L-96-019 At:t:achment 3

ATTACHMENT 3 PROPOSED LICENSE AMENDMENT FOR VARIOUS ADMINISTRATIVETECHNICAL SPECIFICAT1ON IMPROVEMENTS 3/4 0-1 3/4 8-2 3/4 9-8

'P605i70230 960510 f'Oa AOOCK 05000V50 J

p PDR-

4.0.)

Surveillance Requirements shall be met during the OPERATIONAL ggES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement, 4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with a maximum allowable extension not to exceed 25% of the surveillance interval.

4.0.3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation.

The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed.

The ACTION requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Surveillance Requirements do not have to be performed on inoperable equipment.

4.0.4 Entry into an OPERATIONAL NSE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with a Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified.

This provision shill not prevent passage through or to OPERATIONAL HOGES as required to comply with ACTION requirements.

4.0.5 Surveillance Requirements for fnservice inspection ind testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows:

a ~

Inservice inspection of ASIDE Code Class I, 2, and 3 components and inservice testing of ASIDE Code Class I, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a.

TURKEY POINT - UNITS 3 8

4 3/4 0-3 AMENDMENT NOS. ~MD~

KIH5:

a ~

b.

C.

ISDES 1, 2, 3, and 4.

With one of two startup transformers or an associated circuit inoper-

able, demonstrate the OPERABILITY of the other startup transformer and fts assocfated circuits by performing Surveillance Requirement I.S.l.l.l.a wfthin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

atAo If the inoperable startup transforwer is the associated startup transformer and became inoperable while the unit fs in HOOE 1, reduce THERNL POWER to 5 30K RATED THERNL POWER within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or restore the inoperable startup transformer and associated circuits to OPERABLE status within the next IS hours or be fn at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and fn COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

If THERNL PO'WER is reduced to s 30%

RATED THERNL POWER within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or ff the inoperable star'tup transformer is associated with the opposite unit restore the startup transformer and its associated circuits to OPERABLE status within 30 days of the loss of OPERABILITY, or be fn at least HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTDOWN withfn the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

If the inoperable startup transformer fs the associated startup transformer and became inoperable while the unit was in NODE 2, 3, or 4 restore the star tup transformer and fts associated circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

This ACTION applies to both units simultaneously.

Mfth one of the required diesel generators inoperable, demonstrate the OPERABILITY of the above required startup transformers and their associated circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

If the diesel generator became inoperable due to any cause other than an inoperable support

system, an independently testable component, or preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining required diesel gener ators by performing Surveillance Requirement 4.8.1.1.2a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the absence of any potentfal comaon mode failure for the remainfng diesel generators is determined.

If testing of remaining required diesel generators fs required, this testing must be performed regardless of when the inoperable diesel generator is restored to OPERABILITY.

Restore the inoperable diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUTOOMN within the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> s.

With one startup transformer and one of the required diesel genera-tors inoperable, demonstrate the OPERABILITY of the remaining A.C.

sources by performing Surveillance Requirement 4.8. 1. 1. 1.a on the remaining TURKEY POINT - UNITS 3 5 4 3/4 8-2 AHENDHENT NOS.

HQ AND h%

REFUELIUG OPERATIONS 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION HIGH WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8. 1 At least one residual heat removal (RHR) loop shall be OPERABLE and in operation."

APPLICABILITY:

MODE 6, when the water level above the top of the reactor g

1 g <<3 1

23 ACTION:

With no RHR loop OPERABLE and in operation, suspend all operations involving an increase in the reactor decay heat load or a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required RHR loop to OPERABLE and operating status as soon as possible.

Close all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.9.8.1.1 At least one RHR loop shall be verified in operation and circulating reactor coolant at a flow rate of greater than or equal to 3000 gpm at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.9.8.1.2 The RHR flow indicator shall be subjected to a CHANNEL CALIBRATION at least once per 18 months.

TURKEY POINT - UNITS 3 8

4 3/4 9-8 AMENDMENT NOS.~ AND~

1

Z,-96-0l9 Attachment 3

The required RHR loop may be removed from operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause reduction of the Reactor Coolant System boron concentration.

If an ACTION item requires periodic performance on a "once per

.." basis, the above frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.