ML17345B348

From kanterella
Revision as of 01:22, 6 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Rev 14 to QA Manual Procedure QP 4.1, Control of Requisitions & Issuance of Purchase Orders for Spare Parts, Replacement Items & Svcs.
ML17345B348
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/15/1983
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345B345 List:
References
QP-4.1, NUDOCS 8311160162
Download: ML17345B348 (33)


Text

QUAY'SSURANCE MANUAL Proc.No.P 4.1 R ev.14 RiM RowER a LiGHT COMPAPiv CONTROL OF REQUIKZT1ONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTSP REPLACEMENT ZIZMS, Sc SERVICES Date Se tember 15, 1983 Page cI 1 25 1.0 APPROVAL: The following signatures have been obtained prior to issuance of this procedure:

I I I I I I Manager of Purchasing Manager of Popover Plant Stores Director of Corporate Contracts Manager of Nuclear Energy 0 Manager of Quali Assurance 2.0 PURPOSE: This procedure provides a system to assure that the appropriate technical and quality requirements are placed upon suppliers who provide material, equipment, and services for operating nuclear plants.3.D SCOPE: This procedure applies to all FPL Requisitions on Purchasing Agents (RPAs), Purchase Orders (POs), contracts and other procurement documents originated by the Stores Department-Operating Poser Plants, and by Nuclear Energy (Operating Plant Personnel Only).The requirements for all of the other FPL organizations are defined in QP 4.4.4.0 RESPONSH3IIZTIZSt 4.1 The originator is responsible for initiating the RPA, incorporating adequate technical requirements and routing the RPA in accordance urith this procedure.

)RIOA R a I.IGHT coMPAHY QUASH%ASSURANCE MANUAL CONTROL OF REQUISITTONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTS'EPLACEMENT ITEMS, h SERVICES Proc.No.P 4.1 Rev.Oate S tcmber 15, 1983 Page cf 25 4.Z The plant QC Supervisor is responsible for: 1.identifying the RPA classification and including appropriate quality requirements in RPAs', 2.revieming OC-Required, QL-2, RIR and RPAs for adequacy of technical requirements; 4.3 3.routing RPAs in.accordance with this procedure.

The Manager of QA Procurement h Reliability or his designee is responsible for: 1.reviewing and routing RPAs submitted to QA to verify the adequacy of the inclusion of items such as quality level, quality requirements, scope of work, and source verification as specified in this procedure; Z.assisting the originator of RPAs and QC in resolving problems or questions concerning RPAs, 3.maintaining an Approved Suppliers List (ASL)for QC-Required and QL-2 items and services and controlling the utiliration of suppliers not on the ASL 4.signing POs, PO supplements and final drafts of contracts (including amendments and supplements) signifying review and approval as required by this procedure including supplier bid exceptions, 5.providing~chasing and Corporate Contracts mith a list of personnel authorised t~o reviem'nd sign procuremcnt documents for the QA Department.

DA POWER a LIGHT CO4IPANV QUALITY ASSURANCE MANUAL CONTROL OF REQUISZTLONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTS, REPLACEMENT HXMS, h SERVICES R ev.Date Se tember 15, 1983 Page 3.25 cI 4,4 The Purchasing Agent or Contracts Agent is responsible for: l.reviewing proper routing and approvals of RPAs when received in their department with the exception of RPAs for replacing material transferred from another plant (where the originating quality assurance or quality control group is responsible to obtain the second quality assurance or quality control review);2.incorporating RPA rcquircments into PO or contract documents; 3.assuring that record copies of POs (including supplements) are signed by QA signifying review and approval as required by this procedure.

4.Assuring that purchase orders for QC-Required and QL-2 items and services are placed with suppliers, locations and scope/limitations approved by Quality Assurance.

5.0 PROCEDURE

5.1 Originating RPAs-the originator of the requisition or change to the requisition sha.ll: 1.include information such that the item requested is described in enough detail that it is clear what is desired.Depending on the complexity of what is requested, the details may consist of: a.scope (extent of work to be performed or application of item).The-I scope may be in the form of a specification or contract which shall be referenced on the RPA and if the supplier does not have acocss to these documents they must be attached to the RPA;b.referenced and/or attached specific drawings, codes, standards, procedures, instructions, etc., including the particular revision data (where the revision is critical to the proper form, fit or function).

A a t.tGHT COMPANY QUAIZIY ASSURANCE MANUAL CONTROL OF REQUISITIONS 8r, THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT ITEMS, 8c SERVICES Proc.No.P 4.1 Rev.14 Date S tember 15, 1983 Page c,f.4 25 5.1 (Cont'd)c.dimensions on simple items, i.e., inside diameter, outside diameter, length,~idth, etc.;d.catalog numbers, part numbers, FPL material and supplies (MRS)numbers may be used to describe the item;Z.shen practical, reference the original purchase order number and supplier F for spare or replacement parts, 3.ttthen available, reference the PCM number the RPA is being issued against;4.methods used for determining that spare parts meet or exceed original requirements shall be delineated in plant procedures or instructions; 5.consider, as applicable, the follotvingt a.need for an engineering evaluation, e.g.;o the need for upgrading of the item o the reliability of the item o-effect of code changes on the item b.need for special tests;c.need to supply any special instructions or requirements to the supplier for: designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage, and testing;d.need for supplier to provide to ordering location instructions or requirements for: cleaning, erecting, handling, shipping, and extgnged storage 1 e.need for chemical and physical analysis;1 f.performance data; ioA povvER 4 t.tGHT COMpANv QUALITY ASSURANCE MANUAL CONTROL OF REQUIStTIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTS, REPLACEMENT ITEMS, 8c SERVICES P No.P Fl ev.Date Se tember 15 1983 Page ct 5.Z5 5.1 (Cont'd)g.calibration data;h.qualification of personnel performing the service;6.utilixe plant implementing procedures for confirming purchase orders, when they are necessary.

