Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17309A9961999-06-30030 June 1999 Rev 35 to HP-90, Emergency Equipment. ML17355A3581999-06-28028 June 1999 Cycle 18 Startup Rept. with 990628 Ltr ML17309A9941999-06-17017 June 1999 Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. ML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17309A9951999-05-27027 May 1999 Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17229B0441999-03-0202 March 1999 Cycle 11 Reactor Startup Physics Testing Rept. with 990304 Ltr ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17355A2011999-01-25025 January 1999 Cycle 17 Startup Rept. with 990125 Ltr ML17229B0361998-12-22022 December 1998 Rev 20 to Procedure C-200, Odcm. ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML20197C9661998-08-27027 August 1998 Rev 15 to Security Training & Qualification Plan ML20153G0781998-08-26026 August 1998 Rev 19 to Plstqp, Guard Training & Qualification Plan ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17354A9471998-04-27027 April 1998 Rev 2 to Turkey Point Nuclear Plant Recovery Plan. ML17229A6751998-03-27027 March 1998 Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept. W/980402 Ltr ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A6381998-02-12012 February 1998 Rev 19 to C-200, Offsite Dose Calculation Manual. ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17355A2711998-01-30030 January 1998 Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point Plant,Units 3 & 4. ML17229A6141998-01-12012 January 1998 Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. ML17229A6151998-01-12012 January 1998 Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5851997-12-12012 December 1997 Rev 0 to ADM-29.01, IST Program for Pumps & Valves. ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17309A9171997-11-26026 November 1997 Rev 0 to PSL-ENG-SENS-97-068, Spent Fuel Pool Dilution Analysis. ML17229A5931997-09-26026 September 1997 Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. ML17229A5921997-09-18018 September 1997 Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. ML20211Q5841997-09-10010 September 1997 Rev 18 to Training & Qualification Plan ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 1999-07-27
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17309A9961999-06-30030 June 1999 Rev 35 to HP-90, Emergency Equipment. ML17309A9941999-06-17017 June 1999 Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. ML17309A9951999-05-27027 May 1999 Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. ML17229B0361998-12-22022 December 1998 Rev 20 to Procedure C-200, Odcm. ML20197C9661998-08-27027 August 1998 Rev 15 to Security Training & Qualification Plan ML20153G0781998-08-26026 August 1998 Rev 19 to Plstqp, Guard Training & Qualification Plan ML17354A9471998-04-27027 April 1998 Rev 2 to Turkey Point Nuclear Plant Recovery Plan. ML17229A6381998-02-12012 February 1998 Rev 19 to C-200, Offsite Dose Calculation Manual. ML17355A2711998-01-30030 January 1998 Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point Plant,Units 3 & 4. ML17229A6151998-01-12012 January 1998 Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. ML17229A6141998-01-12012 January 1998 Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. ML17229A5851997-12-12012 December 1997 Rev 0 to ADM-29.01, IST Program for Pumps & Valves. ML17229A5931997-09-26026 September 1997 Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. ML17229A5921997-09-18018 September 1997 Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. ML20211Q5841997-09-10010 September 1997 Rev 18 to Training & Qualification Plan ML17309A8951997-06-11011 June 1997 Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project. ML17354A4971997-05-0101 May 1997 Rev 1 to Turkey Point Nuclear Plant Recovery Plan. ML17229A2981997-03-0606 March 1997 Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A. ML17229A2441996-09-23023 September 1996 Rev 18 to Offsite Dose Calculation Manual (Odcm). ML17229A0971996-06-10010 June 1996 Rev 0 to TP-9419-CSE96-2104, Steam Generator Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination. ML20137P3651996-05-20020 May 1996 Rev 5 to Procedure 1-1220055, Calibration of Area Radiation Monitoring Sys (Arms) ML17228B4921996-04-22022 April 1996 FPL St Lucie Unit 1 SG Program. ML20137P3381996-03-0404 March 1996 Rev 0 to Procedure 1-1400207, Calibr of Containment Process Monitor ML17353A5801996-02-29029 February 1996 Plant Procedures & Training Matl Provided for Preparation of Licensing Exams for Reactor Operator Group Xvi & Senior Reactor Operator Upgrade. ML17353A6191996-02-15015 February 1996 Offsite Dose Calculation