ML17349A368

From kanterella
Revision as of 10:09, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Turkey Point Plant Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1992 & Rev 10 to Procedure PT-51-WS, Solidification Process Control Procedure.
ML17349A368
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/21/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17349A369 List:
References
L-92-240, NUDOCS 9209090167
Download: ML17349A368 (6)


Text

A.CCELERATED TRIBUTION DEMOITRACTION SYSTEM~~REGULATORY INFORNATION DISTRIBUTION SYSTEN (RIDS)ACCESSION NBR: 9209090167 DOC.DATE: 92/OB/2 1 NOTARIZED:

NO DOCKET 8 FACIL: 50-250 Turkey Point Plant.Unit 3>Florida Power and Light C 05000250 50-251 Turkey Point Plant>Unit 4>Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFXLXATION PLUNKETT.T.F.Florida Power 8c Light Co.RECXP.NANE RECIPIENT AFFlLXATXON Document Control Branch (Document Control Desk)

SUBJECT:

Forwards"Turkey Point Plant Units 3 Zc 4 Semiannual Radioactive Effluent Release Rept>Jan-June 1'7'V2" Rev 10 to Procedure PT-51-MS>"Solidif ication Process Control Procedure.

" DISTRIBUTION CODE: IEOSD COPIES RECEIVED: LTR Q ENCL SIZE: (+l TITLE: 50.3&a(a)(2)Semiannual EFFluent Release Report NOTES'RR RAGHAVAN>L NRR RAGHAVAN>L>~a+>~REC IP IENT XD CODE/NANE PD2-2 LA AULUCK>R INTERNAL'RR/DREP/PRPB1 1 RGN2 DRSS/RPB EXTERNAL: BNL TICHLER>J03 NRC PDR NOTES: COP IES LTTR ENCL 3 3 1 1 2 2 2 2 1 1 1 1 RECIPIENT ID CODE/NANE PD2-2 PD Of RGN2 FILE 02 EG8<G SIMPSON F COP IES LTTR ENCL 1 1 f 1 1 1 2 2 05000250 05000251 Q NOTE TO ALL"RIDS" REC!PIFNTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK.ROOM Pl-37 (EXT.504-'2065)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR fh ENCL 16 0 t t H\'81 P.O.Box 029100, Miami, FL, 33102-9100 L-92-240 10 CFR 50.36(a)(2)

U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

AU8 Ri II Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Semiannual Radioactive Effluent Release Re ort Attached is the Radioactive Effluent Release Report for the period of January 1, 1992r through June 30, 1992, for Turkey Point Units 3 and 4, as required by Technical Specification 6.9.1.4 and 10 CFR 50.36 (a)(2).No effluent monitoring equipment was inoperable during the reporting period for times in excess of that allowed by Technical Specifications 3.3.3'or 3.3.3.6.No liquid or gas storage tanks exceeded the limits allowed by Technical Specification 3.11.2.6 during the reporting period.No changes were made to the Offsite Dose Calculation Manual pursuant to Technical Specification 6.14.No major changes were made to the Liquid, Gaseous, or Solid Radwaste Treatment Systems pursuant to Technical Specification 6.15.No new locations for dose calculations and/or environmental monitoring were identified by the Land Use Census pursuant to Technical Specification 3.12.2.Should there be any questions regarding this information, please contact us.Very truly yours, T.F~Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Ross C.Butcher Senior Resident Inspectorr USNRCr Turkey Point Plant O3OO5O 9209090167 92082lPDR ADOCK 05000250 R PDR an FPL Group company~Yak 1'OCi'Ou'ACE REVIEW RTSNo~Z REQUEST FOR x~'.Procedure Title: I C n Procedure'Aumber: Check One:~Safety Related Current Revision Date: D Quality Related Non Safety Related 2.Request ProeChSRerl.

