2009 EOC Letter and Report 22
ML100620808
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/03/2010
From: Burritt A L
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
Burritt A
References
IR-10-001
Download: ML100620808 (5)


Text

UNITED NUCLEAR REGULATORY REGION 475 ALLENDALE KING OF PRUSSIA, PENNSYLVANIA March 3. Mr. Thomas President and Chief Nuclear PSEG Nuclear LLC -P. O. Box Hancocks Bridge, NJ ANNUAL ASSESSMENT LETTER -SALEM NUCLEAR GENERATING STATION. UNITS 1 AND 2 (05000272/2010001 AND 0500031112010001)

Dear Mr. Joyce:

On February 9,2010. the NRC staff completed its performance review of Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan . . Overall. Salem Unit Nos. 1 and 2 operated in a manner that preserved public health and safety . apd fully met all cornerstone objectives.

Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

In our Annual Assessment Letter, dated March 4.2009 (ML090620756)1, we advised you of a substantive cross-cutting issue in the area of human performance with a cross-cutting aspect of documentation and procedure adequacy {H.2(C>>)2.

We defined the exit criteria for clearing the substantive cross-cutting issue as demonstrated sustainable improved performance evidenced by effective implementation of a corrective action plan that resulted in no safety Significant inspection findings and a notable reduction in the overall number of inspection findings with the same causal factor. In our mid-cycle assessment letter, dated September 1, 2009 (ML09244030)1, we concluded that you had not met these criteria.

Specifically.

we determined that many of the corrective actions that resulted from your cause analyses were not completed at the time of our review. As such, at that time, we maintained this substantive cross-cutting issue open. 1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this fetter are publicly available using the accession number in ADAMS. 2 This is a descriptor that correlates to this cross-cutting aspect in Inspection Manual Chapter 0310, "Components within the cross-cutting areas.n 2 During this assessment period, we have determined that you have made substantial progress in implementation of an appropriate corrective action plan to address the substantive cross-cutting issue in documentation and procedure adequacy.

In 2009 all inspection findings identified at Salem were Green, and there were two findings with a documentation and procedure adequacy cross-cutting aspect. As such we considered it a siignificant reduction when compared to the seven findings identified with this cross-cutting aspect in 2008. Therefore, based on the exit criteria, we have concluded that PSEG has demonstrated sustainable improved performance in this cross-cutting aspect, and we have closed this substantive cross-cutting issue. The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. In addition to the baseline inspections, we plan to conduct inspections related to license renewal and pre-operational testing and operation of an independent spent fuel storage facility.

The inspec:tion plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. In accordance with 10 CFR 2,390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible.

Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan. since1Jfk Arthur L. Burritt, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272, 50-311 License Nos, DPR-70, cc Distribution via ListServe Salem Nuclear Generating Station Inspection/Activity Plan I f T. Joyce 2 During this assessment period, we have determined that you have made substantial progress implementation of an appropriate corrective action plan to address the substantive issue in documentation and procedure adequacy.

In 2009 all inspection findings identified Salem were Green, and there were two findings with a documentation and procedure cross-cutting aspect. As such we considered it a significant reduction when compared to seven findings identified with this cross-cutting aspect in 2008. Therefore, based on the criteria, we have concluded that PSEG has demonstrated sustainable improved performance this cross-cutting aspect, and we have closed this :substantive cross-cutting The enclosed inspection plan details the inspections.

less those related to physical protection scheduled through June 30, 2011. In addition to the baseline inspections, we plan to conduct inspections related to license renewal and pre-operational testing and operation of an independent spent fuel storage facility.

The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and enclosure will be made available electronically for public inspection in the NRC Public Room or from the Publicly Available Records (PARS) component of NRC's document (ADAMS). ADAMS is accessible from the NRC site at http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible.

Please contact me at 61

-5069 with any questions you may have regarding this letter or the inspection plan. Sincerely.

/RAJ Arthur L. Burritt, Director Division of Reactor Projects Projects Branch 3 Distribution w/encl: R. Moore, DRP R. Barkley, ORA S. Collins, RA DRS Directors John Thompson, NRR M. Dapas, DRA DRS Branch Chiefs (6) D. Schroeder, DRP, SRI D. LeiN, DRP D. Silk, DRS H. Balian, DRP, RI J. Clifford.

DRP N. McNamara, SLO L. Troelne, RI OEDO A. Burritt, DRP D. Tifft. SLO RidsNrrPMSalem Resource L.Cline, DRP D. Serenci. PAO RidsNrrDirslpabrRes@nrc.gov A. Turilin, DRP N. Sheehan, PAO ROPreportsRes@nrc.gov SUNSI Review Complete:

ALB (Reviewer's Initials)

ML 100620808 DOCUMENT NAME S:\ROP-10 EOC REVIEw\BRANCH 3\LETTERS\2009 EOC -SALEM ASSESSMENT LETTERREV4.DOC After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this documenllndlcate In the box: 'C';; Copy without altachmentlencklsure

'f"" Copy wilh attachment.!