Manual for Gaseous & Liquid Effluents from Turkey Point Plant Units 3 & 4. ML17353A7631996-02-0808 February 1996 Conduct of Operations. ML20137K6111995-12-0707 December 1995 Auxiliary Feedwater Pump 1C Disassembly Insp & Reassembly Mechanical Maint Procedure for St Lucie Plant,Unit 1 ML17228B3461995-11-16016 November 1995 Rev 0 to Plant Administrative Procedure 2-0010024, Inservice Testing Program for Pumps & Valves. ML20137P3061995-08-31031 August 1995 Rev 2 to Procedure 2-1220057, Functional Testing of RM-80 Power Supply Assemblies ML17353A7641995-08-23023 August 1995 Emergency & Off-normal Operating Procedure Usage. ML17228B0491995-02-0303 February 1995 Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles. ML17228B0171995-01-0606 January 1995 Rev 5 to Second 10-Yr ISI Interval IST Program for Pumps & Valves St Lucie Nuclear Power Plant Unit 1. ML17228A8811994-09-28028 September 1994 Rev 0 to PSL-200-AOA-94-1, St Lucie Nuclear Plant,Unit 2 ISI Interval Request for Authorization of Alternative Exam. W/Attachment Re Implementation of Reg Guide 1.150 ML20137M1611994-09-15015 September 1994 Rev 2 to Procedure 1-1220053, Calibr of Control Room Outside Air Intake Monitors ML20080M4881994-06-14014 June 1994 Rev 15 to Chemistry Procedure C-200, Odcm ML20080M4791994-01-14014 January 1994 Rev 14 to Chemistry Procedure C-200, Odcm ML17228A4621994-01-14014 January 1994 Rev 4 to Second Ten-Yr ISI Interval IST Program. ML17352A3821993-12-28028 December 1993 Third Ten-Yr ISI Interval IST Program for Pumps & Valves. ML17228A2461993-07-24024 July 1993 Rev 0 of PSL-200, St Lucie Nuclear Power Plant,Unit 2 Second ISI Interval Program Plan & Schedule from 930808- 200808 ML17228A2471993-07-24024 July 1993 Rev 0 of PSL-201, St Lucie Nuclear Power Plant,Unit 2 Second ISI Interval ISI Selected Component Schedule. ML20137P3551993-03-0808 March 1993 Rev 1 to Procedure 1-1220055, Calibration of Area Radiation Monitoring Sys (Arms) ML17353A7621992-12-28028 December 1992 Pre-fire Plan Guidelines & Safe Shutdown Manual Actions. ML17349A7491992-12-0808 December 1992 Revised Odcm. ML17227A6011992-08-11011 August 1992 Rev 2 to JNS-PSL-204, First Ten-Year Inservice Inspection Interval Inservice Testing Program for Pumps & Valves, St Lucie Nuclear Power Plant,Unit 2. ML20141M4901992-07-30030 July 1992 Rev 14 to Training & Qualification Plan ML17349A3711992-05-21021 May 1992 Rev 10 to Procedure PT-51-WS, Solidification Process Control Procedure. ML20137P3431992-04-10010 April 1992 Rev 1 to Procedure 1-1220053, Calibration of Control Room Putside Air Intake Monitors ML17349A2511992-03-27027 March 1992 Rev 0 to Pc/M 91-128, 480 Volt Undervoltage Protection Scheme Mod for Unit 3 ML17348B4121991-10-22022 October 1991 Health Physics Procedure 0-HPS-042.8, Dewatering Controls for Radwaste Liners. ML17223B2931991-10-10010 October 1991 Rev 3 to JNS-PSL-203, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves,St Lucie Nuclear Power Plant,Unit 1. 1999-06-30
[Table view] |
Text
EMERGENCY PLAN IMPLEMENTING PROCED eS PROCEDURE 1107 Rev.
UTIES OF THE EMERGENCY PLANNING SUPERVISOR OFFSITE EMERGENCY ORGANIZATION 9/1/84 l
LORIDA POWER 5 LIGHT COMPANY P~9~ Gf
]
1.0 Title
Duties and Responsibilities of the Emergency Pl arming Superviso 2.0 A royal and List of Effective Pa es:
2.1 ~aroval:
Reviewed by Services
~
'3 R~ ..
Manager, Nut
, 1984 ar Energy Approved by
' , Group Vice Pre dent Nuclear Energy, 19 9 List of Effective Pa es
~Pa e Date Pages 1-4 inclusive 9/ /84 3~ ~co e:
3.1 ~lrur ose Thi s pr ocedure provid duties and responsibilities of the Emergency Pl arming Supervi sor.
3.2 Di scussi on The Emergency P arming Supervisor is a member of the Nuclear Energy Services Staf . He has the respon'sibility for radiological eIIIergency pl arming an maintaining emergency preparedness. The Emergency Pl arming Supervisor reports to the Manager, Nuclear Energy Services.
4.0 Precautions
None 5.0 Res on bi l i ti es:
5.1 he Emergency Planning Supervisor is responsible for insuring that the St.
Lucie Plant Radiological Emergency Plan, Turkey Point Plant Radiological Emergency Plan and the Offsite Emergency Organization procedures are adequate and up-to-date.
5.2 He shall revise and distribute the emergency plans as necessary. He shall revise and distribute Offsite EIIIergency Organization procedures as necessary.
S409180340 8409i4 PDR ADOCK 05000250 F PDR
0 ~ v I
GENCY PLAN IMPLEMENTING PROCE S PROCEOURE 1107 Rev.
UTIES OF THE EMERGENCY PLANNING SUPERVISOR OFFSITf EMERGENC Y ORGANIZATION 9/1/84 FLORIDA POWER 4 LIGHT COMPANY Pe9e 2 of 4 5.3 The Emergency Planning Supervisor is responsible for maintaining the FPL Offsite Emergency Organization Roster.
