|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With 990714 Ltr ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With 990512 Ltr ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 990218 Ltr ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with 981209 Ltr ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With 981109 Ltr ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 981007 Ltr ML17313A5301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3.W/980812 Ltr ML17313A5001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980710 Ltr ML17313A4211998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3.W/980609 Ltr ML17313A3691998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for PVNGS.W/980412 Ltr ML17313A3461998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for PVNGS Units 1,2 & 3.W/980408 Ltr ML17313A2521998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980311 Ltr ML17313A2061998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Palo Verde Nuclear Generating Station,Unit 1,2 & 3.W/980210 Ltr ML17313A1811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A1351997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/971208 Ltr ML17313A1821997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for Palo Verde Nuclear Generating Station,Unit 3 ML17312B7521997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/971112 Ltr ML17312B6641997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Pvngs,Units 1,2 & 3.W/970909 Ltr ML17313B0621997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Pvngs,Units 1,2 & 3.With 970812 Ltr ML17312B1741996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Pvngs,Units 1,2 & 3.W/970109 Ltr ML17312A9981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for PVNGS Unit 1,2 & 3 ML17312A9681996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/960911 Ltr ML17312A9181996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Pvngs,Units 1,2 & 3 ML17312A9191996-04-30030 April 1996 Rev to MOR for Apr 1996 for PVNGS Unit 1 ML17312A6881996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for PVNGS.W/960411 Ltr ML17312B0001996-03-31031 March 1996 Revised Monthly Operating Rept for Mar 1996 for Palo Verde Nuclear Generating Station,Unit 2 ML17312A5371996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for PVNGS Units 1,2 & 3. W/960213 Ltr ML17311B3121995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for PVNGS Units 1,2 & 3.W/951213 Ltr ML17311B2681995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Palo Verde Nuclear Generating Station.W/951108 Ltr ML17311B2221995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Palo Verde Nuclear Generating Station.W/951011 Ltr ML17311B1821995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Palo Verde Nuclear Generating Station.W/950913 Ltr ML17311B0441995-06-30030 June 1995 Monthly Operating Repts for June 1995 for PVNGS Unit 1,2 & 3 ML17311B0451995-05-31031 May 1995 Revised Page 6 to Monthly Operating Rept for May 1995 for PVNGS Unit 2 ML17311A9471995-04-30030 April 1995 Revised Monthly Operating Rept for Apr 1995 for PVNGS ML17311A8721995-04-30030 April 1995 Monthly Operating Repts for Apr 1995 for PVNGS Units 1-3. W/950509 Ltr ML17311A8061995-03-31031 March 1995 Monthly Operating Repts for Mar 1995 for Palo Verde Nuclear Generating Station.W/950412 Ltr ML17311A7101995-02-28028 February 1995 Monthly Operating Repts for Feb 1995 for Palo Verde Nuclear Generating Station ML17311A6601995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station.W/950210 Ltr ML17311A7121994-11-30030 November 1994 Revised Monthly Operating Rept for Nov 1994 for Palo Verde Nuclear Plant Unit 3 ML17311A2691994-08-31031 August 1994 Monthly Operating Repts for Aug 1994 for Palo Verde Nuclear Generating Station.W/940913 Ltr ML17310B2811994-04-30030 April 1994 Monthly Operating Repts for Apr 1993 for Palo Verde Nuclear Generating Station.W/940513 Ltr ML17310B2161994-03-31031 March 1994 Monthly Operating Repts for Mar 1994 for PVNGS Units 1,2 & 3 ML17310B1001994-02-28028 February 1994 Monthly Operating Repts for Feb 1994 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/940314 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 ML17313B0751999-08-27027 August 1999 LER 99-002-00:on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with 990827 Ltr ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr ML17313B0191999-07-16016 July 1999 LER 99-005-00:on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With 990714 Ltr ML17313A9921999-06-21021 June 1999 Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was Initiated ML17313A9911999-06-18018 June 1999 Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr ML17313A9281999-05-0707 May 1999 LER 99-004-00:on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With 990512 Ltr ML17313A8951999-04-14014 April 1999 LER 99-003-00:on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked ML17313A8921999-04-13013 April 1999 LER 98-003-01:on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc ML17313A8891999-04-0909 April 1999 LER 99-001-00:on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with 990409 Ltr ML17300B3071999-03-31031 March 1999 Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee. ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207H7471999-03-10010 March 1999 1999 Emergency Preparedness Exercise 99-E-AEV-03003 ML17313A8361999-03-0101 March 1999 LER 99-001-00:on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With 990302 Ltr ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr ML17313A7791999-02-0505 February 1999 Safety Evaluation Accepting Licensee Rev to Emergency Plan That Would Result in Two Less Radiation Protection Positions Immediatelu Available During Emergencies ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 990218 Ltr ML17313A7701999-01-15015 January 1999 LER 96-008-00:on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr ML20206H2101998-12-31031 December 1998 SCE 1998 Annual Rept ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with 981209 Ltr ML17313A6701998-11-0404 November 1998 Rev 2 to PVNGS Unit 2 Colr. ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With 981109 Ltr ML17313A6611998-10-24024 October 1998 LER 98-008-00:on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 981007 Ltr ML17313A5961998-09-14014 September 1998 LER 98-002-00:on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired ML17313A5761998-09-0808 September 1998 LER 98-003-01:on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters ML17313A5591998-08-28028 August 1998 LER 98-001-00:on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to svc.W/980828 Ltr ML20151S0941998-08-21021 August 1998 Rev 6 to COLR for PVNGS Unit 3 ML20151S0861998-08-21021 August 1998 Rev 4 to COLR for PVNGS Unit 1 ML20151S0901998-08-21021 August 1998 Rev 1 to COLR for PVNGS Unit 2 ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17313A5401998-08-13013 August 1998 Special Rept:On 980715,declared PASS Inoperable.Caused by Failure of Offgas Flush/Purge Control Handswitch HS0101. Handswitch Replaced & Post Maintenance Retesting Was Initiated ML17313A5301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3.W/980812 Ltr ML17313A5201998-07-30030 July 1998 LER 98-004-00:on 980630,personnel Discovered That Pressure Safety Valve Had Not Received Periodic Set Pressure Test for ASME Class 1 Pressure Safety Valve.Caused by Personnel Error.Pressure Safety Valve reviewed.W/980730 Ltr ML17313A5791998-07-0707 July 1998 to PVNGS SG Tube ISI Results for Seventh Refueling Outage Mar & Apr 1998. ML17313A5001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980710 Ltr ML17313A4671998-06-19019 June 1998 LER 98-007-00:on 980520,CR Personnel Observed Flow & Pressure Perturbations on Chemical & Vol Control Sys Letdown Sys.Caused by Cyclic Fatigue Due to Dynamic Pressure Transients.Unit Letdown Piping Replaced ML17313A4521998-06-19019 June 1998 Rev 5 to COLR for Pvngs,Unit 3. ML17313A4501998-06-19019 June 1998 Rev 4 to COLR for Pvngs,Unit 3. ML17313A4131998-06-0505 June 1998 LER 98-006-00:on 980507,determined That Plant Was Outside Design Basis Due to SI Discharge Check Valve Reverse Flow. Check Valve Was Disassembled,Examined & Reassembled, Whereupon Valve Met Acceptance Criteria ML17313A4211998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3.W/980609 Ltr ML17313A3951998-05-26026 May 1998 LER 98-005-00:on 980428,noted That Required Response Time Testing Had Not Been Performed.Caused by Personnel Error. Coached I&C Personnel Responsible for Reviewing Work Authorization Documentation ML17313A3691998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for PVNGS.W/980412 Ltr ML17313A3251998-04-0101 April 1998 LER 98-004-00:on 980304,safety Valves as-found Pressures Out of Tolerance.Cause of Event Is Under Investigation.Three Mssv'S & Psv Will Be Replaced W/Refurbished & Recertified Valves During Refueling Outage U1R7 1999-09-30
[Table view] |
Text
paxoa1TY 1~(ACCELERATED RTDS PROCESSING)
,,Y REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9511150007 DOC.DATE:&5+34~NOTARIZED:
NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION FULTON,J.D.
