ML17348B413

From kanterella
Jump to navigation Jump to search
Rev 8 to Procedure PT-51, Solidification Process Control Procedure.
ML17348B413
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/10/1988
From:
PACIFIC NUCLEAR SYSTEMS, INC.
To:
Shared Package
ML17348B410 List:
References
PT-51, NUDOCS 9203040176
Download: ML17348B413 (104)


Text

VWLIFII:

hlULLEflA.

SOLIDI F1CATION PROCESS CONTROL PROCEDURE CONTROLLED PT-51 BA i'-H c-o l-&

Revision: Effective Date: '30-Essential Related NuPac Documents The following related Nupac Document(s) contain operations or information essential to performance of instructions here'in and mus t be issued in conjunction with this document:

1 . ON-1.04 2, 4,

S. 6.

/ /

Pr epar ed by Date

~i .;/~/'~

Engineering Date

/',

'gap f" Fige'ie.~s

,4uality Ass'urance Date Nanu acturing/Production Date i/I AS Other Date Doc ent Control/Release Nupac services, Inc. BrooKsae Or':ce parK nc.: Harrison wai. s ce 2"9 c~umoa srL:". carom. 29>'2 VeOccoe i8S3) 75:4-'25 Te ei >52667 PNS." UD .e eCOOr {803) 7c,'"93:6 920304017b 920304 PDR ADOCK 05000250 R PDR

c ~ Preparaticn Date Au uSt 15.

TITLE: Solidification Process Control Procedure RECORO OrwRE J. NS
REV: PESCRIPTION PAGc.l S) DATE SIGNATURE AFF=" EO i:

0 7 . Added sign-of fs on Adden-: Annotated,

dums, added addendum H by vert ical

- revised addendum G, Buri&line in volumes C4~~u ' '~:

Wight margin

) ~ ~p: 4:

LIST L"" r FECTIVE PAGES

~ ~

~ ~

Pace No. Rev  :  : Pace No. Rev  :  : Pace No. Rev

F'T-51 . Rev. 8

'..  ! SCOPE Thl s document contains. the Process Control Procedures f or the sol l dl f l catl ori of vari ous types of waste uslno the F'acl f'i c Nuclear Systems, Inc. (PNSI) Solidification System and Enviro-stone. Control of the process paraIneters involves the solidi f i-cation of a iabgfptorv samoi e of each separate type of waste product. to be spl l8i f i ed, cal cul ati on of the cnemi cal volumes to be added in the pecif ic waste container to be used and loggino of the solidification details. wnile followlna the solidification opel at ing pl ocedvI es Log:-hect s f ol caen of these thl ee sepal ate

~

tas):s are included in thi s document.

F'E-. EREN ES

~ S United States Gypsum' Topical Report on Envirostone 1CI CFR 61 NRC &ranch Technical F'osition on lJaste Form

.4 PNSI System Operating Procedure. ON-104 A ~ 5 Nuclear Pac):aging, Inc.. Quality Assurance Progr am NFC Branch Technical Report. Nay 198, Rev. 0

i. I I F'ROC=SS DESCR IF'T ION The PN i Solidif ication System is specif leal iv designed to facll itate solidification of various forms anc mi;:tures of I adl o active wast= in large scale ligers. Ihe wa~' ls ef f ec tively immooiii "ed using Envirostone, which is thoroughly ml lI ed wi th the waste using the system in-container miring blades.

The f ina product has proven to be a homogeneotIsl v mi;;ed,

~

iree st. and ing monoli h with no free standino water.

I.I PROCESS PARAf'1ETERS Naste can be solidified usino the PNSI sclidification -Unit and Envirostone in accordance with the formulas listed in this PCP.

Soeciiic waste conditioners are required ior some 'waste forms before solidification. The procedures for solidification of various wastes are included as separate addendums to this procedure.

if the laboratory -analysis of the waste solidification shows the waste setup time will be less than desired, Rcd Top Retarder can be added in smail amounts to e tend thE setup time o long enouah to ensure that the full volume of Envirostone can be thor oughly blended wi th the waste to f orm a homogeneous mi xture.

If the waste/Envirostone mi::ture exhibits a iona setup time. as indicated by laboratory tes ino, accelerator iAlum or equival ent) can be added to the mix. ure. The e<;act amount of retarder o, accelerator w li be determi ned durirIg the laboratory soiidif ication and then will be applied in the same proportion in the f ul I scale soi i di f ication <wi thin + 2!!) ~

Mar ch 1'..

5. <. SYSTEM OF'E~'AT IOhl f

ihe F'NSI Sol xaa ication Svstem as operareo xn accordance wx tn approved procedures. wnx ch ensure reproauci 0i 1 x r> of the wast=-

product from liner to liner. The process parameters and chemical rat]os used in each solidification are spec: f ical lv caiculared f or~rgach waste batch and a sample veri f i carson satisfactory 1 i performed bef ore attemptino a f ul 1 seal e solidi f 1 cati on.

e. 0 SAMPLE 'ERIF I CA ION Frior to ful scale soiidi f icatior of each iiner of wast=

1 orcdupz. a representati ve samol e cf each waste pr oduct shai I b=

test (sol i di f 1 ed n the abora orv.

z 1 ~

tai ed prccedures f or tee

1 solidi;ication for each waste type a. artached as addendums

=-

the s procedure ~ A portion of the sampl e s lal 1 ce i+'otopi cali; anal v" ed to determine the waste class. This tes- soli dif icatic~

confirms the correct process chemistry ratios to be used in the full scale solidifications of the same waste batch. The sample sol idi f ication shoul d ver i f y that the sol idio i ed waste product wi I be a un' orm, dry, f ree-s anding monolith.

1 The waste en@

produc shall resist penetration when probed with =-. f irm object.

Th= operator will number each soli aif'd sample and recora tne contents of each test solidification on a Same i e Veri Tl t'-.

Worksheet. A -oi idi f ication Wor':sheet wi 11 then be prepared f cr each liner prior to soiidifi ation. An Operations Logsheet wli.

be prepared for each liner during solidf ication. The 1'ner serial number will be r ecorded on the Operations Logsheet.

The waste batch will be sampled and a PCF'erformed per the following schedule:

Initial sample.

Af ter additional waste is added to the hoidup tanks.

After every seven days.

4. After every tenth liner or 5000 oallons of bitch waste.

whichever is more frequent.

7. 0 FULL SCALE SOLIDIFICATION CALCULATIONS After a laboratory sample has been solidified and confirmed that the waste product it will meet tne reauirements for has been satisfactorily solidified end product, the caiculations can be made for solidificat'ion of the waste form in large containers.

Calculations will be made and recor ded on the Soii dif ication Worl;sheet included in each addendum.

4 PT-51, Rev. 8 March 10, 1988.--.r 8.0 ADDENDUNS A. Liner Data Sheets Solidification of CITROX and Bead Resins C. Solidification of AP and Bead Resins or 100% Cation Bead Resins D. Solidification of Oi l Solidification of Bead Resins and Boric Acid or Class A Graniilar Acti v'ated Carbon and Bori c Aci d F. Sol i di f i cation of Boric Acid G. Solidification of Bead Resins or Class A Granular Activated Carbon H. Solidification of Powdered Resins.

PT-51 ~ Rev. '8 '('Addendum A) 'arch 10. 1988' ADDENDUM A LINER DATA SHEETS Paae 1 of 5

PT-51. Rev. 8 (Addendum A) i%arch 10, 1988

>>> '>>. ~

)

L INER DATA SHEET 50 CUBIC FOOT SOLIDIFICATION LINER Burial Volume: 52.0 cubic feet Usable Internal Volume: 46.8 CF (with 2" of free space in top) 51.00 Empty Weight: 600 lbs 43.75 Solidified Weight: (Envirostone) 47.

7 00 Oi 1 4150 1 bs Resin: 4500 Concentrates: 4850 1bs l 47.25 Solidification Data:

Waste Ht (E) Void Space (F) 40% 6. 1% 18. 7 CF 18. 7 in 30. 1 in 45 40. 6 21. 0 7~

50 45. 1 4 23 4~ 25. 4 55 49. 6 25 7~ 25. 7 3.0 60 54. 1 8.0 28. 0 0.7 65 58. 7 .0. 4 30. 4 0

18. 4 70 63. 2 7 M2 ~ 7 16. 0 71 74. 1 MMo ~ QVo w 15. 6 7~ 65. 0 3 '. 6 33. 6 15. 1 7M 65. 9 34. 1 4 14. 6 74 66. 8 34. 6 34. 6 14. 2 75 67. 7 v5 0~ M5e 0 13. 7 76 68. 6 ~'5 ~ >J 35 ~ 5 1 '.2 77 69. 5 36. 0 36. 0 12. 8 78 70. 4 36. 4 36. 4 12. 3 79 71.3 '2
36. 9 36. 9 11.8 80 r 37. 4 37. 4 11.4 81 73. 1 37 8 37. 8 10. 9 82 74. 0 38. 3 38. 3 10. 4 83 74. 9 -8. 8 38. 8 10. 0 84 75. 8 39. 2 39. 2 9.5 85 76. 7 9.7 39. 7 9.0 100 90. 2 46. 8 46. 8 2.0 Solidification Efficiency ~ (Waste Volume/Solidified Vol) X 100%

Packaging Ef f ici ency = (Waste Volume/Burial Volume) x 100%

Waste Height (E) and Void Space (F) dimensions are prior to solidif ication and are used to set the bubble tube level indicator.

Page 2 of 5

'IMIER tl " i ~ l PT-51, Rev 8 (Addendum A) Mar ch 10 ~ 1988 DATA SHEET

~ 14 CUBIC FOOT SOLIDIFICATION LINER Burial Volume: 1 8.~ cubic feet Usable Internal Volume: 118.6 CF Jg (wl th 2" of f r ee space in top )  !

Empty Weight: 1100 lbs

69. 75 67.25 7

Solidified Weight: (Envirastone)

Oil: 10, 125 l bs 63.25 Resin: ~

11,000 Ibs T i Conc ntrates: 11,900 lbs I l

Solidification Data: 83. 5 I Sol Eff P4oino Eff Waste Vol Waste Ht (E) Vo'jd Saace (F) 40% v5. 1% 47.5 CF .6. 1 in in

~9. 5 5..4 ~9 >5 ~ 9 50 4~ ~ 9 .6 0 la ~ r 48, 65o i) ~5. 9 =9. 4 60 5:6 71. 2 '9. 26 1 65 5r 0 ~ 77. 1 42. 4 =.9 70 61. 4 8 .1 45. 7 19. 6 71 6=. 84. 2 46. ~ 19. 0

7. h~. = 85. 4 47 0 ~ 18.

7~ 64. 0 86. 6 47. 6 7 '7.

