IR 05000445/2018006

From kanterella
Revision as of 15:54, 14 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Letter for Comanche Peak, Units 1 and 2 (Report 05000445/2018006 and 05000446/2018006)
ML19057A547
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/2019
From: Haire M S
NRC/RGN-IV/DRP
To: Peters K J
Vistra Operations Company
References
IR 2018006
Download: ML19057A547 (6)


Text

March 4, 2019

Mr. Ken J. Peters, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Vistra Operations Company LLC P.O. Box 1002 Glen Rose, TX 76043

SUBJECT: ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000 445/2018 00 6 AND 05000 446/2018 00 6)

Dear Mr. Peters:

T he U.S. Nuclear Regulatory Commission (NRC) has completed its end

-of-cycle performance assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2

, reviewing performance indicators (PIs)

, inspection results

, and enforcement actions from January 1, 20 18 , through December 31, 20 18. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 , during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC

's Reactor Oversight Process (ROP) Action Matrix

, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31

, 20 20. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency has proposed changes regarding engineering inspections (SECY

-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections") and is drafting proposed changes to the ROP for Commission consideration. Should the Commission approve changes to the ROP, the engineering and other region

-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1148 with any questions you have regarding this letter.

Sincerely,/RA/ Mark S. Haire, Chief Project Branch A Division of Reactor Projects Dockets: 50-445 and 50-446 Licenses:

NPF-87 and NPF-89

Enclosure:

Inspection Plan

Comanche Peak

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

COMANCHE PEAK 10CFR50.59 INSPECTION

3 1, 2 02/04/2019

02/08/2019

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

CPSES 2019 BRQ

2 1, 2 03/17/2019

03/23/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

INSERVICE INSPECTION 1R20

1 1, 2 04/29/2019

05/10/2019

IP 71111.08P

000702 Inservice Inspection Activities (PWR)

RP INSPECTION (1,3)

2 1, 2 04/29/2019

05/03/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 04/29/2019

05/03/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

CPSES 2019 INITIAL EXAM

7 1, 2 05/05/2019

05/11/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 06/09/2019

06/15/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Security Access Control .02

1 1, 2 06/17/2019

06/21/2019

IP 71130.02

000734 Access Control

1, 2 06/17/2019

06/21/2019

IP 71151 001338 Performance Indicator Verification

RP INSPECTION (2,4)

2 1, 2 08/05/2019

08/09/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 08/05/2019

08/09/2019

IP 71124.04

000728 Occupational Dose Assessment

IN OFFICE SCENARIO REVIEW

5 1, 2 09/02/2019

10/08/2019

IP 71114.08

000723 Exercise Evaluation

Scenario Review

BIENNIAL PI&R

4 1, 2 09/16/2019

10/04/2019

IP 71152B 000747 Problem Identification and Resolution

1, 2 09/30/2019

10/04/2019

IP 71152B 000747 Problem Identification and Resolution

EP EXERCISE INSPECTION

4 1, 2 11/04/2019

11/08/2019

IP 71114.01

000716 Exercise Evaluation

1, 2 11/04/2019

11/08/2019

IP 71114.04

000719 Emergency Action Level and Emergency Plan Changes

1, 2 11/04/2019

11/08/2019

IP 71151 001397 Performance Indicator Verification

2/22/2019 8:26:22 AM

Page 1

of 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Comanche Peak

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

FORCE-ON-FORCE PLANNING AND EXERCISES

6 1, 2 11/18/2019

11/22/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

1, 2 12/09/2019

12/13/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

RS5678 Radiation Safety PS Team

4 1, 2 01/27/2020

01/31/2020

IP 71124.05

000729 Radiation Monitoring Instrumentation

1, 2 01/27/2020

01/31/2020

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

1, 2 01/27/2020

01/31/2020

IP 71124.07

000731 Radiological Environmental Monitoring Program

1, 2 01/27/2020

01/31/2020

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

Cyber Security Inspection

2 1, 2 02/10/2020

02/14/2020

IP 71130.10P

000741 Cyber Security

1, 2 02/24/2020

02/28/2020

IP 71130.10P

000741 Cyber Security

Inservice Inspection 2RD18

1 2

04/27/2020

05/08/2020

IP 71111.08P

000702 Inservice Inspection Activities (PWR)

RS13PI Radiation Safety

2 1, 2 04/27/2020

05/01/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 04/27/2020

05/01/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

Triennial Fire Protection Inspection

4 1, 2 06/07/2020

06/13/2020

IP 71111.05T

000696 Fire Protection (Triennial)

1, 2 06/21/2020

06/27/2020

IP 71111.05T

000696 Fire Protection (Triennial)

Comanche Peak 1, 2 - Design Bases Assurance Inspection (Programs)

3 1, 2 08/10/2020

08/14/2020

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

1, 2 08/24/2020

08/28/2020

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

EP Program Inspection

1 1, 2 10/05/2020

10/09/2020

IP 71114.02

000717 Alert and Notification System Testing

1, 2 10/05/2020

10/09/2020

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

1, 2 10/05/2020

10/09/2020

IP 71114.04

000719 Emergency Action Level and Emergency Plan Changes

1, 2 10/05/2020

10/09/2020

IP 71114.05

000720 Maintenance of Emergency Preparedness

1, 2 10/05/2020

10/09/2020

IP 71151 001397 Performance Indicator Verification

2/22/2019 8:26:22 AM

Page 2

of 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Comanche Peak

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

Inservice Inspection 1RF21

1 1

10/12/2020

10/23/2020

IP 71111.08P

000702 Inservice Inspection Activities (PWR)

2/22/2019 8:26:22 AM

Page 3

of 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

ML19057A547 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: MSH/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SPE:A DRP/C:A NAME RAlexander MHaire SIGNATURE /RA/ /RA/ DATE 2/19/19 3/4/19