Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14
ML17354A287
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/03/1996
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17354A286 List:
References
RTR-REGGD-01.014, RTR-REGGD-1.014 NUDOCS 9610100215
Download: ML17354A287 (3)


Text

ATTACHMENT 3 to L-96-200 PROPOSED LICENSE AMENDMENTS FOR DEFERRAL OF REACTOR COOLANT PVMP FLYWHEEL INSPECTION 3/4 4-38

'76iOi002i5 96i003 PDR

  • DOCK 05000250 P

PDR

REACTOR COOLANT SYSTEM 3/4. 4. 10 STRUCTURAL INTEGRITY LIMITING CONDITION FOR OPERATION 3.4. 10 The structural integrity of ASME Code Class 1,

2 and 3 components shall be maintained in accordance with Specification 4.4. 10.

APPLICABILITY:

Al 1 MODES ACTION:

a 0 b.

C.

With the structural integrity of any ASME Code Class 1 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature more than 50'F above the minimum temperature required by NDT considerations.

With the structural integrity of any ASHE Code Class 2 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature above 200 F.

With the structural integrity of any ASME Code Class 3 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) from service.

SURVEILLANCE RE UIREMENTS

4. 4. 10 In addition to the requirements of Specification 4. 0. 5, each reactor coolant pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1. 14, Revision 1, August 1975~>
except, the volumetric examination of the Turkey Point Units 3 and 4

flywheels may be delayed one cycle to coincide with the refueling outages currently scheduled for September 1998 and March 1999 respectively.

TURKEY POINT - UNITS 3 8( 4 3/4 4-38 AMENDMENT NOS. 137AND 132

e 5

1'