ML17355A241
| ML17355A241 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/24/1999 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17355A240 | List: |
| References | |
| NUDOCS 9903080412 | |
| Download: ML17355A241 (4) | |
Text
L-99-018 Attachment 3
ATTACHMENT 3 PROPOSED L1CENSE AMENDMENT FOR ULTIMATE HEAT SINK TEMPERATURE MONITORING
'ROPOSED TECHNICAL SPECIFICATION PAGES 3/4 7-15 iiOS080aaa qe02ae PDR ADQCK 05000250
0 V
I
~'
41 PLANT SYSTEMS 3/4. 7.4 ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7.4 The ultimate heat sink shal temperature ~e-4a4eke-C~ 'e OPERABLE with an average supply water less than or equal to 100'F.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With the requirements of the above HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in This ACTION shall be applicable to speci ficati'on not sat i s fied, be in at 1 east COLD SHUTDOWN within the fol 1 owing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
both units simultaneously.
SURVEILLANCE RE UIREMENTS 4.7.4 The ultimate heat sink shall be determined OPERABLE at least once per YY YY YY Y
Y YYYY em to be within its limit.
Portable monitors may be used to measure the temperature.
TURKEY POINT - UNITS 3 & 4 3/4 7-15 AMENDMENT NOS.137AND 132
0 T
gO I'