7.route the RPA for review to Plant Quality Control at the plant where the material or item will be delivered, and then to thc Quality Assurance Department (site or staffl.5.2 Plant Ouality Control Revietv of RPAs-the plant Quality Control group shall revietv all requisitions for proper classification and shall revictv all QC-Required, OL-Z, and RIR for adequacy of technical requirements.

'Ihe P)ant QC Group shall reviem the source documents (e.g., Q-List, Spin-List, Line List, Instrument List, Valve List, Drawings, etc.)which identify safety related items and requirements as applicable.

The performance and documentation of this review shall be described in plant procedures.

If quality requirements are required, then QC shall provide the necessary quality requirements to assure that the item meets or exceeds thc requirements of thc original specification.

Methods used for determining that spare parts meet or exceed original requirements shall be delineated in plant procedures or instructions.

5.3 Classification of RPAs-the RPA shall be classified by Plant QC (marked)in one of the following ways: 1.QC-Required 2.OL-2 (Note: For purposes of identifying RPAs, Form Z115-QC, and DWAs,"QC-Required

-QL-2" or"QC-Required (QL-2)" are to be considered synonvmous with"QL-Z"

I a.OR~s~FR a t.tGHT COMPANY QUALITY ASSURANCE MANUAL CONTROL OF REQUISTXTONS h THE ISSUANCE OP PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT II%MS, 8c SERVICES Proc.No.P 4.1 Rev.14 Date Se tember 15, 1983 Page ef 25 5.3 (Cont'd)3.Receiving Inspection Required (RIR)4.No OC-Required or QC Not Required 5.4'QC-Required" Classification

-this classification shall be used when one or more\of the following conditions mist: I.The item is for use in, or in conjunction with, a safety related system and/the item or service does not meet the definition of a Co'mmercial Grade Item".2.The Plant QC Group desires to upgrade an item or assure that only suppliers with approved QA Programs are used when purchasing thc item or service.3.Doubt exists as to the Quality Assurance Program requirements to be imposed on the item or service.%here possible, the originator or any other mtercsted party should contact the Power Plant Engineering Department to make a determination as to whether or not an item or service is safety related.Refer to QP 2.7 for identification of safety related structures, system, and components.

Thc results of this determination shall be documented by the person requesting the response.4.For items and services when no other classification level properly applies.5.5"OL-2" Classification This classification should be used when onc of the following conditions exists: , 1.Thc item is for use in, or in conjunction with, a safety related sys>em and meets the definition of a"commercial grade item" and documentation (e.g., mill test reports, certification of compliance, chemical or physical test reports, heat treat certification, reports of inspection, ctc.)is required.

Aioa POwER d LiGHT COMPmv QUAL1(TY ASSURANCE MANUAL CONTROL OF REQUISITIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTSi, REPLACEMENT ITEMS, h SERVICES Proc.No.P 4.1 Rev.14 Date Se tember 15 1983 Page c,t 7 25 5.5 (Cont'd)2.The item is for use in, or in conjunction with, a safety related system and meets the definition of a'commercial grade item" and the functional or material characteristics of the item cannot be verified upon receipt inspection or post installation.

3.The Plant QC Group desires to upgrade an item meeting the definition of"commercial grade item" or to assure that only suppliers approved by QA are used for the purchase.5e6"Receiving Inspection Required" (RIR)Classification

-this classification may be used when one or more of the following conditions are met: 1.The item is for use in, or m conjunction with, a safety related system and meets the deiinition of a Com'mercial Grade item and'no documentation is required (if documentation is required, refer to paragraph 5.5).2.The item is for use in, or in conjunction with, a safety related system and the functional or material characteristics of the item can be verified upon receipt inspection or post installation testing.3.The item is for use in, or in conjunction with, fire protection equipment or components that are important to safety.4.The item or service is not for use in, or in conjunction with, a safety related system but plant QC desires to perform a QC receiving inspection.

NOTE: FOR ADDITIONAL GUIDANCE ON DETERMINING QUALITY LEVELS, REFER TO FIGURE 4.1-8 AND 4.1-9." 5.7 Items classified as"QC-Required","QL-2", or"RIR" require a QC inspection in addition to the normal Stores Department receiving inspection.

These inspections shall be accomplished in accordance with QP 7.1.

f.OA WER 4 I.IQHT cQMPANy QUALTZV ASSURANCE MANUAL CONTROL OF REQUISIIIONS hr, THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT ITEMS, h SERVICES Proc.No.P 4.1 Rev.14 Oale S tember 15, 1983 Page of 8 Z5 5.8'No QC-Required" Classification

-this classification may be used in lieu of the above classifications when any of the following conditions exist.1.the item is not for a safety related system or Z.the item is used in a safety related system, satisfies the definition of a'Commercial Grade Item" and the normal Stores Department inspection for shipping damage, quantity and identification is satisfactory to assure that the item or services meets the requirements of the original equipment and the needs of the plant.Items to be installed in safety related systems which require traceability or documentation submittal or certification to standard(s) shall not be classified as'No QC-Required." Qualitv Assurance Department review of RPAs-the QA Department shall review RPAs as stated in this procedure'to assure adequate inclusion of information specified in paragraphs 5.1 through 5.8 of this procedure.

