ML17355A241

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored
ML17355A241
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/24/1999
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17355A240 List:
References
NUDOCS 9903080412
Download: ML17355A241 (4)


Text

L-99-018 Attachment 3

ATTACHMENT 3 PROPOSED L1CENSE AMENDMENT FOR ULTIMATE HEAT SINK TEMPERATURE MONITORING

'ROPOSED TECHNICAL SPECIFICATION PAGES 3/4 7-15 iiOS080aaa qe02ae PDR ADQCK 05000250

0 V

I

~'

41 PLANT SYSTEMS 3/4. 7.4 ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7.4 The ultimate heat sink shal temperature ~e-4a4eke-C~ 'e OPERABLE with an average supply water less than or equal to 100'F.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With the requirements of the above HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in This ACTION shall be applicable to speci ficati'on not sat i s fied, be in at 1 east COLD SHUTDOWN within the fol 1 owing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

both units simultaneously.

SURVEILLANCE RE UIREMENTS 4.7.4 The ultimate heat sink shall be determined OPERABLE at least once per YY YY YY Y

Y YYYY em to be within its limit.

Portable monitors may be used to measure the temperature.

TURKEY POINT - UNITS 3 & 4 3/4 7-15 AMENDMENT NOS.137AND 132

0 T

gO I'