Monthly Operating Rept for Feb 1993 for Washington Nuclear Plant 2.W/undated Ltr
ML17289B226
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1993
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-059, GO2-93-59, NUDOCS 9303190385
Download: ML17289B226 (9)


Text

seem,mam oonmmx orsx m"row svsxmr Ci~REGULA INFORMATION DISTRIBUTI YSTEM (RIDS)ACCESSION NBR:9303190385 DOC.DATE: 93/02/28 NOTARIZED:

NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.

Washington Public Power Supply System BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD5 LA CLIFFORD,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 EXTERNAL: EG6G BRYCE,J.H NSIC COPIES LTTR ENCZ 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR DORS/OEAB EG FIL 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

I'LEASE HELP US'fO REDUCE WASTE!CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 1 aw (q., s, t'0~'sn I'I vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 G02-93-059 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sir:

Subject:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT FEBRUARY, 1993 Transmitted herewith is the Monthly Operating Report for the month of February, 1993 as required by our Technical Specifications 6.9.1.6.Very truly ours, J.W.Baker WNP-2 Plant Manager (MD 927M)LBH/hh cc: Mr.Mr.Ms.Mr.Mr.Mr.W;: H.Lovelace, NRC, Washington, DC J.B.Martin, NRC Region V Dottie Sherman, ANI, Farmington, CT R.C.Barr, NRC Resident Inspector (901A)J.T.Wheelock, INPO F.Yost, Utility Data Institute tgyta I~9303i90385 930228,'PDR ADOCK 05000397 R'-'"-.PDR 4 g*wj 1 P I', N.4 fl,lt~., l'I~

OPERATING DATA REPORT WNP-2 DATE: March 1, 1993 DOCKET: 50-397 REPORTING PERIOD: Feb-93 OUTAGE+ON-LINE HOURS: 672 3.UTILITY CONTACT: Leonard Hutchison (509)377-2486 4 5.6.7.8.9.LICENSED THERMAL POWER (MWt)'AMEPLATE RATING (GROSS MWe): DESIGN ELECTRICAL RATING (NET MWe): MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): MAXIMUM DEPENDABLE CAPACITY (NET MWe): IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE 3323 1200.9 1120 1165 1112 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): REASONS FOR RESTRICTIONS, IF ANY: N NE 12.13.14.15.16.17.18.19.20.21.22.23.24.25.REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)GROSS ELECTRICAL ENERGY (he<)NET ELECTRICAL ENERGY (MWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (MDC NET)UNIT CAPACITY FACTOR (DER NET)UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 672.0 435.9 0.0 386.5 0.0 1,057,089 361,160 339,012 57.5%57.5%45.4%45.0%33,3%192.8 YEAR 1,416.0 968.3 0.0 878.3 0.0 2,668,613 924,470 873,977 62.0%62.0%55.5%55.1%30.9%392.5 CUMULATIVE 71,984.2 50,116.9 340.4 48,186.0 381.7 139,833,263 46,773,560 44,824,396 66.9%67.5%56.9%56.6%13.7%7,665.8 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION: REF ELIN TA E R8 S BED LED F R APRIL 30 1 93 FOR 4 DAY 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

0 I ,)I I-DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: MARCH 8;1993 COMPLETED BY: LB HUTCHISON TELEPHONE:

(509)377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO.DATE TYPE HOURS REASON METHOD I.ER NO SYSTEM COMPONENT CAUSE&CORRECTIVE ACTION TO PREVENT RECURRENC 93-03 2/01/93 S 92.74 B 9344 2/06/93 F 32.42 A 93%5 2/10/93 F 160.38 A N/A HA Turbine 93~CB Pumpxx 93-007 CH Pumpxx Turbine bearing vibration reached unacceptable levels, resulting in plant shutdown.After completion of turbine balance, plant startup was further delayed due to containment isolation valve problems.After valves were repaired, the plant was returned to service.Reactor was manually scrammed when reactor recirc pump failed to transfer to 60 HZ operation due to false signal (noise)in the pump control circuitry.

Reactor automatically scrammed on low level due to loss of reactor feedwater pump.The cause of failure was an electric coil in the feed pump governor control circuitry.

After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems.After compl of assessment, the plant was returned to service.

SUMMARY

F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINT OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING&LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUAL SCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM&COMPONENT EXHIBIT F&H INSTRUCTIONS FOR PREPARATION OF DATA ENTRY SHEET LICENSEE EVENT REPORT (LER)FILE (NUREG-0161)

'4 lt~~LWW-4 A C

~4+f~~0 AVERAGE DAILY VNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 FEBRUARY, 1993 LB HUTCHISON (509)377-2486 MONTH: FEBRUARY, 1993 DAY AVERAGE DAILY POWER LEVEL (M We-NET)DAY'AVERAGE DAILY POWER LEVEL (MWe-NET)&2 17.102 2.18.823 3.19.1078 4.20.1075 5.6.72 21.I 22.1110 7.27 23.1106 8.24.9.948 1113 10.o 657 26.1091 27.1103 12, 28.1108 13.14.15.16.INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH.COMPUTE TO THE NEAREST WHOLE MEGAWATT.THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH.NOTE THAT WHEN MAXIMUM DEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE).IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET , SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.