Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20058K1396 December 1993Safety Evaluation Supporting Amend 193 to License NPF-1
ML20058L2122 August 1990Special Rept:On 900720,discovered Circuit Breaker,Which Supplies Stated Fire Pump,In Open Position.Pump Would Have Been Unable to Automatically Start.Caused by Fire Water Sys Low Pressure While Filling Sprinkler.Personnel Counseled
ML20058L5642 August 1990Safety Evaluation Concluding That Operable Instrumented Ammonia Detection Capability Unncessary for Protection of Control Room Personnel in Event of Spill of Anhydrous Ammonia in Vicinity of Plant
ML20058L80030 November 1993Monthly Operating Rept for Nov 1993 for Trojan Nuclear Plant
ML20058N08810 August 1990Special Rept:On 900710,review Revealed That 99 Fire Dampers Classified as Tech Spec Fire Barriers.Qa Audit in Fall of 1989 Identified Installation Requirements for Fire Dampers Failed to Permit Testing.Repairs to Be Completed by 900928Fire Barrier
ML20058N64910 July 1990Special Rept:On 900618,Deluge Sys 19 for Electrical Penetration Area Declared Inoperable Due to Electrical & Electronic Problems within Sys Actuation Panel.Fire Watch EstablishedFire Watch
ML20058P63531 July 1990Monthly Operating Rept for Jul 1990 for Trojan Nuclear Plant
ML20058P78117 November 1993Trojan Permanently Defueled Emergency Plan 1993 Annual Exercise Scenario Package for Exercise Scheduled for 931117
ML20059A70421 October 1993Errata to Rev 0 to Defueled Sar
ML20059A7447 October 1993Defueled SAR for Trojan Nuclear Plant
ML20059B91921 August 1990Part 21 Rept Re Defects in SA-194 Grade 6 Check Valve Bonnet Nuts Supplied to Westinghouse by Copes-Vulcan.On 900316 Discharge Check Valve Bonnet Found Cracked During Routine Maint.All Bonnet Nuts for Subj Valves Replaced
ML20059C79827 August 1990Safety Evaluation Supporting Amend 162 to License NPF-1
ML20059D10330 August 1990SER Accepting Util 880311,0401 & 1223 & 900319 & 0622 Responses to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes
ML20059E83931 December 1993Monthly Operating Rept for Dec 1993 for Trojan Nuclear Plant
ML20059G83831 August 1990Monthly Operating Rept for Aug 1990 for Trojan Nuclear Plant
ML20059G97130 November 1993Rev 16 to PGE-8010, Trojan Nuclear Plant Nuclear QA Program
ML20059H77217 January 1994Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412
ML20062E88329 July 1982Safety Evaluation Supporting Amend 75 to License NPF-1
ML20062G80115 November 1990Revised Special Rept:On 880916-891221,29 Dampers Could Not Be Confirmed to Meet All Design Specs & Were Inoperable. Problems Identified During Program to Identify Deviations from Mfg Installation Details for Fire Dampers
ML20125B8074 December 1992Safety Evaluation Supporting Amend 188 to License NPF-1
ML20125D7692 January 1980Monthly Operating Rept for Dec 1979
ML20125E66530 November 1992Monthly Operating Rept for Nov 1992 for Trojan Nuclear Plant
ML20126E78616 December 1992Informs Commission of Staff Actions Re Steam Generator Tube Integrity at PlantBackfit
Flow Induced Vibration
ML20126F34131 December 19841984 Annual Rept
ML20126F35131 December 19841984 Annual Rept
ML20126F35831 December 19841984 Annual Rept
ML20126J59631 December 1992Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils EnclHydrostatic
ML20126L21227 May 1981Safety Evaluation Re Environ Qualification of safety-related Electrical Equipment.Equipment,Required to Mitigate LOCA Following Accident in Harsh Environ,Found Acceptable Except as Noted in Section 3
ML20126L2187 November 1980Environ Qualification of Safety-Related Electrical Equipment to Harsh Environs,Ie Bulletin 79-01B, Technical Evaluation Rept
ML20126M20631 December 1991Portland General Corp,Annual Rept,1991
ML20126M52831 December 19911991 Annual Rept for Pacificorp
ML20126M53531 December 19911991 Annual Rept for Eugene Water & Electric Board
ML20127B5856 January 1993Special Rept SR-08-92:from 921209-30,fire Door 288 in South Side Wall of Electrical Penetration Shield Wall Blocked Open to Support Maint Activities.Hourly Fire Patrol Established While Door Blocked OpenFire Barrier
ML20127D35031 August 1992Monthly Operating Rept for Aug 1992 for Tnp
ML20127E21531 December 1992Monthly Operating Rept for Dec 1992 for Trojan Nuclear Plant
ML20127K27614 June 1985Special Rept:3 H Rated Penetration Between 69 Ft Elevation in Turbine Bldg & East Switchgear Room Intentionally Made Nonfunctional for Longer than 7 Days Because of Maint. Corrective Action Completed 850525.Barrier Made FunctionalFire Barrier
Hourly Fire Watch
ML20127L42219 November 1992SE Accepting IST Program Requests for Relief for Pumps & ValvesIncorporated by reference
Cold shutdown justification
ML20127M12430 November 1992Rev 0 to IPE Rept for Trojan Nuclear Power Plant in Response to GL 88-20Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Job Performance Measure
Earthquake
Offsite Circuit
Failure to Scram
ML20127N85618 January 1993Safety Review of Trojan Plant Restart:Steam Generator Deterioration & Interim Plugging CriteriaBoric Acid
Chernobyl
ML20127P11025 November 1992Part 21 Rept Re Calibr,Wind Tunnel for Model 8500 Thermo Anemometer Out of Spec.No New Units Sold to Licensees within Past 12 Months.Range of Possible Calibr Errors Out of Spec Is 3% to 20%.Full Rept Will Be Submitted
ML20127P12711 December 1992Part 21 Rept Re Possibility That Addl Steel & Lead of Figure 2 Would Attenuate 80 Kev Photopeak of Xe-133 Resulting in Failure to Detect Concentration of Xe 102 Microcurie/Cc Range.Schematic Encl
ML20127P23827 January 1993Trojan Nuclear Plant Certified Fuel Handler Training Program
ML20127P58026 January 1993Safety Evaluation Supporting Amend 189 to License NPF-1
ML20127P58623 November 1992Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl
ML20128B73925 January 1993Rev 14 to Nuclear QA Program
ML20128G35626 June 1985Safety Evaluation Re Util 831104 Response to Generic Ltr 83-28,Item 1.1, Post-Trip Review. Subj to Successful Implementation of Listed recommendations,post-trip Review Program & Procedures Acceptable
ML20128K73430 April 1985Rev 10 to PGE-8010, QA ProgramSafe Shutdown
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Emergency Lighting
Condition Adverse to Quality
Process Control Program
Fire Protection Program
ML20128L85531 January 1993Monthly Operating Rept for Jan 1993 for Trojan Nuclear Plant
ML20129F81031 March 1985Monthly Operating Rept for Mar 1985
ML20129G29230 April 1985Monthly Operating Rept for Apr 1985Boric Acid