5.10 Quality Requirements

-if QC review indicates that the requisition needs to be stamped"QC-Required" the specific quality requirements shall be referenced on, written on, or attached to the RPA utilizing the form shown in Figures 4.1-1.All RPAs for items and services classified"QC-Required" shall state that the provisions of 10CFR Part 21 apply to the purchase and should reference the latest revision of FPL Special Quality Assurance Document SQAD-1002.

Other Qualitv requirements which may be included on"QC-Required" or"QL-2" RPAs are the following:

~~1.Requirements for the supplier to have a documented Quality Assurance Program that implements the applicable portions of 10CFR50, Appendix 8, or ANSI N45.2.

IOA POWER a LIGHT COMPANY QUhGHY ASSURANCE MANUAL CONTROL OF REQUISITIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTS, REPLACEMENT XZKMS, Sc SERVICES Proc.No.P 4.1 R ev.14 Date Se tember 15, 1983 Page cf 9 25 5.10 (Cont'dj 2.Right of access for inspection or audit by FPL or designee.This requirement should also include the identification of, or method for identification of witness and hold points, if applicable.

3.Documentation requirements shall identify the documentation to be submitted, including quality assurance records for information,.

review, or reapproval.

The statement,"Documentation Required is per the attached Form 3524" is to be used to reference Form 3524, (Figure 4.1-1)on the RPA.4.Nonconformances

-The method for reporting and requirements for approving nonconformances shall be specified.

Nonconformance reports shall include corrective action to be taken.5.Lower tier suppliers-The requirement that the supplier shall include the-~appropriate quality assurance requirements in all lower tier purchases.

6.If Special Quality Assurance Documents are to be used, they shall be the lastest revision and properly referenced.

Any additions or exceptions to Special Quality Assurance Documents shall be made on the RPA.Exceptions shall be noted immediately adjacent to the referencing statement.

SQAD 1001 should be used for"QC-Required" items, SQAD 1002 should be used for identifying the provisions of 10CFR Part 21, SQAD 1003 for"QC-Required" services, SQAD 1004 should be used for requested surveillances, SQAD 1005~~should be used when documentation is requested and SQAD 1006 for"QL-2" items or services.

R a LIGHT CO4IPANY QUASH%ASSURANCE MANUAL CONTROL OF REQUISITIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT ZZZMS, 8c SERVICES Proc.No.P 4.1 Rev.Date Se tember 15, 1983 Pa9e , e,f 25 5.10 (Cont'd)Special Quality Assurance Documents and associated Quality Control Notices may be shown on the face of Form 2115 QC or 2115 RI RPAs by checking the appropriate blocks and indicating the proper Quality Control Notices code number on the form.5.11 Routing of RPAs for quality review.1.'No QC-Required'PAs shall be routed to plant QC for review.No review bv the QA Department is required.2.'QC-Required',"QL-2", or'RIR" RPAs shall be routed to both plant QC and the OA Department for review.3.If the RPA is for replacing material or an item transferred from another plant, then route the RPA to the Quality Control or Quality Assurance group at the plant from which the material or item was transferred.

4.Quality Control reviews shall be documented by signing, initialingf or stamping.(traceabie to an mdividual) either the Form 1 RPA or the hard card (Figure 4.1-2 and Figure 4.1-3)and any quality clauses which may be at tachcd.5.Quality Assurance shall document their review by signing or initialing either the Form 1 RPA or thc hard card and any quality clauses which may be attached.6.Qualitv reviews shall assure that both technical and quality requirements.age adequate and complete.7.In the situation where the generic SQAD Documents are not applied to provide comprehensive QA Program requirements on an RPA, the QA

'6%OA POWER a LIGHT COMPAH Y QUAL'V ASSURANCE MANUAL CONTROL OF REQUISITIONS 8c THE ISSUANCE OF PVRCHASE ORDERS FOR SPARE PARTS'EPLACEMENT ZZXMSI, 4c SERVICES Proc.No.P 4.l Rev.14 Page e,f 25 Date Se tember 15, 1983 5.11 (Cont'd)reviewer should consider whether the scope of work covered by a"QC-Required" RPA interfaces with work covered by other procurement documents or work done by FPI If so, the QA reviewer shall assure that the Quality Assurance requirements incorporated in separate procurement documents, in conjunction with the FPL QA P~ogram, will collectively satisfy the QA requirements

.applicable to the total items and services procured.5.12 Automatic Release Order (Inventory Resources)

-Quantity releases against current BPO's do not require QA or QC review.Automatic Release Order (Inventory Resources)

BPO's can not be used for QC-Required or QL-2 items.~5.13 Use of Hard Card RPAs-'QC-Required" i'tems may be requisitioned on Form Z115 QC (Figure 4.1-2)."RIR" items may be requisitioned on Form 2115 RIR (Figure 4.1-3).QL-2 items shall be requisitioned on Form 2115 QC by stamping the card'OL-Z" (see paragraph 5.3.Z)only.'No QC-Required" items may be ordered on Form Z115 (Figure 4.1&).l.If form 2115 QC or Form 2115 RIR is used, QC shall review the requisition initially and each time the material is requisitioned.

