Similar Documents at Salem |
---|
Category:Inspection Plan
MONTHYEARIR 05000272/20244032024-03-20020 March 2024 and Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) ML22234A0362022-08-22022 August 2022 Request for Information to Support Triennial Baseline Design - Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000272/2022011 and 05000311/2022011 ML22104A1762022-04-14014 April 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000272/2022402 and 05000311/2022402 IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 20302021-02-16016 February 2021 Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030 ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000272/2020005 and 05000311/2020005) ML20077L3492020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request IR 05000272/20190062020-03-0303 March 2020 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2019006 and 05000311/2019006) IR 05000272/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000272/2019005 and 05000311/2019005) IR 05000272/20180062019-03-0404 March 2019 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2018006 and 05000311/2018006) IR 05000272/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Reports 05000272/2018005 and 05000311/2018005) IR 05000272/20170062018-02-28028 February 2018 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017006, 05000311/2017006, 05000272/2017402, 05000311/2017402, 05000272/2017501, and 05000311/2017501 IR 05000272/20170052017-08-28028 August 2017 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017005 and 05000311/2017005) IR 05000272/20160062017-03-0101 March 2017 Annual Assessment Letter for Salem Nuclear Generating Station (Salem), Units 1 and 2 (Reports 05000272/2016006 and 05000311/2016006) IR 05000272/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005) IR 05000272/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 & 2 (Inspection Report 05000272/2015006 and 05000311/2015006) IR 05000272/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2015005 and 05000311/2015005) IR 05000272/20140012015-03-0404 March 2015 ROP-15 Annual Assessment Letter for Salem Nuclear Generating Station Units 1 and 2 (Report 05000272/2014001 and 05000311/2014001) IR 05000272/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2014006 and 05000311/2014006 IR 05000272/20130012014-03-0404 March 2014 ROP-14 2013 Salem Nuclear Generating Station Units 1 and 2, Annual Assessment Letter, Report 05000272-13-001 and 05000311-13-001),and Inspection Plan IR 05000272/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006 IR 05000272/20120012013-03-0404 March 2013 Annual Assessment Letter for Salem Nuclear Generating Station, Unit 1 and 2 (Report 05000272/2012001 and 05000311/2012001) ML12248A0402012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20110012012-03-0505 March 2012 Annual Assessment Letter for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Report 05000272/2011001 and 05000311/2011001) ML1124112942011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20100012011-03-0404 March 2011 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001) ML1024403642010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2 ML1029505872010-03-12012 March 2010 Email from Ohara, Timothy to Conte, Richard, FW: Salem U1 Inspection Plan. ML1006208082010-03-0303 March 2010 EOC Letter and Report 22 ML0924403092009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station, Unit Nos. 1 and 2 (September 1, 2009) IR 05000272/20090012009-03-0404 March 2009 Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001) IR 05000272/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001) ML0734706552007-12-13013 December 2007 ROP 8 - Salem - Change to Inspection Plan, 12/13/07 ML0724309472007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000272/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001) ML0624306512006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station IR 07200200/19600012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Salem Nuclear Generating Station (Report 05-272/2006001 and 05-311/2006001) ML0406307982004-03-0303 March 2004 2003-04 Annual Assessment Letter - Salem ML0323905112003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Salem Units 1 and 2 ML0306206932003-03-0303 March 2003 2003 Annual Assessment Letter - Salem Nuclear Generating Station ML0223500582002-08-23023 August 2002 2002 Mid-Cycle Performance Review and Inspection Plan - Salem Generating Station Units 1 & 2 2024-03-20
[Table view] Category:Letter
MONTHYEARIR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 and Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 2024-07-30
[Table view] |
Text
UNITED NUCLEAR REGULATORY REGION 475 ALLENDALE KING OF PRUSSIA, PENNSYLVANIA March 3. Mr. Thomas President and Chief Nuclear PSEG Nuclear LLC -P. O. Box Hancocks Bridge, NJ ANNUAL ASSESSMENT LETTER -SALEM NUCLEAR GENERATING STATION. UNITS 1 AND 2 (05000272/2010001 AND 0500031112010001)
Dear Mr. Joyce:
On February 9,2010. the NRC staff completed its performance review of Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan . . Overall. Salem Unit Nos. 1 and 2 operated in a manner that preserved public health and safety . apd fully met all cornerstone objectives.
Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
In our Annual Assessment Letter, dated March 4.2009 (ML090620756)1, we advised you of a substantive cross-cutting issue in the area of human performance with a cross-cutting aspect of documentation and procedure adequacy {H.2(C>>)2.
We defined the exit criteria for clearing the substantive cross-cutting issue as demonstrated sustainable improved performance evidenced by effective implementation of a corrective action plan that resulted in no safety Significant inspection findings and a notable reduction in the overall number of inspection findings with the same causal factor. In our mid-cycle assessment letter, dated September 1, 2009 (ML09244030)1, we concluded that you had not met these criteria.