O TPNo.M POP~Othen OTRC No.: TSPo:~~New Pros~'~Periodii: Rhview C3 Coneellaiion' oR Oao Toss~Oaly I a corporate Prior Posse Roqutreqt 3.Commitinent NRC C]INPO C3 CTRAC C3 QA/QC~OTHER C3 PC/MNo.Reason for Request: I I'Oh IAC,+e'4 e'~0 JO lO))/ctPRA/)1 tr 5 (1 dth (I ti S'f I Cr'I I O~t C f'Ctcl It CnCg tg'C SS,<tC tt'M Incorp.OTSC~0 vt.Co.~<-~(~r~j.t'rc l+C c do I cv.rtcnss eg iwy 1 Commitment Date:~PM N ApprovaL'P.'ISC Roved~for:~Dtatrlbuttoa ense.v e fsv cpe;3/~I.11.$.4.Describe Details of Request: (e List affected pages or attach entire procedure.)(o If no changes are recommended as a result of a periodic review, write NOTE).lt C=n (;l Ct)" p>>(cs (I tnv e ds.ties cl'tc.o I 5.Submitted by:/~l~tq Signature Print Dcpartcncnt Check One: hVo Basis Document Vo Basis Document change necessary Basis Document change necessary and attached 6.Safet Reviesvt oes t Is request affect the facility or procedures as described in the FSAR2 B.Does this request involve a test or experiment not described in the FSAR2 C.Could this request affect nuclear safety In a vray not previously evaluated in the FSAR2 D.Is a change in Technical Siseciflcations lnvolved2 (If YESis chcckcd for any question abois, then rcfcr to thc instructions for ncccssary actions)Safety Review by: Od c.h Signa turr Print Date:~<o 7.Approved by: Date: Signature Print Responsible Dept.Plant Staff member for OTSCs;Responsible System Engineer for others lSee instructions) 8.Approved by Signature Print Nuclear Plant Supervisor for OTSCs;Responsible Department Head for others.9.Admin.Procedures Final Review by: Ignatuc'c 1e--10.Reviewed by PNSC Subcommittee tIo.Approved by: Date: Tcchnical III a nagcr R w P!sIS No.-O nt Gc I bfanagcr-N lear or Scrviccs hfanagcr(tor cssstccy la pie as oaths S Procoscaros i Disposition:

H Ceneelled Approved Q Tohledto: Other:~t l 1 S t Immediate Distribution Required IRI cecoicod pec APztsossI Immediate la:piemc..tation Req':ed as csz;.~d ps-I o".1st R'ate: Date:

Inter-Office Correspondence REVIEWS ARE REQUIRED BY THE FOLLOWING:

DATE 0 R.Steinke J.D.Lindsay M.Wayland J.Gianfrancesco M.O.Pearce E.Hayes G.Heisterman D.H.Taylor A.R.Licalri Y.K aminsk as (CHEM)(Hpi (MAIN)(M SUP)(M.ELEC)(M-l&C)(M.MECH)(OPS1 tOPS)(OPS)C.V.Rossi G.A.Warriner G.L.Marsh G.Hollinger F.IL Timmons M.E.Powers D.R.Powell D.E.Jernigan G.Tracxyk (QA)(QC)(RXENG)(TRNG)(SEC)(SYSP)(SVCS)(TECH)(FP)J.Kirkpatrick A.S.Mann G.Salamon K.L.Reminl(ton System Engineer M.L.Lacal J.Marchese G.Casto (E.PLAN)(E.Q.Coord.)(INPO Coord.)(IST)(TECH)(PCC)(CONST)(JB)[EPIPs Only)(Other)(Other)Ql/PROCEDURE NUMBER: RETURN FORM TO: I i<<wl-H.RTS NUMBER: DEPT:.P EXT~C~>COMMENTS: Q NO YES (please document below and attach additional sheets if'ncccssary J ITEM NO.PAGE/PARA NO.REVIEWER COMMENTS ORIGINATOR RESPONSE OR RESOLUTION P.'h I'4(sk S net)0s~0su lb gy.q AI)644 c Z r i'5 PA(t-40I)aeub~.i9 PW)r+0&4h E-2, iI.I'0k'D~cw F z.)4 P/t)(A4 QPe4v Q Z.)u EA/th'I ei)/)uo~Reviewed/Approved by: LA s 1 s,cdMcE.sHbu(b~O lt84 ZH AQ..5~A s AGo4-8 s~cd P,s A9~St(~4~5 I Isi 0 (iL)i g f28%IKSi&AAT(UK WHcs i 5))li 5 PG,t-<t)<~r 5z,i, r'+/n'c s (Signature)(C CC'R Pcs~T1-g)~I(S<s-SO~MISO~bg.bESI(yM (Date)The comments above have been'torily resolved.'Resolution Sign-OK i.//"3'M Pi~~1 ming.ignat irhc sigeuuurc uboor ousy bc/co sided by thc roc/cour s dc/esrterecrethead or thc plaeet Gcucrat btaeeogcr.

dcreedieeg oes the/cool at eoh/ch/trust rcsolutiou oceuraJ+F490/sr//Ig/bc (5/14/92)a~