QC shall indicate their review by initialing and dating the form in the"Quality Control" section of the form.QA shall review the requisition initially and thereafter only if changes are made in the"Description" or'Spare Parts For" area of the card.QA shall indicate their review by signing and dating the"QA~~Approval" block in the"Spare Parts For'rea of the card.5.14 Whenever any changes to"OC-Required","QL-2", or"RIR" RPAs are necessary because of an error in assignment of part number, description, quality reouirements, typing error, etc., and the error is found during the review process

QUAIITY ASSURANCE MANUAL Rev..No.P 4.1 LCM WEB a LIGHT GO4IPAHY CONTROL OF REQUISITIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT XTEMS, 8c, SERVICES Date Se tember 15 1983 Page.e,f 12 25 5.14 (Cont'd)and prior to an order being placed, the person discovering the error shall cross out the error and initial and date the correction.

This correction shall then be initialed by the originator, Quality Control, and Quality Assurance (only for requisitions with quality requirements), or a memo showing concurrence of these individuals shall accompany the RPA to the Purchasing Department and be filed in the PO file.Evaluation of Supplier Exception-Purchasing shall route all supplier exceptions on RPAs addressing technical or QA requirements to the originator for resolution.

Resolution of these supplier exceptions shall be documented.

0 Exceptions to Technical or Quality requirements approved by FPL<<ill result in a change to these requirements which will be processed in accordance with Paragraph 5.14.5.16 FPL Changes to Technical or Quality Requirements of an issued Purchase Order or Contract-shall result in the generation of a supplement to the purchase order or a change to the contract, which will list the changes to these requirements.

To gcneratc the supplement, the originator (or person requesting the change)shall issue an RPA or Contract Change Order (CCO)requesting a supplement to the Purchase Order, and route the RPA or CCO to the plant Quality Control and Ouality Assurance for review in accordance with this procedure.

To generate a contract change, the originator shall prepare an RPA or CCO (Figure 4.1-5)requesting Corporate Contracts to amend the contract and route the RPA or CCO through Quality Assurance for review.Whether used to generate supplements to purchase orders or changes to contr'acts, the CCO must have the

IOA POWER S LIGHT COMPANY I QVAIZIY ASSURANCE MANUAL CONTROL OF REQUISZTIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTS, REPLACEMENT EZXMSI, 8c SERVICES Proc.No.P 4.1 Rev.Date Se tember 15, 1983 Page ct 25 5.16 (Cont'd)quality level identified on the form and shall conform to the content\requirements for an RPA as specified in this procedure.

NOTE: All supplemental RPAs or CCOs for QC>>Required, QL-2, and RIR items/services require review and signature by QA with the following exceptions:

1.cancellation of a PO in its entirety, 2.<cancellation of a PO line item in its entirety, 3.price and schedule changes only, 4.change in the number of items ordered on any line item.Supplemental RPAs for"No QC-Required" items/services do not require review5.17 by QA.Confirming Purchase Orders-shall be evaluated by QC for both Technical and Quality Requirements to assure that the proper requirements are conveyed to the supplier.When ordering'QC-Required","QL-2", or"RIR" items or services, Quality Assurance shall be contacted by the originator for their concurrence with the requirements prior to officially contacting the supplier.If this is not expedient, QA and QC shall bc contacted by the originator for concurrence within one working day of placement oi the verbal order.In the event that the necessary requirements were not imposed, a supplemental purchase order will be negotiated including these necessary requirements.

The Purchasing Agent/Contracts Agent placing the confirming order shall assure that the~~supplier is on the FPL ASL.when required by this procedure.

The originator of the request shall follow all confirming purchase orders with an RPA that will be routed for review and approval in accordance with this procedure.

QUALM%ASSURANCE MANUAL Rev.No.P 4.1 II LO fR al.IGHr COMP~A CONTROL OF REQUISZTIONS 8t THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT ITEMS, 8t SERVICES Date Se tember 15 1983 Page cf'4 25 5.18 Preparation of Purchase Orders and Supplements

-when a PO or supplement is issued, it shall include the technical and quality requirements.

Purchasing or Corporate Contracts shall assure that all RPAs or CCOs for items/services within the scope of this procedure have been identified as'QC-Required","QL-2","RIR" or"No QC-Required", and that all QC-Required, QL-2, and, RIR RPAs or CCOs have been signed or initialed by Quality Assurance (indicating the initial review).CCOs shall be used only to generate Purchase Order supplements or changes to Corporate Contracts.

Purchase Orders generated frozn RPAs or CCOs marked"QC-Required','QL-2", or"RIR" shall have the quality classification identified on thc purchase order.POs and supplements generated from RPAs or CCOs marked'QC-Required""OL-2" and"RIR'xcept as noted in 5.16 shall be reviewed and approved by QA.Prior to issuing a supplement to extend the termination date of a P.O.the Purchasing Agent shaD consult the QA/ASL to ensure that the vendor is still on the list md.present the supplement for QA review and approval.QA will indicate their review and approval by stamping and signing as follows: 'Approved" QA If QA cannot perform this review immediately upon request, a copy of the PO is to be sent to QA for their review and approval on the following working day.5.19 Preparation of Contracts signed by Corporate Officers: When a contra'Z an amendment signed by a corporate officer is issued, it shall include the technical and quality re'quirements.

