Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station.W/950210 Ltr
ML17311A660
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/31/1995
From: ECKLUND B S, LEVINE J M
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
443-00110-JML-B, 443-110-JML-B, NUDOCS 9502170051
Download: ML17311A660 (31)


Text

P RI(GRIMY 1 (ACCELERATED RIDS PROCESSIiC DOCKET 05000528 05000529 05000530 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9502170051 DOC.DATE:~(MKPi.'Y5, NOTARIZED:

NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION ECKLUND,B.S.

Arizona Public Service Co.(formerly Arizona Nuclear Power LEVINE,J.M.

Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts or Jan 1995 for Palo Verde Nuclear Generating Station.W 950210 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVEDILTR ENCL(SIZE: I&TITLE: Monthly Operating Report (per Tech Specs NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.05000528)05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L INTERNAL: ACRS~ILE-CENTEB 01 NRR/DOPS/OECB EXTERNAL LI TCO BRYCE E J H NRC PDR COPIES LTTR ENCL 1 1 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HOLIAN, B AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D C U N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP VS TO REDUCE iVASTE!CONTACT'I'HE DOCL'fENT CONTROL DESK, ROOhi Pl-37 (EXT.504-2083)TO ELIXfl.PATE YOUR NAXfE FROif DISTRI8 O'I'ION LIS'I'S I'OR DOCVh,f EN'I'S YOV DON" I'LZI:DI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21 JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX S2034~PHOENIX, ARIZONA 85072-2034 443-00110-JML/BSE February 10, 1995 U.S.Nuclear Regulatory Commission ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for January 1995 File: 95-024<04 95-056-026 Enclosed are the Monthly Operating Reports for January 1995, prepared and submitted pursuant to Specification 6.9.1.6 of'ppendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Brad S.Ecklund at (602)393-6221.Sincerely, JML/BSE/plv

Enclosures:

January 1995 Monthly Operating Reports (all w/enclosures) cc: L.J.Callan K.E.Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute t~tn n t v'll.: j 9502i7005i 950i3'i PDR ADOCK 05000528 PDR P l~'lr I P kr I P rk k PIk (K, Irked*'p P.~K>>rf.I I~~,')Wj,)I, ,'"'tl!EKI I""'";Ca.'-tiki":;t.~t.r<<i:".P>>K)S<kk'"'Q P" ki4~'kK'P~P)

(~P I k~'k,%1PQK II r~K'k gr Prr'k"<'(,'~'a P~,,~'k,"r,)C rr A~I~~i p E)Klf'I rkk K Kk PK kr" kk I'~~" Il kk kkt I II'l~",lKSP Sgt'KK K>>