Arizona Public Service Co.(formerly Arizona Nuclear Power LEVINE,J.M.
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME
'ECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts r Oct 1995 for Palo Verde Nuclear Generating StationsW/
51108 ltr.'ISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR
!ENCL)SIZE: I 4 TITLE: Monthly Operating Report (per Tech Specs)R NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.05000528 05000529 T 05000530 RECIPIENT ID CODE/NAME ,PD4-2 PD TRAN,L INTERNAL: ACRS~PIC~CENTER 1~RGN'XTERNAL LI TCO BRYCE s J H NRC PDR.COPIES LTTR ENCL 1 1 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HOLIAN, B THOMAS,C AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D 0 N NOTE,.TO ALL"RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21 I t t'I I t I'
.Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 182-06106-JMUJ LT/J DF November 8, 1995 U.S.Nuclear Regulatory Commission
'TI N: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1,2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for October 1995 Enclosed are the Monthly Operating Reports for October 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Judy Fulton at (602)393-5277.Sincerely, JMUJLT/JDF/clj
Enclosures:
October 1995 Monthly'Operating Reports (all w/enclosures) cc: L.J.Callan K.E.Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute---~A".n n 95iii50007 95i03i PDR ADOCK 05000528 PDR NRC MONTHLY OPERATING REPORT DOCKET NO.UNIT NAME KLH~~DATE i2QZLK COMPLETED BY OLD.~QIl UBRIZMRu 1.Unit Name: Palo Verde Nuclear Generating Station, Unit 1 2.Reporting Period: October 1995 3.Licensed Thermal Power (MWt): 3800 4.Nameplate Rating (Gross MWe): 1403 5.Design Electrical Rating (Net MWe): 1249 6.Maximum Dependable Capacity (Gross MWe):.1299 7.Maximum Dependable Capacity (Net MWe): 1227 8.If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)9 10 Since Last Report, Give Reasons: N/A Power Level to Which Restricted, If Any (Net MWe): Reasons For Restrictions, If Any: N/A None 12 13 14 15 16 17 18 19 20 21 22 23 IHo'i'iii'::lii:Reportl'ii'j':Pe'bio'd,"l:',.NNN.,,'::i:::::;:::;:i!
.".4~4mp~~gi':-:.':::;::::.':::::::,':,.'.':i;'::::i:"::;:,'::::
IHollrs'Reactof'.,:was.;:,Crltic8lg)P>.4~5;::i:::::::::::':::;'8<""".9':'-"'-;:.';:."~"~
- .:React8r:.Reserve;,.:8hUtdowA':::Houi's"::::".""',..:.':::.:.:;::::::
':::::'::':::;'::.";
Hourk::6eiiei'atoi':.wis.::0ii:.L'inc;:::;km:;@if>4,';:,":,.:,::,;:::;;::::,;::,,;<":',.,':ging,.;.;'.'m
- ',,Viiit!