74 64. 9 87. 8 48. 3 17. 0 7c'6 65. 8 89. 0 48. 9 16. 4

66. 7 90." 49 ~ 6 15 7 77 67. 6 91. 4 50. 2 15. 1 78 68. 4 9".5 50 9 ~ 14. 4 79 69. 3 9~. 7 51 ~ 5 13. 8 80 70 94. 9 g ~

MA ~ 1>. 1 81 71. 1 96. 1 52.9C' 12. 4 8n 71 ~ 9 97. 3 JI I ~ 1J 11 ~ 8 8Z 72. 8 98. 5 54 2 ~ 11 ~ 1 84 ~ 7~i ~ 7 99. 7 4.8 10. 5 85 74. 6 100. 8 9.8 100 87. 8 118 6 65.~ ~ V Solidification Efficiency = (Waste Volume/Solidified Vol) X 100%

Pachaging Efficiency = (Waste Volume/Burial Volume) w 100%

Was e Height (E) and Void Space (F) dimensions are prior to solidification and are used to set the bubble tube level indicator.

Page ~ of 5

PT- 51. Rev. 8 (Addendum A), Mar ch 10, 1988 LINER DATA SHEET 190 CUBIC FOOT SOLIDIFICATION LINER Burial Volume: 170. cubic feet J Internal Volume: 158. 4 F Usabl e CF (with ." of free space in top) 71.Q Empty Weight: 1 85 lbs GS. 75 Solidified Weight: (Envirostone)

'-2.25 Oil: 13,3SQ 1 bs Resin: 14, 5QO 1 bs Concentrates: ~

5, 7QQ lbs l 72.50 Solidification Data:

40% &74 6 ~. CF =6. 7 a<>. 1 in 45 4 71 ~

i< l," 0 8.8 "

50 46. 7 79. Vw ~ a C'

C0 51- 87. 1 '6. 7 .'". 1

<0 ~ <.l 95 0 ~ 4<.l. 0 8.8 65 6 1<.<~. 0 4=.. 4 =5. 4

/ <.l 65 ~t 11<.l. 9 46.-7 ~ 1-71 66 11 47. 4 21. 4

/>> '7.

114. 0 48. 1 -<.l. 7

/M 68. 1 115. 6 48. 7 =0 1 ~

74 69. 0 117'18.

49 ~ 4 19. 4

/5 70. 0 8 50. 1 la. 7 Io 70 9 ~ 1 .<.l ~ 4 5<,) ~ 7 18. 1 77 71. 8 l 51. 4 17. 4

.78 7 ~ 8 1..6 5..1 16. 7 79 / ~~ /~ 1.5. 1 C'W

~ / 16. 1 80 74. 6 1.6.7 52. 4 15. 4 81 75e 6 1.8. ' 54. 1 14. 7 8= 76. C' 9.9 54. 7 14. 1 8~ 77 ~ 1~1.5 5.4 1Z. 4 84 78. 1 'i.O 56. 1 1. 7 ~

85 79 1v4. 0 56 ~ 7 1 ~ 1 100 '.i

~ 158. 4 66. 8 2+0 Solidification Efficiency = (Waste Volume/Solidified Vol).

X 100/

Pac):aging Ef f i ci ency = (Waste Volume/Buri al Volume):: 100%

Waste Height (E) and Void Space (F) d'mensions are prior to solidification and are used to set he bubble tube level indicator.

Page 4 of 5

PT-51, Rev. 8 (Addendum A) March 10, 1988 L I NER DATA SHEET 210 CUBIC FOOT SOLIDIFICATION LINER Burial Volume: 199.4 cubic (

feet Usabl e Internal Volume: ( 18$."5 CF (with 2" of free space ih top)

Empty Weight: 1400 lbs r 8.25 75.75 Sol i di f i ed Wei ght:

(

(Enviros" ne)

Oi 1: 15,500 lbs (4. 50 Resin: 16,850 lbs Concentrates: 18,300 lbs 74.7i I

Salidif icatian Data:

Sol Ef f Pkaina Ef f Waste Vol Waste Ht (E) Voi d Space (F) 40% '7. 74. 2 t a in 46.: in 45 4~ 0 8& ~ 5 4Vo <2. 6 50 46. 7 9..8 ~6. 9 'B. 9 55 51 ~ ~ 10". 0 40. 6 FC VaJ ~ W 60 56. 0 111. i 44 ~~ w~ 1 ~ v 65 60. 6 47.9 27. 8 70 129.9 51. 6 24. 1 71 66. = 1 i1.7 52. 4 \ ~

7c 67.. 1~~.6 VI~ A 1 ..6 7M 68.1 1~5. 4 5:.8 21. 9 74 69.0 1 ~~ I~Q 54. 6 .1. ~

75 7l( 0~ 139. 1 55e m 20. 4 76 70. 9 141. 0 56. 1 19. 7 77 71. 8 142. 8 56. 8 19. 0 78 7 .8 144. 7 5r 5

~ 18. 2 79 7M ~ 7 146. 5 58. v 17. 5 80 74. 6 148. 4 59. 0 16. 7 Bl 75.' 150. ~ 59. 7 16. 0 8~ 76. 5 152. 1 '0.5 15e M 83 77. 4 154. 0 61. 2 14. 5 84 78. 4 155 8 62. 0 13. 8 85 79. 157 7 62. 7 1 ~.i 100 3 185. 5 .

'~

~ ~ V Solidification Efficiency = (Waste Volume/Solidif ied Vol)

X 100%

Packaging Efficiency = (Waste Volume/Burial Volume)  :< 100%

Waste Height (E) and Void Space (F) dimensions are prior to salidification and ar e used to set the bubble tube level indicator.

Page 5 of 5

PT-51. Rev. 8 (Addendum B): ~ ' ~

Mar ch 10. 1988 ADDENDUM B PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF C I TROX AND BEAD RESINS Paqe 1 o4 10

PT-51. Rev. 8 (Addendum B) March 10, 1988

1. 0 PREREOUISITES
1. ] A sample solidi f'ication shal 1 be performed bef ore attempting to perform a full scale 1 incr sol i di f i cati on.

1.2 The PNSI operator shall ensure that a Radiological Work Permit has been issued for the performance of the sample verification activity and that adequate person-nel monitoring and radiation detection equipment is on hand.

The PNSI operator shal 1 ensure that al 1 necessary ma-terials and equipment are on hand prior to beginning the sample verification. Suggested equipment and mater-ials for the test are as listed below:

6 =-00 to 500 ml plastic beakers 6 mixing spatulas

] - 500 gram capacity scale 20g PNS waste conditioner WC-785 50g - Calcium Hydroxide 1000 g Envirostone NOTE: The waste and chemicals used to solidify the sample waste must be from the same containers or lot numbers to be used in the full seal e sol idi f ication,

].4 A one-liter sample shall be taken for solidification in the laboratory for each separate batch of waste to be processed. The operator may choose to take the samples from the storage tanks to be solidified in the liner, or may take the sample from the liner directly, after the waste has been transf erred to the liner. Due to the importance of obtaining a representative sample for use in the verification procedure, the operator shall confirm that the contents of the waste f orm to be solidified have been adequately mixed and that, the sample is a part of a homogeneously mixed waste batch.

2 0 SAMPLE VERIFICATION

2. 1 Record the information obtained during sample verifica-tion on the Sample Verification Worksheet.

Provide a waste sample (si "e to be specified by the plant) to the plant staff for isotopic analysis.

Place a sample of the waste in the beaker so that the resins are at the 200 ml level with the liquid solution iust covering the resins. This may necessitate pouring off some of the liquid solution.

Page 2 of 10

P7-51. ~ev. 8 (i"ddenoum dl March 10. 1oq Record the xnazsal- oH, farad>-at>on levei- and temperature .-

of the waste sample.

Add Sl acked Lx me (Gal c] um Hydro;: i de) to the waste sam-Ale in the quantxty as per Table I and mx;: the sample thoroughly fcr ten miriutes. Record tne pH of the samp1 e ~

~~ 6 Add PNS WC-785 to the waste sample in +he quantity per Table I and mi:: the sainpl = thoroughly ~or ten mii nu es ~ Recol d the pH of the samp1 e.

~ / Add Envirostone zo tne waste sample in the Quanti ty l i sted in Tabi I ana mx:: the sample untx 1 the mx> ture

=-

begins to thxc);en.'ecord tne time'from "he start c-adding the Erivirostone to +hc tiiTie that the itic;rtur=

thickens such that mi::ino is no lonqer required (mz::

time> and the tame from the start of addinq the Enviro-stone to the time that the waste is firm to the touch (setup time) . Add> ti onal Envirostone can ue added necessary to achieve a satisfactory end product.

However. i f addi ti anal Envirostone must be added. the waste solidi f ication ef fi ci ency must be redete. min-arid the soi i di f i<<ati on l incr waste vol ume ad iusted.

Tabl e I CITROX/Cation Grams fthm Gr ams Grams Resin Ratio Lime WC-785 Envirostone 100% C I Tr.OX 4~0 1 ~ 5 10.:-

75% CITROX/25% Cation ~> ~ 0 1 ~ 1 104 50/ CITROX/50% Cation C). 8 105 25% CITROX/75% Cation 1 ~ 0 0.4 107 Continue to mi;: samoles until a satisfactory ~aste pr is produced. The waste setup time should be o-'uct least ~0 minutes for 50 liners. 60 minutes for f t i liners and <0 minutes for larger liners. If trie setup time is shorter than specified for the liner to bc solidified, add a lesser amount of WC-785 and con-tinue to perform sample testing to verify the setup time. If the setup time is greater than 150 minutes.

add a greater amount of WC-78~ to the waste sample ana continue to perform sample test'g until a satisfactory sample is obtained which will set up in less than 150 minutes. If a satisfactory sample cannot be obtained by ad iusting the amount of WC-785. thc operator can ad iust the amount of lime added to the waste sample and con-

.tinue o test. If a satisfactory sample cannot be obtained. the operator should contact he Manager befor e proceeding. Regiona'perations Page a of 10

PT-51, Rev. 8 (Addendum B) .- -=:. ~- March 1(>, 1988 9 Remove the solidified sample from the sample container and vi sual l y e.:arne ne i t f or evi dence of sof t, porous or f

unsol i di i ed areas. The solidified samples should be hard, homogeneous and of uniform coloration.

. 10 Set samp1 e (s) asi de f or future di sposal .

~ Q) FULL SCALE SOL jDIFICATION Af ter a sati sf actory sampl e sol idi f i cata on has been performed, determine the appropriate amount of waste conditioners and Envirostone to be added to the full scale liner solidification using the Solidification Worksheet.

Af ter determining the appr opri ate volumes of addi ti ves and Envirostone to be added to the Liner. the ful l scale solidification should be performed using the system operating procedures (Reference 2. 4) and the Solidification Operations Logsheet should be filled outa Page 4 of 10

PT-51. Rev. 8 (Addendum B) March 10 1988.

