ML17345B345

From kanterella
Jump to navigation Jump to search
Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events.
Date released: 07/31/2018 Download: ML17345B345


Rev 14 to QA Manual Procedure QP 4.1, Control of Requisitions & Issuance of Purchase Orders for Spare Parts, Replacement Items & Svcs.
ML17345B348
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 09/15/1983
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17345B348 (33)
Administrative Procedure 0103.16, Duties & Responsibilities of Shift Technical Advisor.
ML17345B347
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/29/1982
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17345B347 (102)
Off-Normal Operating Procedure 0208.1, Shutdown Resulting from Reactor Trip or Turbine Trip.
ML17345B346
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 08/03/1983
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17345B346 (13)
Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events.
ML17345B344
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 11/08/1983
From: Williams J
FLORIDA POWER & LIGHT CO.
To: EISENHUT D G
Office of Nuclear Reactor Regulation
References
Download: ML17345B344 (18)