Reset've.'::.Shiitdoe'ii':::H8iiri::,-::::::..':::,::5+~!!74:".:;:::::."::'-:;::':'::,:;;."::.';';"::::,:;':,';';
.'-',;6'ioik TI't'e'ir'n'if;::Ene't'j';::Ceiie'j'ited.'::IMNH)',:',:;:,:;'.'::,.'.;::,::',::::;::,:';:::;::;,':
i'4':4g:;i':4k":i'::g)j;:+>+@
-':+<'~""':<:,':4!':g:'.s
'4+'jxq$(x sh'!i i!N,c a@vK":: 'i'.:.:',6'r'ossgElect'ric'al,:6ii'e're'y",::.:'6'e'nei'a'te'd<
MI/O'::,::'::,',::.::::::::.;::':,:,:,::::;,,';,':;:':::;:,'::;:;,Net.::.EIei:triiNI!Ener';:;.perte'rated.:;(IIII')
l':,::.::::::::::.::::::::.:::.":.:'.:i'::::.:'.:::::::"~Unit..:8ervl'ce:;.Factor:,'(':,A')'..:;:::.:::'.;"'L4::;:::,::,:-'::::":::!
I:;:.:,":.'::::;::::::::,'!,:;.'.,';:,:."::::::.
.':Unit A'villabllI
":)Factoi.'..':.Unit'.:Capacity';-.a'cto40slni
'Q5C.:.Net}',I:,::,::,;::,,::,':,::;.::::.".'--"".".:
'-.";-,':.",::,':,,~
- '
- tJii'lh"::,Cipi'city', Fac'to'rg/Usirig;DER";Net)::,::,::;:,::,::::;::.-~~"~-;':;-,;:.",-",,-,"",,~
I:::;:;:: This.":Nla'ifh'~!.:::;-';
744 744.0 0.0 744.0 0.0 2,826,498 976,500 923,304 100 0%100.0%101.1%99.4%0.0%:;:;.:::;:::::.i:Yr'."..'t'o.':.Date;::::;;-':-;',296 5,962.3 0.0 5,902.2 0.0 21,696,875 7,432,500 6,997,169 80.9%80.9%78 2%76 8%06%:;:;';:;;.:Cumiilatlve 85,536 56,595.1 0.0 55,558.8 0.0 200,778,893 69,479,000 65,228,075 65 pot 65 0%62.5%6p p 12.3%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N/A 25.If Shutdown At End of Report Period, Estimated Date of Start-up: N/A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast QRK.Qgj//j 11'chieved QGLZGLK AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT NAME~V DATE 12QZLK COMPLETED BY MONTH: October 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1246 17 1246 1246 18 1246 1244 19 1246 1244 20 1244 1246 21 1246 1244 22 1246 1246 23 1251 1246 1252 1245 25 1251 10 1244 26 1248 1243 27 , 1247 12'241 28 1247 13 1242 29 1248 14 1244 30 1247 15 i 16 1244 1245 31 1244 I F r CI' REFUELING INFORMATION DOCKET NO.~2/UNIT NAME D'ATE i2QZLK COMPLETED BY Scheduled date for next refueling shutdown.The 6th refueling outage is scheduled to begin on 09/07/96.Scheduled date for restart following refueling.
11/01/96.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Scheduled date for submitting proposed licensing action and supporting information.
5/20/96 important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.The number of fuel assemblies.
b)In the spent fuel storage pool.iV.~Intended change in spent fuel storage capacity.~ale Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.UNIT NAME DATE 12QZ/K COMPLETED BY~~u~10/01 0000 Unit began the month in Mode 1 with Rx power at 100%10/31 2400 Unit ended the month in Mode 1 with Rx power at 100%.
t' SHUTDOWNS AND POWER REDUCTIONS October 1995 DOCKET NO~5-26 UNIT NAME PVN~>~DATE~1/0~7/COMPLETED BY~DFut on Outage Method of Duration Shutting Down Date Type" Hours Reason2 Reactor3 LER No.No reactor shutdowns or significant power reductions occurred during the month of October 1995 System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence"F-Forced S-Scheduled 2Reason: A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source
V AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.QL529 UNIT NAME P~~DATE 11572K COMPLETED BY JJ3~~MONTH: October 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1257 17 1256 1256 18 1256 1256 S 1258 ,19 20 1256 1254 1259 21 1255 1257 22 1250 1258 23 1259 1257 24 1260 1256 25 1258 10 1255 26 1258 1254 27 1257 12 1249 28 1256 13 1253 29 1257 14 1252 30 1256 15 1252 31 1254 16 1253 REFUELING INFORMATION DOCKET NO.SLUR UNIT NAME~Vi~DATE COMPLETED BY~~go Scheduled date for next refueling shutdown.The 6th refueling outage is scheduled for 03/16/96.Scheduled date for restart following refueling.