SANPLE'ERIFICATION WORKSHEET' "=* '-"=" -'

FOR SOLIDIFICATION OF CITROX AND BEAD RESINS Date: No.:

Utility/Location:

Waste Type:

Waste Sample From/By<

Waste Temperature: F Waste pH: Sample Rad Levels Physical Characteristics (viscosity, col or, sedi mentat i on, clarity, etc.):

Sample Proportions:

Waste Sample CITROX/Cation Resin Ratio ml /

Slacl'ed Lime CA (OH) gm pH after Lime Addition WC-785 pH After WC-785 H Chemical Additives Final pH Envirostone gm Blend the required volume of Envirostone into the waste and record the time the addition starts:

Record the time when the mixture viscosity increases to the point when the mixer is secured: (1)

Record the time when the mixture is firm to the touch:

Page 5 of 10

PT-51, Rev. 8 <Adden'dum ~B) -: ~"-*'=-"; '.-'.:. Oar ch 10, 1988 CITROX and Bead Resins Sample Verification Worksheet <continued) 1 Sample Resul t s:

Mi:: time (1): @utes Setup time (2): minutes

'r ee Water, i f any:

Relative set (soft. firm. very hard):

Observations:

Sample proportions and solidification results acceptable calculation of largE scale solidif icati on ratios: 'es for no Isotopic results of sample:

0 Solidification Efficiency < Waste Volume/So 1 i di f i ed Volume>:

Operator" s Signatur e: Date:

Utility Representative's Signature:

Title:

Date:

Page 6 of 10

e PT-51, Rev. 8 (Addendum B) March 10, 1988 SOL ID I'F I CAT I ON WOR)(SHEET FOR SOLIDIFICATION OF CITROX AND BEAD RESINS Operator: Date: No.:

Utility/Location:

Waste Type:

Satisfactory Sample Verification No: Date:

Solidification Efficiency:

Container Nodel:

SEE THE LINER DATA SHEET FOR THE LINER BEIN6 USED Usable Liner Volume (with 2" safety margin): cf Waste Volume: cf Waste Height: in (Waste Full/Level Bubble Tube to be set at this height)

Weight of Lime to be Added to the Liner (Use the values deter-mined from the Sample Veri f i cati on Worksheet):

gms of lime in sample/ ml of wast e i n sampl e 62.='8 = lbs of lime to be added to the liner Actual cf of waste in liner lbs of lime to be added to the liner.

Weight of WC-785 to be Added to the Liner (use the values deter-mined from the Sample Verification Worksheet):

gms of WC-785 in sample/ ml of waste in sample x 62. >8 = 1 bs of WC-785/cf of waste Actual cf of waste in liner lbs of WC-785 to be added to the liner.

0 Page 7 of 10

>='T-5 i . R=~ . 8 (Addenoum 8) '"

-- .~

  • r~arcn ]>.>, 1488 D>"-'v >:-:E!11CAL i'D I . 1'-'ES Che>nxcal Addxt.'e:

W=ight of Chem;cal to be added to the liner iuse the values from the Samp. e V'erxi cat>on War ksheet):

gm4 a%=-mi c~a 1 in sa>np l e/ arne En~xrostone xn sample

\ ~

~ 1 lbs Envir ostone to be added to the 1 xn>er 1 b s C r> e>T> 1 c a 1 Addi t x v<<

he>ni cai Addi . v<<.

Weigrt of Chemical to be adaed to the liner (u e the values from the S=.mole Verification Worksheet):

ams chemical in sample/ ams Envirostone in samp1 e

\~

1' '.bs =nvirostone .= =e adaea to tre 1 one.

lbs Chemical Aad'tave WET CHEt11Cr L ODDITY'-ES C>he>T>i cal Addi t ve Volume of chemical to be added to the liner (use tl>e values from the Sample Verification Wor<:sheet):

m>1 ch em. a1 n s amp 1 e! want xn sa>-ole I~ cf waste to be added to the 1 ir>er gallons Chemical Additive Chemical Addit'e:

Volume of chemical to be adaed> to the liner (use thc values f r om the Samp 1 e Ver i f i c at i or> 4lo )'shee )

ml chem cal in sample>'l waste in sampl e I'I ~~ c. was=e to be adaed to the liner

7. 48 aallons Chemical Add'ive Page 8 of 10

PT-51, Rev. 8 (Addendum 8) . March 10, 1988 CITROX and Bead Resins Solidification, Wor)(sheet .-(continued)

Weight of Envirostone to be added to the liner (use the values determined from the Sample Verification Worksheet):

gms of Envirostone in sample/ ml of Waste in Sample v~62. 38 lbs of Envirostone/cf of waste Actual cf of waste in liner I'bs of Envirostone to be added to the liner.

NOTE: Envirostone weight may be rounded up to the ne::t 100 pound increment thus allowing full 100 pound bags of envirostone to be added to container.

Calculate and record the weight percent of CITROX to resin in the liner:

Date:

Utility Representative's Signature Date:

Page 9 of 10

PT-51. Rev. 8 (Adderidum B) -:--'-'-* March 10. 1988:

PNSI SOLID! F ICATION OPERATIONS LOGSHEET Oper ator: Date: No.

Utility/Location:

Liner Serial No.:

Waste Type:

Waste From:

Solidification Worksheet No:

Waste Volume Added: cf: Time Comp 1 et ed:

Height of Waste: Inches From Inside Bottom of Liner Time Miver Started: Hydraulic Press:

Wet Chemicals Added (List):

gal time completed qal time completed Dry Chemi cal s Added (List):

lbs time completed lbs time completed Envirostone Added: lbs Time- Started: Complete:

Mi x er Hydraulic Pressure PSI Time Time Mi x er Secured:

Waste Setup Time:

Time Fi l lhead Removed: Time Liner Capped:

Only Cap Liner With Utility Representative's Approval:

a%

Comments and Observations:

Date Liner Shipped/Shipment Number:

Operator's Signature: Date:

Utility Representative' Signature Ti tie: Date:

Page 10 of 10

PT-51, Rev. 8 (Addendum C), March 10.

1988'"'DDENDUM C

PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF AP AND BEAD RESINS OR 1V<3/ CATION

&EAD RESINS Page 1 oW 9

PT-51, Rev. 8 (Addendum: C) March 10, 1988 1 ~ 0 PREREQUISITES - - - -* ~ ~; ~ " == ~.-.-..-. - - ~ ~,~

A sample solidif ication shall be performed before attempting to perform a full scale liner solidification.

The PNSI operator shall ensure that a Radiological( W Permit has been issued for the performance of ~ the sample verif ication activity and that adequate person-nel monitoring and radiation detection equipment is on hand. I The PNSI operator shall ensure that all necessary ma-terials and equipment are 'on hand prior to beg> nning the sample verification. Suggested equi pment and ma-terials for the test are as listed below:

6 ~00 to 500 mL plastic beakers 6 mixing spatulas 1 500 gram capacity scale 10 g Red Top Retarder or equivalent (if required) 1000 g Envirostone 20 g Accelerator, Alum or equivalent (if required)

NOTE: The waste and chemicals used to solidify the sam-ple waste must be from the same containers or lot numbers to be used in the full scale sol i di f i cat i on.

1.4 A one-liter sample shall be taken for solidification in the laboratory for each separate batch of waste to be processed. The operator may choose to take the samples from the storage tanks to be solidified in the liner, or may take the sample from the liner directly, after the waste has been transferred to the liner. Due to

~ the importance of 'obtaining a representative sample for use in the verification procedure. the operator shall confirm that the contents of the waste f orm to be solidified have been adequately mixed and that the sample is a part of a homogeneously mixed waste batch.

2 0~ SAMPLE VERIFICATION

2. 1 Record the information obtained during sample verifica-tion on the Sample Verification Worksheet.

2~ 2 Provide a waste sample (si "e to be specified by the plant) to the plant staff for isotopic analysis.

Page 2 of 9

0 PT-51, Rev. 8 (Addendum C) t1ar ch 10, 1988

~~ V Pl ace '

sampl e of the waste in the beaker so that the resins are at the 200 ml level with the liquid solution iust covering the resins. Thxs may necessitate pouring off some of the liquid solution.

2~ Record the ini ti al pH, radiation level'nd temper ature of the waste sample.

108 g of Envirostone to the 200 ml waste /sample and mix the sample until the mixture begins to thicken.

Record the time from the start of adding the Enviro-stone to the time that the mi..ture thickens such that.

mixing is no longer required (mix time) and the time from the start of adding the Envirostone to the time that the waste i s f irm to the touch (setup time) .

Additional Envirostone can be added i f necessary to achi eve a satisfactory end product ~ However, i f addi ti anal Envirostone must be added, the waste solidification efficiency, must be redetermined and the waste volume. to be added to the solidification liner may have to be adjusted.

If the waste setup time is less than ~0 minutes i f a 50 cubic foot liner is being used. is less than 60 minutes a 142 cu f t liner is being used, or is less than 90 minutes if a larger liner is being used, add Red Top Retarder to the 200 ml waste sample at a rate of Retarder Wt = 0. 05% of Envirostone Nt to adjust the waste setup time to the minimum time requirement for the liner si"e being used. Increase the amount of retarder added to the sample until the desired setup time is achieved.

2~ 7 If the waste setup time is longer than operationally desired. add accelerator to the 200 ml waste sample at a rate of Accelerator Nt = 1.0% of Envirostone Nt to adjust the waste'etup time to the maximum time. In-crease the amount of accelerator to the sample until the desired setup time is achieved. C 2.8 Continue to mix samples until a satisfactory waste product is produced. If a satisfactory sample cannot be obtained the operator should contact. the Regional Operations Manager before proceeding.

2.9 the solidified from the sample container Remove and visually examine unsolidif ied areas.

itsample for evidence of soft, porous or The solidif ied sample should be hard, homogeneous and of uniform coloration.

2.10 Set sample(s) aside for future disposal.

F'1-51. r'ev. 8 ikddenoum Ci l'larch 1i:), 1+89 FULL SCALE SOL JDlFIC4T1ON A~ ter a sati sf actor v sampl e soi i ds f cat i on has been a

performed. determine the appropr1 aze amount and Envirostone to be added to the full scale ot'dditive liner sol dificatx on ,

using the Solidification Nor I:sheet.

"s Af er dete. mining the appropriate volumes to be adoed to the Liner. tne ful l scale solidi f icatxon should be performed usina the system operat'no procedures (Ref er ence ". 4) and the,Sol x di f i cati on, Goer at1ons Logsheet should be f l l led ut.

F'age 4 of 9

F'T>>51. Rev. 8 (kid<<ridum C ~ March 10, iv88,-

5~MF LE VEr IF I C~ T I QN WORE.".StlEE"<

FQ.: 5GLIDIFICATION OF AP AND &E'D RESINS QF: 16<.':. C~ T ION &Eau RES I N5 Operator: Da>e No.:

Utility/Location/ rj.

Waste Type:

Waste Sample From/By:

W -"e Temoerature: Was e pH: Sample Rad Level:

F' lysi cal Char .c et l st 1 cs (vi scosi ty. col or. seo] mentati on.

cl ari ty. etc. ):

Sample Proportions:

Was =- Sample ml MP/Cat i on Res> n Ratl o ml / ml pH Chemical Additives (if required)

Envirostone gm Accelerator (if required) gm Blend the required chemical additives the waste before adding the Envirostone.

