ML17285B329

From kanterella
Revision as of 00:17, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for May 1990 for Washington Nuclear Plant Unit 2.W/900606 Ltr
ML17285B329
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1990
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006180235
Download: ML17285B329 (6)


Text

ACCELERATED DISTMBUTION DEMONSTPA.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9006180235 DOC.DATE: NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, ashington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1990 for WNP-2.W/00606 lt DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB N 4DL B10 XG FILE EXTERNAL: EGGG STUART, V.A NRC PDR COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 27 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 June 6, 1990 U.S.Nuclear, Regulatory Commission Document Control Desk Washington, D.C.20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT MAY 1990 Transmitted herewith is the Monthly Operating Report as required by our, Technical Specifications 6.9.1.6.Very Truly Your,s;C N.Powers (N/D 927M)WNP-2 Plant Nanager,.GNP/lc Enclosur,e cc: Nr...Mr,.Ms.Mr..Mr,.J.B.Mar,tin-C.J.Bosted-Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Resident Inspector, (901A)-ANI", Farmington CT-INPO-NRG;Washington D.C.9006i80235 900531 PDR ADOCK 05000397 PDC sp II I 1 ll 4 REPCBT PERIOD MAY 19 90 mcnth, year lt).'D~K TT~E TKKJllb REA'HH~ME CO LAIT SilUTDONNS

/REDUCTIONS 5I~&I UOCKtl NO.50-397 UNIT NNiE WNP-2 DATE COMPLETED BY LB HUTCHISON TELEPflONE (509)377-2486 PBE E BEC HRENC 90-'02 4/21/90 S 744 C 4 RC FUEL XX Refueling Outage Continuing.

f SuhNABY WNP-2 remained shutdown in May for scheduled refueling outage.TYPE F-Forced S-Sched~F-Admin G-Oper Error H-Other A-Equip Failure 0-Maint or Test C-Ref ue ling D-Regula tory Bes triction E-Operator Training h License Examination METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM h COMPONENT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Report (LER)File (NUREG-0161)

'AVERAGE DAILY UNIT POMER LEVEL~DOCKET NO.UNIT WNP-2 DATE 6/6/90 flONTH MAY 1990 COMPLETED BY LB HUTCHISON TELEPHONE (509)377"2486 3.6.7.8.9.10.12.13.14.15.16.DAY AVERAGE DAILY POWER LEVEL (MwE-Net)0 17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.DAY AVERAGE DAILY POWER LEVEL (MwE-Net)0 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest who1e megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100'line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

  • y~~~OPERATING DATA REPORT WNP-2 01-Jun-90 1.DOCKET 50-397 2.REPORTING PERIOD: 3.UTILITY CONTACT: May-90 OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9.IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: None 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): 11.REASONS FOR RESTRICTIONS, IF ANY: None 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 0.0 0.0 0.0 0.0 0 0-5060 0.04 0.0<o 0.0>o 0.04 0.0>o 0.0 YEAR CUMULATIVE 3623 47887.2 2653.8 35729.1 0.0 340.4 2639.5 34487.4 0.0 381.7 8233337 96577777 2739380 32143330 2635133 30921276 72'4'2'~o 72'+o 72'+o 66.44 59.0~66.14'8.74 0.0>o 8.0<o 0.0 2996.2.2 6~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE g DATE I DURATION)27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 6/15/90