5.4 The Emergency Pl arming Supervi sor i s responsible for coordinating all aspects of emergency drills and exercises which involve offsite agencies.,
5.5 The Emergency Planning Supervisor shall assure that the initial training and annual retraining for FPL Offsite Emergency Organization personnel is conducted and documented.
6.0
References:
6.1 Turkey Point Plant Radiological Emergency Pl an 6.2 St. Lucie Plant Radiological Emergency Plan 6.3 "Maintaining Emergency Pr eparedness - fmergency Exercises, Orills, Tests and Evaluations," St. Lucie procedure number 3100050E, Turkey Point procedure number 20113.
6.4 "Maintaining Emergency Pr eparedness - Radiological Emergency Plan Training," St. Lucie procedure number 3100051E, Turkey Point procedure number 20201.
7.0 Records
7.1 Pl ant exerci se cri tique 7.2 Emergency Roster - FPL Offsite Emergency Organization 7.3 Training records - FPL Offsite fmergency Organization 7.4 Emergency Plan and Procedures revision distribution
8.0 Instructions
8.1 Exercises and Oril1s 8.1.1 When an exercise or major drill involving off-site agencies is to be conducted, the Emergency Planning Supervisor shall prepare for the exercise in accordance with the appropriate plant Radiological Emergency Pl an.
8.1.2 The Emergency Planning Supervisor shall coordinate with the off-site emergency response organizations and agencies in selecting a date for the exercise.
8.1.3 The Emergency Planning Supervisor shall provide support as requested to the designated pl ant emergency planning coordinator in carrying out his responsibilities f'r on-site emergency drills.
1
~ ~
0 j
C
~
E RGENCY PLAN IMPLEMENTING PROCE .ES PROCEOURE 1107 Rev.
'UTIES OF THE EMERGENCY PLANNING SUPERVISOR LORIDA POWER d LIGHT COMPANY OFF-SITE EMERGENC Y ORGANIZATION 9/I/84 Page of 3 4 8.1.4 The Emergency Planning Supervisor shall prepare a consolidated summary following an exercise. This summary should take into consideration al 1 avenues of input (i .e., cri ti ques from controllers, pl ayers, etc.). Based on this input, FPL deficiencies should be identified and responsibility f'r corrective actions should be assigned. Where possible, practical recommendations for corrective measures should be made.
8.1.5 The Emergency Planning Supervisor shall offer federal, state and local observers the opportunity to evaluate the exercise.
8.2 The Emergency Pl arming Supervisor shall be responsible for the conduct and documentation of initial training and annual retrainirg for FPL Off-Site Emergency Organization personnel. This training shall involve the following per sonnel and subject matter.
8.2.1 Emergenc Control Officer and Recover Mana er a.. Prompt and effective notification methods, including the types of communication sy'stems.
- b. Method of activating the Florida Power 5 L',ght Company Emergency Response Organi zati on.
I
- c. The methods used for estimating radiation doses and recommending protective actions.
- d. Emergency Pl an fanili arization.
- e. Emergency Pl an impl ementi ng procedures f ani i ari zati on.
1
- f. Frill arization with the Emergency Oper ations Facility and the Technical Support Center.
8.2.2 Emer enc Securit Man er, Emer enc Information Man er Governmental Affairs Man er Emer enc Technical Mana er
- a. Emergency Pl an fanili arization
- b. Emergency Pl an 'impl ementing procedures f anili ari zation
y ~
I E
41 ERGENCY PLAN IMPLEMENTING PROC iES PROCEDURE 1107.
Rev.
DUTIES OF THE EMERGENCY PLANNING SUPERVISOR OFF-SITE EMERGENCY ORGANIZATION 9/1/84 PLORIOA POWER I LIGHT COMPANY Page 0f 8.3 Review and Revision of Plans and Procedures 8.3.1 The Emergency Pl an and Emergency Pl an Implementing procedures shall be under continuing review by the Emergency Planning Supervisor including:
- a. Notification lists and rosters will be verified quarterly and updated as requir ed.
- b. Rev',sions of the Emergency Plans, Emergency Plan Implementing Procedures, 'and noti fication li sts will be di stributed, as needed, to holders of these documents.
8.3.2 Recommended changes to the Emergency Plan submitted to the Emergency Planning Supervisor shall be considered for incorpor ation into the EIIIergency Plans and Procedures. Proposed changes in the Emergency Plan, if approved by the Group Vi'ce Pr esident, Nuclear Energy, shall be incorporated into the Emergency Plan under the di'recti on of the Emergency Pl arming Supervi so r .
8.3.3 The Emergency Planning Supervisor shall ensure that elements of the emergency organization (e.g., FPL, state, federal, local, etc.) are informed of revisions to the Emergency Plan and Emergency Procedures which are significant to effective and coordinated emergency response.
0 h