ML17291B263

From kanterella
Revision as of 23:13, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for WNP-2.W/960308 Ltr
ML17291B263
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/29/1996
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-049, GO2-96-49, NUDOCS 9603200157
Download: ML17291B263 (6)


Text

CATEGORY 1"L'-: i.REGULAT.INFORMATION DISTRIBUTION STEM (RIDS)~i E~, ACCESSION NBR:9603200157 DOC.DATE: 96/02/29 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397

SUBJECT:

Monthly operating rept for Feb 1996 for WNP-2.W/960308 ltr DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR 1 ENCL i SIZE: TITLE: Monthly Operating Report (per Tech Specs)'OTES: C E RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS~ILE CEN~I RGN4 EXTERNAL: LITCO BRYCEPJ H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORDPJ AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 0 R D 0 U E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 March 8, 1996 G02-96-049 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT FEBRUARY 1996 Transmitted herewith is the Monthly Operating Report for the month of February 1996 as required by Technical Specification 6.9.1.6.Sincerely V.Parrish Chief Executive Officer (Mail Drop 1023)JVP:DGE CC: LJ Callan, NRC R IV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)9603200l57 960229 PDR ADOCK 05000397 I PDR+EX f'II OPERATING STATUS REPORT for WNP-2 Date: March 1, 1996 2.3 4.5.6.7.8.9.Docket: 50-397 Reporting Period: FEBRUARY 1996 Outage+On-line Hours: 696.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): 3486 Nameplate Rating (Gross MW,): 1199 Design Electrical Rating (Net MW,): 1153 Maximum Dependable Capacity-summer (Gross MW,);1153 Maximum Dependable Capacity-summer (Net MW,): 1107 If changes occur above since last report, give reasons: MDC changed to reflect reactor feedwater flow calibration.

10.Power to which restricted, if any (Net MW,): 11.Reasons for restrictions, if any: none 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability.

Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 696.0 696.0 0.0 696,0 0.0 1,940,060 658,450 632,887 100.0%100.0%82.1%78.8%0.0o/o 0.0 YEAR 1,440.0 1,440.0 0.0 1,440.0 0.0 4,356,509 1,486,050 1,432,566 100.0%100.0o/o 90 2o/o 86.3%0,0o/o 0.0 CUMULATIVE 98,288.2 71,075.8 744.9 68,690.5 958.8 204,814,059 69,063,530 66, 190,884 69.9%70.9%61.7%60.8%10.8%8,319.7 26.Shutdowns scheduled over the next 6 months (type, date, duration):

27.If currently shutdown, estimated startup date: Refueling, 4/13/96, 55 days NA Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.

AVERAGE DAILY UNIT POKER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 March 1, 1996 D.G.Embree (509)377-8448 REPORT PERIOD: FEBRUARY 1996 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 1161 1159 1139 911 789 639 887 1097 1106 1108 862 1105 984 1093 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1072 670 660 647 650 648 649 648 1047 1083 1070 1083 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPQRT PERIoD: FEBRUARY 1996 DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 March 1, 1996 D.G.Embree (509)377-8448 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96%3 2/3/96 14.5 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of 0 the BPA.9644 2/4/96 69.5 NA HC HTEXCH Main Condenser tube plugging.96%5 2/10/96 S 31.9 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of the BPA.9646 2/16/96 S 250.0 H NA ZZ ZZZZZZ Economic dispatch goad following) at the request of the BPA.S URINARY: At the beginning of the month, the plant was operating near full power.The plant was placed in economic dispatch (load following) at the request of the BPA for portions of the month.On February 4 the plant went into a planned downpower to plug leaking tubes in the condenser.

The plant returned to full power operation at the end of the.month with preparations to shut down at the request of BPA early in March.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG%161 Exhibits F&H

~~~'4'~1 h II l>!"'r