05/1 0/96.3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Technical Specification 3.2.6"Reactor Coolant Cold Leg Temperature" figure 3.2-1 to establish new 100%power operation allowable temperature from 560'F to 550'F.4, Scheduled date for submitting proposed licensing action and supporting information.
12/08/95.5..Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier,'nreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Stretch Power to 102%.The number of fuel assemblies.
e)tn the core.~b)In the spent fuel storage pool.~5K Licensed spent fuel storage capacity.~99 Intended change in spent fuel storage capacity.~~8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.II 2005 (18 Month reloads and full core discharge capability).
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.2L52R UNIT NAME MHGR2 DATE 11LQZLK COMPLETED BY slJ2,~Q!l 10/01 0000 Unit began the month in Mode 1 at 100%Rx power.10/31 2400 Unit ended the month in Mode 1 at 100%Rx power.
0 I SHUTDOWNS AND POWER REDUCTIONS October 1995 DOCKET NO SLVB UNIT NAME PVNI~DATE~11/07/COMPLETED BY~JD Fu/on nul-No.Outage Method of Duration Shutting Down Date Type" Hours Reason2 Reactor3 LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of October 1995.1F Forced S-Scheduled 2Reason: A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee.Event Report (LER)File (NUREG 0161)Exhibit H-Same Source I f
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.K 5K UNIT NAME MbtGM DATE 1UQZLK COMPLETED BY~ultQQ MONTH: October 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1256 17 1254 18 1253 19 4 1254 20 1255 0 1255 22 1256 23 1255 24 1254 25 10 1252 26 1253 27 12 1251 28 13 1233 29 14 18 30 15 31 16 tp REFUELING INFORMATION DOCKET NO.f~UNIT NAME E~GR2 DATE 192ZLK COMPLETED BY JJ2&L!lfQll Scheduled date for next refueling shutdown.The 5th refueling outage began 10/14/95.Scheduled date for restart following refueling.
12/23/95.Will refueling or, resumption of operation thereafter require a Technical Specification change or other license amendment?
a.Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.(approved by NRC 9/20/95).b.Technical Specification change to revise list of analytical methods in 6.9.1.10.(approved 10/4/95 by NRC)Scheduled date for submitting proposed licensing action and supporting information.
None.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevlewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.The number of fuel assemblies.
b)In the spent fuel storage pool.Intended change in spent fuel storage capacity.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
P~I'
~~\
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.59-'QQ UNIT NAME DATE MQZLB5 COMPLETED BY~gltQll Galahad.~10/01 0000 10/13 2124 10/14 0051 Unit began the month in Mode 1 at 100%power.Commenced Reactor Power Shutdown.'Tripped the Reactor for normal plant shutdown entered Mode 3.10/14 1004 Entered Mode 4.10/14 1715 10/1 8 0310 10/23 1728 Entered Mode 5.Entered Mode 6.Exited Mode 6 Reactor is de-fueled.
10/31 2400 Ended the month with Reactor de-fueled.
(o P r SHUTDOWNS AND POWER REDUCTIONS October 1995 DOCKET NO 50-530 UNIT NAME PVN95 3 DATE 11L~2P5 COMPLETED BY LQJ98El ISZaulll No.Outage Method of Duration Shutting Down Date Type" Hours Reason2 Reactor3 LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence 95-01 10/14/95 S 431.1 C N/A N/A N/A Rx manually tripped to begin the fifth refueling outage.1F-Forced S-Scheduled 2Reason.A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source t/~~A I'll