Specifically.
we determined that many of the corrective actions that resulted from your cause analyses were not completed at the time of our review. As such, at that time, we maintained this substantive cross-cutting issue open. 1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this fetter are publicly available using the accession number in ADAMS. 2 This is a descriptor that correlates to this cross-cutting aspect in Inspection Manual Chapter 0310, "Components within the cross-cutting areas.n 2 During this assessment period, we have determined that you have made substantial progress in implementation of an appropriate corrective action plan to address the substantive cross-cutting issue in documentation and procedure adequacy.
In 2009 all inspection findings identified at Salem were Green, and there were two findings with a documentation and procedure adequacy cross-cutting aspect. As such we considered it a siignificant reduction when compared to the seven findings identified with this cross-cutting aspect in 2008. Therefore, based on the exit criteria, we have concluded that PSEG has demonstrated sustainable improved performance in this cross-cutting aspect, and we have closed this substantive cross-cutting issue. The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. In addition to the baseline inspections, we plan to conduct inspections related to license renewal and pre-operational testing and operation of an independent spent fuel storage facility.
The inspec:tion plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. In accordance with 10 CFR 2,390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible.
Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan. since1Jfk Arthur L. Burritt, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272, 50-311 License Nos, DPR-70, cc Distribution via ListServe Salem Nuclear Generating Station Inspection/Activity Plan I f T. Joyce 2 During this assessment period, we have determined that you have made substantial progress implementation of an appropriate corrective action plan to address the substantive issue in documentation and procedure adequacy.
In 2009 all inspection findings identified Salem were Green, and there were two findings with a documentation and procedure cross-cutting aspect. As such we considered it a significant reduction when compared to seven findings identified with this cross-cutting aspect in 2008. Therefore, based on the criteria, we have concluded that PSEG has demonstrated sustainable improved performance this cross-cutting aspect, and we have closed this :substantive cross-cutting The enclosed inspection plan details the inspections.
less those related to physical protection scheduled through June 30, 2011. In addition to the baseline inspections, we plan to conduct inspections related to license renewal and pre-operational testing and operation of an independent spent fuel storage facility.
The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and enclosure will be made available electronically for public inspection in the NRC Public Room or from the Publicly Available Records (PARS) component of NRC's document (ADAMS). ADAMS is accessible from the NRC site at http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible.
Please contact me at 61
-5069 with any questions you may have regarding this letter or the inspection plan. Sincerely.
/RAJ Arthur L. Burritt, Director Division of Reactor Projects Projects Branch 3 Distribution w/encl: R. Moore, DRP R. Barkley, ORA S. Collins, RA DRS Directors John Thompson, NRR M. Dapas, DRA DRS Branch Chiefs (6) D. Schroeder, DRP, SRI D. LeiN, DRP D. Silk, DRS H. Balian, DRP, RI J. Clifford.
DRP N. McNamara, SLO L. Troelne, RI OEDO A. Burritt, DRP D. Tifft. SLO RidsNrrPMSalem Resource L.Cline, DRP D. Serenci. PAO RidsNrrDirslpabrRes@nrc.gov A. Turilin, DRP N. Sheehan, PAO ROPreportsRes@nrc.gov SUNSI Review Complete:
ALB (Reviewer's Initials)
ML 100620808 DOCUMENT NAME S:\ROP-10 EOC REVIEw\BRANCH 3\LETTERS\2009 EOC -SALEM ASSESSMENT LETTERREV4.DOC After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this documenllndlcate In the box: 'C';; Copy without altachmentlencklsure
'f"" Copy wilh attachment.!
