Monthly Operating Rept for Feb 1987.W/870310 Ltr
ML17279A474
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8708190320
Download: ML17279A474 (4)


Text

E?AVERAGE DAILY UNH'OWER LEVEL~DCKET ND.~WNP-2 DATE I 1 LE I COMPLETED BY TELEPHONE 509 377-2486 MONTH"EBRUARY 1 87 DAY AVERAGE DAILY POWER LEVEL (Meet)1 765'771 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 773 771 773 772 768 735 772 19?72 554 8 12 772 772 774 768 762 750 322 741 649 1B 771 769 INSTRUCTIONS On this form, list the a~daily unit power heel in KVe~fet for each day in the reporting month.Compute to the nearest whole megawatt.'Ihese Ggures wiH be used to plot a graph for each reporting month.Note that when maximum dependable capacity h used for the net electlcal rating of the.unit, them may be occasions when~daily average power hvei exceeds the l00%Bne (or the restricted power level line).In such cases, the aveage daily unit power output sheet should be footnoted to explain the apparent anomaly.870aX9OSaO e7a228 0~PDR ADOCK 05000>97 "AEPCAT PEAICO FEBRUARY 1987~mmt>, year..Ki.i'Pif Rm I'.EUH PEYlliV',86-14P 11/10/86 F 0 A 5 87-01 2/20/87 F 122.0 A 87-02 2/25/87 F 5.9 G LAIT SIUTDONNS/AEDUCTIONS eÃaÃDI ve a m p5tEwp CB PUMPXX HA TURBIN HA GENERAX a DOCKET NO.lNIT NAf 1E WNP-2 DATE 3 2 87 CQ1PLETED DY LB Hutchi son TELEPIQNE (509)377-2486 5 ON<C C IO Rl L A C 0.E.POWER OUTPUT LIMITED TO 72K DUE TO INOPERABILITY OF 1A RRC PUMP PLANT WAS SHUTDOWN BECAUSE OF LOW TURBINE BEARING OIL PRESSURE.INSPECTION REVEALED A BROKEN CHECK VALVE IN BEARING OIL SUPPLY HEADER WHICH WAS REPAIRED AND PLANT RETURNED TO SERVICE.TUPBIikE iiEHEPRTOR WAS REMOVED FROM SERVICE DUE TO HIGH EXCITER TEMPERATURE WHICH INITIATED A FIRE PROTECTION SYSTEM AND ADMITTED C02 INSIDE THE EXCITER HOUSING.CAUSE OF THE PERTURBATION WAS MISALIGNMENT OF COOLING WATER VALVING.AN INSPECTION OF EXCITER WAS HADE, VALVE ALIGNMENT CORRECTED AND UNIT RETURNED TO SERVICE.t S~PAAY)WNP-2 OPERATED AT A REDUCED POWER I,EVEL DURING FEBRUARY AND INCURRED TWO SHUTDOWNS.

.F-Admin 0-Oper Error H-Other F-Forced A-Equip Failure S-Schcd 0-Maint or Test~C-Ae f ue ling 0-Aegula tory Aes triction E-Df)era tor Trafning A License Examination 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Aeduced Load 9-Other SYSTEM k COMPOM.:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Aeport (LEA)File (NUAEG-0161)

OPER4TINB DATA REPORT WNP-2 Oi-Mar-87 1.DOCKET: 50-397 2.REPORTING PERIODs 3.UTILITY CONTRCT Feb-87 OUTAGE+ON-LINE HOURS LEONARD HUTCHI SON<509)377-2486 672 LICENSED THERMAL POWER (MWt)!5 NRMEPLRTE RATING (GROSS MWe)s 6.DESIGN ELECTRICAL RATING (NET MWe>: 7-MAXIMUM DEPENDABLE CRPACITY (GROSS MWe)c 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe)!9~IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE RERSONS: 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF 4NY<NET MWe): 1 1~REASONS FOR RESTRICTIONS

~IF ANY!~~Cg~~E~12 13.14.15.16 17 18 19 20 21.22 23 24.25.26.REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHTDWN HRS HRS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)GROSS ELECTRICAL ENERGY (MWH)NET ELECTRICAL ENERGY (MWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CRP4CITY FACTOR (MDC NET)UNIT CAPRCITY FACTOR (DER NET>UNIT FORCED OUTAGE R4TE FORCED OUTAGE HOURS MONTH YEAR CUMULATIVE 672 1416 19376.2 570.9 1314.9 15022.4 0.0 0 0 340.4 544.1 1288.1 14449.0 0.0 0 0 381.7 1255200'988000 36669'180 418870 1006420 12225b90 404350 971693 11741664 81.0/91 0%74.6%81.0/91 0%76.5%55.0/62.7/55 3%54 7%62 4%55.1/19.0%9 0/7 7/127 9 127 9 1203 1 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE DURATION)a REFUELING AND MAINTENANCE OUTAGE SCHEDULED FOR 60 i)AIS STARTING 4/ll/87 27.IF CURRENTLY SHUTDOWN EBTIM4TED STARTUP DATEa WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George N'ashington Way~Richland, N'ashinglon 99352 Docket No.50-397 April 8, 1987 Director Office of Resource Management U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Sir:

Subject:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March 1987 as required by our Technical Specifications 6.9.1.6.Very truly yours, C.'Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.John B.Martin-Mr.Robert T.Dodds-Ms.Dottie Sherman-Mr.J.T.Wheelock-Mr.Phil Ross NRC, Region V NRC Site Representative ANI, Farmington CT INPO NRC, Washington D.C.J g&