~0 NRC MONTHLY OPERATING REPORT 9 DOCKET NO.50-528 UNIT NAME PIGS~DATE~02/0 95 OPE 1.2.3.4.5.6.7.8.9.10.12.13.14.15.TI GS S Unit Name: Palo Verde Nuclear Generatln Station Unit 1 Reporting Period: Janua 1995 Ucensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N/A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N/A KQ+446%0:15509f&'f&} }Iff'i4f9}}-'"M:"%"~4"i&<< <<9<<<<<<f9<<9 a<<9 (h}<HO f%8ea'Cfo~1hQ5~CfQfij54.';jc<~>>43<%~%%<<<ANA@~4:;~:. >>+k~~'+mg&44~~<<@<0@44"<+~~+Ckkj>>P&&~ (.Y4<4<~'cx~A%Ãg~('Ri:8'cto'r@gseNa!8biddkeFiiHoiier5>+k@5~<>i+i::".:'.::4::::."':l%l~f. +gag,)((((((.9.'<<+pg<<((%gg$ (<<@&'+h'j@NNf.'.Ho'ttrs~eeneietoimiilCiii48w~'<~~K'9k..k:,4e@~ek~;f4'~~.U'0'ff Ri99'iiii&8&<<fft&}I}In: R&iiM>>&W~~4~"'>>>i': "4 744.0 0.0 744.0 0.0 744.0 0.0 744.0 0.0 78,984 51,376.8 0.0 50,400.6 0.0 16.17.18.19.20.21.23.f'ii~i'Mf~ i i%0IIPfii~i'~kf&4~%'~i 2,808,750 970,500 917,521 100 0%100 0%101 0%97.1%0.0%2,808,750 970,500 917,521 100 0%100.0%101.0%97.1%00%181,890,768 63,017,000 59,148,427 63.8%63.8%61.3%59.0%13.4%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): scheduled to be in 4/1/95 with a 70 da duration.Refuelin outa e 25.If Shutdown At End of Report Period, Estimated Date of Start-up: INITIAL CRITICALITY, INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast 05/85 06/85 11/85 Achieved 05/25/85 06/10/85 01/28/86 1 t I' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME~VG~S-DATE 02/10/95 COMPLETED BY B S Ecklund MONTH: January 1995 DAY AVERAGE'DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1248 17 1245 1248 18 1249 1247 19 1248 1246 20 1247 1242 21 1247 1245 1247 1246 23 1247 8 1246 24 1245 9 1246 25 1243 10 1245 26 1244 1245 27 1248 12 1245 28 1250 13 1244 1250 14 1016 30 1250 15 1221 31 1250 16 1242 I~fm REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME~VG~S-DATE 02/10/95 Scheduled date for next refueling shutdown.The 5th refueling outage is tentatively scheduled for 04/01/95.Scheduled date for restart following refueling. OB/1 0/95.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information. 12/28/94 Important Ucensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevlewed design or performance analysis methods, significant changes ln fuel design, and new operating procedures. <The fuel assembly will utilize Erbium as a burnable absorber (as was done for Units 2 and 3).The number of fuel assemblies. a)In the core.241 b)In the spent fuel storage pool.388 Licensed spent fuel storage capacity.1329 Intended change In spent fuel storage cepactty.~one Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability). C>4~+I-

