Monthly Operating Repts for June 1990 for Palo Verde Generating Station Units 1,2 & 3.W/900713 Ltr
ML17305A935
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/30/1990
From: LEVINE J M, PORTER K F
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-01024-JML-K, 254-1024-JML-K, NUDOCS 9007180323
Download: ML17305A935 (31)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:STN-50-528 Palo Verde Nuclear Station, STN-50-529 Palo Verde.Nuclear Station, STN-50-530 Palo Verde Nuclear Station, AUTH.NAME AUTHOR AFFILIATION PORTER,K.F.

Arizona Public Service Co.LEVINE,J.M.

Arizona Public Service Co.RECIP.NAME RECIPIENT AFFILIATION NOTARIZED:

NO DOCKET g Unit 1, Arizona Publi 05000528 Unit, 2, Arizona Publi 05000529 Unit 3, Arizona Publi 05000530 (formerly Arizona Nuclear Power R (formerly Arizona Nuclear Power[

SUBJECT:

Monthly operating repts for June 1990 Palo Verde Generating Station Units 1,2&3.W 00713 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: Standardized plant.Standardized plant.D S 05000528 05000529 p5ppp53p D D RECIPIENT ID CODE/NAME PD5 LA PETERSONgS

~INTERNAL: ACRS AEOD/DS P/TPAB NRR/DLPQ/LPEB10 EXTERNAL: EG&G BRYCE,J.H NRC PDR NOTES COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 3 3 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD CHAN,T AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:

A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 31 ill P ll Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 254-01024-JML/KPP July 13, 1990 Docket;Nos.STN 50-528/529/530 Document Control Desk U.S.Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Monthly Operating Reports for June 1990 File: 90-024-404 Attached are the Monthly Operating Reports for June 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses.By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.If you have any questions, please contact Mr.K.F.Porter, at (602)340-4187.Very truly yours, J.M.Levine ice President Nuclear Production JML/KFP Attachments cco S.Peterson (all w/attachments)

J.B.'artin D.H.Coe INPO Records Center 9007180323 900630 PDR ADOCK 05000528 R PDC II-4 I V'l ll NRC MONTHLY OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS l.2.3.4.5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Reporting Period: June 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A 11.12.13.14.15.16.17.18.19.20.21.22.23.24.Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 N A This Month 720 Yr.-to-Date 4 344 13 6 0 0 0 0 0 0 13 6 0 0 0 0 0 0 10 825 10 825 0 0%0 Oa 0 0 0 0 0.0 0 0 Months (Type, Date and Duration of Each): Cumulative 38 60 1 399 0 0 16 826 9 0 0 60 942 046 21 163 100 19 793 190 43 4%43 4 41 8a 40 2 28 1 25'f Shutdown At End of Report Period, Estimated Date of Start-up: Jul 5 1990 Actual Start-u Date INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~05 85~06 85 11 85 Achieved 05/525 85~06 10 85 01 28 86 1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL" 17 18 19 20 21 22 23 24 0 25 10 26 27 12 28 13 29 30 15 16 2 l

REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter 1.Scheduled date for next refueling shutdown.02/01/92, 3rd refueling.

2.Scheduled date for restart following refueling.

04/11/92 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

To be determined.

4.Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

To be determined.

6.The number of fuel assemblies.

a)In the core.241 b)In the spent fuel storage pool.188 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).

3

t i

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter June 1990 06/01 06/13 06/14 06/24 06/25 06/25 06/30 06/30 00:00 18:41 14:10 19:55 08:53 19:21 02:26 24:00 Unit began the month in Mode 5, 2nd Refueling Outage.Unit entered Mode 4.Unit entered Mode 3.Unit entered Mode 2, low power physics testing.Unit entered Mode 3, planned RX trip during low power physics testing.Unit entered Mode 2, continuation of low power physics testing.Unit entered Mode 1.Unit ended the month in Mode 1, 2nd Refueling Outage.4 I I SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F.Porter Method of Duration Shutting System No.Date Type'ours Reason Down Reactor~LER No.Code'omponent Code Cause and Corrective Action to Prevent Recurrence 89/03 04/08/89 S 720 N/A N/A N/A Continuation of 2nd refueling outage.'F-Forced S-Scheduled Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20%or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)

