ML17353A600
| ML17353A600 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/05/1996 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17353A599 | List: |
| References | |
| GL-93-05, GL-93-5, NUDOCS 9603200032 | |
| Download: ML17353A600 (6) | |
Text
L-96-016 Attachment 3
ATTACHMENT 3 PROPOSED LXCENSE AMENDMENTS FOR ZMPLEMENTATXON OF LXNE-ITEM TECHNICAL SPECXFXCATXON IMPROVEMENTS PROPOSED TECHNICAL SPECIFICATIONS PAGES 3/4 4-9 3/4 5-7 9603200032 960305 PDR ADOCK 05000250 P
REACTOR COOLANT SYSTEM 3/4. 4. 3 PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.3 The pressurizer shall be OPERABLE with a water volume of less than or equal to 92K of indicated level, and at least two groups of pressurizer heaters each having a capacity of at least 125 kW and capable of being supplied by emergency power.
APPLICABILITY:
MODES 1, 2, and 3.
ACTION:
With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT
" STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the follow-ing 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the Reactor Trip System breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.4.3. 1 The pressurizer water volume shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.4.3 '
The capacity of each of the above required groups of pressurizer heaters shall be verified by energizing the heaters and measuring circuit current at least once per 92 days.
'I.-I:-L4ti m
W-P I III'J-t demonstrated-OPERABLE-at 1-east-once-per 18-months-by-demons4~&~g-the-Gapab-i-1 sty-to-powerthe-heaters-from-the-emeegen~ower
( 0I'c g i p)
TURKEY POINT - UNITS 3 8 4 3/4 4-9 AMENDMENT NOS.~AND ~
, ~
t
~
~
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS d.
By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be'ransported to the containment sump and cause restriction of the pump suctions during LOCA conditions.
This visual inspection shall be performed:
1)
For all accessible areas of the containment prior to establish-ing CONTAINMENT INTEGRITY, and 2) aS-the-a seas-ataeete cash-eonta4naent-eat~
~ p eWdA4ahe*
e.
At least once per 18 months by:
1)
Verifying automatic isolation and interlock action of the RHR system from the Reactor Coolant System by ensuring that with a simulated or actual Reactor Coolant System pressure signal greater than or equal to 525 psig the interlocks cause the valves to automatically close and prevent the valves from being
- opened, and 2)
Verifying correct interlock action to ensure that the NST is isolated from the RHR System during RHR System operation and to, ensure that the RHR System cannot be pressurized froa the Reactor Coolant System unless the above NST Isolation Valves are closed.
3)
A visual inspection of the containment sump and verifying that the suction inlets are not restricted by debris and that the sump coaponents (trash racks, screens; etc.)
show no evidence of structural distress or abnormal corrosion.
f.
, At least once per 18 months, during shutdown, by:
1)
Verifying that each automatic valve in the flow path actuates to its correct position on Safety In)ection actuation test
- signal, arid 2)
Verifying that each of the following pumps start automatically upon, receipt of a Safety In)ection actuation test signal:
a)
Safety In5ection pump, and b)
RHR puep.
TURKEY POINT - UNITS 3 4 4 3/4 5-7 AMENDMENT NOS.~ND H3
18
~
~
L-96-016 Attachment 3
INSERT A At least once, daily of the areas affected within containment by containment entry and during the final entry when CONTAINMENT INTEGRITY is established.