Robinson Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 16:50:55 Report 22 3 TI-171-B.5.B PHASE 2&3 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 2 2515/171 IP 1 EB3ISI-INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/06/2008 10/10/2008 2 7111108P IP 2 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK1 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/13/2008 10/17/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/13/2008 10/17/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/13/2008 10/17/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/13/2008 10/17/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/13/2008 10/17/2008 2 71151-PR01 IP 2 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/20/2008 10/24/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/20/2008 10/24/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 2 71151-PR01 IP 1 EB3TI172-EB3 TI-172 RCS DM BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 2 2515/172 IP 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 12/15/2008 12/17/2008 2 7112101 IP 4 PSB1-RP-RADIATION PROTECTIO PUBLIC BASELINE INSP Baseline Inspections A ccess Control to Radiologically Significant Areas 01/12/2009 01/16/2009 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 2 71151-PR01 IP 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 03/02/2009 03/06/2009 2 7111111B IP 3 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 05/18/2009 05/22/2009 2 2515/175 IP EP Baseline Inspection Exercise Evaluation 05/18/2009 05/22/2009 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 2 7111404 IP Baseline Inspections ERO Drill Participation 05/18/2009 05/22/2009 2 71151-EP02 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Robinson Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 16:50:55 Report 22 3 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP 1 EB3-HS-HEAT SINK Baseline Inspections Heat Sink Performance 06/01/2009 06/05/2009 2 7111107B IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/06/2009 07/10/2009 2 V23310 3 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/27/2009 07/31/2009 2 V23310 2 OL EXAM-INTIAL EXAM - WEEK2 Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 08/10/2009 08/14/2009 2 V23310 4 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 09/28/2009 10/02/2009 2 7111117B IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.