ML17348B413

From kanterella
Jump to navigation Jump to search
Rev 8 to Procedure PT-51, Solidification Process Control Procedure
ML17348B413
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/10/1988
From:
PACIFIC NUCLEAR SYSTEMS, INC.
To:
Shared Package
ML17348B410 List:
References
PT-51, NUDOCS 9203040176
Download: ML17348B413 (104)


Text

VWLIFII:

hlULLEflA.

SOLIDIF1CATION PROCESS CONTROL PROCEDURE CONTROLLED BA i'-H c-o l-&

PT-51 Revision:

Effective Date:

'30-Essential Related NuPac Documents The following related Nupac Document(s) contain operations or information essential to performance of instructions here'in and mus t be issued in conjunction with this document:

1.

ON-1.04 2,

4, S.

6.

Pr epar ed by

~i Engineering

/

/

Date

.;/~/'~

Date

'gap f" Fige'ie.~s

/',

,4uality Ass'urance Date Nanu acturing/Production i/I AS Other Date Date Doc ent Control/Release Nupac services, Inc.

BrooKsae Or':ce parK nc.: Harrison wai. s ce 2"9 c~umoa srL:". carom. 29>'2 VeOccoe i8S3) 75:4-'25 Te ei

>52667 PNS." UD

.e eCOOr {803) 7c,'"93:6 920304017b 920304 PDR ADOCK 05000250 R

PDR

c

~

Preparaticn Date Au uSt 15.

TITLE: Solidification Process Control Procedure RECORO OrwRE J.

NS

REV:

PESCRIPTION PAGc.l S)

AFF=" EO DATE SIGNATURE 0

7

. Added sign-of fs on Adden-: Annotated,

dums, added addendum Hi:by vert ical

- revised addendum G, Buri&line in

volumes Wight margin C4~~u

' '~:

)

~ ~p:

4:

LIST L"" r FECTIVE PAGES Pace No.

Rev Pace No.

~

~

~

~

Rev Pace No.

Rev

F'T-51.

Rev.

8 SCOPE Thl s document contains. the Process Control Procedures for the sol l dl flcatl ori of vari ous types of waste uslno the F'acl f'ic Nuclear

Systems, Inc.

(PNSI) Solidification System and Enviro-stone.

Control of the process paraIneters involves the solidi fi-cation of a iabgfptorv samoi e of each separate type of waste product. to be spl l8ified, cal cul ati on of the cnemi cal volumes to be added in the pecif ic waste container to be used and loggino of the solidification details.

wnile followlna the solidification opel at ing pl ocedvI es

~ Log:-hect s fol caen of these thl ee sepal ate tas):s are included in thi s document.

F'E-. EREN ES

~

S

.4 A

~ 5 United States Gypsum' Topical Report on Envirostone 1CI CFR 61 NRC &ranch Technical F'osition on lJaste Form PNSI System Operating Procedure.

ON-104 Nuclear Pac):aging, Inc.. Quality Assurance Progr am NFC Branch Technical Report.

Nay 198, Rev.

0

i. I I F'ROC=SS DESCR IF'T ION The facll I adl o effec ml lIed The st. and PN i Solidification System is specif leal iv designed to itate solidification of various forms anc mi;:tures of active wast=

in large scale ligers.

Ihe wa~'

ls tively immooiii "ed using Envirostone, which is thoroughly wi th the waste using the system in-container miring blades.

fina

~ product has proven to be a homogeneotIsl v mi;;ed, iree ing monoli h with no free standino water.

I.I PROCESS PARAf'1ETERS Naste can be solidified usino the PNSI sclidification -Unit and Envirostone in accordance with the formulas listed in this PCP.

Soeciiic waste conditioners are required ior some

'waste forms before solidification.

The procedures for solidification of various wastes are included as separate addendums to this procedure.

if the laboratory -analysis of the waste solidification shows the waste setup time will be less than desired, Rcd Top Retarder can be added in smail amounts to e tend thE setup time o

long enouah to ensure that the full volume of Envirostone can be thor oughly blended with the waste to form a homogeneous mi xture.

If the waste/Envirostone mi::ture exhibits a iona setup time.

as indicated by laboratory tes ino, accelerator iAlum or equival ent) can be added to the mix. ure.

The e<;act amount of retarder o,

accelerator w li be determi ned durirIg the laboratory soiidification and then will be applied in the same proportion in the ful I scale soi i di fication

<within

+ 2!!) ~

March 1'..

5.

SYSTEM OF'E~'AT IOhl ihe F'NSI Sol xaa f ication Svstem as operareo xn accordance wx tn approved procedures.

wnx ch ensure reproauci 0i 1 x r> of the wast=-

product from liner to liner.

The process parameters and chemical rat]os used in each solidification are spec: fical lv caiculared for~rgach waste batch and a sample veri fi carson satisfactory 1 i performed bef ore attemptino a ful 1 seal e solidi f 1 cati on.

e. 0 SAMPLE 'ERIF I CA ION Frior to ful 1 scale soiidi ficatior of each iiner of wast=

orcdupz.

a representati ve samol e cf each waste pr oduct shai I b=

test (sol idi f 1 ed z n the 1 abora orv.

~ =tai 1 ed prccedures for tee=

solidi;ication for each waste type a.

=- artached as addendums the s procedure

~

A portion of the sampl e s lal 1 ce i+'otopi cali; anal v"ed to determine the waste class.

This tes-soli dificatic~

confirms the correct process chemistry ratios to be used in the full scale solidifications of the same waste batch.

The sample sol idification shoul d ver ify that the sol idio i ed waste product wi I 1 be a un'

orm, dry, free-s anding monolith.

The waste en@

produc shall resist penetration when probed with

=-. firm object.

Th=

operator will number each soli aif'd sample and recora tne contents of each test solidification on a

Same i e Veri Tl t'-.

Worksheet.

A -oi idification Wor':sheet wi 11 then be prepared fcr each liner prior to soiidifi ation.

An Operations Logsheet wli.

be prepared for each liner during solidf ication.

The 1'ner serial number will be r ecorded on the Operations Logsheet.

The waste batch will be sampled and a PCF'erformed per the following schedule:

Initial sample.

After additional waste is added to the hoidup tanks.

After every seven days.

4.

After every tenth liner or 5000 oallons of bitch waste.

whichever is more frequent.

7. 0 FULL SCALE SOLIDIFICATION CALCULATIONS After a

laboratory sample has been solidified and it has been confirmed that the waste product will meet tne reauirements for satisfactorily solidified end product, the caiculations can be made for solidificat'ion of the waste form in large containers.

Calculations will be made and recor ded on the Soii dification Worl;sheet included in each addendum.

4

PT-51, Rev.

8 March 10, 1988.--.r 8.0 ADDENDUNS A.

Liner Data Sheets Solidification of CITROX and Bead Resins C.

Solidification of AP and Bead Resins or 100%

Cation Bead Resins D.

Solidification of Oi l Solidification of Bead Resins and Boric Acid or Class A

Graniilar Activ'ated Carbon and Bori c Aci d F.

Sol i di fi cation of Boric Acid G.

Solidification of Bead Resins or Class A

Granular Activated Carbon H.

Solidification of Powdered Resins.

PT-51

~

Rev.

'8 '('Addendum A) arch 10.

1988' ADDENDUM A LINER DATA SHEETS Paae 1 of 5

PT-51.

Rev.

8 (Addendum A)

~ )

i%arch 10, 1988 LINER DATA SHEET 50 CUBIC FOOT SOLIDIFICATION LINER Burial Volume:

52.0 cubic feet Usable Internal Volume:

46.8 CF (with 2" of free space in top)

Empty Weight:

600 lbs Solidified Weight:

(Envirostone) 51.00 43.75 7

47. 00 Oi 1 Resin:

Concentrates:

Solidification Data:

4150 1 bs 4500 4850 1bs l

47.25 Waste Ht (E)

Void Space (F) 0 40%

45 50 55 60 65 70 71 7~

7M 74 75 76 77 78 79 80 81 82 83 84 85 100

6. 1%
40. 6 45.

1

49. 6 54.

1

58. 7
63. 2 74.

1

65. 0
65. 9
66. 8
67. 7
68. 6
69. 5
70. 4 71.3

'2 r

73.

1

74. 0
74. 9
75. 8
76. 7
90. 2
18. 7 4

25 ~ 7 8.0

.0. 4 7

MMo ~

3 '. 6 34.

1

34. 6 v5 ~ 0

~'5 ~ >J

36. 0
36. 4
36. 9
37. 4 37 8
38. 3

-8. 8

39. 2 9.7
46. 8 CF
18. 7
21. 0 23 ~ 4
25. 7
28. 0
30. 4 M2 ~ 7 QVo w
33. 6

'>> 4

34. 6 M5e 0 35 ~ 5
36. 0
36. 4
36. 9
37. 4
37. 8
38. 3
38. 8
39. 2
39. 7
46. 8 in
30. 1 in 7 ~
25. 4 3.0 0.7
18. 4
16. 0
15. 6
15. 1
14. 6
14. 2
13. 7 1 '.2
12. 8
12. 3 11.8 11.4
10. 9
10. 4
10. 0 9.5 9.0 2.0 Solidification Efficiency ~

(Waste Volume/Solidified Vol)

X 100%

Packaging Efficiency

= (Waste Volume/Burial Volume) x 100%

Waste Height (E) and Void Space (F) dimensions are prior to solidification and are used to set the bubble tube level indicator.

Page 2 of 5

tl i

~l PT-51, Rev 8 (Addendum A)

Mar ch 10 ~

1988

~'IMIERDATA SHEET 14 CUBIC FOOT SOLIDIFICATION LINER Burial Volume:

1 8.~ cubic feet Usable Internal Volume:

118.6 CF (wlth 2" of fr ee space in top )

Empty Weight:

1100 lbs Solidified Weight:

(Envirastone)

Oil:

10, 125 lbs Resin:

~ 11,000 Ibs Conc ntrates:

11,900 lbs Solidification Data:

69. 75 Jg 67.25 7

63.25 T

i I

83. 5 l

I Sol Eff P4oino Eff Waste Vol Waste Ht (E)

Vo'jd Saace (F) 40%

50 60 65 70 717.

7~

74 7c'6 77 78 79 80 81 8n 8Z 84 85 100 v5. 1%

~9. 5 4~ ~ 9 48, 5:6 5r ~ 0

61. 4 6=.

h~. =

64. 0
64. 9
65. 8
66. 7
67. 6
68. 4
69. 3 70
71. 1 71 ~ 9
72. 8

~

7~i ~ 7

74. 6
87. 8 47.5 CF 5..4 65o i)
71. 2 77.

1 8.1

84. 2
85. 4
86. 6
87. 8
89. 0 90."
91. 4 9".5 9~. 7
94. 9
96. 1
97. 3
98. 5
99. 7 100. 8 118 6

.6.

1

~9.6

~5. 9

'9.

42. 4
45. 7
46. ~

47 ~ 0

47. 6
48. 3
48. 9 49 ~ 6
50. 2 50 ~ 9 51 ~ 5 gMA ~ ~

52.9 C'

JI I ~ 1J 54 ~ 2 4.8 65.~

in

>5 ~ 9 0 la

~ r

=9. 4 26 1

=.9

19. 6
19. 0 18.

