Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week
ML17354A616
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/27/1997
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17354A615 List:
References
NUDOCS 9709040124
Download: ML17354A616 (4)


Text

L-97-202 Page 1

ATTACHMENT 3 PROPOSED LICENSE AMENDMENT POR THE USE OP DZPPERENT WORK SHIFT DVRATIONS Page 6-2 9709040i24 970827 PDR ADOCK 05000250 P

PDR

0 0

L 1l I

L-97-202 Page 2 ELMLZHKE 6.2.2 The plant organization shall be subject to the following:

a.

Each on-duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1; b.

At least one licensed Operator shall be in the control room when fuel is in either reactor.

At least two licensed Operators shall be present in the control room during reactor startup, scheduled reactor shutdown and during recovery from reactor trips.

In addition, while either unit is in NODE 1, 2, 3, or 4, at least one licensed Senior Operator shall be in the control room:

d.

A Health Physics Technician* shall be on site when fuel is in the reactor; e.

All CORE ALTERATIONS shall be observed and directly supervised by either a

licensed Senior Operator or licensed Senior Operator Limited to Fuel Handling who has no other concur rent responsibilities during this operation; and Administrative procedures shall be developed and implemented to limit the working hours of plant staff who perform safety-related functions (e.g.,

licensed Senior Operators.

licensed Operators.

health physicists.

auxiliary operators, and key maintenance personnel).

The procedures shall include guidelines on working hours that ensure that Aadequate shift coverage 9m+Hm is maintained without routine heavy use of overtime for individuals.

epee~

However, in the event that unforeseen problems require substantial amounts of overtime to be used.

or during extended periods of shut-down for refueling, major maintenance, or major plant modification.

on a temporary basis the following guidelines shall be followed:

  • The Health Physics Technician composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

in order to accommodate unexpected absence.

provided imediate action is taken to fill the required positions.

TURKEY POINT UNITS 3

& 4 6-2 AMENDMENT NOS.

AND

~

~

~

~

~ e