H oldup Tanks ............................................................................
B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation
....................................................
TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation M onitoring Instrum entation .........................................................
TRM/B 3.7-22 B 3 .7 .8 S nubbers ....................................................................................
T R M /B 3 .7-24 B 3.7.9 Control Structure HVAC ...............................................................
TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ...........................................................
TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent P rotective D evices .......................................................................
T R M /B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection
-C ontinuo us ..................................................................................
T R M /B 3 .8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection
-A uto m atic .....................................................................................
T R M /B 3 .8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities
............................
TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem
............................................
TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection
......................................................
TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling ..................
TRM/B 318-17-B 3.8.7 Battery Monitoring and Maintenance Program .............................
TRM/B 3.8-18 B .3 .9 .1 D e ca y T im e .........................................................................................
B 3 .9-1 B 3 .9 .2 C om m unications
..................................................................................
B 3 .9-2 B 3.9 .3 R efueling P latform ...............................................................................
B 3 .9-3 B 3.10.1 Sealed Source Contam ination .............................................................
B 3. 10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation
........................
B 3.10-2 B 3.10,3 Independent Spent Fuel Storage Installation (ISFSI) ...................
TRM/B 3.10-4 B 3.10.4 Leading Edge Flow Meter (LEFM) ...............................................
TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents C oncentration
.............................................................
B 3.11-1 B 3,11A12 Liquid Effluents Dose .........................
B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System ...................
.....................................
B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation
..........................
B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation
..............
TRM/B 3.11-10 B 3.11.2.1 Dose Rate ......................................
TRM/B 3.11-12 B 3.11.2.2 D ose -N oble G ases ...........................................................................
B 3.11-16 SUSQUEHANNA
-UNIT 2 TRM / TOC-5 EFFECTIVE DATE 0 1/30/2008 SUSQUEHANNA
-UNIT 2 TRM /TOC-5 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)PPL Rev. 13 SECTION B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Dose -Iodine, Tritium, and Radionuclides in Particulate Form .....................
B 3.11-18 Gaseous Radwaste Treatment System .......................................
TRM/B 3.11-20 Ventilation Exhaust Treatment System ........................................
TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrum entation ............................................................................
T R M /B 3.11-24 T o ta l D o se ...........................................................................................
B 3 .1 1-2 6 M onitoring Program ...............................................
- .....................
T R M /B 3.11-28 La nd U se C e nsu s ................................................................................
B 3. 11-34 Interfaboratory Comparison Program ...........................................
TRM/B 3.11-36 LOADS CONTROL PROGRAM ...................................................
TRM/B 3.12-1 Crane Travel -Spent Fuel Storage Pool .....................................
TRM/B 3.12-1 Heavy Loads Requirements
........................................................
TRM/B 3.12-2 Light Loads Requirements
...........................................................
TRM/B 3.12-3 TRM2 Text TOC 1/28/08 SUSQUEHANNA
-UNIT 2 TRM/TOC-6 EFFECTIVE DATE 0 1/30/2008 SUSQUEHANNA
-UNIT 2 TRM /TOC-6 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Pages TRM / 2.0-6 and TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 3.0 APPLICABILITY Page TRM / 3.0-1 Page TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 Effective Date 01/30/2008 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 03/27/2007 12/03/2004 11/15/2004 03/27/2007 11/15/2004 11/15/2005 01/10/2007 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 02/18/1999 02/18/1999 08/31/1998 03/30/2007 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 04/12/2007 12/17/1998 10/31/2007 06/02/2005 05/30/2006 3.1 3.2 3.3 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Pages TRM / 3.1-6 through TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-48 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11a SUSQUEHANNA
-UNIT 2 TRM / LOES-1 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title 3.4 3.5 Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9, PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Effective Date 03/30/2001
-09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 03/27/2007 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 03/31/2006 10/23/1998 08/31/1998 10/31/2007 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 07/29/1999 08/31/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 0.1/21/2000 08/02/1999 08/09/2005 08/02/1999 03/31/2006 3.6 3.7 SUSQUEHANNA
-UNIT 2 TRM / LOES-2 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRMI. 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Page TRM / 3.7-41 Page 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Pages TRM / 3.8-26 through TRM / 3.8-29 Effective Date 08/02/1999 03/31/2006 08/02/1999 03/31/2006
.08/02/1999 10/31/2007 11/29/2006 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 01/30/2008 08/31/1998 10/05/2006.
06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 11/29/2006 3.8 SUSQUEHANNA
-UNIT 2 TRM / LOES-3 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM /3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 08/16/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 SUSQUEHANNA
-UNIT 2 TRM / LOES-4 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.12 4.0 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 02/05/1999 01/30/2008 02/05/1999 08/31/1998 SUSQUEHANNA
-UNIT 2 TRM / LOES-5 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title B 3.0 B 3.1 B 3.2 B 3.3 B 3.4 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Pages TRM / B 3.0-5 and TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3-19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Effective Date 08/31/1998 01/10/2007 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/31/2007 10/15/1999 08/31/1998 SUSQUEHANNA
-. UNIT 2 TRM / LOES-6 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.5 B 3.6 B 3.7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 and TRM / B3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 01/30/2008 10/05/2006 06/07/2007 10/05/2006 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 SUSQUEHANNA
-UNIT 2 TRM / LOES-7 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title B 3.8 B.3.9 ELECTRICAL POWER BASES Page TRM / B 3.8-1-Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 Effective Date 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 08/31/1998 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 B,3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 08/31/1998 03/27/2007 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 09/19/2007 02/05/1999 TRM2 text LOES.doc 1/28/08 SUSQUEHANNA
-UNIT 2 TRM / LOES-8 EFFECTIVE DATE 01/30/2008 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 1 3.7.7 3.7 Plant Systems 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation TRO 3.7.7 One channel of Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation shall be OPERABLE.APPLICABILITY:
During operation of the Main Condenser Air Ejector and Offgas Treatment System.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A Main Condenser Offgas A. 1 Verify that the Offgas System Immediately Pretreatment Logarithmic is not bypassed.Radioactivity Monitor AND inoperable.