enclosure
'N'" No copy OFFICE RIIDRP RlfDRP RIIDRP NAME for LCline/LC ABurrittJ ALB DATE 02124/10 02124/10 03/02/10 OFFICIAL RECORD COpy Page 1 of3 0310512010 09:34:14 Report 22 Planned Dates 1,2 1,2 1 1 1,2 1,2 2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 Start 01/04/2010 01/04/2010 04/0612010 05/10/2010 02/0612010 0212212010 0212312010 04/12/2010 04112/2010 04112/2010 04/1212010 04/1212010 05/1712010 05;"17 i2010 05/1712010 05/17/2010 0511712010 08/0712010 06/2112010 07/1912010 07/19/2010 07/1912010 08/0212010 End 0110612010 01/08/2010 04/09/2010 05/1412010 02/1212010 02126/2010 0212512010 0411612010 04/16/2010 04/1612010 0412312010 0412312010 05/21/2010 05;21/2010 0512112010 0512112010 05121/2010 06/1112010 06/25/2010 07/2312010 0712312010 0712312010 08/0612010 71124 IP 71124.05 IP 71124.06 5/10EXAM U01764 U01764 MODS IP 7111117T IP 7111117T 50001 IP 50001 71121 IP 71124.01 IP 71124.02 IP 71124.03 7111108P !P 7111108P TI-172 IP 25151172 EPEX IP 7111401 iP 7111404 Salem Inspection I Activity Plan 01/0112010
-06/30/2011 Title -RETS 1 RadiaUon Monitoring Instrumentation Radioactive Gaseous and Liquid Effluent Treatment
-OPERATOR LICENSING INITIAL EXAM 4 FY10 -SALEM UNITS 1&2 INITIAL OPERATOR LICENSING EXAM FY10 -SALEM UNITS 1&2 INITIAL OPERATOR LICENSING EXAM -PERMANENT PLANT MODIFICATIONS 4 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
-HP 1 Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation
!nservice Inspection Activities
-PWR
-MANAGING GAS ACCUMULATION IN ECCS 3 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal &Containment Spray System this report does not include INPO and OUTAGE This report shows only on-site and announced inspection Page2of3 03/0512010 09:34:14 Report 22 ------pjanned Dates Start 3' 1.2 0810912010 1,2 08109/2010
1.2 0810912010
1.2 08/09/2010
1.2 0912712010
1.2 0912712010
1.2 0912712010
1.2 09/2712010
1.2 0912712010
1.2 1210612010
1,2 01/03/2011 1,2 0110312011 r'l4 H'\" P"U'\ <I ..(1,2 V UVtJIl&.V t I 1,2 01124/2011 1,2 02/07/2011 1,2 02/14/2011 1,2 03/1412011 1,2 03/14/2011 1,2 03114/2011
1.2 0311412011
1.2 03/1412011 1,2 03/14/2011 1.2 03114/2011 2 04/11/2011 2 04/111201'1 2 04/18/2011 End 08/20/2010 0812012010 0812012010 0812012010 1010112010 10/01/2010 10/01/2010 10/01/2010 10/01/2010 12110/2010 0110712011 01/07/2011 01/0712011 01/28/2011 02/11/2011 02/18/2011 0311812011 03/1812011 0311812011 03/1812011 03118/2011 0311812011 03118/2011 04/2212011 0412212011 04/22/2011 ISFSI IP 60854 IP 60854.1 IP 60855 IP 60855.1 71124 IP 60855.1 IP 71124.01 IP 71124.05 Salem Inspection I Activity Plan 01/01/2010
-06/30/2011 Title -ISFSI -DRY RUN AND INITIAL LOADING 1 Preoperational Testing Of An ISFSI Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants Operation Of An ISFSI OperatIon of an Independent Spent Fuel Storage Installation at Operating Plants
- HP&ISFSI 1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiological Hazard Assessment and Exposure Controls Radiation Monitoring Instrumentation IP 71151*0R01 Occupational Exposure Control Effectiveness IP 71151-PR01 RETSlODCM Radiological Effluent 7111107T IP 711110lT 71124 IP 71124.01 IP 71124.02 IP 71124.04 7111121 IP 7111121 IP 7111121 IP 7111121 EP PROGR IP 7111402 IP 7111403 IP 7111404 IP 7111405 IP 71151-EP01 IP 71151-EP02 IP 71151*EP03
-TRIENNIAL HEAT SINK 1 Heat Sink Performance
- HP INSPECTION 1 Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Occupational Dose Assessment -CDBI 6 Component Design Bases Inspection Component Design Bases Inspection Component Design Bases Inspection
-EP PROGRAM INSPECTION 1 Alert and Notification System Evaluation Emergency Response Organization Staffing and Augmentation System Emergency Action Level and Emergency Plan Changes Correction of Emergency Preparedness Weaknesses and DefICiencies Drill/Exercise Performance ERO Drill Participation Alert & Notification System 2515/172 -TI2515/172 RCS OM WELDS 1 IP 25151172 Reactor Coolant System Dissimmar Metal Butt Welds 7111108P -U21NSERVICE INSPECTION 1 IP 7111108P Inservlce Inspection Activities*
PWR 71124
- HP 1 IP 71124.01 Radiological Hazard Assessment and Exposure Controls lis report doesnot includelNPO arid OUTAGE This report shows only on-site and announced inspection Page 3of3 Salem 0310512010 09:34:14 Inspection I ActivIty Plan Report 22 01/01/2010
-0613012011 Planned Start End I Title 71124 -HP 1 2 04118/2011 04/22/2011 IP 71124,02 Occupational ALARA Planning and Controls 2 04/1812011 0412212011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71152 -PI&R 4 1.2 06/2712011 0710112011 IP 711528 IdentificatiOn and Resolution of Problems his report does lIot include INPO and OUTAGE activities.
This report shows only on-site and announced Inspection procedures.