(if any) thoroughly in-o Blend the required volume of Envir ostonc into the waste and record the time thE'ddition s arts:

Record the time when the mi::ture viscosity increases to the point when the mixer is secured: (1)

Record the time when the mi::ture is f irm to the touch:

Page 5 of

PT-51. Rev. 8 (Addendum ') March 10. 19BB

~

'P and Bead Resins Sample Veri f'ication'orksheet (continued)

Sample Results:

~

time (I): minutes

'etup time (2): minutes Fr ee Wat r'. i f any:

~ Relative set (sof t, f irm. very hard):

Observations:

Sample proportions and solidification results for calculatio'n of large scale solidification ratios: acceptable yes no Isotopic results of sample:

0 Solidification Efficiency (Waste Volume/Solidified Volume):

Operator's Signature: Date:

Utility Representative's 'I Signature:

Title:

Date:

Page 6 of 9

PT-51, Rev. 8 (Addendum 'C) Inarch 10, 1988 SOLIDIFICATION WORf(SHEET FOR SOLIDIFICATION OF AP AND BEAD RESINS OR 100% CATION BEAD RESINS Operator: Date: No.:

Utility/Location:

Waste Type:

Satisfactory Sample Verification No: Date:

Solidif ication Eff iciency:

Container Model:

SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin): cf Waste Volume: cf Waste Height in Liner: in (Waste Full/Level Bubble Tube to be set at this height)

Weight of Envirostone to be added to the liner (Use the values determined from the Sample Verification Worl<sheet):

1 gms oi samp1 e Envirostone in sample/ ml of waste in 6=.38 = lbs of Envir ostone/cf of Waste cf of waste to be added to the liner lbs of Envirostone to be added to the liner.

NOTE: Envirostone weight may be rounded up to the next 100 pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

Page 7 of 9

PT-5J. Rev. 8 (Addendum=.C) . Narc h ) i.. 19S- (-;,. ~ =,.

SOLIDiFICATION WOR)'.,SHEET FOR SOLIDIFIC"TICN OF -P ND READ RESINS OR 1O~.~i.'AT'ON BEAD Rl SINS ontinued)

DPV'HEMICAL ADDIT i VES loaner Chemical Additive:

Weight af chemical to ae added ta the (use the values from the Sample Vera f i cat i on Wor ksheet):

cms chemi c al in sampl=/ gm= Envir os-ane zn

=ama1 e lbs Envxrastane to ae acaed ta the .' ner lb Chemic .1 ACd:tive Chemi ca i Addi t i ve:

Weight af Chemical to be adced to the liner (u e tne value=

fram the Sample Verification Wor):sheet):

chemical n samp e/ ams Envi. astane in sample lbs Envirastone ta be added to the liner lbs Chemical Acditive WET CHEYii CAL ADDITIVES Chemical Addi ve: ti Volume of chemi cal ta be added to the liner (use the values fram the Sample Veri fication Worksheet):

ml chemical in sample/ m waste in sample iY cf waste to be added to the liner x 7.4S = gallons .Chemical Adaitive Chemi cal Addi ve:ti Volume of chemical to be added to the liner (use the values from the Sample Verif icatian Worksheet):

ml chemi c a 1 i n samp 1 e/ ml waste in sample cf waste to be added ta the liner 7 aallon Cnemical Additive Operata~'s Signature: Dat =-:

U:lity Pepresentative's Sicnature:

Date'age 8 of 9

0 PT-51, Rev. 8 (Addendum C) March 10. 1988 t Operator:

PNSI SOLIDIFICATION OPERATIONS LOGSHEET Utility/Location:

Liner Serial No.:

Date! No.s Waste Type:

Waste From!

Solidification Worksheet No:

Waste Volume Added: cf: Time Completed:

Hei qht of Waste: Inches From Inside Bottom of Liner Time Mixer Started: Hydraulic Press:

Wet Chemical Added (List):

qal time completed gal time completed l Dry Chemicals Added (List):

lbs time completed lbs time completed h,

Waste Condi ti oner Added: Type: lbs: Time:

Envirostone Added: lbs: Time Started: Complete:

Mixer Hydraulic Pressure PS I Time Time Mixer Secured:

Waste Setup Time:

Time Fillhead Removed: Time Liner Capped:

Only Cap Liner With Utility Representative's Approval:

Comments and Observations:

Date Liner Shipped/Shipment Number:

Operator's Signature: Date:

Utility Representative's Signature:

Title:

Date:

Page 9 of 9

PT>>5l . Rev. 8 (Addendum

-. D), ";;~.-,,, t1arch l0, 1988".

ADDENDUM D PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF 0 I L O.

Page 1 o$ 9

PT-51, Rev. 8"(Addendum D) March i0, 1988 .

I.0 PREREQU IS I TES .'

sample solidification shall be performed befor e at-tempting to perform a ful scale liner sol xdif ication.

1 2 The PNSI operator shal 1 ensure that a -Radi ol ogi cal Work Permit has been issued f or ~b performance of the sample verification activitP and that adequate person-nel monitoring and radiation detection equipment is on hand.

The PNSI operator shal 1 ensure tpat al 1 necessary ma-ter i al s and equi pment ar e on hapd pri or to beginning the sample verification. Suggested equipment and ma-terials for the test are as listed below:

6 - 200 to 500 mL plastic beakers 6 mixing spatul as i 500 gram capacity scale 50 ml Envirostone Emulsifier 10 g Envirostone Accelerator or Alum (if required) 10 g Red Top Retarder or equivalent (if required) 1000 g Envirostone 50g Calcium Hydroxide (Lime) 50g Boric Acid NOTE: The waste and chemicals used to solidify the sam-be from the same containers or Tot 0 i.4 A ple waste solidification.

one-liter must numbers to be used in the full scale sample shal 1 be taken for sol i di f i cati on in the laboratory for each separate batch of oil to be processed. The operator may choose to take the samples from the storage drums to be solidified in the liner, or may take the sample from the liner directly, after the oil has been transf erred to the liner . If the sample is taken from the drums prior to transferring the oil to the liner, the operator will take a sample f rom each drum and mi x the samples together. in the same ratio that will be mixed in the liner. The sample will consist of 126.6 ml of oil. CThis will produce a total sample si-e of 200 ml af ter 59.6 ml of water (or Boric Acid concentrations up to 24 wt%) and 1~.8 ml of Emul-sifier has been added. 3 The operator may also choose to transfer the appropriate volume of waste oil, water (or Boric Acid concentrations up to 24 wt%) and Emulsi-fier to the liner, thoroughly emulsify the waste, then take a 200 ml sample of the waste mixture for sample solidification. This should be done only af ter it has been established that the oil will solidify using the standard formul as.

Page 2 of 9

PT-51. Rev. 8 (Addendum D)'- March 10, 1988

.0 SAMPLE VERIF ICATION 2.1 Af ter the materials and equ>pment,

~

as listed in the prerequi si tes to this procedure. are verified avail-able. a sample of the waste will be taken. The opera-tor shall take the sample. as described above. When the operate~ cPoses to tal:e the sample directly from the liner. the 'iner should be f i 1 led to the nor mal level for solidification of oil (see the appropriate Liner Data Sheet) and the oil mixed for f ive sampling. The sample can then be drawn directly minutes'efore from the liner. A+ter the operator has conf irmed that the waste oil normal f ormul as, pil'olidify in accordance with the the water (or Bor i c Acid) and emul si-fier can be added to the waste oil in the liner ana mixed prior to taking the sample for solidification verification. The waste oil and the chemicals used to

=

solidify the waste oil must be from the same batches as will be used in the full scale solidif ication. Record the inf ormation obtained during sample verification on the Sample Verification Worksheet.

Provide a waste sample (si=e to be soecified by the plant) to the plant s af f for isotopic anal ysi s.

If the oi), water (or Boric Acid), and emulsifier have already been blended together, ootain a 200 ml sample of the mixture and ski~ to Step 2.6.

2.4 Obtain a 126.6 ml sample of the oil to be solidified.

C V Add 59. 6 ml of tap water (or Bori c Aci d) to the waste

~

oil. If Boric Acid is used, it may be necessary to adjust the pH using calcium hydroxide <lime) such that the pH is between 2 and 6. Allow appro" imately 10 to 15 minutes f or reaction time bef ore f uther addi ti ons.

2.6 Add 13.8 ml of emulsif ier to the waste/water <or Boric Acid) mixture and mix until emulsified as indicated by uni f orm color ation wi thout streaking.

Add 125 grams of Envirostone to the waste mixture and mix with a smal 1 spatula until the waste beains to thicken. Record the time that mixing was required (mix time) and the time from the addition of the Envirnstone until the waste becomes firm to the touch (setup time).

Additional Envirostone can be added if necessary to achieve a satisfactory end product. Ho~ever. if additional Envirostone must be added, the waste solidification efficiency must be redetermined and the waste volume to be added to the sol i di f i cat i on 1 incr may have to be adjusted.

0 Page ~ of

PT-51. Rev. 8 (Addendum D). March 10, 1988 ...

.8 If the setup tame is less than desired, add 0.05 grams of Red Top Retarder to the 200 ml emulsified waste mi>;ture, to adjust the waste setup tame to at least .0 minutes for solidification in 50 cubic foot liners.

The setup time should be adjusted to at least 60 mibutes for 14 cubic foot liner solidifications and to at"~least 90 minutes for larger liners. Adjust the 4 wdight of retarder added to the sample and continue to per f orm sample soli di f i cations until the desired setup time i s./obtained.

=.9 If the waste setup time is longer than is operationally des red. the operator may add Envirostone Accelerator or Alum in quanti ti es up to =. 0% of the wei ght of the Envirostone added. The Accelerator or Alum should be added after the waste mi::ture and Envirostone have been thoroughly blended for a minimum of 5 minutes.

2. 10 Remove the solidified sample from the sample container and visually evamine unsol i di f i ed areas.

it for evidence of soft, porous or The sol i di f i ed sampl es should be hard, homogeneous 'and of uni f orm coloration.

2. 11 Set sample(s) aside for future disposal.

If a satisfactory sample solidi f ication cannot be ob-tained using the waste oil/water(or Boric Acid) /emulsi-f i er/ Envirostone mi,ture for 50/ solidification 'ef f i-ciency, as listed in Steps 2.4 through 2.7, above.

repeat the sample solidification using the formulas for 45% solidif ication ef f iciency as listed below:

114 ml of oil

59. 6 ml of water (or Boric Acid) 12.7 ml of emulsifier 146 gms of Envirostone 2.13 If a satisfactory sample solidification connot be obtained, the operator should contact the PNSI Director of Operations before proceeding.

3 0 FULL SCALE SOLIDI F I CAT I ONS After a satisfactory sample solidification has been performed, determine the appropriate amount of Retarder and Envirostone to be added to the full scale liner solidification using the Solidification Morhsheet.

After determining the appropriate volumes of chemicals and Envriostone to be added to the Liner, the full scale solidi f ication should be performed using the system operating procedures (Ref erence 2.4) and Solidification Operations out.