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 02/10/95 COMPLETED BY B.S.Ecklund Janua 1995 01/01 0000 Unit began the month ln Mode 1 with 100%power.01/14 0103 Commence power reduction to 70%for Steam Generator Hide Out return.01/14 0355 Completed power reduction to 70%.01/15 0100 Commenced raising power to 100%.01/15 0700 Rxpowerlsat100%. 01/19 2317 Reduced Rx power to 99%as required to perform Hl Rate Steam Generator Blow Down.01/20 0132 Restored Rx power to 100%following Hl rate Blow Down completion. 01/21 2310 Commenced lowering Rx power to 98%for Control Valve Testing.01/22 0037 Returned Rxpowerto100%. 01/31 2359 Ended month at 100%power.4- "'I I 0 4 J SHUTDOWNS AND POWER REDUCTIONS-January 1995 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE 02/10/95 COMPLETED BY B.S.Ecklund No.Date Outage Method of Duration Shutting Down T e1 Hours Reason2 ReactoR LER No.System Component Cause and Corrective Action Code4 Code>to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995.1F-Forced S-Scheduled Reason: A-Equipment Failure(Explain) B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)Fire (NUREG Otet)Exhibit H-Same Source 'I F 7 II F~7 7 7 t l NRC MONTHLY OPERATING REPORT DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE 02/10/95 COMPLETED BY B.S Ecklund OPERATING S US 1.2.3.4, 5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Reporting Period: Janua 1995 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N/A Power Level to Which Restricted,'If Any (Net MWe): None Reasons For Restrictions, If Any: N/A>>Fi%:>>>'4@4'i";<<g&>>: a".'<g@4p.'4>%$4?>>~>>g&Pm+g 18.iw~@'~>>%!g@P)%r:. $~4@WNNg~~~ij~ji+ j!Pj@~~>:::,-,:,:,'k@~g~~>.!~g@+k+<V~~4~>~>> P4S~~~>>)~~:jjjg+i~$ '>>j<>>qg>::>W~ QN j%pggg@g@@gP"j'~@/"g'/~V~~~ '"P',MetlEYeotrtcaj':Ehii '<<6enerate'di'NMH k4",'~4~%~",.F.::.'.': Y 744.0 0.0 744.0 0.0 2,820,387 976,700 918,740 744.0 0.0 744.0 0.0 2,820,387 976,700 918,740 73,368 51,395.7 0.0 50,344.9 0.0 183,064,294 63,708,170 59,612,635 19.(6AItl88fvic?eYFac>>foal Fi$RPe~;"'~wk%'":Mr~kYN~49SN~,"'~OFT ~+45gjiki&MW~>~<-'~NP4')4g>~g>4YN>'Sbi4XM@M>'p",~~44m';p';.?'j ">>%~4v~g:4<$ @%5+j%4@gpg)%&4~gq~NN? '<<%Y~j)>>if'~~k'PjP~k>>%?'2..'..Unit:;:Ck ac(-<<Fiifor.:. slii'(GER.:',Net::i~~&@~,:.'.:."'=';5'"X"':..4 100 0%100 0%101.1%97.2%0.0%100.0%100 0%101 1%97.2%0.0%68.6%68.6%66 5%64.0%60%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): scheduled to be in 2/4/95 with a 60 da duration.Refuelin outa e 25.If Shutdown At End of Report Period, Estimated Date of Start-up: N/A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-6-Forecast 03/88 06/86~1/86 Achieved 04/18/86 05/20/86 09/19/BB I~4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE~02/0/95 MONTH: January 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1242 17 1241 1239 18 1244 1241 19 1242 1240 20 1241 1236 21 1242 1239 1241 1240 23 1239 1239 24 1237 1238 25 1234 10 1239 26 1237 1238 27 1242 12 1239 28 1239 1238 29 1237 1241 30 1232 15 1240 1234 16 1240 4' REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME EVNGS-2 DATE 02/10/95 COMPLETED BY B.S.Ecklund Scheduled date for next refueling shutdown.The 5th refueling outage is scheduled for 02/04/95.Scheduled date for restart following refueling. 04/05/95.Will refueling or resumption of operation thereafter require a Technical Specification change or other'icense amendment'F b.C.Technical Specification 3.9.6 will be changed to raise the overload cutoff limit to accommodate the new fuel assembly modification. Technical Specification 3.4.2.1 will be modified to lower the PSV lift setting from 2500 psla to 2475 psia.Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.Scheduled date for submitting proposed licensing action and supporting information. 10/27/94.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures., The fuel assembly will consist of a denser fuel pellet, Erbium burnable absorber and guardian grid.A primary temperature drop of 10'is currently planned.The number of fuel assemblies. a)In the core.241 b)In the spent fuel storage pool.384 Licensed spent fuel storage capacity.1329 Intended change In spent fuel stcrege cepachy.~Nc e Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 UNIT NAME~VNGS-DATE 02/10/95 COMPLETED BY B.S.Ecklund Janua 1995 01/01 0000 Unit began the month in Mode 1 at 100/o power.01/08 2258 Started reducing Rx power to 99/G as required to perform Hl Rate Steam Generator Blow Down.01/07 0032 Returned Rx power to 100%.01/13 2227 Commenced down power to 98/o for Hl Rate Blow Down and Control Valve Testing.01/14 0034 Returned Rx power to 100 lo.01/28 0141 Commenced power reduction to 99/G as required to perform Hl Rate Steam Generator Blow Down.01/31 2359 Ended month at 100o/o power. SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE 02/10/95 COMPLETED BY B.S.Ecklund-No.Date Outage Method of Duration Shutting Down T e" Hours Reason>Reactor LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995.a 1F-Forced S-Scheduled 2R A-Equipment Failure(Explain) B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source l P>>'! 7 NRC MONTHLY OPERATING REPORT 0 ERATING STA US DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE~02/0/95 COMPLETED BY B S Ecklund MW-1.2.3.4, 5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 3 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Glace last Report.Give Reasons: N/A Power Level to Which Rest!let/at, lf Any (Net MWe): None Reasons For Restrictions, If Any: N/A<<.Wo@fi'R~-AiÃie~P.o'itR<HN':-4~>":":Fi 7~12.lttodoar RM~CilttcatW"'Kik@li'4W~"<'i@it 744 0@Sg&i@<SN'~4%~4'%@Ã~~P8~/<@gj': 13.!Risetor'Reserve,sb6tdowii'::Hoiirek~~".'k>I",~zmk'K~< 0.0 14.!tfc'a~isaGoarfesrart9niiiyraert904r toniVkt!t~i..-::-"L!~ran:.,'i~i~~ 744.O 15.~vn~i~e.~"'-"WttohWd'"~%~M'-'&e':~~k%eii".."ill o.o 21.o~o, gk+~(~Q~+gQK&~+&>~x++Z~jxc..4N'jxYt@ggggg@pcj.<< 8 i nit.-'.Ca iC,Feaetata sf'MOClNet 4%:;"o~.::: -."".-',NS..".".4 101.8%22 if'tttta Pi'F eet'f"'rtttf!R'aNLat 2'>W~"".:"""~4!i 97 9%17.:.,G%ir ctd t8"%n't""d lilJWH"":'4""""::-::. Ão,Ã18.iMitiEhdiicabEom ",:::Siini.riti8ÃlNNH 4<";~~IV'i,:;;:.:::5 924,654 19.otto" t'!9er'fv" ca~friiitot/ '/~i" ymir!vs~a" r!:%%-"'!.".i"., 100.0%20.+5d~it::AV'alta bill:!vFa'Ctn&!~84~6'kS:":~k~M~.:ti,:,":,'4~+! 100 0%744.0 0.0 744.0 0.0 2,805,969 980,000 924,654 100 0%100 0%101.8%97.9%61,944 45,758.0 0.0 45,091.5 0.0 164,582,902 57,511,700 54,047,361 72.8%72.8%71.5%68 7%23, Skri':Fo'roe/dtC/oraWlRa'atei 'rl's/k@tov. W~~'::::::"'r!,"::." o.o%00%61%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N/A 25.If Shutdown At End of Report Period,,Estimated Date of Start-up: N/A INITIAL CRITICALITY, INITIAL ELECTRICITY, COMMERCIAL OPERATION-11-Forecast 07/87 07/87 09/87 Achieved~to/25/8 11/28/87~008/88

.AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 02/1 0/95 MONTH: January 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1259 17 1258 1258 18 1260 1257 19 1259 125B 20 1258 1254 21 1258 1258 1255 7 1255 23 1258 125B 24 1258 125B 25 1254 10 1256 26 1255 1256 27 1257 12'256 28 1088 13 125B 29 1147 14 1255 30 1258 15 1254 31 1259 1B 1259 ~, REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME~VGS-3 DATE~02(0 95 Scheduled date for next refueling shutdown.10/14/95 5th refueling. Scheduled date for restart following refueling. 12/23/95.VNII refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined. Scheduled date for submitting proposed licensing action and supporting information. June 1995, if required.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevIewed design or performance analysis methods, significant changes In fuel design, and new operating procedures.,I. None.The number of fuel assemblies. a)In the core.241 b)In the spent fuel storage pool.380 Licensed spent fuel storage capacity.1329 Intended change In spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability). JA".Cxl IE

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 02/10/95 COMPLETED BY B.S.Ecklund Janua 1995 01/01 0000 Began the monthwithunitln Mode1 at100%power.0101 0015 Commenced a 1%power decrease as required to perform Hl Rate Steam Generator Blow Down.01/01 0302 Returned Rx power to 100%.01/07 2045 Commenced lowering Rx power to 99%as required to perform Hl Rate Steam Generator Blow Down.01/07 2216 Returned Rx power to 100%.01/15 0048 Reduced power to 99%as required to perform HI Rate Steam Generator Blow Down.01/15 0220 Returned Rx power to 100%.01/22 0149 Commenced reducing Rx power to 99%as required to perform HI Rate Steam Generator Blow Down.01/22 0352 Restored Rx power to 100%.01/26 0022 Commenced reducing power to 97.2%for Control Valve Testing.01/26 0342 Restored Rx power to 100%.01/28 0100 Commenced a plant down power to 86%for Chemistry Hideout testing.01/28 0224 Completed down power, Unit is now at 86%.01/29 1430 Commenced power increase to 100%at 5%per hour.01/29 1700 Unit restored to 100%power.01/31 2359 Ended month at 100%power.

SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE 02/1 0/95 COMPLETED BY B.S.Ec/0und No.Outage Method of Duration Shutting Down Date T e1 Hours Reason2 ReactoR LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995."F-Forced S-Scheduled Reason: A-Equipment Failure(Explain) B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 Ucense Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) --15-4Exhibit F-instructions for Preparation of the Data Entry Sheets for Ucensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source e}}