enclosure

'N'" No copy OFFICE RIIDRP RlfDRP RIIDRP NAME for LCline/LC ABurrittJ ALB DATE 02124/10 02124/10 03/02/10 OFFICIAL RECORD COpy Page 1 of3 0310512010 09:34:14 Report 22 Planned Dates 1,2 1,2 1 1 1,2 1,2 2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 Start 01/04/2010 01/04/2010 04/0612010 05/10/2010 02/0612010 0212212010 0212312010 04/12/2010 04112/2010 04112/2010 04/1212010 04/1212010 05/1712010 05;"17 i2010 05/1712010 05/17/2010 0511712010 08/0712010 06/2112010 07/1912010 07/19/2010 07/1912010 08/0212010 End 0110612010 01/08/2010 04/09/2010 05/1412010 02/1212010 02126/2010 0212512010 0411612010 04/16/2010 04/1612010 0412312010 0412312010 05/21/2010 05;21/2010 0512112010 0512112010 05121/2010 06/1112010 06/25/2010 07/2312010 0712312010 0712312010 08/0612010 71124 IP 71124.05 IP 71124.06 5/10EXAM U01764 U01764 MODS IP 7111117T IP 7111117T 50001 IP 50001 71121 IP 71124.01 IP 71124.02 IP 71124.03 7111108P !P 7111108P TI-172 IP 25151172 EPEX IP 7111401 iP 7111404 Salem Inspection I Activity Plan 01/0112010

-06/30/2011 Title -RETS 1 RadiaUon Monitoring Instrumentation Radioactive Gaseous and Liquid Effluent Treatment

-OPERATOR LICENSING INITIAL EXAM 4 FY10 -SALEM UNITS 1&2 INITIAL OPERATOR LICENSING EXAM FY10 -SALEM UNITS 1&2 INITIAL OPERATOR LICENSING EXAM -PERMANENT PLANT MODIFICATIONS 4 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

-HP 1 Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation

  • U1 INSERVICE INSPECTION

!nservice Inspection Activities

-PWR

-MANAGING GAS ACCUMULATION IN ECCS 3 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal &Containment Spray System this report does not include INPO and OUTAGE This report shows only on-site and announced inspection Page2of3 03/0512010 09:34:14 Report 22 ------pjanned Dates Start 3' 1.2 0810912010 1,2 08109/2010

1.2 0810912010

1.2 08/09/2010

1.2 0912712010

1.2 0912712010

1.2 0912712010

1.2 09/2712010

1.2 0912712010

1.2 1210612010

1,2 01/03/2011 1,2 0110312011 r'l4 H'\" P"U'\ <I ..(1,2 V UVtJIl&.V t I 1,2 01124/2011 1,2 02/07/2011 1,2 02/14/2011 1,2 03/1412011 1,2 03/14/2011 1,2 03114/2011

1.2 0311412011

1.2 03/1412011 1,2 03/14/2011 1.2 03114/2011 2 04/11/2011 2 04/111201'1 2 04/18/2011 End 08/20/2010 0812012010 0812012010 0812012010 1010112010 10/01/2010 10/01/2010 10/01/2010 10/01/2010 12110/2010 0110712011 01/07/2011 01/0712011 01/28/2011 02/11/2011 02/18/2011 0311812011 03/1812011 0311812011 03/1812011 03118/2011 0311812011 03118/2011 04/2212011 0412212011 04/22/2011 ISFSI IP 60854 IP 60854.1 IP 60855 IP 60855.1 71124 IP 60855.1 IP 71124.01 IP 71124.05 Salem Inspection I Activity Plan 01/01/2010

-06/30/2011 Title -ISFSI -DRY RUN AND INITIAL LOADING 1 Preoperational Testing Of An ISFSI Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants Operation Of An ISFSI OperatIon of an Independent Spent Fuel Storage Installation at Operating Plants

  • HP&ISFSI 1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiological Hazard Assessment and Exposure Controls Radiation Monitoring Instrumentation IP 71151*0R01 Occupational Exposure Control Effectiveness IP 71151-PR01 RETSlODCM Radiological Effluent 7111107T IP 711110lT 71124 IP 71124.01 IP 71124.02 IP 71124.04 7111121 IP 7111121 IP 7111121 IP 7111121 EP PROGR IP 7111402 IP 7111403 IP 7111404 IP 7111405 IP 71151-EP01 IP 71151-EP02 IP 71151*EP03

-TRIENNIAL HEAT SINK 1 Heat Sink Performance

  • HP INSPECTION 1 Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Occupational Dose Assessment -CDBI 6 Component Design Bases Inspection Component Design Bases Inspection Component Design Bases Inspection

-EP PROGRAM INSPECTION 1 Alert and Notification System Evaluation Emergency Response Organization Staffing and Augmentation System Emergency Action Level and Emergency Plan Changes Correction of Emergency Preparedness Weaknesses and DefICiencies Drill/Exercise Performance ERO Drill Participation Alert & Notification System 2515/172 -TI2515/172 RCS OM WELDS 1 IP 25151172 Reactor Coolant System Dissimmar Metal Butt Welds 7111108P -U21NSERVICE INSPECTION 1 IP 7111108P Inservlce Inspection Activities*

PWR 71124

  • HP 1 IP 71124.01 Radiological Hazard Assessment and Exposure Controls lis report doesnot includelNPO arid OUTAGE This report shows only on-site and announced inspection Page 3of3 Salem 0310512010 09:34:14 Inspection I ActivIty Plan Report 22 01/01/2010

-0613012011 Planned Start End I Title 71124 -HP 1 2 04118/2011 04/22/2011 IP 71124,02 Occupational ALARA Planning and Controls 2 04/1812011 0412212011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71152 -PI&R 4 1.2 06/2712011 0710112011 IP 711528 IdentificatiOn and Resolution of Problems his report does lIot include INPO and OUTAGE activities.