Logsheet should be f ilthe led Page 4 of 9

e PT-51, Rev..8 (Addendum 'D) March 10, 1988 SAMPLE VER IF I CAT ION WORKSHEET FOR SOLIDIFICATION OF OIL Operator: Ne.

Types'ate:

I Ut i 1 i ty/Locati on:

Waste Waste Sample From/By:

r I

Waste Temperature: F Waste pH: Sample Rad Level:

Physi cal Characteri sti cs (vi scosi ty. col or, sedimentation.

cl ari ty, etc. ):

Sample Proportions:

Waste Oil Sample mL Water (or Bori-c Aci d concentrati ons up to 24 wt%) Added to Sample Emul si f i er Added to Samp 1 e mL Chemical Additives Envirostone gm Blend the oil; water (or Boric Acid) and emulsifier toaether thoroughly before adding Envirostone. Retarder and other chemical Additives should be added, if needed, and thoroughly blended in before adding Envirostone. Accelerator.

should be added after the waste and Envirostone have been if needed, thoroughly mi>:ed for a minimum of 5 minutes..

Blend the required volume of Envirostone into the waste and record the time the addition starts:

Record the time when the mi>:ture viscosity increases to the point when the mi.er is secured: (1)

Record the time when the mi .ture is firm to the touch:

Page 5 of 9'

PT-51, Rev. 8 (Addendum D)

March 10 1988 Oi 1 Solidification Sample Verification Worksheet (continued)

Sample Results:

Mi x t'i me (1): minutes Setup time (2): minutes Free Water (or Boric Acid), if any:

Relative set (soft, firm, very hard):

Observations:

Sample proportions and solidification results acceptable for calculation of large scale solidification ratios: yes no Isotopic results of sample:

Sol i di f i cati on Ef f i ci ency (Waste Volume/Sol i di f 1 ed Volume):

Operator' Signature: Date:

Utility Representative's Signature:

Title:

Date:

Page 6 of 9

PT-51, Rev. 8 (Addendum D) March 10, 1988 SOLIDIFICATION WORKSHEET FOR SOLIDIFICATION OF OIL Date: No.:

Utility/Location:

Waste Type:

Satisfactory Sample Verification No: Date:

Solidification Efficiency:

Container Model:

SLE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin): cf Oil Volume to be Added to Liner: cf Oil Height in liner: in Water (Boric Acid) to be added to the Liner (Use the values determined from the Sample Verification Worksheet):

ml oi water ior Bor ic Acid> in sample/ of oil 0

mi i n sampl e inches of, oil to be added to the liner inches of Water (or Boric Acid) to be added to the Liner.

Oi 1 Height inches + Inches of Water (or Boric Acid)

Inches inches Height of Water (and Oil) in Liner (Water Level Setpoint)

Emulsifier to be Added to the Liner (use the values determined from the Sample Verification Worksheet) ml of Emul si f i er in Sampl e/ ml of Oi 1 x n Sampl e cf of oil to be Added to the Liner 7.48 >:

Gallons of Emulsif ier to be added to the Liner Page 7 of 9

0 PT- 1, Rev. 8 (r" ddenoum Di Mar ch 10, -1 o88 DRY CHEMICAL ADDITIVES ~ .-. 2;, i( .p .,--

~

Chemical Additive

'n Weight of chemical to be adaed to the 1 incr iuse the values from the Sample Verif ication Wort;sheet ) ~

I gms chemical in sample/ gms Enviros c sample lbs Envirostone to bc added to the I incr lbs Chemical Additive Chemical Additive:

Weight of Chemical io oe added to t'h e liner 'L use the Ialue=

from the Sample Verification Worksheet):

gms chemi cal in sampl e/ gms En rirostone in sample lbs Envirostone to be added to the liner lbs Chemical Additive WET CHEMICAL 4DD I T I VES Chemical Additive Volume of chemical to be added to the liner {use the values from the Sample Verification Worksheet):

ml chemical in sample/ ml waste i n samp I c cf waste to be added to the liner

. 7.48 = ga lons Chemical Additive Chemical Additive:

Volume of chemical to be added to the liner (use the values from the Sample Verification Norksheet):

ml chemi cal in sampl e/ ml waste in sample V

I ~ cf waste to be added to the liner 7.48 = gallons Chemical Additive Wei ght of Envirostone to be Added to the Liner:

gms of Envirostone in Sample/ ml of Oi 1 in Sample

8. i4 lbs of Envirostone/Gallon of Oil Gallons of Oil to be Added to the Liner lbs of Envirostone to be Added to the Liner NOTE: Envirostone weiaht may be rounded up to he ne;;t 100 pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

Page 8 of

PT-51, Rev. 8 (Addendum D) March 10, 1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET OIL SOLIDIFICATION Operator: Date: No.:

Utility/Location:

Waste Type:

Waste From!

Sol i di f i cat i on Wor ksheet No:

Oil Volume Added to Liner: Time ompleted:

Height of Oil: Inches from Inside Bottom of Liner Water (or Bor ic Acid) Volume Added to Liner:

Time Completed:

Height of Water (or Boric Acid) and Oil: Inches from Inside Bottom of Liner Emulsifier Volume Added to Liner: Time Completed:

Time Mixer Started: RPM'et Chemicals Added (List):

gal time completed gal time completed Dry Chemicals Added (List):

lbs time completed lbs time completed Envirostone Added: 1 bs: Tx me Added: Complete:

Accelerator Added: lbs: Time Added:

Mixer Hydraulic Pressure: PSI Time i

T me Mi x er Se cur ed:

Waste Setup Time:

Time Fillhead Removed: Time Liner Capped:

Only Cap Liner With Utility Representative" s Approval:

Comments and Observations:

Date Liner Shipped/Shipment Number:

Operator's Signature: Date!

Utility Representative's Signature:

Title:

Date:

Page 9 of 9

PT-51, Rev. 8 (Addendum E) March 10, 1988 -'-.-.r.-.

ADDENDUM E PROCESS CONTROL PROGRAM FOR SOLIDIFICATION OF BEAD RESINS AND BORIC ACID OR CLASS A GRANULAR ACTIVATED CARBON AND BORIC ACID Page 1 o4 9

PT-51, Rev. 8 (Addendum E) March 10, 1988 4

1. 0 PREREOUISI TES ~

A sample solidification shall be performed bef ore attempting to perform a full scale I incr solidification.

operator shall ensure that 2

Pe~i sample

~

The PJpg a has been issued for the performance Radiological verification activity and that adequate Work of the personnel monitoring and radiation detection equipment is on hand.

The PNP operator shal 1 ensure that al 1 necessary materials and equipment are on hand prior to beginning the sample verification. Suagested equipment and ma-terials for the test are as listed below:

6 i00 to 500 mL plastic beakers 6 mixing spatulas 1 500 gram capacity scale 50g pH Adjustment Additive (Example: &oric Acid, Cal-cium Hydroxide. etc.)

10 g Red Top Retarder or equivalent 1000 g Envirostone 20 g Accelerator, Alum or equivalent (if required)

NOTE: The waste and chemicals used to solidify the sample waste must be from. the same containers or lot numbers to be used in the full scale solidification.

1.4 A one-liter sample shal 1 be taken for solidification in the laboratory from the bead resin tank and from the boric acid tank. Due to the importance of obtaining a representative sample for use in the verification procedure, the operator shal 1 conf irm that the contents of the waste form to be solidified have been adequately mixed and that the sample is a part of a homogeneously mixed waste batch.

2+ 0 SAMPLE VERIFICATION Record the initial pH, radiation level and temperature of the waste samples.

2I 2 Provide a waste sample (si"e to be specified by the plant) to the plant staff for isotopic analysis.

Page 2 of 9

F'T- 1. Rev. 8 <.Accenoum -Er I'1al cn 1'. ~ 19co F'1 ace ul ar a <~0 acta vated ml samoi e'f carbon dewa+ered x n beac the beaker.

resins or gran'-

Note: If the rat>o of Boric Acid to bead resin or carbon is to be increased. calculate the pro-per ratios on the work sheet included xn this addencum.

Add 4 wt/ (mav.) boric acid at 1S0 F until the liquid level is at or slightly above the resin or activated carbon level.

f 'dd ad the appropriate chemical additive, i f requ rec, to iust the pH to between = and r dd 0. orams retarder <Red Top) . i f requx red.

1 Thoroughly blend the waste and record the tame when f i ni shed.

Add 117 g of Envirostone to the 200 ml waste sample and mi:: the sample unti 1 the mivture begins to thicken.

Fccord the time from the start of add ng th=

Envirostonc to the time thar the mi;<ture thickens such that mi::ing is no longer required <mi:: t'e) ano tne

+ime from the start of adding the Enviros+one to the time that the waste is firm to the touch <setuo t me)

Additional Envirostone can be added if necessary to

~

achieve a satzsfac+orv end product. However, if additional Envirostone must be added, the waste solicification efficiency must be redetermined and the waste volume to be added to the solidification liner may have to be ad iusted.

2.9 If the waste setup time is less than '0 minute= if a 50 cubic foot liner is being used is less than 60 minutes fi if a 142 cu liner is being used, or is less than 90 minutes if a larger liner is being used, add 0.05 g of Red Top Retarder to the 200 ml waste sample to adjus the waste setup time. Vary the amount of retarder added to the sample until the desired setup time is achieved.

If the waste setup time is longer than operationally desired, add accelera or to the 200 ml waste sample at a rate of Accelerator Wt. = 1.0/ of Envir ostone Wt to adiust the waste setup time to the ma;:imum time. In-crease the amount of accelerator to the sample until the desired setup time is achieved.

=. the solidifieo from the samole container 11 Remove and visually e::amine unsolidified areas.

itsample for evidence of sof t.

Thc solidified samples porous or should ne hard, homogeneous and of uniform coloration.

Page c of 9

PT-5$ . Rev. 8 <Addendum E) Mar h 1~:~, 1+88

.1 Set samole s> assoc for future-dxsposas;:~

'. 1: Continue to ml:l samples unti a satisf actory 1 waste product xs produceo. If a satisf ac or v sample cannot be obtained the operator should contact the Regional Operati on=- Manaoer bef ore proceeds ng.