'7.7

17. 0
16. 4 15 7
15. 1
14. 4
13. 8 1>. 1
12. 4 11 ~ 8 11 ~ 1
10. 5 9.8

~ V in Solidification Efficiency =

(Waste Volume/Solidified Vol)

X 100%

Pachaging Efficiency = (Waste Volume/Burial Volume) w 100%

Was e

Height (E) and Void Space (F) dimensions are prior to solidification and are used to set the bubble tube level indicator.

Page

~ of 5

PT-51.

Rev.

8 (Addendum A),

Mar ch 10, 1988 LINER DATA SHEET 190 CUBIC FOOT SOLIDIFICATION LINER Burial Volume:

170.

cubic feet Usabl e Internal Volume:

158. 4 CF (with." of free space in top)

Empty Weight:

1 85 lbs Solidified Weight:

(Envirostone) 71.Q GS. 75

'-2.25 J

F Oil:

13,3SQ 1 bs Resin:

14, 5QO 1 bs Concentrates:

~ 5, 7QQ lbs Solidification Data:

l 72.50 40%

45 50 C0 65

/ <.l 71

/>>

/M 74

/5 Io 77

.78 79 80 81 8=

8~

84 85 100

&74 4

46.

51-

<0 ~

65 66

'7.

68.

69.

70.

70 ~

71.

7

~

/ ~~ ~

74.

75e 76.

77 ~

78.

79

'.i

~

7

<.l 6

~t 1

0 0

9 8

8

/

6 6

C' 6 ~.

71

~

79.

87. 1 95 ~ 0 1<.<~. 0 11<.l. 9 11 114. 0 115. 6 117'18. 8 1.<.l ~ 4 l

1..6 1.5. 1 1.6.7 1.8. '

9.9 1~1.5 1 'i.O 1v4. 0 158. 4 CF

=6. 7 i< l,"0 a

Vw ~

'6. 7 4<.l. 0 4=.. 4 46.-7

47. 4 48.

1

48. 7 49 ~ 4 50.

1 5<,) ~ 7

51. 4 5..1 C'W

~ /

52. 4
54. 1
54. 7 5.4
56. 1 56 ~ 7
66. 8 a<>. 1 in 8.8 C'

.'". 1 8.8

=5. 4

~ 1-

21. 4

-<.l. 7

=0 ~ 1

19. 4 la. 7
18. 1
17. 4
16. 7 16.

1

15. 4
14. 7
14. 1 1Z. 4 1.

~ 7 1

~ 1 2+0 Solidification Efficiency =

(Waste Volume/Solidified Vol).

X 100/

Pac):aging Effici ency

= (Waste Volume/Buri al Volume)::

100%

Waste Height (E) and Void Space (F) d'mensions are prior to solidification and are used to set he bubble tube level indicator.

Page 4 of 5

PT-51, Rev.

8 (Addendum A)

March 10, 1988 LINER DATA SHEET 210 CUBIC FOOT SOLIDIFICATION LINER Burial Volume:

199.4 cubic feet

(

Usabl e Internal Volume:

(

18$."5 CF (with 2" of free space ih top)

Empty Weight:

1400 lbs r 8.25 75.75 Sol idifi ed Wei ght:

Oi 1:

Resin:

Concentrates:

Salidificatian Data:

15,500 16,850 18,300

(

(Enviros" ne) lbs lbs lbs (4. 50 74.7i I

Sol Eff Pkaina Eff Waste Vol Waste Ht (E)

Voi d Space (F) 40%

45 50 55 60 65 70 71 7c 7M 74 75 76 77 78 79 80 Bl 8~

83 84 85 100

'7.

4~

0

46. 7 51

~ ~

56. 0
60. 6
66. =

67..

68.1 69.0 7l( ~ 0

70. 9
71. 8 7.8 7M ~ 7
74. 6 75.'
76. 5
77. 4
78. 4 79.

'~

~ 3

74. 2 8& ~ 5 9..8 10". 0 111.

i 129.9 1 i1.7 1~~.6 1~5. 4 1 ~~ I ~ Q 139.

1 141. 0 142. 8 144. 7 146. 5 148. 4 150. ~

152.

1 154. 0 155 8

157 7 185. 5 t4Vo a

~6. 9

40. 6 44 ~ ~

47.9

51. 6
52. 4 VI~A 1 5:.8
54. 6 55e m
56. 1
56. 8 5r

~ 5

58. v
59. 0
59. 7

'0.5

61. 2
62. 0
62. 7 in 46.: in

<2. 6

'B. 9 FC VaJ ~ W w~ 1

~ v

27. 8 24.

1

\\

~..6

21. 9

.1.

~

20. 4
19. 7
19. 0
18. 2
17. 5
16. 7
16. 0 15e M
14. 5
13. 8 1 ~.i

. ~ V Solidification Efficiency = (Waste Volume/Solidified Vol)

X 100%

Packaging Efficiency =

(Waste Volume/Burial Volume) 100%

Waste Height (E) and Void Space (F) dimensions are prior to salidification and ar e used to set the bubble tube level indicator.

Page 5 of 5

PT-51.

Rev.

8 (Addendum B):

~ '

~

March 10.

1988 ADDENDUM B PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF C I TROX AND BEAD RESINS Paqe 1

o4 10

PT-51.

Rev.

8 (Addendum B)

March 10, 1988

1. 0 PREREOUISITES
1. ]

A sample solidi f'ication shal 1

be performed attempting to perform a

full scale sol idi ficati on.

bef ore 1 incr 1.2 The PNSI operator shall ensure that a Radiological Work Permit has been issued for the performance of the sample verification activity and that adequate person-nel monitoring and radiation detection equipment is on hand.

The PNSI operator shal 1 ensure that al 1 necessary ma-terials and equipment are on hand prior to beginning the sample verification. Suggested equipment and mater-ials for the test are as listed below:

6

=-00 to 500 ml plastic beakers 6

mixing spatulas

] - 500 gram capacity scale 20g PNS waste conditioner WC-785 50g - Calcium Hydroxide 1000 g

Envirostone NOTE:

The waste and chemicals used to solidify the sample waste must be from the same containers or lot numbers to be used in the full seal e sol idification,

].4 A one-liter sample shall be taken for solidification in the laboratory for each separate batch of waste to be processed.

The operator may choose to take the samples from the storage tanks to be solidified in the

liner, or may take the sample from the liner
directly, after the waste has been transf erred to the liner.

Due to the importance of obtaining a representative sample for use in the verification procedure, the operator shall confirm that the contents of the waste form to be solidified have been adequately mixed and

that, the sample is a part of a homogeneously mixed waste batch.

2 0 SAMPLE VERIFICATION 2.

1 Record the information obtained during sample verifica-tion on the Sample Verification Worksheet.

Provide a

waste sample (si "e to be specified by the plant) to the plant staff for isotopic analysis.

Place a sample of the waste in the beaker so that the resins are at the 200 ml level with the liquid solution iust covering the resins.

This may necessitate pouring off some of the liquid solution.

Page 2 of 10

P7-51.

~ev.

8 (i"ddenoum dl March 10.

1oq Record the xnazsal-oH, farad>-at>on levei-and temperature of the waste sample.

Add Sl acked Ale in the thoroughly samp1 e ~

Lx me (Gal c] um Hydro;: i de) to the waste sam-quantxty as per Table I and mx;: the sample fcr ten miriutes.

Record tne pH of the

~ ~ 6 Add PNS WC-785 to the waste sample in +he quantity per Table I

and mi:: the sainpl =

thoroughly

~or ten mii nu es

~

Recol d the pH of the samp1 e.

~ /

Add Envirostone zo tne waste sample in the Quanti ty l i sted in Tabi =-

I ana mx:: the sample untx 1 the mx> ture begins to thxc);en.'ecord tne time'from "he start c-adding the Erivirostone to +hc tiiTie that the itic;rtur=

thickens such that mi::ino is no lonqer required (mz::

time>

and the tame from the start of addinq the Enviro-stone to the time that the waste is firm to the touch (setup time).

Add>tional Envirostone can ue added necessary to achieve a

satisfactory end product.

However.

if addi tianal Envirostone must be added.

the waste solidi fication effici ency must be redete. min-arid the soi i difi<<ati on l incr waste vol ume ad iusted.

Tabl e I CITROX/Cation Resin Ratio Grams Lime Gr ams WC-785 Grams Envirostone 100%

C I Tr.OX 75% CITROX/25% Cation 50/ CITROX/50% Cation 25% CITROX/75% Cation 4 ~ 0

~> ~ 0 1

~ 0 1

~ 5 1

~ 1 C). 8 0.4 10.:-

104 105 107 Continue to mi;: samoles until a satisfactory

~aste pr o-'uct is produced.

The waste setup time should be least

~0 minutes for 50 fthm liners.

60 minutes for ft i liners and

<0 minutes for larger liners.

If trie setup time is shorter than specified for the liner to bc solidified, add a lesser amount of WC-785 and con-tinue to perform sample testing to verify the setup time.

If the setup time is greater than 150 minutes.

add a greater amount of WC-78~ to the waste sample ana continue to perform sample test'g until a satisfactory sample is obtained which will set up in less than 150 minutes. If a satisfactory sample cannot be obtained by ad iusting the amount of WC-785. thc operator can ad iust the amount of lime added to the waste sample and con-

.tinue o

test.

If a satisfactory sample cannot be obtained.

the operator should contact he Regiona'perations Manager befor e proceeding.

Page a of 10

PT-51, Rev.

8 (Addendum B)

.- -=:.~-

March 1(>,

1988 9

Remove the solidified sample from the sample container and visual l y e.:arne ne it for evi dence of sof t, porous or unsol idifi ed areas.

The solidified samples should be

hard, homogeneous and of uniform coloration.
~ Q)

. 10 Set samp1 e (s) asi de for future di sposal FULL SCALE SOL jDIFICATION After a

sati sf actory sampl e sol idifi cata on has been performed, determine the appropriate amount of waste conditioners and Envirostone to be added to the full scale liner solidification using the Solidification Worksheet.

After determining the appr opri ate volumes of addi tives and Envirostone to be added to the Liner.

the full scale solidification should be performed using the system operating procedures (Reference

2. 4) and the Solidification Operations Logsheet should be filled outa Page 4 of 10

PT-51.

Rev.

8 (Addendum B)

March 10 1988.

SANPLE'ERIFICATION WORKSHEET'

"=* '-"=" -'

FOR SOLIDIFICATION OF CITROX AND BEAD RESINS Date:

No.:

Utility/Location:

Waste Type:

Waste Sample From/By<

Waste Temperature:

F Waste pH:

Sample Rad Levels Physical Characteristics (viscosity, clarity, etc.):

col or, sedi mentat i on, Sample Proportions:

Waste Sample CITROX/Cation Resin Ratio ml /

Slacl'ed Lime CA (OH) pH after Lime Addition WC-785 pH After WC-785 Chemical Additives gm H

Final pH Envirostone gm Blend the required volume of Envirostone into the waste and record the time the addition starts:

Record the time when the mixture viscosity increases to the point when the mixer is secured:

(1)

Record the time when the mixture is firm to the touch:

Page 5 of 10

PT-51, Rev.