'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source 5 NRC MONTHLY OPERATING REPORT DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F.Porter OPERATING STATUS l.2.3.4.5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Reporting Period: June 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A ll 12 13.14.15.16.17 18 19 20 21 22 23 24 This Month 720 Yr.-to-Date 4 344 1 295 0 0 0 1 295.0 29 8 0 0 30 4 Hours in Reporting Period Number of Hours Reactor Was Critical 0 0 Reactor Reserve Shutdown Hours 0 0 Hours Generator On-Line 0 0 Unit Reserve Shutdown Hours 0 0 0 0 Gross Thermal Energy Generated (MWH)0 Gross Electrical Energy Generated (MWH)0 1 712 500 Net Electrical Energy Generated (MWH)0 1 614 008'nit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N A Cumulative 33 144 20 546 1 0 0 20 042 2 0 0 3 499 053 25 682 370 23 996 820 60.5 60 5 59 3 57.0a 9 9 25.If Shutdown At End of Report Period, Estimated Date of Start-up: Jul 16 1990 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~03 86 06 86 11 86 Achieved 04/618 86~05 20 86 09/919 86 6 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16 7

REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter 1.Scheduled date for next refueling shutdown.10/17/91, 3rd refueling.

2.Scheduled date for restart following refueling.

12/26/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined.

4.Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

To be determined.

6.The number of fuel assemblies.

a)In the core.241 b)In the spent fuel storage pool.204 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).

8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter June 1990 06/01 06/03 06/30 00'00 ll:24 24:00 Unit began the month in Mode 6, 2nd Refueling Outage.Unit entered Mode 5.Unit ended the month in Mode 5, 2nd Refueling Outage.9 V~

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F.Porter No.Duration Date Type'ours Reason Method of Shutting Down Reactor System LER No.Code Component Code Cause and Corrective Action to Prevent Recurrence 90/01 02/23/90 S 720 N/A N/A N/A Continuation of 2nd Refueling Outage.'F-Forced S-Scheduled

'Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20$or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)

'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)'Exhibit H-Same Source 10-P NRC MONTHLY OPERATING REPORT DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS 1.2.3.4., 5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 3 Reporting Period: June 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): one Reasons For Restrictions, If Any: N A 11'2.13.14.15.16.17.18.19.20.21.22.23.24.Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 N A This Month 720 Yr.-to-Date 4 344 20 0 0 0 720 0 0 0 3 813 2 0 0 3 14 0 0 2 723 341 954 400 901 098 100 0 100 0 13 061 555 4 583 100 4 291 203 85 5 85 5 102 5 80 9 0 Oa Months (Type, Date and Duration of Each): Cumulative 21 720 13 224 4 0 0 12 988.7 0 0 4 4 1 946 16 650 900 15 654 668 59 8 59 8 59 0 56 8 10.9%25.If Shutdown At End of Report Period, Estimated Date of Start-up: N A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~07 87~08~09 8 Achi.eve d~10 25 8~11 28 8~01 08 88 e

~,'AVERAGE DAILY UNIT POWER LEVEL DOCKET NO~50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1261 1261 1259 17 19 1252 1252 1251 1254 20 1249 1252 21 1249 1255 22 1248 1255 23 1245 1248 24,.1241 1219 25 1240 10 1245 26 1241 1251 27 1243 12 1248 28 1243 13 1249 29 1240 14 1253 30 1245 15 1252 16 1256

't REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F.Porter Scheduled date for next refueling shutdown.03/16/91, 2nd refueling.

Scheduled date for restart following refueling.

05/25/91 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 To be determined.

Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

To be determined.

The number of fuel assemblies.

a)In the core.241 b)In the spent fuel storage pool.104 Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).

13 g 4'k i I t l 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter June 1990 06/01 06/09 06/09 06/30 00'00 05:00 13:27 24:00 Unit began the month in Mode 1, 100%RX power.Began RX power reduction to 95%for planned valve testing.Unit back at 100$RX power.Unit ended the month in Mode 1, 100%RX power.14-l'g t h SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F.Porter No.Duration Date Type'ours Reason Method of Shutting Down Reactor System LER No.Code~Component Code Cause and Corrective Action to Prevent Recurrence No outages or power reductions of greater than 20$occurred during the month.'F-Forced S-Scheduled Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20%or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)

'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)'Exhibit H-Same Source 15 g~I'4 f i I