FL~LL SCALE

    ',ence~ . er determin:ng h= aporoori ate volumes to be added to ~he Liner. the full scale sol iaaf ication should bc performed using the system operating procedures (Ref erence 2. 4) and the Solidi f ication Operations Logsheet should bc filled out. Page 4 ot 9 P -5'. Rev. 8 .(Aocenoum E), larch lt.>o i +.36, ., . SA('lPLE VERI F I CAT ION WL'Rt'SHL'ET FOR SOLIDIFICATION OF BORIC ACID AND BEAD RESINS 0 Operator: Date: No.: Utili ty/Location: Waste Type: Waste Sample From/&v: Wast e Temper at ure: F Waste pH: Sama-'e R .d Lsvel: Physical Characteristics (; scosity. color. sedimentatior. c ar: zv. etc.':: Samole Proportions: Bead Resin or GranuIar Activated mL Carbon Dcwatercd Boric Aced .4 wt% mL Chemi cal Addi ti ves Final pH Envirostone Accelerator (if requirec) &lend the waste thorouohly (with pH adjustment additi ves. retarder, finished: or conditioners. if required) and record the time when &lend the required volume of Envirostone into the waste and record the time when finished: Record the time when the mi>:ture viscosity increases to the poxnt when he mi~;er is secured: (I) Record the time when the mi::ture is f irm to the touch: e PT-51, Rev. 8 (Addendum E] t1arch 10, 1988 e ' Sample Verification Wor f:sh'eet . (continued) Sample Results: Ni x time (1): minutes Setup time (2>: minutes Free Mater, i f any: Relative set (soft, firm, very hard): Observations: Sample proportions and solidif ication results acceptable for calculation of large scale sol i di f i cati on ratios: yes no Isotopic results of sample: Solidification Efficiency (Waste Volume/Solidified Volume>: Oper at or ' Si gnatur e: Date: Utility Representative's Sionature:

    Title:

    Date:

    0 Page 6 of 9

    0 F'T-51, F ev. 8 (Adderfdum E) March 10. 1988 SOL I D I F I CAT I QN WOR)".SHEET FQR SOLIDIFICATION OF BORIC ACID AND BEAD RESIN Operator: Dat e No.:

    Uti 1 i ty/'cati on:

    Waste Type:

    Satisfactory Sample Verification No.: Date:

    r Solid f ication Efficiencv:

    Cont ai ner Model:

    ~er i ~E L ~ NER D~ TA SHEe,: r GR The. L ~ NE~ BE I Ntn QISE DI Usable Liner Volume (u)i th 2" saf ety margin): cf Volume Bead Resin or Acti vated Carbon: ct Volume Bori c Aci d (0:/ Bead Vol . ): cf Waste Height in Liner:

    Total Waste Volume added to Lirier:

    (Bead Resiri Volume '.. Boric Acid Volume)

    Weight of Envirostone to be Added to the Liner (Use .the values determined from the Samole Verification Worksheet):

    gms of Envirostone in sample/ ml of waste in sample

    C 0>> ~

    O

    ~t8 I bs of Envirostone/c f of Waste AI

    ~

    cf of waste to be Added to the Liner lbe oi enviroetone to be edded to the .liner.

    NOTE: Envirostone weiqht may be rounded up to the ne;:t 100 pound increment thus allowing full 100 pound baqs of Envirostone to be added to cont, airer.

    Paqe 7 of 9

    p, c Rev. 8 (add>~ndum E) cn 1>> ~ . P&

    SOLIDIF I~AT lUN WGRt.~HEE7 FOR SOLIDIFICATION OF BORIC ACID "ND &E "D RESIN (Contanueo)

    Chemi cal Addi ve ti Weiqnt of chemical to be adoed, the 1inel (use the values f rom the Sample Veri f i cati on~Worhsheet ):

    gms chemical in sample/ ,J gms Envirostone in samp 1 e

    ~ ~ lbs Envirostone to be addle> to the oner 1 lbs Chemical Additive Chem: cal Addi ve: ti Wei qn>t of Chemical to be added to the liner (use the values from the Samole Verif ication Worksheet):

    qms chemical in samole/ gms Envirostone in sample I~ lbs Envzrostone to be added to =he liner lbs Chemical Additive WET CHEi'll CAL ADDITIVES Chemi cal Addi ti ve Volume of chemical to be added to tne liner (use the values from the Sample Veri f ication Wori.sheet):

    ml chemical in samole/ ml waste in sampl>

    'I(

    - 7.~8 cf waste to be added to the 'incr

    = qallons Chemical Additive Chemical Addi ve: ti Volume of chemical to be added to tne line.- (use the values from the Sample Verification Worksheet):

    ml chemical in sample/ ml waste in sample cf waste to be added to the liner

    7. 68 gallons Chemical Additive Ooe. ator's Siqnature: Date:

    Utilitv Pcpresentative's Sionature:

    Titles Date:

    Page 8 ot

    PT-51, Rev. 8 (Addendum E) March 10. 1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET Operator: Date: No.:

    Utility/Location:

    f Liner Serial No.:

    Waste Type:

    Waste From:

    Solidification Worksheet o:

    Waste Volume Added: cf: Time Completed:

    Height of Waste: Inches From Inside 8ottom of Liner Time Mixer Started: Hydraulic Press:

    Wet Chemicals Added (List):

    gal time completed gal time completed Dry Chemicals Added (List):

    lbs time completed lbs time completed Waste Conditioner Addeda Type: lbs: Time:

    Envirostone Added: lbe: Time Started: Complete:

    Mixer Hydr aulic Pressure PSI Time Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed: Time Liner Capped:

    Only Cap Liner With Utility Representative's Approval:

    Comments and Observations:

    Date Liner Shipped/Shipment Number:

    Operator's Signature: Date:

    Utility Representative's Signature:

    Date:

    Page 9 of 9

    'heF'T-51. Pev. 8 <C'adenavm F) I'1ar cri I i.>, 1988

    ".DDENDUM r F F QC F<S GQ@ TPQL s'FQ; ~ ~

    FQF: SQLIDIFIC'. IQN QF PQF IC ACID PBDe 1 Qt

    PT-51. Rev. 8 (~<'.'endum -F) March 10, 1088

    ~.i PREREOVI SI TES

    1. ' samole solzdifzcatxon shall be performed before attempting to oeriorm a full scale liner solidifi,cation.

    1 ~ 2 ThE PNSI oner atar shal 1 ensure that a Fadi ol ogi cal vJork F'ermit has been issued for the performance of the sample veriiicat]on activity and that adequate personnel monitoring and radiatian detection equ]pment is an hand.

    The Pl'!SI aoe. star hal 1 ensure that al 1 necess-,ry material= and eci."pmen are on hand pr cr to beainnina the sample ver] "..'cation. Sugaested eau'.pment and ma-teri-'=- for the tesL are as 1]sted below:

    i00 to 500 mL plastic beakers o mixina spatula

    <00 oram caoacltv scale 50g pH Ad iustment Additive (E::amble: Boric Acid. Cal-cium Hydro::ide. etc.)

    10 a Fed Tao Fetarder or equivalent 1300 a Envi. asxane 0 a Acceleratar. Alum or equivalent (xf required)

    WQTE: The waste and chemicals used to soiidiiy the samole waste must be fram the same containers or lot number= ta be used in the full scale sal i dx f cati on.

    x 1.4 one-I 'el sampl e shai 1 be taken i ar sol i di f i cation in the laboratory irom the boric acid tank. Due ta the impor ance oi obtaining a representative sample for use in the verification procedure. the ooeratar shall confirm that the contents of the waste f orm to be solidiiied have been adequately mixed and that the sampl e i s a pal of - a hamogeneousl y mi:.ed waste batch

    2. 0 SAMPLE VEP I F I CAT ION 2~ 1 Record the initial pH. radiation level and temperature of the waste samples.

    ~ ~ Provide a waste ample (si=e ta be soecified by the blant) to the plant staff -:or isotopic analysis.

    ~ . ~ Place a 00 ml sample af 24 wt/ (ma>;. ) baric acid at 180 F in the beakel 2.4 Add the appropriate chemical additive. xi reauired, to adjust the pH to between 2 and a.

    C' 4! Add 0. 1 arams retarder (Red Too) . i f reaui red.

    Page = of 9

    PT-51. Rev. 8 (Addendum F) March 10, 1988

    ~ 6 Thoroughly blend the waste.and record the time 'when f ini shed.

    .7 Add 162 g of Envirostone to the 200 ml waste sample and mi:; the sample until the mi:cture begins to thicken.

    Record the time from the start of addinq the Envirostone to the time that the mivture thickens such that mi::ing is no lonoer required (mx>: time) and the time from the start of adding the Envirostone to the time that the waste is firm to the touch (setup time).

    Additional Envirostone can be added i f necessary to achieve a satisfactory end product. However, if additional Envirostone must be added. the waste solidification efficiency must be redetermined and the waste volume to be added to the solxdification liner may have to be adjusted.

    2.8 If the waste setup time is less than 0 minutes if a 50 cubic foot liner is being used. is less than 60 minutes if a 142 cu ft liner is being used, or is less than 90 minutes if a larger liner is being used. add 0.05 g of Red Top Retarder to the 200 ml waste sample to adjust the waste setup time to the minimum time requirement for the liner si"e being used. Vary the amount of retarder added to the sample until the desired setup time is achieved.

    If the waste setup time is longer than operational ly desired, add accelerator to the 200 ml waste sample at a r ate of Accel er ator Wt = 1. 0/ of Envirostone Wt to adjust the waste setup time to the ma~imum time.

    Increase the amount of accel erator to the samp1 e unti l the desired setup time is achieved.

    Remove the soli di f i ed sample from the sample container and visually e>:amine unsol i di f i ed areas.

    it for evidence of soft, porous or The sol i dif i ed samples should be hard, homogeneous and of uni f orm col orati on.

    2. 11 Set sample(s) aside for future di sposal.

    2e 12 Continue to mix samples until a satisfactory waste product is produced. If a satisfactory sample cannot be obtained the operator should contact the Regional Operations Manager bef ore proceeding.

    w ~ 0 FULL SCALE SOL ID IF ICATIONS

    '. 1 Af ter a satisfactory sample solidif ication has been performed, determine the appropriate amount of additives and Envirostone to be added to the full scale liner solidification using the Solidification Worksheet.

    Page 3 of 9

    0 PT-51, Rev. 8 (Addendum F) tahar ch 10, }988 Af ter determining the appropri ate'olumes of'etarder and Envirostone to be added to the Liner, the f ul l scale solidification should be performed using the system operating pr ocedures (Reference 2.4) and the Solidification Operations Logsheet should be filled out ~

    Page 4 of 9

    PT- ', Rev. 8<". (Addendum F) I'larch I Cl, SAI'1F'LE VEF. IF I C~ T I ON WORiiSHEET FOR SQLIDIF ICATION OF BORIC ACID Operator:

    a Date: No.:

    Uti I i ty/Locati on:

    Wa te Type:

    Waste Samnl e From/By:

    Waste Temoerat<<re: was <.e QH Samol e Rad Lev i'hvsi cal Ch<aracteri "= i cs '.VI scosl zy, col or. sedimental. on.

    c al 1ty, e~c ~ ) e Sample Prooorrion Boric Acid =4 wt/

    Chemical Additives 0 Final pH Envirostone om Accelerator (i f required) om Blend the waste thorouohly (with pH ad iustment additives, retarder. or conditioners, if requi-red) and. record the time when f ini shed:

    Blend the required volume of Envirostone into the waste and record the time when finished:

    Record the time when the mi.ture viscosity increases to the point wher the mi::er i secured: (I)

    Recor d the time when the mi;:ture is firm to the touch:

    Paoe 5 of 9

    PT-51, Rev. 8 (Addendum,, F) March 10, 1988 Sample Ver ification Worksheet (continued)

    Mi,", time (1): ~mjnutes Setup time (2): minutes Free Water, if any:

    Relative set (soft, firm, very hard):

    Observations:

    Sample proportions and solidification results acceptable for calculation of large scale soli di f ication ratios: yes no Isotopic results of sample:

    0 Solidification Efficiency (Waste Volume/Solidified Volume):

    Operator's Signature: Date:

    Utility Representati ve' Si gnature:

    Title:

    Date!