8

<Adden'dum

~B) -:

~"-*'=-"; '.-'.:.

Oar ch 10, 1988 CITROX and Bead Resins Sample Verification Worksheet

<continued) 1 Sample Resul ts:

Mi:: time (1):

@utes Setup time (2):

minutes

'r ee Water, if any:

Relative set (soft. firm. very hard):

Observations:

Sample proportions and solidification results acceptable for calculation of largE scale solidificati on ratios: 'es no Isotopic results of sample:

0 Solidification Efficiency

<Waste Volume/So 1 idifi ed Volume>:

Operator" s Signatur e:

Date:

Utility Representative's Signature:

Title:

Date:

Page 6 of 10

e

PT-51, Rev.

8 (Addendum B)

March 10, 1988 Operator:

SOL IDI'FICATI ON WOR)(SHEET FOR SOLIDIFICATION OF CITROX AND BEAD RESINS Date:

No.:

Utility/Location:

Waste Type:

Satisfactory Sample Verification No:

Solidification Efficiency:

Container Nodel:

Date:

SEE THE LINER DATA SHEET FOR THE LINER BEIN6 USED Usable Liner Volume (with 2" safety margin):

Waste Volume:

Waste Height:

(Waste Full/Level Bubble Tube to be set at this height) cf cf in Weight of Lime to be Added to the Liner (Use the values deter-mined from the Sample Verificati on Worksheet):

gms of lime in sample/

ml of wast e in sampl e 62.='8

=

lbs of lime to be added to the liner Actual cf of waste in liner lbs of lime to be added to the liner.

Weight of WC-785 to be Added to the Liner (use the values deter-mined from the Sample Verification Worksheet):

gms of WC-785 in sample/

ml of waste in sample x 62. >8 =

1 bs of WC-785/cf of waste Actual cf of waste in liner lbs of WC-785 to be added to the liner.

0 Page 7 of 10

>='T-5 i.

R=~.

8 (Addenoum 8)

.~

r~arcn

]>.>,

1488 D>"-'v

>:-:E!11CAL i'DI. 1'-'ES Che>nxcal Addxt.'e:

iuse the values arne En~xrostone xn sample W=ight of Chem;cal to be added to the liner from the Samp. e V'erxi cat>on War ksheet):

gm4 a%=-mi c~a 1 i n sa>np le/

\\ ~

~ 1 lbs Envir ostone to be added to the 1 xn>er 1 b s C r> e>T> 1 c a 1 Addit x v<<

he>ni cai Addi. v<<.

Weigrt of Chemical to be adaed to the liner (u e the values from the S=.mole Verification Worksheet):

samp1 e ams chemical in sample/

ams Envirostone in

\\ ~

1'

'.bs =nvirostone

.= =e adaea to tre 1 one.

lbs Chemical Aad'tave WET CHEt11Cr L ODDITY'-ES C>he>T>i cal Addi t ve Volume of chemical to be added to the liner from the Sample Verification Wor<:sheet):

(use tl>e values m>1 ch em.

a 1 n s amp 1 e!

want xn sa>-ole I ~

cf waste to be added to the 1 ir>er gallons Chemical Additive Chemical Addit'e:

Volume of chemical to be adaed> to the liner (use thc values from the Samp 1 e Ver ifi c at i or>

4lo )'shee

)

ml chem cal in sample>'l waste in sampl e

'I ~I ~

c.

was=e to be adaed to the liner

7. 48 aallons Chemical Add'ive Page 8 of 10

PT-51, Rev.

8 (Addendum

8).

March 10, 1988 CITROX and Bead Resins Solidification, Wor)(sheet.-(continued)

Weight of Envirostone to be added to the liner (use the values determined from the Sample Verification Worksheet):

ml of Waste in lbs of Envirostone/cf of waste gms of Envirostone in sample/

Sample v~62. 38 Actual cf of waste in liner I'bs of Envirostone to be added to the liner.

NOTE:

Envirostone weight may be rounded up to the ne::t 100 pound increment thus allowing full 100 pound bags of envirostone to be added to container.

Calculate and record the weight percent of CITROX to resin in the liner:

Date:

Utility Representative's Signature Date:

Page 9 of 10

PT-51.

Rev.

8 (Adderidum B)

March 10.

1988:

PNSI SOLID!F ICATION OPERATIONS LOGSHEET Oper ator:

Utility/Location:

Liner Serial No.:

Date:

No.

Waste Type:

Waste From:

Solidification Worksheet No:

Waste Volume Added:

Height of Waste:

Time Miver Started:

cf:

Time Comp 1 et ed:

Inches From Inside Bottom of Liner Hydraulic Press:

Wet Chemicals Added (List):

gal qal time completed time completed Dry Chemi cal s Added (List):

lbs lbs time completed time completed Envirostone Added:

Mixer Hydraulic Pressure lbs Time-Started:

PSI Complete:

Time Time Mixer Secured:

Waste Setup Time:

Time Fi llhead Removed:

Time Liner Capped:

Only Cap Liner With Utility Representative's Approval:

a%

Comments and Observations:

Date Liner Shipped/Shipment Number:

Operator's Signature:

Utility Representative' Signature Titie:

Date:

Date:

Page 10 of 10

PT-51, Rev.

8 (Addendum C),

March 10.

1988'"'DDENDUM C

PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF AP AND BEAD RESINS OR 1V<3/ CATION

&EAD RESINS Page 1

oW 9

PT-51, Rev.

8 (Addendum: C)

March 10, 1988 1 ~ 0 PREREQUISITES

~

~;

~

"==

~.-.-..-.

~ ~,~

A sample solidification shall be performed before attempting to perform a

full scale liner solidification.

The PNSI operator shall ensure that a Radiological(

W Permit has been issued for the performance of ~ the sample verification activity and that adequate person-nel monitoring and radiation detection equipment is on hand.

The PNSI operator shall ensure that all terials and equipment are 'on hand prior the sample verification.

Suggested equi terials for the test are as listed below:

I necessary ma-to beg> nning pment and ma-6 ~00 to 500 mL plastic beakers 6 mixing spatulas 1

500 gram capacity scale 10 g Red Top Retarder or equivalent (if required) 1000 g

Envirostone 20 g

Accelerator, Alum or equivalent (if required)

NOTE:

The waste and chemicals used to solidify the sam-ple waste must be from the same containers or lot numbers to be used in the full scale sol idificat ion.

1.4 A one-liter sample shall be taken for solidification in the laboratory for each separate batch of waste to be processed.

The operator may choose to take the samples from the storage tanks to be solidified in the

liner, or may take the sample from the liner directly, after the waste has been transferred to the liner.

Due to

~ the importance of 'obtaining a representative sample for use in the verification procedure.

the operator shall confirm that the contents of the waste form to be solidified have been adequately mixed and that the sample is a part of a homogeneously mixed waste batch.

2 ~ 0 SAMPLE VERIFICATION

2. 1 Record the information obtained during sample verifica-tion on the Sample Verification Worksheet.

2 ~ 2 Provide a

waste sample (si "e to be specified by the plant) to the plant staff for isotopic analysis.

Page 2 of 9

0

PT-51, Rev.

8 (Addendum C) t1ar ch 10, 1988

~ ~ V Pl ace sampl e of

  • the waste in the beaker so that the resins are at the 200 ml level with the liquid solution iust covering the resins.

Thxs may necessitate pouring off some of the liquid solution.

2 ~

Record the initial pH, of the waste sample.

radiation level'nd temper ature 108 g of Envirostone to the 200 ml waste sample and mix the sample until the mixture begins to thicken.

/

Record the time from the start of adding the Enviro-stone to the time that the mi..ture thickens such that.

mixing is no longer required (mix time) and the time from the start of adding the Envirostone to the time that the waste i s firm to the touch (setup time).

Additional Envirostone can be added i f necessary to achi eve a

satisfactory end product

~

However, if addi tianal Envirostone must be
added, the waste solidification efficiency, must be redetermined and the waste volume.

to be added to the solidification liner may have to be adjusted.

If the waste setup time is less than

~0 minutes if a 50 cubic foot liner is being used.

is less than 60 minutes a

142 cu ft liner is being used, or is less than 90 minutes if a larger liner is being used, add Red Top Retarder to the 200 ml waste sample at a

rate of Retarder Wt

= 0. 05% of Envirostone Nt to adjust the waste setup time to the minimum time requirement for the liner si"e being used.

Increase the amount of retarder added to the sample until the desired setup time is achieved.

2 ~ 7 If the waste setup time is longer than operationally desired.

add accelerator to the 200 ml waste sample at a

rate of Accelerator Nt = 1.0% of Envirostone Nt to adjust the waste'etup time to the maximum time.

In-crease the amount of accelerator to the sample until the desired setup time is achieved.

C 2.8 Continue to mix samples until a

satisfactory waste product is produced.

If a satisfactory sample cannot be obtained the operator should contact.

the Regional Operations Manager before proceeding.

2.9 Remove the solidified sample from the sample container and visually examine it for evidence of soft, porous or unsolidif ied areas.

The solidified sample should be

hard, homogeneous and of uniform coloration.

2.10 Set sample(s) aside for future disposal.

F'1-51.

r'ev.

8 ikddenoum Ci l'larch 1i:),

1+89 FULL SCALE SOL JDlFIC4T1ON A~ter a

sati sf actor v sampl e soi i ds f a cat i on has been performed.

determine the appropr1 aze amount ot'dditive and Envirostone to be added to the full scale liner sol dificatx on

, using the Solidification Nor I:sheet.

"s Af er dete. mining the appropriate volumes to be adoed to the Liner.

tne ful l scale solidi f icatxon should be performed usina the system operat'no procedures (Ref er ence

". 4) and the,Sol x di ficati on, Goer at1ons Logsheet should be f l l led ut.

F'age 4 of 9

F'T>>51.

Rev.

8 (kid<<ridum C ~

March 10, iv88,-

5~MF LE VEr IFI C~ T I QN WORE.".StlEE"<

FQ.: 5GLIDIFICATION OF AP AND &E'D RESINS QF:

16<.':.

C~ T ION &Eau RES I N5 Operator:

rj.

Utility/Location/

Da>e No.:

Waste Type:

Waste Sample From/By:

W -"e Temoerature:

Was e pH:

Sample Rad Level:

F' lysi cal Char

.c et lst 1 cs cl ari ty. etc. ):

(vi scosi ty.

col or.

seo] mentati on.

Sample Proportions:

Was

=- Sample MP/Cat i on Res> n Ratl o ml /

ml ml pH Chemical Additives (if required)

Envirostone Accelerator (if required) gm gm Blend the required chemical additives (if any) thoroughly in-o the waste before adding the Envirostone.

Blend the required volume of Envir ostonc into the waste and record the time thE'ddition s arts:

Record the time when the mi::ture viscosity increases to the point when the mixer is secured:

(1)

Record the time when the mi::ture is firm to the touch:

Page 5 of

PT-51.

Rev.

