IR 05000445/2018405
| ML18166A151 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/14/2018 |
| From: | Jeremy Groom Plant Support Branch-1 |
| To: | Peters K Vistra Operations Company |
| References | |
| IR 2018405 | |
| Download: ML18166A151 (7) | |
Text
June 14, 2018
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000445/2018405, 05000446/2018405
Dear Mr. Peters:
On May 24, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Comanche Peak Nuclear Power Plant Units 1 and 2. The NRC inspector discussed the results of this inspection with Mr. J. Dreyfuss, Plant Manager, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Jeremy R. Groom, Chief Plant Support Branch 1 Division Reactor Safety
Docket Nos. 50-445, 50-446 License Nos. NPF-87 and NPF-89
Enclosure:
1. NRC Inspection Report 05000445/2018405, 05000446/2018405
cc w/encl: Electronic Distribution
Enclosure U.S. NUCLEAR REGULATORY COMMISSION Region IV
Docket Numbers:
05000445, 05000446
License Numbers:
Report Numbers:
05000445/2018405; 05000446/2018405
Enterprise Identifier:
I-2018-405-0002
Licensee:
Vistra Operations Company LLC
Facility:
Comanche Peak Nuclear Power Plant, Units 1 and 2
Location:
Glen Rose, Texas
Dates:
May 21 to May 24, 2018
Inspector:
A. Meyen, Physical Security Inspector
R. Lanfear, Physical Security Inspector
Approved By:
Jeremy R. Groom
Chief, Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Comanche Peak Nuclear Power Plant Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations
No Findings
Additional Tracking Items
No Additional Items
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
71130.05 - Protective Strategy Evaluation and Performance Evaluation Program
The inspectors evaluated the security program. The following elements were evaluated:
Tier I: all 24 requirements Tier II: all 14 requirements Tier III: all 4 requirements
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS
On May 24, 2018, the inspectors presented the Baseline Security Inspection results to Mr. J. Dreyfuss, Plant Manager, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71130.05 - Protective Strategy Evaluation and Performance Evaluation Program
Condition Reports
2015-011296
2015-011784
2016-002768
2016-000519
2016-008710
2017-010786
2017-007425
2017-008808
2017-007617
2017-003396
2018-000360
2018-003679
Post Orders
Audit
EVAL-2016-011
CPNPP Nuclear
Oversight Evaluation
Repo
Procedures
(Number)
Title
Revision
Security Field Report, Issue, and Security
Reporting Requirements
Security Drills and Exercises
Protective Strategy and Target Set Development
Protective Strategy
Security Contingency Events
Security Response During Personnel and
Operating Emergencies
3.5
PA/VA Patrols
3.10
Alarm Stations
4.0
Compensatory and Contingency
Security Instructions
(Number)
Title
Revision
Logs
Security Event Logs
Dates, 5-1-17 to 5-11-18
Entire Report:
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
SUNSI Review By: JRG Yes No
Publicly Available
Sensitive ______ NRC-002
OFFICE
PSI:PSB1
PSI:PSB1
C:PSB1
C:RPA
C:PSB1
NAME
AMeyen
RLanfear
JGroom
MHaire
JGroom
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
6/6/18
6/6/18
6/7/18
06/14/18
06/14/18