    Page 6 of 9

    PT-51. Rev. 8 (Addendum F) March lv. 1988 SOLIDIFICATION WOR)~SHEET .

    FOR SOLIDIFICATION OF BORIC ACID Operator: Date. No.:

    Utility/Location:

    Waste Type:

    Satisfactory Sample Verification No.! Date:

    Sol i di f i cati on Ef f i ci ency:

    Container Model:

    SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin):

    Naste Volume cf Waste Heioht in Liner in Weight of Envirostone to be Added to the Liner (Use the values determined from the Sample Verification Nor):sheet):

    gms of. Envirostone in sample/ ml -of waste in sample

    62. ~8 = lbs of Envirostone/cf of Waste cf of waste to be Added to the Liner lbs of Envirostone to be added to the liner.

    NOTE: Envirostone weight may be rounded up to the ne>:t 1CD pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

    DRY CHEMICAL ADDITIVES Chemical Additive Weight of chemical to be added to the liner (use the values from the Sample Verification Norksheet):

    gms chemi cal in sampl e/ gms Envirostone in sample lbs Envirostone to be added to the 1 in'er lbs Chemical Additive Page 7 of

    PT-51. Rev. 6 (Addendum,F) ., thar ch 10. ! 968 SOL ID IF I CAT ION WGR). SHEET FOR SOLIDIFICATION OF BORIC ACID AND BEAD RESIN (Contxnuedi DRY CHEMICAL ADDITIVES continued Chemi cd'g Addi t i ve:

    Wee ght of Chemx cal to be added to the I x ner (use the va 1 ues from he Sampl e Veri f cat>on Worhsheet):

    gms, chemical in samole/ gms Enviros~one a n sampl e lbs Enviro<<tone to be adoed to the liner 1 bs Chemi cal Addi ~ i ve WET CHEMICAL ADDITIVES Chemic:I Additive Volume of chemical to be aoded to the liner (use the values from the Sample Verification  !~Jorksheet).

    ml chemical >n <<ample/ ml waste in sampl e t cf waste to be added to the liner r.48 = ga'I one Chemical

    ~

    Additive Chemical Additive:

    Volume of chemical to be added to the liner (use the values from thc Sample Veri f ication Worksneet):

    ml chemi c a 1 in samp 1 e/ ml waste in sample cf waste to bc adaed to the liner

    7. <8 gal I on Chemi cal Addi ve ti Operator's Signature: Date:

    L(tility Representative's Signature:

    Date:

    Page 8 of 9

    PT-51, Rev. 8 (Addendum F) March 10, 1988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET Operator: Date: No.:

    Uti I i.ty/Locati on:

    ~ Liner

    ~

    Serial No.:

    /

    Waste Type:

    Waste From:

    rSolidification Wor):sheet No:

    Waste Volume Added: cf: Time Completed:

    Height of Waste: Inches From Inside Bottom of Liner Time Mixer Started: Hydraulic Press:

    Wet Chemi cal s Added (Li st):

    gal time completed gal time completed tJ Dry Chemicals Added Envirostone Added:

    Mixer Hydraulic Pressure (List):

    lbs 14s ibe: Time time completed time completed Started:

    PSI Cdmpiete:

    Time Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed: Time Liner Capped:

    Only Cap Liner With Utility Representative's Approval:

    Comments and Observations:

    Date Liner Shipped/Shipment Number:

    Operator's Signature: Date:

    Utility Representative' Signature:

    Title:

    Date:

    Page 9 of

    PT-51, Rev. 8 (Addenduni G)'arch 10, 1988 ADDENDUM G PROCESS CONTROL PROGRAM FOR SOL ID IF ICATION OF BEAD RESINS OP. CLASS A GRANULAR ACTIVATED CARBON Page 1 af 9

    PT-51, Rev. 8 (Addendum 5) March 10, 1988

    1. 0 PREREQUI SITES - c "*.

    0 1.1 A sample attempting solidification shall sol i di f icati on.

    to perf orm a be ful I performed scale bef ore liner The PNSI operator shall ensure that a Radiological Work Permit has been issued for the performance of the sample verification activity and that adequate personnel monitoring and radiation detection equipment is on hand.

    The PNSI operator shal 1 ensure that al I necessary materials and equipment are on hand prior to beginning the sample verifica ion. Suggested equipment and materials for the test are as listed below:

    6 300 to 500 mL plastic beakers 6 mixing spatul as 1 500 gram capacity scale 50g pH Adjustment Additive (Example: Boric Acid, Cal-cium Mydroxide, etc.)

    Red Top Retarder or equivalent (if required) 10 g 1000 g Envirostone 20 g Accelerator, Alum or equivalent (if required)

    NOTE: The waste and chemicals used to solidify the sample waste must be from the same containers or lot numbers to be used in the full scale sol i di f i cati on.

    1.4 A one-liter sample shall be taken for solidification in the laboratory from the'torage tank or sol.idification liner. Due to the importance of obtaining a represen-tative sample for use in the verification procedure.

    the operator shall confirm that the contents of the waste form to be solidified have been adequately mixed and that the sample i s a part of a homogeneously mixed waste batch.

    2. 0 SAMPLE VERIFICATION
    2. 1 Record the ini ti al pH, radi ati on l evel and temperature of the waste samples.

    ~ ~ Pr uvide a waste sample (si "e to be specif ied by the plant) to the plant staff for isotopic analysis.

    Place a 200 ml sample of dewatered bead resins or granular activated carbon in the beaker.

    2.4 Add water until the liquid level is at or slightly above the resin or activated carbon level.

    Page 2 of 9

    tahar PT-51, Rev. 8 '(Addendu'm 6)- ch 10, 1988 ~

    Add the appropri ate chemi cal addi ad.iust the pH to between 2 and 6.

    ti ve, i f required,

    .6 Add 0. 1 grams retarder (Red Top), if required.

    .7 Thoroughly blend the waste and record the time when f ini shed.

    2. 8 Add 117 g of Envirostone to the 200 ml waste sample and mix the sample until the mi:<ture begins to thicken.

    Record the time from the start of adding the Envirostone to the time that the mivture thickens such that mi::ing is no longer required (mi:: time) and tfRe time from the start of adding the Envirostone to (he time that the waste is firm to the touch (setup time).

    ,Additional Envirostone can be added if necessary to achieve a satisfactory end product. However, if additional Envirostone must be added, the waste solidification efficiency must be redetermined and the waste volume to be added to the solidification liner may have to be ad iusted.

    =.9 If the waste setup time is less than 20 minutes if - ~<0 cubic foot liner is being used. is less than 60 minutes if a 142 cu ft liner is used, or is less minutes if a larger liner is beino used, than 90 add 0.05 o of Red Top Retarder to the 200 ml waste sample to adiust the waste setup time to the minimum time requirement for the liner si=e being used. Vary the amount .of retarder added to the sample until the desired setup time is achieved.

    ".. 10 If the waste setup time is longer than operationally desired, add accelerator to the 200 ml waste sample at a rate of Accelerator Wt = 1.0% of Envirostone Wt to adjust the waste setup time to the ma':imum time.

    Increase the amount of accelerator to the sample until the desired setup time is achieved.

    the solidif ied from the sample container

    2. 11 Remove and visually examine unsolidified areas.

    itsample for evidence of soft, The solidified samples porous or should be hard, homogeneous and of uniform coloration.

    Set sample(s) aside for future disposal.

    2. 13 Continue to miv samples until a satisfactory waste product i s produced. If a sati sf actory sample cannot be obtained the operator should contact the Regional Operations Manager before proceeding.

    Page 3 of

    PT-51 Rev. 8 (Addendum G) March 10, 1988

    ~. 0 FULL SCALE SOLIDIF ICATIONS After a satisfactory sample solidification has been performed, determine the appropriate amount of addi tives and Envirostone to be added to the full scale liner solidif ication using the Solidification Nor):sheet ~

    Af ter determining the appropri ate volumes~of Retarder and Envri ostone to be added to the Liner, the f ul l seal e solidification should be per f ormed using the system operating procedures (Reference 2.4) and the Solidification Operations Loasheet ould be filled out ~

    ~ .

    Page 4 of 9

    PT-51, Rev. 6 (Addendum 6) Oar ch 1' 1~$ 8 SAMPl E VER IF I Ce" T I O(IWQR)~SHEET.,

    FOR SOL ID IF ICATION GF BEAD RESINS OR GRANULAR ACTIVATED CAR&ON Date: No.:

    Utility/Location:

    Waste Type:

    Waste Sample From/&y:

    I Waste Temoerature: F Waste pH: Sample Rad Level:

    Phys] cal Characteristics (visco xrv. color. sea>ment ation.

    clarity. etc.):

    Sample Proportions:

    Bead Resin or Activated Carbon Chemical Additives Final pH Envirostone am Accelerator (if reouired) am

    &lend the waste thorouohly (witn pH adiustment additives, retarder, or conditioners, if reouired) and record the time when

    ~

    f ini shed:

    Blend the reouired volume of Envirostone into the waste and record the time when finished:

    Record the time when the mi::ture viscosi y increases to the point when thc mi;:er is secured: \ A ~

    Record the time when the mi sture is f irm to the touch.

    Page 5 of 9

    PT-51, Rev. 8 (Addendum '6)

    Sample

    arch Verification Worksheet (continued) 10, 1988 Sample Results:

    I Mi:: time P]: minutes im mi,nutes Free Water, if an Relative set (soft, firm, very hard):

    Observations:

    I Sample proportions and sol i di f ication resul t s acceptable for calculation of large scale solidification ratios: yes no Isotopic results of sample:

    Sol i di f i cati on Efficiency (Waste Vol ume/Sol i di f i ed Volume):

    Operator's Signature: Date:

    Utility Representative's Signature:

    Title:

    Date:

    t Page 6 of 9

    PT-51. Rev. 8 (Addendum 6) March 10, 1988 SOLIDIFICATION WORKSHEET FOR SOLIDIFICATION OF BEAD RESIN OR GRANULAR ACTIVATED CARBON Operator: Date: No.:

    Uti.l,ity/Location!

    Waste Type:

    Satisfactory Sample Verification No.: Date:

    Soli f ication Eff iciency:

    Container Nodel:

    SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (wi th 2" saf ety margin): cf Waste Volume Beads or Carbon Waste Height in Liner: in Weiaht of Envirostone to be Added to the Liner (Use the values determined from the Sample Verification Worksheet):

    gms of Envirostone in sample/ ml of waste in sample lbs of Envirostone/cf of Waste cf of waste (Resin Only) to be Added to the Liner lbs of Envirostone to be added to the liner.

    NOTE: Envirostone weight may be rounded up to the next 100 pound increment thus allowing full 100 'pound bags of Envirostone to be added to container.