8 (Addendum ')

March 10.

19BB

~'P and Bead Resins Sample Verif'ication'orksheet (continued)

Sample Results:

time (I):

~

'etup time (2):

minutes minutes Fr ee Wat r'. if any:

~ Relative set (soft, firm. very hard):

Observations:

Sample proportions and solidification results acceptable for calculatio'n of large scale solidification ratios:

yes no Isotopic results of sample:

0 Solidification Efficiency (Waste Volume/Solidified Volume):

Operator's Signature:

Utility Representative's Signature:

'I

Title:

Date:

Date:

Page 6 of 9

PT-51, Rev.

8 (Addendum 'C)

Inarch 10, 1988 SOLIDIFICATION WORf(SHEET FOR SOLIDIFICATION OF AP AND BEAD RESINS OR 100%

CATION BEAD RESINS Operator:

Utility/Location:

Waste Type:

Date:

No.:

Satisfactory Sample Verification No:

Solidification Efficiency:

Container Model:

Date:

SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin):

Waste Volume:

cf cf Waste Height in Liner:

(Waste Full/Level Bubble Tube to be set at this height) in Weight of Envirostone to be added to the liner (Use the values 1

determined from the Sample Verification Worl<sheet):

gms oi Envirostone in sample/

ml of waste in samp1 e 6=.38

=

lbs of Envir ostone/cf of Waste cf of waste to be added to the liner lbs of Envirostone to be added to the liner.

NOTE:

Envirostone weight may be rounded up to the next 100 pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

Page 7 of 9

PT-5J.

Rev.

8 (Addendum=.C).

Narc h

) i..

19S-(-;,.

~ =,.

SOLIDiFICATION WOR)'.,SHEET FOR SOLIDIFIC"TICN OF -P ND READ RESINS OR 1O~.~i.'AT'ON BEAD Rl SINS ontinued)

DPV'HEMICAL ADDIT iVES Chemical Additive:

Weight af chemical from the Sample Vera to ae added ta the loaner (use the values ficat i on Wor ksheet):

=ama1 e cms chemi c al in sampl=/

gm=

Envir os-ane zn lbs Envxrastane to ae acaed ta the lb Chemic

.1 ACd:tive

.' ner Chemi ca i Addit i ve:

Weight af Chemical to be adced to the liner (u e tne value=

fram the Sample Verification Wor):sheet):

sample chemical

n samp e/

ams Envi. astane in lbs Envirastone ta be added to the liner lbs Chemical Acditive WET CHEYiiCAL ADDITIVES Chemical Additive:

Volume of chemi cal fram the Sample Verita be added to the liner (use the values fication Worksheet):

ml chemical in sample/

m waste in sample iY cf waste to be added to the liner x 7.4S

=

gallons.Chemical Adaitive Chemi cal Additive:

Volume of chemical to be added to the liner (use the values from the Sample Verificatian Worksheet):

ml chemi c a 1 i n samp 1 e/

ml waste in sample cf waste to be added ta the liner 7

aallon Cnemical Additive Operata~'s Signature:

U:lity Pepresentative's Sicnature:

Dat =-:

Date'age 8 of 9

0

PT-51, Rev.

8 (Addendum C)

March 10.

1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET t

Operator:

Utility/Location:

Date!

No.s Liner Serial No.:

Waste Type:

Waste From!

Solidification Worksheet No:

Waste Volume Added:

Hei qht of Waste:

Time Mixer Started:

cf:

Time Completed:

Inches From Inside Bottom of Liner Hydraulic Press:

Wet Chemical Added (List):

qal gal Dry Chemicals Added (List):

lbs lbs time completed time completed time completed time completed h,l Waste Condi tioner Added:

Envirostone Added:

Type:

lbs:

Time Started:

lbs:

Time:

Complete:

Mixer Hydraulic Pressure PS I Time Time Mixer Secured:

Waste Setup Time:

Time Fillhead Removed:

Time Liner Capped:

Only Cap Liner With Utility Representative's Approval:

Comments and Observations:

Date Liner Shipped/Shipment Number:

Operator's Signature:

Utility Representative's Signature:

Title:

Date:

Date:

Page 9 of 9

PT>>5l.

Rev.

8

-. (Addendum D), ";;~.-,,,

t1arch l0, 1988".

ADDENDUM D PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF 0 IL O.

Page 1

o$

9

PT-51, Rev.

8"(Addendum D)

March i0, 1988.

I. 0 PREREQU IS I TES sample solidification shall be performed befor e at-tempting to perform a ful 1 scale liner sol xdification.

2 The PNSI operator shal 1 ensure that a -Radi ol ogi cal Work Permit has been issued for ~b performance of the sample verification activitP and that adequate person-nel monitoring and radiation detection equipment is on hand.

The PNSI operator shal 1 ensure tpat al 1 necessary ma-ter ial s and equi pment ar e on hapd pri or to beginning the sample verification.

Suggested equipment and ma-terials for the test are as listed below:

6 - 200 to 500 mL plastic beakers 6 mixing spatul as i

500 gram capacity scale 50 ml Envirostone Emulsifier 10 g

Envirostone Accelerator or Alum (if required) 10 g

Red Top Retarder or equivalent (if required) 1000 g

Envirostone 50g Calcium Hydroxide (Lime) 50g Boric Acid 0

NOTE:

The waste and chemicals used to solidify the sam-ple waste must be from the same containers or Tot numbers to be used in the full scale solidification.

i.4 A one-liter sample shal 1

be taken for sol i di ficati on in the laboratory for each separate batch of oil to be processed.

The operator may choose to take the samples from the storage drums to be solidified in the

liner, or may take the sample from the liner
directly, after the oil has been transf erred to the liner.

If the sample is taken from the drums prior to transferring the oil to the liner, the operator will take a

sample from each drum and mi x the samples together.

in the same ratio that will be mixed in the liner.

The sample will consist of 126.6 ml of oil.

CThis will produce a total sample si-e of 200 ml after 59.6 ml of water (or Boric Acid concentrations up to 24 wt%)

and 1~.8 ml of Emul-sifier has been added.

3 The operator may also choose to transfer the appropriate volume of waste oil, water (or Boric Acid concentrations up to 24 wt%)

and Emulsi-fier to the liner, thoroughly emulsify the waste, then take a

200 ml sample of the waste mixture for sample solidification.

This should be done only af ter it has been established that the oil will solidify using the standard formul as.

Page 2 of 9

PT-51.

Rev.

8 (Addendum D)'-

March 10, 1988

. 0 SAMPLE VERIFICATION 2.1 After the materials

~ and equ>pment, as listed in the prerequi si tes to this procedure.

are verified avail-able.

a sample of the waste will be taken.

The opera-tor shall take the sample.

as described above.

When the operate~

cPoses to tal:e the sample directly from the liner.

the 'iner should be fi 1 led to the nor mal level for solidification of oil (see the appropriate Liner Data Sheet) and the oil mixed for five minutes'efore sampling.

The sample can then be drawn directly from the liner.

A+ter the operator has conf irmed that the waste oil pil'olidifyin accordance with the normal formul as, the water (or Bor i c Acid) and emul si-fier can be added to the waste oil in the liner ana mixed prior to taking the sample for solidification verification.

= The waste oil and the chemicals used to solidify the waste oil must be from the same batches as will be used in the full scale solidification.

Record the information obtained during sample verification on the Sample Verification Worksheet.

Provide a

waste sample (si=e to be soecified by the plant) to the plant s af f for isotopic anal ysi s.

If the oi),

water (or Boric Acid),

and emulsifier have already been blended

together, ootain a 200 ml sample of the mixture and ski~ to Step 2.6.

2.4 Obtain a 126.6 ml sample of the oil to be solidified.

C

~ V Add

59. 6 ml of tap water (or Bori c Acid) to the waste oil.

If Boric Acid is used, it may be necessary to adjust the pH using calcium hydroxide

<lime) such that the pH is between 2 and 6.

Allow appro" imately 10 to 15 minutes for reaction time bef ore futher addi tions.

2.6 Add 13.8 ml of emulsif ier to the waste/water

<or Boric Acid) mixture and mix until emulsified as indicated by uni form color ation without streaking.

Add 125 grams of Envirostone to the waste mixture and mix with a smal 1 spatula until the waste beains to thicken.

Record the time that mixing was required (mix time) and the time from the addition of the Envirnstone until the waste becomes firm to the touch (setup time).

Additional Envirostone can be added if necessary to achieve a

satisfactory end product.

Ho~ever.

if additional Envirostone must be

added, the waste solidification efficiency must be redetermined and the waste volume to be added to the sol idificat i on 1 incr may have to be adjusted.

0 Page

~ of

PT-51.

Rev.

8 (Addendum D).

March 10, 1988...

.8 If the setup tame is less than desired, add 0.05 grams of Red Top Retarder to the 200 ml emulsified waste mi>;ture, to adjust the waste setup tame to at least

.0 minutes for solidification in 50 cubic foot liners.

The setup time should be adjusted to at least 60 mibutes for 14 cubic foot liner solidifications and to at"~least 90 minutes for larger liners.

Adjust the 4 wdight of retarder added to the sample and continue to per form sample soli di fications until the desired setup time is./obtained.

=.9 If the waste setup time is longer than is operationally des red.

the operator may add Envirostone Accelerator or Alum in quanti ti es up to =. 0% of the wei ght of the Envirostone added.

The Accelerator or Alum should be added after the waste mi::ture and Envirostone have been thoroughly blended for a minimum of 5 minutes.

2. 10 Remove the solidified sample from the sample container and visually evamine it for evidence of soft, porous or unsol idifi ed areas.

The sol idi fi ed sampl es should be

hard, homogeneous

'and of uni form coloration.

2. 11 Set sample(s) aside for future disposal.

If a satisfactory sample solidi fication cannot be ob-tained using the waste oil/water(or Boric Acid) /emulsi-fier/

Envirostone mi,ture for 50/ solidification 'effi-

ciency, as listed in Steps 2.4 through 2.7, above.

repeat the sample solidification using the formulas for 45% solidification ef ficiency as listed below:

114 ml of oil

59. 6 ml of water (or Boric Acid) 12.7 ml of emulsifier 146 gms of Envirostone 2.13 If a

satisfactory sample solidification connot be

obtained, the operator should contact the PNSI Director of Operations before proceeding.

3 0 FULL SCALE SOLIDI F ICATI ONS After a

satisfactory sample solidification has been performed, determine the appropriate amount of Retarder and Envirostone to be added to the full scale liner solidification using the Solidification Morhsheet.

After determining the appropriate volumes of chemicals and Envriostone to be added to the

Liner, the full scale solidi fication should be performed using the system operating procedures (Ref erence 2.4) and the Solidification Operations Logsheet should be filled out.

Page 4 of 9

e

PT-51, Rev..8 (Addendum 'D)

March 10, 1988 SAMPLE VERIF ICATION WORKSHEET FOR SOLIDIFICATION OF OIL Operator:

I Uti 1 ity/Locati on:

Waste Types'ate:

Ne.

Waste Sample From/By:

Ir Waste Temperature:

F Waste pH:

Sample Rad Level:

Physi cal Characteri sti cs (viscosi ty.

cl ari ty, etc. ):

col or, sedimentation.