A.2 Verify the turbine building vent Immediately monitor low range noble gas channel is in operation AND A.3 Perform TS SR 3.7.5.1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.4 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor to OPERABLE status B. Main Condenser Offgas B.1 Verify that the Offgas System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor and AND Turbine Building Vent Monitor Low Range Noble B.2 Perform TS SR 3.7.5.1 Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Gas Channel inoperable AND B.3 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor OR Turbine Building Vent Monitor Low Range Noble Gas Channel to OPERABLE status SUSQUEHANNA
-UNIT 2 TRM / 3.7-41 EFFECTIVE DATE 01/30/2008 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 1 3.7.7 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.7.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.7.7.2 Perform SOURCE CHECK 31 days TRS 3.7.7.3 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.7.7.4 Perform CHANNEL CALIBRATION 24 Months SUSQUEHANNA
-UNIT 2 3.7-42 EFFECTIVE DATE 08/31/1998 Heavy Loads Requirements 3.12.2 PPL Rev. 3 312 Loads Control Program 3.12.2 Heavy Loads Requirements TRO 3.12.2 APPLICABILITY:
'The Technical Specification Limiting Conditions of Operation and Technical Requirements for Operation listed in Table 3.12.2-1 shall be met..During movement of heavy loads in the proximity of irradiated fuel.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. The Conditions of A.1 Suspend movement of Immediately TRO 3.12.2 are not met. heavy loads in the proximity of irradiated fuel.TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.12.2.1 Administratively verify that all requirements of Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior TRO are met. to commencing movement of heavy loads AND Every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter SUSQUEHANNA
-UNIT 2 TRM / 3.12-3 EFFECTIVE DATE 02/05/1999 Heavy Loads Requirements PPL Rev. 3 3.12.2 TABLE 3.12.2-1 TRO 3.12.2 REQUIREMENTS
- a. LCO 3.3.6.2(a)
- b. LCO 3.3.7.1 -(b)c. LCO 3.6.4.1(c)
- d. LCO 3.6.4.2(c)
- e. LCO 3.6.4.3(d)f. LCO 3.7.3(d)g. LCO 3.7.7(e)h. LCO 3.8.2 i. LCO 3.8.5 j. LCO 3.8.8 k. LCO 3.9.6 (g)I. TRO 3.3.4()M. TRO 3.7.1(')n. TRO 3.9.1 (g)o. TRO 3.11.2.6(h)(a) Functions 3, 4, 5, 6, and 8.(b) Functions 3, 4, 5, 6, 8, and 9.(c) Zone III only.(d) Minimum of one subsystem OPERABLE.(e) Only required for movement of heavy load in the proximity of irradiated fuel in the spent fuel storage pool.f Function 4 from Table 3.3.4-1.(g) Only required for movement of heavy load in the proximity of irradiated fuel in the Reactor Pressure Vessel with the Steam Separator removed.(h) Function 3 from Table 3.11.2.6-1.) Two ESW pumps capable of supplying cooling to the required diesel generators.
SUSQUEHANNA
-UNIT 2 TRM / 3.12-4 EFFECTIVE DATE 01/30/2008 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation.PPL Rev. 2 B 3.7.7 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRO Technical Specification 3.7.5, requires that the gross radioactivity release rate of noble gases from the main condenser is maintained within limits. This provides reasonable assurance that the total body exposure to an individual at the exclusion area boundary will not exceed a small fraction of the limits of 10 CFR 50.67 in the event this effluent is inadvertently discharged directly to the environment without treatment.
This specification ensures that this release path is continuously monitored to ensure that the requirements LCO 3.7.5 and General Design Criteria 60 and 64 of Appendix A to 10 CFR Part 50 are implemented. (References 1 and 2)ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
The actions required for both the Main Condenser Pretreatment Logarithmic Radioactivity Monitor and the Turbine Building Vent Monitor Low Range Noble Gas Channel inoperable ensure that increases in the offgas radioactivity rate are detected.
This is consistent with TS 3.7.5 which requires sampling when increases in the radioactivity rate are detected.
Without continuous monitoring, increases in the radioactivity rates can only be detected by sampling.
The sampling frequency is set to the Technical Specification 3.7.5 frequency to ensure that the intent of the Technical Specification is met. If both monitors are not restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, sampling every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> will continue and TRO 3.0.3 should be entered to ensure that appropriate actions are being taken to restore the equipment.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.Performance of the CHANNEL CHECK ensures that a gross failure of the instrument has not occurred.
A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels.
It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between (continued)
SUSQUEHANNA
-UNIT 2 TRM / B 3.7-22 SUSQEHANA -UNI 2 TM IB 3.-22EFFECTIVE DATE 01/30/2008 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation B 3.7.7 PPL Rev. 2 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRS (continued) instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrument continues to operate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are developed by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability.
If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
The CHANNEL FUNCTIONAL TEST (TRS 3.7.7.3) shall also demonstrate that that control room alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm/trip setpoint.2. Circuit Failure 3. Instrument indicates a downscale failure. .4. Instrument controls not set in operate mode.The initial Channel Calibration (TRS 3.7.7.4) shall be performed using one or more of the reference standards certified by the National Institute of Standards and Test (NIST) or that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.REFERENCES
- 1. Technical Specification 3.7.5 2. 10 CFR Part 50.SUSQUEHANNA
-UNIT 2 TRM / B 3.7-23 EFFECTIVE DATE 01/30/2008