05/25/10 Summary of Annual Assessment Open House Meeting with Exelon Generation Co., Llc., to Discuss Nrc'S Assessment of Safety Performance of Limerick, Units 1 & 2 for 2009
ML101470869
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/27/2010
From: Krohn P G
Reactor Projects Region 1 Branch 4
To:
KROHN P G, RI/DRP/PB4/610-337-5120
References
Download: ML101470869 (3)


Text

Ul'\ITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 May 27,2010 LICENSEE:

EXELON GENERATION COMPANY, LLC. FACILITY:

LIMERICK GENERATING STATION

SUBJECT:

SUMMARY

OF MAY 25,2010, ANNUAL ASSESSMENT OPEN HOUSE MEETING WITH EXELON GENERATION COMPANY, LLC. On May 25,2010, from 6:00 pm to 8:00 pm, the NRC conducted an Annual Assessment House Meeting at the Limerick Township Municipal Building in Limerick, PA. The NRC conducted the open house meeting to discuss the NRC's assessment of the safety performance of the Limerick Generating Station Units 1 & 2 for 2009. A notice of the open-house meeting was issued on March 9, 2010, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML 100680093).

The NRC presented poster boards and was available to discuss its assessment of the safety performances of Limerick Generating Station Units 1 and 2 for the period of January 1 through December 31, 2009, as documented in our letter dated March 3, 2010 (ADAMS Accession No. ML 100621090).

The NRC poster boards provided background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Limerick Generating Station can be found on the NRC's web site Limerick Township Supervisors, Exelon employees, and members of the public attended the open-house and were offered the opportunity to speak with the NRC staff regarding Exelon's safety performance and the role of the agency in ensuring safe plant operations.

Sincerely, IRA! Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet Paul Krohn Eugene DiPaolo Phillip McKenna Andrew Rosebrook Jeffrey Bream Diane Screnci William McGuire Edward Callan 2 Organization Nuclear Regulatory Commission (NRC) Nuclear Regulatory Commission (NRC) Nuclear Regulatory Commission (NRC) Nuclear Regulatory Commission (NRC) Nuclear Regulatory Commission (NRC) Nuclear Regulatory Commission (NRC) Exelon Generation Company, LLC. Exelon Generation Company, LLC. Members of the Public on Sign-in Sheet.

2 May 27,2010 EXELON GENERATION COMPANY, LLC.

LIMERICK GENERATING STATION

SUMMARY

OF MAY 25,2010, ANNUAL ASSESSMENT OPEN HOUSE MEETING WITH EXELON GENERATION COMPANY, LLC. On May 25,2010, from 6:00pm to 8:00pm, the NRC conduct'3d an Annual Assessment Open-House Meeting at the Limerick Township Municipal Building in Limerick, PA. The NRC conducted the open house meeting to discuss the NRC's assessment of the safety performance of the Limerick Generating Station Units 1 and 2 for 2009. A notice of the open-house meeting was issued on March 9, 2010, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML 100680093).

The NRC presented poster boards and was available to discuss its assessment of the safety performances of Limerick Generating Station Units 1 &2 for the period of January 1 through December 31, 2009, as documented in our letters dated March 3, 2010 (ADAMS Accession No. ML 100621090).

The NRC poster boards provided background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Limerick Generating Station can be found on the NRC's web site atwww.nrC.gov/NHR/OVERSIGHT/ASSESSlindex.html.

Limerick Township Supervisors, Exelon employees and members, of the public attended the open-house and were offered the opportunity to speak with the NRC staff regarding Exelon's safety performance and the role of the agency in ensuring safe plant operations.

Sincen3ly, IRA! Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet Distribution J. Clifford, DRP G. DiPaolo, DRP, SRI S. Colins, RA P. Krohn, DRP P. McKenna, DRP, RI M. Dapas, DRA A. Rosebrook, DRP N. Sieller, DRP, RI D. Lew, DRP J. Bream, DRP SUNSI Review Complete:

AAR (Reviewer's ML 101470869 DOC NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 10\2009 EOC\LlMERICK AAM

SUMMARY

.DOC After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box: "e" =Copy without atlllchmentienciosure "E" = Copy with attachment/enclosure "N" =No copy R1/DRP R1/DRP ARosebrook/

MR PKrohn/ PGK OS/27/10 OFFICIAL RECORD COpy