    Page 7 of

    PT-51, Rev. 8 (Aadenoum 6) March 10, 1$ '88 SOLIDIFICATION WORI'SHEET FOR SOLIDIFICATION OF BORIC ACID AND BEAD RESIN (Continueo)

    DRY CHEMICAL ADDI T IVES Chemical Additive Weight of chemical to be added to the liner (use the values f rom the Sampl e Vera f i cati on Wor):sheet):

    Qms chemical in sample/ oms Envirostone in sample lbs Envirostone to be adoed to the liner lbs Chemical Additive Chemical Additive:

    Weight of Chemical to be added to the liner (use the values from the Sample Verification Worksheet):

    gms chemi cal in sampl e/ gms Envirosione in sample lbs Envzrostone to be added to the liner lbs Chemical Additive WET CHEMICAL ADDITIVES Chemi cal Addi veti of chemical to be added to the liner (use the values Volume from the Samole Verification Wor):sheet):

    ml chemi cal in sampl e/ ml waste in sample

    ~~

    cf waste to be added to the liner 7.48 = gallons Chemical Additive Chemical Additive:

    Volume of chemical to be added to the liner (use the values from the Sample Verification Worksheet):

    ml chemical in sample/ ml waste in sample v cf waste to be added to the liner 7.48 = gal 1 ons Chemi cal Addi t i ve Operator's Signature: Date:

    Utility Representative's Sionature:

    Title:

    Date:

    Page 8 of

    PT-51, Rev. 8 (Addendum 6) March 10, 1988 i

    PNSI SOLIDIFICATION OPERATIONS LOGSHEET Operator: Date: No.:

    Utility/Location!

    Liner Serial No.:

    Waste Type:

    Waste From:

    Solidification Worksheet No:

    Waste Volume Added: cf: Time Completed:

    Height of Waste! Inches From Inside &ottom of Liner Time Mi,.er Started: 'Hydraulic Press:

    Wet Chemicals Added (List) gal time completed gal time completed Dry Chemicals Added (List) lbs time completed lbs time completed Envirostone Added: ibs: Time Bterted: Complete:

    Mixer Hydraulic Pressure PSI Time Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed: Time Liner Cappedr Comments and Observations:

    Only Cap LIner *With Utility Representat've's Approval.

    Date Liner Shipped/Shipment Number:

    Oper at or ' Si gn atur e: Date:

    Utility Representative's Signature:

    Title:

    Date:

    Page 9 of

    PT-51. Rev. 8 (Addendum H). Narch 10. 1988 v ge, ADDENDUM H PROCESS CONTROL PROGRAN FOR SOLIDIFICATION OF POWDERED RESINS Page 1 of

    PT-51, Rev. 8 (Addendum H) March 10, 1988

    1. 0 PREREOUI S I TES
    1. 1 A sample sol i di f x cati on shal 1 be performed before attempting to perform a ful 1 scale I oner solidification.

    1 ~ The PNSI operator shall ensure that a, Radpologlcal Work Permit has been issued for the perfoi Oance of the sample verification activity and that adequate~ person-nel monitoring and radiation detection equipment / is on hand.

    The PNSI operator shall ensure that al 1 ecessary ma-terials and equipment are on hand prior to beginning the sample verification. Suagested equipment and ma-terials for the test are as listed below:

    6 300 to 500 mL plastic beakers 6 mixing spatulas 1 500 gram capacity scale 10 g Red Top Retarder or equivalent 1000 g Envirostone (if required)

    =0 o Accelerator. Alum or equivalent (if required)

    NOTE: The waste and chemicals used to solidify the sam-ple waste must be from the same container s or lot numbers to be used in the full scale solidi f ication.

    1.4 A one-liter sample shall be taken for solidification in the laboratory for each separate batch of waste to be processed. The operator may choose to take the samples from the storage tanks to be solidified in the liner.

    or may take the sample from the liner directly, after the waste has been transferred to the liner. Due to the importance of obtaining a representative sample for use in the verification procedure, the operator shall confirm that the contents of the waste f orm to be solidified have been adequately mixed and that the sample is a part of a homogeneously mixed waste batch.

    2~ 0 SAMPLE VERIFICATION Record the inf ormati on obtained during sample veri f ica-tion on the Sample Verification Worksheet.

    ~ 4 Provide a waste sample (si=e to be specified by the plant) to the plant staff for isotopic analysis.

    Page 2 of 9

    PT-51, Rev. 8 (Addendum H) March 10, 1988 e ~ Pl ace -a 200 ml sampl e,of;waste in,a the beaker so that the resins are at the 200 ml level with the liquid solution just covering the resins. This will necessitate al lowing the resins to settle. then pouring off some of the liquid solution.

    2 4 ~ ti Record the ini al pH,; rappti on l evel and temperature of the waste sample.

    a ~ %J Add tapwater inorder to bring the waste sample volume up to 253 ml.

    1

    .6 Add 9~ g of Envirostone to +e 25 ml waste sample and mi:: the sample until the mL:<ture begins to thicker.

    Record the time from the start of adding the Enviro-stone to the time that, the mi:<ture thickens such that mixing is no longer required (mi>l time> and the time from the start of adding the Envirostone to the time that the waste is firm to the touch (setup time).

    Additional Envirostone can be added if necessary to achieve a satisfactory end product. However.

    tional Envirostone must be added, the waste solidifica-if addi-tion efficiency must be redetermined and the waste volume to be added to the solidification liner may have to be adjusted.

    ~ / I f the waste setup time i s less than 20 minutes i f a 50 cubic foot liner is being used, is less than 60 minutes if a 142 cu f t liner is being used. or xs less than 90 minutes if a larger liner is being used, Retarder to the 200 ml waste sample at a rate of add Red Top Retarder Wt = 0.05% of Envirostone Wt to adjust the waste setup time to the minimum time requirement for the liner si=e being used. Increase the amount of retarder added to the sample until the desired setup time is achieved.

    2.8 If the waste setup time is longer than operationally desired, -add accelerator to the 200 ml waste sample at a rate of Acceler'ator Wt = 1.0/ of Envirostone Wt to adjust the waste setup time to the ma;<imum time. In-crease the amount of accelerator to the sample until the desired setup time is achieved.

    =.9 Continue to mi ~ samples until a satisfactory waste product is produced. If a satisfactory sample cannot be obtained the operator should contact the Regional Operations Manager before proceeding.

    "-. 10 Remove the solidified from the sample container and visually examine unsolidified areas.

    itsample for evidence of soft, pol ous ol The solidified sample should be hard, homogeneous and of uniform coloration.

    . 11 Set sampl e (s) asi de f or f uture di sposal .

    Page 3 of 9

    PT-51, Rev. 8 (Addendum') March 10, 1988

    3. 0 FULL SCALE SOLIDIFICATION After a satisfactory sample solidification has been performed, determine the appropriate amount of additives and Envirostone to be added to the full scale liner solidification using the Solidification worl.sheet ~

    Af ter defer~'ning the appropri ate volumes of Retarder and Envirostone to be added to the Liner, the full scale soli di f i cati'on should be performed using the system operating procedures (Ref er ence 2. 4) and the Sol idi f i cati on Operations Logsheet should be f i ed1 1 Page 4 of

    0 PT-51. Rev. 8 (Addendum hs Marcn 1v, 1988-SAMPLE VERIFICATION WQR).SHEE FOR SOLIDIFICATION OF POWDERED RESINS 1

    Ooer ator: Date: No.:

    Uti i ty/Locati on:

    1

    .~ w'.

    Waste Type:

    Waste Sample From/By:

    Waste Te erature: F Waste pH: Sample Rao Level:

    Phvsical Character:stxc- (viscosity, color sedlmentat1on clarity. etc.):

    ~

    Sample Proportions:

    Powdered Resin (Dewatered) ml Volume with water added ml 0 Chemical Additives Final pH Envirostone gm Accel erat or (i f required) Qm Bl end the water added and any Chemi cal 'Addi ti ves thoroughly into the waste before adding the Envirostone.

    Blend the required volurrie of Envirostone into the waste and record the time the addition starts:

    Record the time when the mi:;ture viscosity increases to the point when the miser is secured: (1)

    Record the time when the mi>:ture is firm to the touch:

    0 Page 5 of 9

    PT-51. Rev. 8 (Addendum H) March 10, 19BB Powdered Resins Sample Verification Worksheet "('continued)

    - Sample Results:

    Mi >: time (1): minutes Setup time (2): minutes Free Water, if any:

    r Relative set (soft, f irm, very hard):

    Observations:

    Sample proportions and solidif ication results acceptable for calculation of large scale solidification ratios: yes no Isotopic results of sample:

    0 Solidification Efficiency (Waste Volume/Solidified Volume):

    Operator's Signature: Date:

    Utility Representative's Signature:

    Title:

    Date:

    Page 6 of

    PT-51, Rev. 8 (Ad'dendum H) March 10, 1988 SOLI DIF ICATION WORKSHEET FOR SOLIDIFICATION OF POWDERED RESINS Operator: Date: No.:

    Utility/Location:

    Waste Type:

    Satisfactory Sample Verification No: Date:

    Solidification Efficiency:

    Container Model:

    SEE THE LINER DATA SHEET FOR THE LINER BEING USED Usable Liner Volume (with 2" safety margin): cf Waste Volumes Waste Heioht in Liner: in (Waste Full/Level Bubbler Tube to be set at this height)

    Maximum Waste and Water Added Height In Liner: in (Waste and Water Added Level Bubbler Tube to be set at this height>

    Weight of Envirostone to be added toe the liner (Use the values determined from the Sample Verification Workshee't):

    gms o< Envirostone in sample/ ml of waste in sample x 62. i8 lbs of Envirostone/cf of Waste cf -of waste <Resin Only) to be added to the liner lbs of Envirostone to be added to the liner.

    NOTE: Envirostone weight may be rounded up to the next 100 pound increment thus allowing full 100 pound bags of Envirostone to be added to container.

    Page 7 of

    l PT-51, Rev. 8 (Addendum H> March 'IV $ 988 PNSI SOLIDIFICATION OPERATIONS LOGSHEET Operator: Date: No.:

    Utility/Location:

    Liner Serial No.:

    Waste Type:

    Waste From:

    Solidif ication Worl:sheet No:

    Waste Volume Added: cf: Time Completed:

    Height of Waste: Inches From Insi de Rottom of Liner Height of Waste 5 Mater Added: Inches From Inside Rottom of Liner Time Mixer Started: Hydraulic Press:

    Met Chemicals Added (List) gal time completed gal time completed Dry Chemicals Added (List) lbs time completed lbs time completed Envirostone Added: 1bs: Time Started: Complete:

    Ni xer Hydraulic Pressure PSI Time Time Mixer Secured:

    Waste Setup Time:

    Time Fillhead Removed: Time Liner Capped:

    Only Cap Liner

    ~

    Withe

    ~

    pili.fy Representative's Approval:

    Comments and Observati ons:

    Date Liner Shipped/Shipment Number:

    Operator's Signature: Date:

    Utility Representative's Signature:

    Title:

    Date:

    Page 9 of 9

    I I

    1 i

    P'(