Corporate Contracts shall assure that all RPAs and I l-I I I I I I OA gtQWEA a LIGHT COMP>N g QUAL)KY ASSURANCE MANUAL CONTROL OF REQUIEfTIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTS, REPLACEMENT II%MS, 8c SERVICES Proc.No.P 4.1 Rev.Date Se tember 15, 1983 Page ef 25 5.19 (Cont'd)CCOs for items or services within the scope of their procedure have been identified as'QC-Required","QL-2" or'No QC-Required" and that all"QC-Required","OL-2", and'1UR" RPAs and CCOs have been signed by QA (indicating the initial review).Contracts and amendments generated from RPAs or CCOs marked"QC-Required",'QL-2" or"RIR" shall be revievred and approved by QA.Prior to issuing a supplement to extend the termination date of an"accounting purposes only" PO, the contracts agent shall consult the QA/ASL to ensure that the vendor is stil)on the list and present the supplement for QA review and approval.QA will indicate their review and approval of original contracts by stamping and signing the file copy of the'accounting purposes only" PO referencing the contract.For amendments not affecting QA or Technical Requirements, QA shall sign the RPA only, no further review is required.For amendments affecting the QA or Technical obligations of the contract, QA shall indicate their review and approval by stamping and signing the file copy of the"accounting purposes only" supplement referencing the contract.5.20 Blanket Purchase Orders: 1.Whenever a Blanket Purchase Order (BPO)is used for the procurement of a OC-Required, QL-Z, or RIR item or service, the RPA shall specify the Quality level.Each Deliverv h Work Authorization (DWA)released against a QC-Required, QL-2 or RIR purchase order shall specify the quality requirements consistent with the BPO, the technical requirements (unless s technical requirements are specified~te original order), and shall be revieqgred by QC and QA prior to issue in accordance with this procedure.

'.ORi f R a LIGHT COMWH Y QUALZTY ASSURANCE MANUAL CONTROL OF REQUISITIONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT ITKhlS, Ic SERVICES Proc.No.P 4.1 Rev 14 Date Se tember 15 1983 Page ef 16 Z5 5.ZO (Cont'd)DWAs of a different quality level than the BPO may not be issued against a BPO issued by the Purchasing Department.

IF the SQAD requirements are not included on the DWA, the following statement must be included: "QUALITY ASSURANCE REQUIREMENTS APPLY-refer to Blanket Purchase Order and Supplements'.

In addition, where the QA-ASL requires a state'ment to appear on the DWA, this statement must be specified whether or not it is stated in the original purchase order.BPO DWAs shall not be used for procurement of inventory items controlled by Inventory Resources.

Z.If QA or QC cannot perform the review of DWAs immediately upon request, a copy of the DWA is to be sent to OA or QC for their reviem and approval on the following~orking day.3.When items to be procured on a blanket purchase order arc fully specified in the BPO itself, (inclutiing all quality and technical requirements), the following method may be employed to authorise release of material from the supplier: a.Inventory Resources Release (Form 1019)As a minimum, identify to thc vendor the blanket purchase order number, FPL stock number and release number.These methods shall not be used to specify technical or quality requirements or to change or modify conditions in the BPO or supplements.

~~b.Any changes to technical or quality requirements or changes modifications to conditions can only be made by supplement mhich will require reviem by QC and QA prior to issue in accordance mith this procedure.

~~&6.IOA PQWEA a LIGHT CGlAPANY QUAI YTY ASSURANCE MANUAL CONTROL OF REQUISITIONS hc THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTS, REPLACEMENT ITEMS, 8c SERVICES Proc.No.P 4.1 Rev.14 Date Se tember 15, 1983 Page t;f 17.25-5.Z1 Check requests may be used for the procurement of RIR items for immediate use in lieu of Purchase Orders as required, upon approval of the plant Quality Control Supervisor and are subject to all of the controls of this procedure for RIR items.Check requests shall not be used for the procurement of"QC-Required","QL-2" or for any inventory items controlled by Inventory Resources.

Changes to issued check requests shall be processed as in Paragraph 5.16 except that any changes shall result in the creation of a new check gequest incorporating the change and the cancellation of the original check request.5.Z2 Other Procurement Documents:

Only those documents specifically identifieg inthis procedure shall bc used for the procurement of'QC-Required","QL-2" or"RIR" items or services.6 0 RECORDS: 7.0 Purchase Ordersf Contracts, Supplements, Check Requests and DVAs including quality and tcchnical requirements referenced m this QP shall be maintained in accordance with QP 17.1.REFERENCES DEFBiFHONS ae ABBREVIATIONS:

7.1

References:

10 CFR 50, Appendix B-"Quality Assurance Criteri for Nuclear Power Plants and Fuel Reprocessing Plants" ANSI N45.2-"Quality Assurance Program Requirements for Nuclear Power Plants" OP 4.4"Review of Proctuemcnt Documents for Items and Services other Man Spare Parts"=-I-I C'OP 7.1"Receipt Inspection of Materials, Parts and Components for Operating Plants" i.ORi KA a LIGHT COMPANY QUALI'IV ASSURANCE MANUAL CONTROL OF REQUISTHONS h THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PAR~REPLACEMENT ITEMS, h SERVICES Proc.No.P 4.1 R ev.14 Date Se tember 15, 1983 Page of 18.25 7.1 (Cont'd)7.2 OP 17.1 The Collection and Storage of Quality Assurance Records for Nuclear Pottier Plants" Definitions:

The follotving terms are defined in the Glossary: Automatic Release Order (Inventory Resources)

Blanket Purchase Order (BPO)Commercial Grade Item 7.3 Confirming Purchase Order Contract Change Order (CCO)Delivery and Work Authorization (DWA)Requisition on Purchasing Agent (RPA)Special Quality Assurance Document (SQAD)Abbreviations:

ASL-FPL Quality Assurance Department Approved Suppliers List BPO-Blanket Purchase Order CCO-Contract Change Order DWA-Delivcrv h Work Authorization PO-Purchase Order QL-2-Qualitv Level 2 RIR-Receiving Inspection Required RPA>>Requisition on Purchasing Agent SQAD-Special Quality Assurance Document

A PQWER a QIQHT QQMPANY CONTROL OF REQUISITIONS 8c THE ISSUANCE OF PURCHASE ORDERS FOR SPARE PARTSt REPLACEMENT ITEMS, 8c SERVICES Proc.No.P 4.1 R et.14 Date Se tember 15, 1983 Page c,f 19 ZS I CL'I>><<>>>>I<<>>I*'lag)DDl'IAt 0Ot I~C'0 i i>>>>~I<<IlhaaWQ<<<<>>0 tt I lt I I I I I I I I I I I I I I I I I I I I I I I I I I I~ski Dl>>0 I D<~I~'t I~<<w>><<c~c~I~<<<<<<0!a~0 re~I OS>>I~en<<<<D~I tt I I I I I I I I I I I I I I I I I I I I I<<>>~t>>i>>I tl'0 I C'0 I I I I I I~%0 ltd<<<<t wJ l<<>><<<<<<AO I tt I I I<<<>VI<>0 I~l>>0 i~~<<%<<>><<C P<<A>><<<<D~D t<<<<D t~I Ot~~s M~A I I It>>tt I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 C D I I 0C I I I I I I I I>>I I I I I I I>>a<>>>!!!~<<l Jt<<l IotI I I I I I I I I uaaltltooo owe LLvaav I'SCCOLL0OI VLLV3O VRHLO~<<<<AO I I I I I I I ll~i ll't I vt~I I'~l'0 I l'0 I&C PPt4w~0~<<>><<<<t I I I I I I I I I I I I I I I I I I I I I I I I I, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Iee I I I I I I I I I I I I I I I I I I I 01 0 I~IW I~I 0~tl'0 I~I'00 I l<<<<lA I'EC>I I I I I I I I I 5t I I I I I I IDC I I I I I IDC I I I I I I)DC I I I I I I I~w~~<<A.t>~<<<<tt I Ot I I I I I I I 0<<~~'SeOuO~IIOaaeaS00 I I II~J 4>>O%8 I OTIC~SC51 Ort7S'KOI OYt5'SSO I OPS 2CO I OLIOS'CO I OYQS~~J<<S~SJALI~~~~V AII~H~&'%<<CLI+~W 0~W~COaaV~I<<Pet~lW 00~C~~~~Ia QtDRJ cll<<<<litaoO 0 IC C C WN'Lkl/2tOILVOIAQgjOI

~Figure QP 4.1-1 fOR NUCLf AR POWER PLANt-USE ONLY-Stev ttnnn<ot L~eco<ew<$et<Mes est<to"QC REQUIREO" I kv>>4 I'<erect 0 L~l Cnenleonr REOUISItION ON I'URCIIASING AGENt-StOREROOIII Ml SNv L<AIL<ILH~D f<<eclsooc C<nft.vl I~Ie<<Heal<vs<I 55 LAI A<In<4<t Oe<<I I I 5<I<~k<~<<HI I vl lvNC<<ASL VHII VI IIIVI I<ISCN<olh<H 6 DA<oc Note'I CI50ADI00I Q soADI001+SDAolooe D 50AD<co>>SOAfs1flIS.

OCH'o Ita I I~<HI I<AL OO<H~off<<00 IOONDI<s MAA OIV I-I AUIO~INR Tm CENTRALIZED TUACIIASING 0 RLL I~RtL I-I~REL I-I SIT<CKING I(K."N 5<'At<I tan<5 I V<t 0 St<lie IO I$04<DA OOrtl II~I oft<el Col<Or AHr ACLOVH f 0<SINtOVf<I<H LO LIO IO SAIC TII Rw<l<5 NI I r<V<hr0<<I<I CL TLA TR ACCOVHI tV<<Of II L OC'H COOt INVOICE TO P.0 boe SlSSSO M<etnt.flotn4 3)ISl S IIRI IIOIIM OAII pleat<I<I r 4<Oft<Ii 4IVV<S<IO OIL I nls t<lv0 re 0 Veo I<el 0<IOHVIII olfe<I<I o At<I<f 1<NI0 I I<I 0 VHI 1 hntt TOTAL TIIICL TO~TO<II I OIL NIOO OH 04 OLIO<<I PIIIICIIAc<ING III tAR I M I NI TVNCNA ST ONOI 4<<voto I II Sse<rhl<O<