Sample Proportions:

Waste Oil Sample mL Water (or Bori-c Acid concentrati ons up to 24 wt%)

Added to Sample Emul si fier Added to Samp 1 e Chemical Additives mL Envirostone gm Blend the oil; water (or Boric Acid) and emulsifier toaether thoroughly before adding Envirostone.

Retarder and other chemical Additives should be added, if needed, and thoroughly blended in before adding Envirostone.

Accelerator.

if

needed, should be added after the waste and Envirostone have been thoroughly mi>:ed for a minimum of 5 minutes..

Blend the required volume of Envirostone into the waste and record the time the addition starts:

Record the time when the mi>:ture viscosity increases to the point when the mi.er is secured:

(1)

Record the time when the mi.ture is firm to the touch:

Page 5 of 9'

PT-51, Rev.

- 8 (Addendum D)

March 10 1988 Oi 1 Solidification Sample Verification Worksheet (continued)

Sample Results:

Mi x t'i me (1):

minutes Setup time (2):

minutes Free Water (or Boric Acid), if any:

Relative set (soft, firm, very hard):

Observations:

Sample proportions and solidification results acceptable for calculation of large scale solidification ratios:

yes no Isotopic results of sample:

Sol idificati on Effici ency (Waste Volume/Sol idi f 1 ed Volume):

Operator' Signature:

Date:

Utility Representative's Signature:

Title:

Date:

Page 6 of 9

PT-51, Rev.

8 (Addendum D)

March 10, 1988 SOLIDIFICATION WORKSHEET FOR SOLIDIFICATION OF OIL Date:

No.:

Utility/Location:

Waste Type:

Satisfactory Sample Verification No:

Solidification Efficiency:

Container Model:

Date:

SLE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin):

Oil Volume to be Added to Liner:

Oil Height in liner:

Water (Boric Acid) to be added to the Liner (Use determined from the Sample Verification Worksheet):

cf cf in the values 0

ml oi water ior Bor ic Acid> in sample/

mi of oil i n sampl e inches of, oil to be added to the liner inches of Water (or Boric Acid) to be added to the Liner.

Oi 1 Height Inches inches

+ Inches of Water (or Boric Acid) inches Height of Water (and Oil) in Liner (Water Level Setpoint)

Emulsifier to be Added to the Liner (use the values determined from the Sample Verification Worksheet) ml of Emul si fi er in Sampl e/

ml of Oi 1 x n Sampl e cf of oil to be Added to the Liner

>: 7.48 Gallons of Emulsif ier to be added to the Liner Page 7 of 9

0

PT-1, Rev.

8 (r"ddenoum Di March 10,

-1 o88 DRY CHEMICAL ADDITIVES ~.-. 2;, i(.p

~.,--

sample gms chemical in sample/

lbs Envirostone to bc added to lbs Chemical Additive Chemical Additive Weight of chemical to be adaed to the from the Sample Verification Wort;sheet 1 incr iuse the values

)

~

I gms Enviros'n c

the I incr Chemical Additive:

Weight of Chemical io oe added to t'h e liner from the Sample Verification Worksheet):

'L use the Ialue=

sample gms chemi cal in sampl e/

gms En rirostone in lbs Envirostone to be added to the liner lbs Chemical Additive WET CHEMICAL 4DD ITIVES Chemical Additive Volume of chemical to be added to the liner

{use the values from the Sample Verification Worksheet):

. 7.48

=

ml chemical in sample/

ml waste i n samp I c cf waste to be added to the liner ga lons Chemical Additive Chemical Additive:

Volume of chemical to be added to the liner (use the values from the Sample Verification Norksheet):

VI ~

ml chemi cal in sampl e/

ml waste in sample cf waste to be added to the liner 7.48 =

gallons Chemical Additive Wei ght of Envirostone to be Added to the Liner:

gms of Envirostone in Sample/

Sample ml of Oi 1 in

8. i4 lbs of Envirostone/Gallon of Oil Gallons of Oil to be Added to the Liner lbs of Envirostone to be Added to the Liner NOTE:

Envirostone weiaht may be rounded up to he ne;;t 100 pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

Page 8 of

PT-51, Rev.

8 (Addendum D)

March 10, 1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET OIL SOLIDIFICATION Operator:

Date:

No.:

Utility/Location:

Waste Type:

Waste From!

Sol idificat i on Wor ksheet No:

Oil Volume Added to Liner:

Time ompleted:

Height of Oil:

Inches from Inside Bottom of Liner Water (or Bor ic Acid) Volume Added to Liner:

Time Completed:

Height of Water (or Boric Acid) and Oil:

Inside Bottom of Liner Inches from Emulsifier Volume Added to Liner:

Time Mixer Started:

Time Completed:

RPM'et Chemicals Added (List):

gal gal time completed time completed Dry Chemicals Added (List):

lbs lbs Envirostone Added:

Accelerator Added:

Mixer Hydraulic Pressure:

time completed time completed 1 bs:

Tx me Added:

lbs:

Time Added:

PSI Complete:

Time Time Mixer Se cur ed:

Waste Setup Time:

Time Fillhead Removed:

Time Liner Capped:

Only Cap Liner With Utility Representative" s Approval:

Comments and Observations:

Date Liner Shipped/Shipment Number:

Operator's Signature:

Utility Representative's Signature:

Title:

Date!

Date:

Page 9 of 9

PT-51, Rev.

8 (Addendum E)

March 10, 1988

-'-.-.r.-.

ADDENDUM E PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF BEAD RESINS AND BORIC ACID OR CLASS A GRANULAR ACTIVATED CARBON AND BORIC ACID Page 1

o4 9

PT-51, Rev.

8 (Addendum E)

March 10, 1988

1. 0 PREREOUISI TES

~ 4 2

bef ore I incr A

sample solidification shall be performed attempting to perform a

full scale solidification.

The PJpg operator shall ensure that a Radiological Work Pe~i ~ has been issued for the performance of the sample verification activity and that adequate personnel monitoring and radiation detection equipment is on hand.

The PNP operator shal 1 ensure that al 1 necessary materials and equipment are on hand prior to beginning the sample verification.

Suagested equipment and ma-terials for the test are as listed below:

6 i00 to 500 mL plastic beakers 6

mixing spatulas 1

500 gram capacity scale 50g pH Adjustment Additive (Example:

&oric Acid, Cal-cium Hydroxide. etc.)

10 g Red Top Retarder or equivalent 1000 g

Envirostone 20 g Accelerator, Alum or equivalent (if required)

NOTE:

The waste and chemicals used to solidify the sample waste must be from. the same containers or lot numbers to be used in the full scale solidification.

1.4 A one-liter sample shal 1 be taken for solidification in the laboratory from the bead resin tank and from the boric acid tank.

Due to the importance of obtaining a

representative sample for use in the verification procedure, the operator shal 1 conf irm that the contents of the waste form to be solidified have been adequately mixed and that the sample is a part of a homogeneously mixed waste batch.

2+ 0 SAMPLE VERIFICATION Record the initial pH, radiation level and temperature of the waste samples.

2I 2 Provide a

waste sample (si"e to be specified by the plant) to the plant staff for isotopic analysis.

Page 2 of 9

F'T-1.

Rev.

8

<.Accenoum -Er I'1al cn 1'.

~

19co F'1 ace a

<~0 ml samoi e'f dewa+ered beac resins or gran'-

ul ar acta vated carbon x n the beaker.

Note:

If the rat>o of Boric Acid to bead resin or carbon is to be increased.

calculate the pro-per ratios on the work sheet included xn this addencum.

Add 4 wt/ (mav.) boric acid at 1S0 F until the liquid level is at or slightly above the resin or activated carbon level.

f 'dd the appropriate chemical additive, ad iust the pH to between

= and i f requ rec, to r dd 0.

1 orams retarder

<Red Top). if requx red.

Thoroughly blend the waste and record the tame when fi ni shed.

Add 117 g of Envirostone to the 200 ml waste sample and mi::

the sample unti 1 the mivture begins to thicken.

Fccord the time from the start of add ng th=

Envirostonc to the time thar the mi;<ture thickens such that mi::ing is no longer required

<mi:: t'e) ano tne

+ime from the start of adding the Enviros+one to the time that the waste is firm to the touch

<setuo t me)

~

Additional Envirostone can be added if necessary to achieve a

satzsfac+orv end product.

However, if additional Envirostone must be
added, the waste solicification efficiency must be redetermined and the waste volume to be added to the solidification liner may have to be ad iusted.

2.9 If the waste setup time is less than

'0 minute= if a 50 cubic foot liner is being used is less than 60 minutes if a 142 cu fi liner is being used, or is less than 90 minutes if a larger liner is being used, add 0.05 g of Red Top Retarder to the 200 ml waste sample to adjus the waste setup time.

Vary the amount of retarder added to the sample until the desired setup time is achieved.

If the waste setup time is longer than operationally

desired, add accelera or to the 200 ml waste sample at a

rate of Accelerator Wt.

= 1.0/ of Envir ostone Wt to adiust the waste setup time to the ma;:imum time.

In-crease the amount of accelerator to the sample until the desired setup time is achieved.

=. 11 Remove the solidifieo sample from the samole container and visually e::amine it for evidence of sof t. porous or unsolidified areas.

Thc solidified samples should ne

hard, homogeneous and of uniform coloration.

Page c of 9

PT-5$.

Rev.

8

<Addendum E)

Mar h 1~:~,

1+88

.1 Set samole s>

assoc for future-dxsposas;:~

'. 1: Continue to ml:l samples unti 1 a

satisf actory waste product xs produceo.

If a satisf ac or v sample cannot be obtained the operator should contact the Regional Operati on=- Manaoer bef ore proceeds ng.

FL~LL SCALE

    ',ence~. er determin:ng h= aporoori ate volumes to be added to ~he Liner. the full scale sol iaaf ication should bc performed using the system operating procedures (Ref erence
    2. 4) and the Solidi f ication Operations Logsheet should bc filled out.
    Page 4 ot 9 P -5'. Rev. 8.(Aocenoum E), larch lt.>o i +.36,.,. SA('lPLE VERI F I CAT ION WL'Rt'SHL'ET FOR SOLIDIFICATION OF BORIC ACID AND BEAD RESINS 0 Operator: Date: No.: Utility/Location: Waste Type: Waste Sample From/&v: Wast e Temper at ure: F Waste pH: Sama-'e R.d Lsvel: Physical c ar: zv. Characteristics (; scosity. etc.':: color. sedimentatior. Samole Proportions: Bead Resin or GranuIar Activated Carbon Dcwatercd mL Boric Aced .4 wt% mL Chemi cal Additives Final pH Envirostone Accelerator (if requirec) &lend the waste thorouohly (with pH adjustment additi ves.
    retarder, or conditioners. if required) and record the time when finished:
    &lend the required volume of Envirostone into the waste and record the time when finished: Record the time when the mi>:ture viscosity increases to the poxnt when he mi~;er is secured: (I) Record the time when the mi::ture is firm to the touch: e PT-51, Rev. 8 (Addendum E] t1arch 10, 1988 e Sample Verification Worf:sh'eet . (continued) Sample Results: Ni x time (1): minutes Setup time (2>: minutes Free Mater, if any: Relative set (soft, firm, very hard): Observations: Sample proportions and solidification results acceptable for calculation of large scale sol i di fi cati on ratios: yes no Isotopic results of sample: Solidification Efficiency (Waste Volume/Solidified Volume>: Oper at or ' Si gnatur e: Date: Utility Representative's Sionature:

    Title:

    Date:

    0 Page 6 of 9

    0

    F'T-51, F ev.