VI<I<I I<ri 0 Ntthf TOO HO DAft ntc 0.ovA to I I'I'r RICTIVTO Sf ORt OOIIM<4v 0~I 5 st~Svee 0 See~Ltee 0th het.ht Moe.~0<<~III<Iae Rte-00 TO<<i~R~n 00fbo<e Oeotetr Ceae<V Isev~e Sees Sw>>ls~5<<<<tie f1<tee Te>>he L<rs list<~Ltfe Hee fit<00 I Dnt Ilteewcn00 bhe Ovtetr Cannel two<eon>>~yon

~lee<Ot 5eee SWr I I>5te~vte Oett hee.ht a<re Dote sore lat I<n CO ONe ore<ReeewcoeOO Dost Owl<f CeanV 5 vt<seovao Otto<4v It Sv~L>>I<t>>'Ste~otv It<tee Tev ht ktee l4s~cafe lae Iles 00 Ipost enefloeow<nCOIOht Owl<r<a<<V he<tv<we'Dote reren 1ll~Den IHoa Set<teel Aoe Igl~'tf Lv n Tef O~.U~r TII IS 0 n z 0 Ul

~~~~~~~~~>>s~r\~~~SI Ie~t>>~N I~I FOR NUCI FAR POWER PLANT-"-USE ONLY-RECEIVING INSPECTION REQUIRED Mb 5th Cs ASS~~I es CO O D 0 m I 54>>o~ra>>~a I eos~S ra'ST~~~s>>eh I lo>>ssl~Vs<ran A I ergot I.swsu+<T RFOUI<<ITION ON PUIICIIASINR AtiLNT-STORCIIOOM P>>4 1 Co>>it.~I ts vl s<IN<<IIAI<I<HI 55\'A<As SN<So<UN<It'I~tat, sestet srl te>>r<~<ASI 1st ss to<vs<sees Vs<st 0<~SSVI D~Z C Isa II~~hot<AC le S<S MAA Ml I<KNI 1st O<tlsl tt OA<OC Hwa I VIA<suit'll:H

~SOAOIINl~SOAO<00t~50A0100 5P Ass<tA<I I 5 I<HI VUHDIASItlti I)SIIIP SO I I 0<I<HA t<NTIH~te4<tl CUl<PAHT As.Isle<HI i<st ltsstutt<IH tOMV I<1 Isles Ss'I I, I II C l slots)<5<0 lt 4 I so<lett<0 I II ACC UVHI HVM4IH lOC ls COOt IIIVOICF SO P 0 baa 52%950 At<A>>el.f 14<<<14 55152 OIS<AVIO.IHH CTNSIIAIIZI0 ttt I I l HI L U HI I I I SIISCNHIII I OC tt III Qo any 0'sly)0 t<gg 5 IIOI HOIIM PIIHC IIASIHIIO<<AntMI ttt 51tllll HtX)M UAI I~os<st<<It OVAHI<1 1 HtUus<<ltl

'Uh~Iahle UH IJ<l<IH Itl I<<I U 0 I<H Ots~I I Vest r<0 leO IVA<<tsle sssslel III II VHI'I Pls<CI 101 AC tH<01 I OH PIN<<1 1st I HI<I ll I srs I I<I~<t 0<<I tvhcs<A5t Os<lit tt Herl<41<I 5<IIPP<II~U<IUI II Ht I nl I ls I<O~0 OAT I IIIC 0 OVAHIIIT HICtlvtO o<~e 4e Scan 5>>0 0th rr 5<r~llr hre hs Mtr ltt~st tar I<re (<0<It<re t H GO bees Or<Ate Csea<et<twcahwt el)tee ss s~r Ss~5>>It>>Sere Msr 10<or W tss Mse Veer Mp<~l4<(0 Is>>r pr>>H>>>re<00 Uter Owe<st Ca>>Hat~wears>>e<%<<<

~I I 4~sas 5>>a 4t s'I>>Ssr~le>>Itth u>>Ser~MS I toter te>>hs lsp lets~stre sat Ilrs 60 It<sr peer Hteawet<btltlsese her tss M<r loth Vtr<ae On-(<0 10<or te>>He<two<<CO O>>t Or<Alt Ca>><rat Or<tetr Ca>>teal tao<tote>>1 It<or tw>or Itch<wart<It<re>>

<ha>>so>>rett Ae Il~<e O tS t+8 U'4 tll 00 t<J 0 tI 2l 0

~.Slo etoom or Locot toto ov>>onL conf~)f lot Ide Ptaoer I Llfftl Compeaf REOI/ISITIOff ON PURCHASING AGENT STOREELOOLE Se L$ffo CLALL oil>>Pttrrfta e Cotfr CU I 0 m D I V l HOG tl I A Q Q a f 5 5 CATALOG HUMeltl SIO~toG ltatf fir pvactte$f Of 5Cat~ItQH Vtttf Qr l55VI 5."" 6..~~OAIfr IHI I ILL Mta MA1~uRCTIASWO Q 5PAttf Peltl5 IO(t OIV~AUTO~ITIIT I g Lf flf RALflEO REL l~REL<-5 REL I l STIICKIITRLOCTI

~~IS O SIIIP TO ILOtltOA PQHLO~LIGHT CO>>Peto T Accotttrl Dt5 latpvf ton IOMO IO spfc fa aao StO I toO VI tl CL ACCIHNIT~I a toVMel tl la L OC'H COOL OA'Il IHOlafl PUIICI IAt(ING ill PAR 5 Ml N 5 OVAHIIIT IITOV(HTO OH HAtrD QH PIIOI II OEL Ill Q O Otr Otl~IPOal AotTITO OIIDT ALV Val f PAICl TOfAL pa tel roo~Otto'I OSL HID D QH oa~llorll WVOICE tO.P.O.Tftto SESSSOMtetrd.

Sloride lll51 SlfjRL ROOM Pl(IICHA Sl Ottltl lt~at>>of to 1('allrolf 4 Ht)D*i f AICO QVAHI IT T to I f I I vf 0 STOtll ROOM to g[~toto or Stto 5<<pv U(t 5(tt M<<O>>r DH.TOO<<P Met Oo<<Ott TAOtew htr 5t<<lr(~IS(<<r'Q A a<<t or Svo 5>>tt D<<5t.~4>>Too>>Ott ICOrf tf>>fb>>i Mp Im Rro Oooo t(t TOOr<<t tl iV>>t t~~.<<If (O A Pv(t t(to~%to Hott Or 5<<r Svev<<5tt~4<<O>>t T tt fobrP O>>t H(t atl&Z5r~~aro o>>.tmrSg rt IQA MÃre Ooo or U>>Stto Met bott Ott TAOrP Met Ooto Itn aro'>>r Ov 46<<t RHT6>>t foe IStttrl tfi A I vttt(~(t<<O>>t~tte(O It tl<>'Ihi~Char l I~'Inlohds4 Dosed on epeclClc oppllcatlone, so>>>>its>>a<<a ning quality clat Liaaifsd 4ICCet ICI atlonoss II'l Lf o CUSSSIP CA't!AI QC NQJIIIKD I Isl:P I H I'r I OH (Ibtos tor Cull slvflnltlon, aoo pcoceducs.l Tho lto>>or service la liood In or In con)unction Nlth a OOCsty co-lottd>>fete>>and does not OILt ills deflnlilon of cnscsecolqi grado, Ha other clseolf lcetlon level appl Inc.ASSUHPTICNIS Pressure boundary lta>>shd/oc~esess'llal Co oafo opsscatlon or shut dose oC unit, h APs KWAL APA PO for yea QAS ALLPICO IIIPPLICA Too~Aequi fee~I pl lrabl e portions oC IDCTASDa Ap pondla I nc ulher QA PCO slee>>to bo appl lo4, HChlOA DP sccEITAHcc QC Aecolvlnf Inc p>>cllun ahd~ulsILSC tLVO dOCu<<entst ion and/or>>etI&a descclbed ln QP 7.4, icetIls Tee sT 1 QL-2 The Its>>I~Coc uve lns oc In con)unct Lon vlils~a osfoty-related

~fels>>s<<sots th>>deflnltlon of~cosvssccIOL qred>>Ite>>"c and dacu-<<esslat Loll Io q~EEL LL Coat celsostes crrl If Ication nI co>>pl lance, chs>>I cal or pny>>ical tnst ropoctos heat leo~I I:~rtl Cleat los cepucto of In~peLclon, oto.l I~required or CI:~functional os wlorIOL charactorl

~tice of clio It>>>>cahho'l bo vocl CI>>s upon cvcelpt Inspection or post I sset vl I scion I~Ito>><<seta do-Clnlt Ion of c~eccl~I grade 2 A~IOLsl If lsd auppl lac ovslu ation lo neces-saryy to>>stab l I eh c>>a soss-~ble conCIdence ln ths suppliers product and docu>>entat lan fee TOO Tees but oval%ation NIIL be wds nn t~uppl lees ablllty ta Cucnleh n q>>silty pfo-dlsoC based OA lslduotcf oo copted pcec-tlcoo~past pscfor<<ance,~to~QC Local>>LAS Inspection an4~uppor Clvs doer>>entatlon I IC roqul cadi and/or<<othods 4<<sec ibad In QP 7.C.tI g)i IIIA or AIA ILs Subetltuts Ha QC A>>quired A c~erclal grade It>>>>used In~~alvtf celate4 syote>>, no docunen-totson ls required, an/oc tli~chsc.octoclstlce ol lh>>ltv>>oan bo vssrLCL>>d at c>>celpt ar poet lnotsl~tlo toot.qLSA~epsro peels A balance of plant Itesla oc services, Ths quality of the ltd>>I~cantrol led by tho Industry 4 dose nac var f/coal-Ly Lotus>>n supplies%a'I tr>>oc eel v Lcs ls nut foc OOCOCT related appLIostlos foe Ho sg Ilo QC Aecs IV I srl Iliepsct lan end/ol>>othoda doeoclbei In QP 7.C.Hoc<>7 t Na O2st h!VE3 TO VPt>>hAO%7 STOhKX Iasp.Oat.T ts*CCEt7At Lf t CL~2 hlh hth.IeS VY Ot:%E, 0'0 AOO A$T*T&l'T aoT+h, COCIr h'21 OOPS NOT APPI.Y (ti o 2 0>>OR Ceaira To Vpgsade OR Criucal~~etict Can Not Be Verified Upon Receipt Eigure QP 4.1-7