    8 (Adderfdum E)

    March 10.

    1988 SOL I D I F I CATIQN WOR)".SHEET FQR SOLIDIFICATION OF BORIC ACID AND BEAD RESIN Operator:

    Dat e No.:

    Uti 1 ity/'cati on:

    Waste Type:

    Satisfactory Sample Verification No.:

    Solid fication Efficiencv:

    Date:

    r Cont ai ner Model:

    ~er i ~E L ~ NER D~TA SHEe,:

    r GR The.

    L ~ NE~

    BE I Ntn QISE DI Usable Liner Volume (u)i th 2" saf ety margin):

    Volume Bead Resin or Activated Carbon:

    cf ct Volume Bori c Aci d (0:/ Bead Vol. ):

    cf Waste Height in Liner:

    Total Waste Volume added to Lirier:

    (Bead Resiri Volume

    '.. Boric Acid Volume)

    Weight of Envirostone to be Added to the Liner (Use determined from the Samole Verification Worksheet):

    .the values gms of Envirostone in sample/

    sample ml of waste in O

    C 0>> ~ ~t8

    ~IA I bs of Envirostone/c f of Waste cf of waste to be Added to the Liner lbe oi enviroetone to be edded to the.liner.

    NOTE:

    Envirostone weiqht may be rounded up to the ne;:t 100 pound increment thus allowing full 100 pound baqs of Envirostone to be added to cont, airer.

    Paqe 7 of 9

    p, c

    Rev.

    8 (add>~ndum E) cn 1>> ~

    . P&

    SOLIDIFI~ATlUN WGRt.~HEE7 FOR SOLIDIFICATION OF BORIC ACID "ND &E"D RESIN (Contanueo) gms samp 1 e Chemi cal Additive Weiqnt of chemical to be adoed, the 1inel (use the values from the Sample Veri ficati on~Worhsheet ):

    chemical in sample/

    gms Envirostone in

    ,J

    ~ ~

    lbs Envirostone to be addle> to the 1 oner lbs Chemical Additive Chem: cal Additive:

    Wei qn>t of Chemical to be added to the liner (use the values from the Samole Verification Worksheet):

    qms chemical sample in samole/

    gms Envirostone in I ~

    lbs Envzrostone to be added to =he liner lbs Chemical Additive WET CHEi'llCAL ADDITIVES Chemi cal Additive Volume of chemical to be added to tne liner (use the values from the Sample Verification Wori.sheet):

    ml chemical in samole/

    ml waste in sampl>

    'I(

    cf waste to be added to the 'incr

    - 7.~8

    =

    qallons Chemical Additive Chemical Additive:

    Volume of chemical to be added to tne line.-

    (use the values from the Sample Verification Worksheet):

    ml chemical in sample/

    ml waste in sample cf waste to be added to the liner

    7. 68 gallons Chemical Additive Ooe. ator's Siqnature:

    Utilitv Pcpresentative's Sionature:

    Date:

    Titles Date:

    Page 8 ot

    PT-51, Rev.

    8 (Addendum E)

    March 10.

    1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET Operator:

    Utility/Location:

    f Liner Serial No.:

    Waste Type:

    Waste From:

    Solidification Worksheet o:

    Date:

    No.:

    Waste Volume Added:

    cf:

    Time Completed:

    Height of Waste:

    of Liner Inches From Inside 8ottom Time Mixer Started:

    Wet Chemicals Added (List):

    gal gal Hydraulic Press:

    time completed time completed Dry Chemicals Added (List):

    lbs lbs time completed time completed Waste Conditioner Addeda Type:

    lbs:

    Time:

    Envirostone Added:

    Mixer Hydr aulic Pressure PSI Time lbe:

    Time Started:

    Complete:

    Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed:

    Time Liner Capped:

    Only Cap Liner With UtilityRepresentative's Approval:

    Comments and Observations:

    Date Liner Shipped/Shipment Number:

    Operator's Signature:

    Utility Representative's Signature:

    Date:

    Date:

    Page 9 of 9

    'heF'T-51.

    Pev.

    8

    <C'adenavm F)

    I'1ar cri I i.>,

    1988

    ".DDENDUM r F F QC F<S GQ@ TPQL s'FQ; ~ ~

    FQF: SQLIDIFIC'. IQN QF PQF IC ACID PBDe 1

    Qt

    PT-51.

    Rev.

    8 (~<'.'endum -F)

    March 10, 1088

    ~.i PREREOVI SI TES

    1. '

    samole solzdifzcatxon shall be performed before attempting to oeriorm a

    full scale liner solidifi,cation.

    1

    ~ 2 ThE PNSI oner atar shal 1 ensure that a Fadi ol ogi cal vJork F'ermit has been issued for the performance of the sample veriiicat]on activity and that adequate personnel monitoring and radiatian detection equ]pment is an hand.

    The Pl'!SI aoe. star hal 1 ensure that al 1 necess-,ry material=

    and eci."pmen are on hand pr cr to beainnina the sample ver] "..'cation.

    Sugaested eau'.pment and ma-teri-'=- for the tesL are as 1]sted below:

    i00 to 500 mL plastic beakers o

    mixina spatula

    <00 oram caoacltv scale 50g pH Ad iustment Additive (E::amble: Boric Acid. Cal-cium Hydro::ide. etc.)

    10 a

    Fed Tao Fetarder or equivalent 1300 a

    Envi. asxane 0 a Acceleratar.

    Alum or equivalent (xf required)

    WQTE:

    The waste and chemicals used to soiidiiy the samole waste must be fram the same containers or lot number=

    ta be used in the full scale sal i dx f x cati on.

    1.4 one-I 'el sampl e shai 1

    be taken iar sol idification in the laboratory irom the boric acid tank.

    Due ta the impor ance oi obtaining a representative sample for use in the verification procedure.

    the ooeratar shall confirm that the contents of the waste form to be solidiiied have

    . been adequately mixed and that the sampl e i s a pal of - a hamogeneousl y mi:.ed waste batch

    2. 0 SAMPLE VEP IF ICATION 2 ~ 1 Record the initial pH.

    radiation level and temperature of the waste samples.

    ~

    ~

    Provide a

    waste ample (si=e ta be soecified by the blant) to the plant staff -:or isotopic analysis.

    ~

    ~

    Place a

    00 ml sample af 24 wt/

    (ma>;. ) baric acid at 180 F in the beakel 2.4 Add the appropriate chemical additive.

    xi reauired, to adjust the pH to between 2 and a.

    C'4!

    Add 0.

    1 arams retarder (Red Too). if reaui red.

    Page

    = of 9

    PT-51.

    Rev.

    8 (Addendum F)

    March 10, 1988

    ~ 6 Thoroughly blend the waste.and record the time

    'when finished.

    .7 Add 162 g of Envirostone to the 200 ml waste sample and mi:;

    the sample until the mi:cture begins to thicken.

    Record the time from the start of addinq the Envirostone to the time that the mivture thickens such that mi::ing is no lonoer required (mx>: time) and the time from the start of adding the Envirostone to the time that the waste is firm to the touch (setup time).

    Additional Envirostone can be added i f necessary to achieve a

    satisfactory end product.

    However, if additional Envirostone must be added.

    the waste solidification efficiency must be redetermined and the waste volume to be added to the solxdification liner may have to be adjusted.

    2.8 If the waste setup time is less than 0 minutes if a 50 cubic foot liner is being used.

    is less than 60 minutes if a 142 cu ft liner is being used, or is less than 90 minutes if a larger liner is being used.

    add 0.05 g of Red Top Retarder to the 200 ml waste sample to adjust the waste setup time to the minimum time requirement for the liner si"e being used.

    Vary the amount of retarder added to the sample until the desired setup time is achieved.

    If the waste setup time is longer than operational ly

    desired, add accelerator to the 200 ml waste sample at a

    r ate of Accel er ator Wt =

    1. 0/ of Envirostone Wt to adjust the waste setup time to the ma~imum time.

    Increase the amount of accel erator to the samp1 e unti l the desired setup time is achieved.

    Remove the soli di fi ed sample from the sample container and visually e>:amine it for evidence of soft, porous or unsol idi fi ed areas.

    The sol idifi ed samples should be

    hard, homogeneous and of uni form col orati on.
    2. 11 Set sample(s) aside for future di sposal.

    2e 12 Continue to mix samples until a satisfactory waste product is produced.

    If a satisfactory sample cannot be obtained the operator should contact the Regional Operations Manager bef ore proceeding.

    w ~ 0 FULL SCALE SOL ID IF ICATIONS

    '. 1 After a

    satisfactory sample solidification has been performed, determine the appropriate amount of additives and Envirostone to be added to the full scale liner solidification using the Solidification Worksheet.

    Page 3 of 9

    0

    PT-51, Rev.

    8 (Addendum F) tahar ch 10,

    }988 After determining the appropri ate'olumes of'etarder and Envirostone to be added to the

    Liner, the ful l scale solidification should be performed using the system operating pr ocedures (Reference 2.4) and the Solidification Operations Logsheet should be filled out

    ~

    Page 4 of 9

    PT- ',

    Rev.

    8<". (Addendum F)

    I'larch I Cl, SAI'1F'LE VEF. IF IC~ T I ON WORiiSHEET FOR SQLIDIFICATION OF BORIC ACID Operator:

    a Date:

    No.:

    UtiI ity/Locati on:

    Wa te Type:

    Waste Samnl e From/By:

    Waste Temoerat<<re:

    i'hvsi cal Ch<aracteri

    "= ics c

    al 1ty, e~c

    ~ )

    e was <.e QH

    '.VIscosl zy, Samol e Rad Lev col or.

    sedimental. on.

    Sample Prooorrion Boric Acid =4 wt/

    0 Chemical Additives Final pH Envirostone om Accelerator (if required) om Blend the waste thorouohly (with pH ad iustment additives, retarder.

    or conditioners, if requi-red) and. record the time when finished:

    Blend the required volume of Envirostone into the waste and record the time when finished:

    Record the time when the mi.ture viscosity increases to the point wher the mi::er i secured:

    (I)

    Recor d the time when the mi;:ture is firm to the touch:

    Paoe 5 of 9

    PT-51, Rev.

    8 (Addendum,, F)

    March 10, 1988 Sample Ver ification Worksheet (continued)

    Mi,", time (1):

    Setup time (2):

    ~mjnutes minutes Free Water, if any:

    Relative set (soft, firm, very hard):

    Observations:

    Sample proportions and solidification results acceptable for calculation of large scale soli di fication ratios:

    yes no Isotopic results of sample:

    0 Solidification Efficiency (Waste Volume/Solidified Volume):

    Operator's Signature:

    Utility Representati ve' Si gnature:

    Date:

    Title:

    Date!

    Page 6 of 9

    PT-51.

    Rev.

    8 (Addendum F)

    March lv.

    1988 SOLIDIFICATION WOR)~SHEET FOR SOLIDIFICATION OF BORIC ACID Operator:

    Date.

    No.:

    Utility/Location:

    Waste Type:

    Satisfactory Sample Verification No.!

    Sol i di ficati on Effici ency:

    Container Model:

    Date:

    SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin):

    Naste Volume Waste Heioht in Liner cf in Weight of Envirostone to be Added to the Liner (Use the values determined from the Sample Verification Nor):sheet):

    gms of. Envirostone in sample/

    sample ml -of waste in

    62. ~8 =

    lbs of Envirostone/cf of Waste cf of waste to be Added to the Liner lbs of Envirostone to be added to the liner.

    NOTE:

    Envirostone weight may be rounded up to the ne>:t 1CD pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

    DRY CHEMICAL ADDITIVES Chemical Additive Weight of chemical to be added to the liner (use the values from the Sample Verification Norksheet):

    sample gms chemi cal in sampl e/

    gms Envirostone in lbs Envirostone to be added to the 1 in'er lbs Chemical Additive Page 7 of

    PT-51.

    Rev.

    6 (Addendum,F).,

    thar ch 10.

    !968 SOL IDIF ICAT ION WGR). SHEET FOR SOLIDIFICATION OF BORIC ACID AND BEAD RESIN (Contxnuedi DRY CHEMICAL ADDITIVES continued Chemi cd'g Addit i ve:

    Wee ght of Chemx cal to be added to the I x ner (use the from he Sampl e Verif cat>on Worhsheet):

    va 1 ues gms, chemical in samole/

    gms Enviros~one a n sampl e lbs Enviro<<tone to be adoed to the liner 1 bs Chemi cal Addi ~ i ve WET CHEMICAL ADDITIVES Chemic:I Additive Volume of chemical to be aoded to the liner (use the values from the Sample Verification !~Jorksheet).

    ' t ml chemical

    >n <<ample/

    ml waste cf waste to be added to the liner r.48

    =

    ga'I

    ~ one Chemical Additive in sampl e Chemical Additive:

    Volume of chemical from thc Sample Veri to be added to the liner (use the values fication Worksneet):

    ml chemi c a 1 in samp 1 e/

    ml waste in sample cf waste to bc adaed to the liner

    7. <8 gal I on Chemi cal Additive Operator's Signature:

    Date:

    L(tilityRepresentative's Signature:

    Date:

    Page 8 of 9

    PT-51, Rev.

    8 (Addendum F)

    March 10, 1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET Operator:

    Date:

    No.:

    UtiI i.ty/Location:

    ~

    ~ Liner Serial No.:

    /

    Waste Type:

    r Waste From:

    Solidification Wor):sheet No:

    Waste Volume Added:

    Height of Waste:

    Time Mixer Started:

    Wet Chemi cal s Added (List):

    gal gal cf:

    Time Completed:

    Inches From Inside Bottom of Liner Hydraulic Press:

    time completed time completed Dry Chemicals Added t

    J Envirostone Added:

    (List):

    lbs 14s time completed time completed ibe:

    Time Started:

    Cdmpiete:

    Mixer Hydraulic Pressure PSI Time Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed:

    Time Liner Capped:

    Only Cap Liner With Utility Representative's Approval:

    Comments and Observations:

    Date Liner Shipped/Shipment Number:

    Operator's Signature:

    Utility Representative' Signature:

    Title:

    Date:

    Date:

    Page 9 of

    PT-51, Rev.

    8 (AddenduniG) arch 10, 1988 ADDENDUM G PROCESS CONTROL PROGRAM FOR SOL ID IF ICATION OF BEAD RESINS OP. CLASS A GRANULAR ACTIVATED CARBON Page 1 af 9

    PT-51, Rev.

    8 (Addendum 5)

    March 10, 1988

    1. 0 PREREQUI SITES c

    0 1.1 A

    sample solidification shall be performed attempting to perf orm a

    ful I scale sol idificati on.

    bef ore liner The PNSI operator shall ensure that a Radiological Work Permit has been issued for the performance of the sample verification activity and that adequate personnel monitoring and radiation detection equipment is on hand.

    The PNSI operator shal 1 ensure that al I necessary materials and equipment are on hand prior to beginning the sample verifica ion.

    Suggested equipment and materials for the test are as listed below:

    6 300 to 500 mL plastic beakers 6

    mixing spatul as 1

    500 gram capacity scale 50g pH Adjustment Additive (Example:

    Boric Acid, Cal-cium Mydroxide, etc.)

    10 g

    Red Top Retarder or equivalent (if required) 1000 g

    Envirostone 20 g Accelerator, Alum or equivalent (if required)

    NOTE:

    The waste and chemicals used to solidify the sample waste must be from the same containers or lot numbers to be used in the full scale sol idi ficati on.

    1.4 A one-liter sample shall be taken for solidification in the laboratory from the'torage tank or sol.idification liner.

    Due to the importance of obtaining a represen-tative sample for use in the verification procedure.

    the operator shall confirm that the contents of the waste form to be solidified have been adequately mixed and that the sample i s a part of a homogeneously mixed waste batch.

    2. 0 SAMPLE VERIFICATION
    2. 1 Record the initial pH, radi ati on level and temperature of the waste samples.

    ~

    ~

    Pr uvide a

    waste sample (si "e to be specif ied by the plant) to the plant staff for isotopic analysis.

    2.4 Place a

    200 ml sample of dewatered bead resins or granular activated carbon in the beaker.

    Add water until the liquid level is at or slightly above the resin or activated carbon level.

    Page 2 of 9

    PT-51, Rev.

    8 '(Addendu'm 6)-

    tahar ch 10, 1988

    ~

    Add the appropri ate chemi cal addi tive, i f required, ad.iust the pH to between 2 and 6.

    .6 Add 0.

    1 grams retarder (Red Top), if required.

    .7

    2. 8 Thoroughly blend the waste and record the finished.

    time when Add 117 g of Envirostone to the 200 ml waste sample and mix the sample until the mi:<ture begins to thicken.

    Record the time from the start of adding the Envirostone to the time that the mivture thickens such that mi::ing is no longer required (mi:: time) and tfRe time from the start of adding the Envirostone to (he time that the waste is firm to the touch (setup time).

    ,Additional Envirostone can be added if necessary to achieve a

    satisfactory end product.

    However, if additional Envirostone must be
    added, the waste solidification efficiency must be redetermined and the waste volume to be added to the solidification liner may have to be ad iusted.

    =.9 If the waste setup time is less than 20 minutes if -

    ~<0 cubic foot liner is being used.

    is less than 60 minutes if a

    142 cu ft liner is used, or is less than 90 minutes if a larger liner is beino used, add 0.05 o of Red Top Retarder to the 200 ml waste sample to adiust the waste setup time to the minimum time requirement for the liner si=e being used.

    Vary the amount

    .of retarder added to the sample until the desired setup time is achieved.

    ".. 10 If the waste setup time is longer than operationally

    desired, add accelerator to the 200 ml waste sample at a

    rate of Accelerator Wt = 1.0% of Envirostone Wt to adjust the waste setup time to the ma':imum time.

    Increase the amount of accelerator to the sample until the desired setup time is achieved.

    2. 11 Remove the solidified sample from the sample container and visually examine it for evidence of soft, porous or unsolidified areas.

    The solidified samples should be

    hard, homogeneous and of uniform coloration.

    Set sample(s) aside for future disposal.

    2. 13 Continue to miv samples until a satisfactory waste product i s produced.

    If a sati sf actory sample cannot be obtained the operator should contact the Regional Operations Manager before proceeding.

    Page 3 of

    PT-51 Rev.

    8 (Addendum G)

    March 10, 1988

    ~. 0 FULL SCALE SOLIDIFICATIONS After a

    satisfactory sample solidification has been performed, determine the appropriate amount of addi tives and Envirostone to be added to the full scale liner solidification using the Solidification Nor):sheet

    ~

    After determining the appropri ate volumes~of Retarder and Envri ostone to be added to the

    Liner, the ful l seal e solidification should be per formed using the system operating procedures (Reference 2.4) and the Solidification Operations Loasheet ould be filled out

    ~

    ~.

    Page 4 of 9

    PT-51, Rev.

    6 (Addendum 6)

    Oar ch 1' 1~$ 8 SAMPl E VER IF I Ce" T I O(IWQR)~SHEET.,

    FOR SOL ID IF ICATION GF BEAD RESINS OR GRANULAR ACTIVATED CAR&ON Date:

    No.:

    Utility/Location:

    Waste Type:

    Waste Sample From/&y:

    Waste Temoerature:

    F Phys] cal Characteristics clarity. etc.):

    I Waste pH:

    Sample Rad Level:

    (visco xrv.

    color.

    sea>ment ation.

    Sample Proportions:

    Bead Resin or Activated Carbon Chemical Additives Final pH Envirostone Accelerator (if reouired) am am

    &lend the waste thorouohly (witn pH adiustment additives,

    retarder, or conditioners, if reouired) and record

    ~ the time when finished:

    Blend the reouired volume of Envirostone into the waste and record the time when finished:

    Record the time when the mi::ture viscosi y increases to the point when thc mi;:er is secured:

    \\ A

    ~

    Record the time when the mi sture is firm to the touch.

    Page 5 of 9

    PT-51, Rev.

    8 (Addendum '6) arch 10, 1988 Sample Verification Worksheet (continued)

    Sample Results:

    I Mi:: time P]:

    im minutes mi,nutes Free Water, if an Relative set (soft, firm, very hard):

    Observations:

    I Sample proportions and sol idification resul t s acceptable for calculation of large scale solidification ratios:

    yes no Isotopic results of sample:

    Sol idi ficati on Efficiency (Waste Volume/Sol idifi ed Volume):

    Operator's Signature:

    Utility Representative's Signature:

    Date:

    Title:

    t Date:

    Page 6 of 9

    PT-51.

    Rev.

    8 (Addendum 6)

    March 10, 1988 SOLIDIFICATION WORKSHEET FOR SOLIDIFICATION OF BEAD RESIN OR GRANULAR ACTIVATED CARBON Operator:

    Date:

    No.:

    Uti.l,ity/Location!

    Waste Type:

    Satisfactory Sample Verification No.:

    Soli fication Efficiency:

    Container Nodel:

    Date:

    SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" saf ety margin):

    Waste Volume Beads or Carbon cf Waste Height in Liner:

    Weiaht of Envirostone to be Added to the Liner (Use determined from the Sample Verification Worksheet):

    in the values gms of Envirostone in sample/

    sample ml of waste in lbs of Envirostone/cf of Waste cf of waste (Resin Only) to be Added to the Liner lbs of Envirostone to be added to the liner.

    NOTE:

    Envirostone weight may be rounded up to the next 100 pound increment thus allowing full 100 'pound bags of Envirostone to be added to container.

    Page 7 of

    PT-51, Rev.

    8 (Aadenoum 6)

    March 10, 1$'88 SOLIDIFICATION WORI'SHEET FOR SOLIDIFICATION OF BORIC ACID AND BEAD RESIN (Continueo)

    DRY CHEMICAL ADDIT IVES Chemical Additive Weight of chemical to be added to the liner (use the values from the Sampl e Vera ficati on Wor):sheet):

    Qms sample chemical in sample/

    oms Envirostone in lbs Envirostone to be adoed to the liner lbs Chemical Additive Chemical Additive:

    Weight of Chemical to be added to the liner (use the from the Sample Verification Worksheet):

    values sample gms chemi cal in sampl e/

    gms Envirosione in lbs Envzrostone to be added to the liner lbs Chemical Additive WET CHEMICAL ADDITIVES Chemi cal Additive Volume of chemical to be added to the liner (use the values from the Samole Verification Wor):sheet):

    ml chemi cal in sampl e/

    ml waste in sample

    ~ ~

    cf waste to be added to the liner 7.48

    =

    gallons Chemical Additive Chemical Additive:

    Volume of chemical to be added to the liner (use the values from the Sample Verification Worksheet):

    ml chemical in sample/

    ml waste in sample v

    cf waste to be added to the liner 7.48

    =

    gal 1 ons Chemi cal Additive Operator's Signature:

    Date:

    Utility Representative's Sionature:

    Title:

    Date:

    Page 8 of

    PT-51, Rev.

    8 (Addendum 6)

    March 10, 1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET i

    Operator:

    Utility/Location!

    Liner Serial No.:

    Date:

    No.:

    Waste Type:

    Waste From:

    Solidification Worksheet No:

    Waste Volume Added:

    Height of Waste!

    Time Mi,.er Started:

    cf:

    Time Completed:

    Inches From Inside &ottom of Liner

    'Hydraulic Press:

    Wet Chemicals Added (List) gal gal Dry Chemicals Added (List) lbs lbs time completed time completed time completed time completed Envirostone Added:

    Mixer Hydraulic Pressure PSI Time ibs:

    Time Bterted:

    Complete:

    Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed:

    Time Liner Cappedr Comments and Observations:

    Only Cap LIner *With Utility Representat've's Approval.

    Date Liner Shipped/Shipment Number:

    Oper at or '

    Si gn atur e:

    Utility Representative's Signature:

    Title:

    Date:

    Date:

    Page 9 of

    PT-51.

    Rev.

    8 (Addendum H).

    Narch 10.

    1988 v

    ge, ADDENDUM H PROCESS CONTROL PROGRAN FOR SOLIDIFICATION OF POWDERED RESINS Page 1 of

    PT-51, Rev.

    8 (Addendum H)

    March 10, 1988

    1. 0 PREREOUI S I TES 1.

    1 A

    sample sol i di f x cati on shal 1

    attempting to perform a

    solidification.

    be performed before ful 1 scale I oner 1

    ~

    The PNSI operator shall ensure that a, Radpologlcal Work Permit has been issued for the perfoi Oance of the sample verification activity and that adequate~

    person-nel monitoring and radiation detection equipment is on

    /

    hand.

    The PNSI operator shall ensure that al 1 ecessary ma-terials and equipment are on hand prior to beginning the sample verification.

    Suagested equipment and ma-terials for the test are as listed below:

    6 300 to 500 mL plastic beakers 6 mixing spatulas 1

    500 gram capacity scale 10 g

    Red Top Retarder or equivalent (if required) 1000 g

    Envirostone

    =0 o

    Accelerator.

    Alum or equivalent (if required)

    NOTE:

    The waste and chemicals used to solidify the sam-ple waste must be from the same container s or lot numbers to be used in the full scale solidi f ication.

    1.4 A one-liter sample shall be taken for solidification in the laboratory for each separate batch of waste to be processed.

    The operator may choose to take the samples from the storage tanks to be solidified in the liner.

    or may take the sample from the liner directly, after the waste has been transferred to the liner.

    Due to the importance of obtaining a representative sample for use in the verification procedure, the operator shall confirm that the contents of the waste form to be solidified have been adequately mixed and that the sample is a part of a homogeneously mixed waste batch.

    2 ~ 0 SAMPLE VERIFICATION Record the informati on obtained during sample veri fica-tion on the Sample Verification Worksheet.

    ~ 4 Provide a

    waste sample (si=e to be specified by the plant) to the plant staff for isotopic analysis.

    Page 2 of 9

    PT-51, Rev.

    8 (Addendum H)

    March 10, 1988 e

    ~

    Pl ace

    -a 200 ml sampl e,of;waste in,a the beaker so that the resins are at the 200 ml level with the liquid solution just covering the resins.

    This will necessitate al lowing the resins to settle.

    then pouring off some of the liquid solution.

    2 ~ 4 a

    ~ %J

    .6 Record the initial pH,; rappti on l evel and temperature of the waste sample.

    Add tapwater inorder to bring the waste sample volume up to 253 ml.

    1 Add 9~ g of Envirostone to +e 25 ml waste sample and mi::

    the sample until the mL:<ture begins to thicker.

    Record the time from the start of adding the Enviro-stone to the time that, the mi:<ture thickens such that mixing is no longer required (mi>l time>

    and the time from the start of adding the Envirostone to the time that the waste is firm to the touch (setup time).

    Additional Envirostone can be added if necessary to achieve a satisfactory end product.

    However. if addi-tional Envirostone must be added, the waste solidifica-tion efficiency must be redetermined and the waste volume to be added to the solidification liner may have to be adjusted.

    ~ /

    If the waste setup time i s less than 20 minutes if a 50 cubic foot liner is being used, is less than 60 minutes if a 142 cu ft liner is being used.

    or xs less than 90 minutes if a larger liner is being used, add Red Top Retarder to the 200 ml waste sample at a

    rate of Retarder Wt

    = 0.05% of Envirostone Wt to adjust the waste setup time to the minimum time requirement for the liner si=e being used.

    Increase the amount of retarder added to the sample until the desired setup time is achieved.

    2.8 If the waste setup time is longer than operationally

    desired,

    -add accelerator to the 200 ml waste sample at a

    rate of Acceler'ator Wt = 1.0/ of Envirostone Wt to adjust the waste setup time to the ma;<imum time.

    In-crease the amount of accelerator to the sample until the desired setup time is achieved.

    =.9 Continue to mi ~

    samples until a

    satisfactory waste product is produced.

    If a satisfactory sample cannot be obtained the operator should contact the Regional Operations Manager before proceeding.

    "-. 10 Remove the solidified sample from the sample container and visually examine it for evidence of soft, pol ous ol unsolidified areas.

    The solidified sample should be

    hard, homogeneous and of uniform coloration.

    . 11 Set sampl e (s) asi de for future di sposal.

    Page 3 of 9

    PT-51, Rev.

    8 (Addendum')

    March 10, 1988

    3. 0 FULL SCALE SOLIDIFICATION After a

    satisfactory sample solidification has been performed, determine the appropriate amount of additives and Envirostone to be added to the full scale liner solidification using the Solidification worl.sheet

    ~

    After defer~'ning the appropri ate volumes of Retarder and Envirostone to be added to the

    Liner, the full scale soli di fi cati'on should be performed using the system operating procedures (Ref er ence
    2. 4) and the Sol idificati on Operations Logsheet should be fi 1 1 ed Page 4 of

    0

    PT-51.

    Rev.

    8 (Addendum hs Marcn 1v, 1988-1 Ooer ator:

    SAMPLE VERIFICATION WQR).SHEE FOR SOLIDIFICATION OF POWDERED RESINS Date:

    No.:

    Uti 1 ity/Locati on:

    . ~ w'.

    Waste Type:

    Waste Sample From/By:

    Waste Te erature:

    F Phvsical Character:stxc-clarity. etc.):

    Waste pH:

    (viscosity, Sample Rao Level:

    color

    ~

    sedlmentat1on Sample Proportions:

    Powdered Resin (Dewatered) ml 0

    Volume with water added Chemical Additives ml Final pH Envirostone gm Accel erat or (if required)

    Qm Bl end the water added and any Chemi cal 'Additives thoroughly into the waste before adding the Envirostone.

    Blend the required volurrie of Envirostone into the waste and record the time the addition starts:

    Record the time when the mi:;ture viscosity increases to the point when the miser is secured:

    (1)

    Record the time when the mi>:ture is firm to the touch:

    0 Page 5 of 9

    PT-51.

    Rev.

    8 (Addendum H)

    March 10, 19BB Powdered Resins Sample Verification Worksheet "('continued)

    Sample Results:

    Mi >: time (1):

    minutes Setup time (2):

    minutes r

    Free Water, if any:

    Relative set (soft, firm, very hard):

    Observations:

    Sample proportions and solidification results acceptable for calculation of large scale solidification ratios:

    yes no Isotopic results of sample:

    0 Solidification Efficiency (Waste Volume/Solidified Volume):

    Operator's Signature:

    Date:

    Utility Representative's Signature:

    Title:

    Date:

    Page 6 of

    PT-51, Rev.

    8 (Ad'dendum H)

    March 10, 1988 SOLI DIFICATION WORKSHEET FOR SOLIDIFICATION OF POWDERED RESINS Operator:

    Date:

    No.:

    Utility/Location:

    Waste Type:

    Satisfactory Sample Verification No:

    Solidification Efficiency:

    Container Model:

    Date:

    SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin):

    Waste Volumes cf Waste Heioht in Liner:

    (Waste Full/Level Bubbler Tube to be set at this height) in Maximum Waste and Water Added Height In Liner:

    in (Waste and Water Added Level Bubbler Tube to be set at this e

    height>

    Weight of Envirostone to be added to the liner (Use the values determined from the Sample Verification Workshee't):

    gms o< Envirostone in sample/

    sample ml of waste in x 62. i8 lbs of Envirostone/cf of Waste cf -of waste

    <Resin Only) to be added to the liner lbs of Envirostone to be added to the liner.

    NOTE:

    Envirostone weight may be rounded up to the next 100 pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

    Page 7 of

    l

    PT-51, Rev.

    8 (Addendum H>

    March 'IV

    $ 988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET Operator:

    Utility/Location:

    Liner Serial No.:

    Date:

    No.:

    Waste Type:

    Waste From:

    Solidification Worl:sheet No:

    Waste Volume Added:

    Height of Waste:

    Height of Waste 5 Mater Added:

    of Liner cf:

    Time Completed:

    Inches From Insi de Rottom of Liner Inches From Inside Rottom Time Mixer Started:

    Hydraulic Press:

    Met Chemicals Added (List) gal gal time completed time completed Dry Chemicals Added (List) lbs lbs time completed time completed Envirostone Added:

    Nixer Hydraulic Pressure 1bs:

    Time Started:

    PSI Complete:

    Time Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed:

    Time Liner Capped:

    Only Cap Liner Withe pili.fy Representative's Approval:

    ~

    ~

    Comments and Observati ons:

    Date Liner Shipped/Shipment Number:

    Operator's Signature:

    Utility Representative's Signature:

    Title:

    Date:

    Date:

    Page 9 of 9

    II 1

    i P'(