OPERATING DATA REPORT DOCKET NO.
50-344 DATE 1-2-79 C051PLETED BY Cr n,!r TELEPHONE
" A-1711 Ext. 234 OPERAT!NG STATUS Notes Trojan Nuclear Plant
- 1. Unit Name:
December 1979
. 2. Reporting Period:
3411
- 3. Licensed Thermal Power (51Wt):
1216
- 4. Nameplate Rating (Gross SIWE):
1130
- 5. Design Electrical Rating (Net 31We):
1122
- 6. blaximum Dependable Capacity (Gross 51We):
1080
- 7. Siaximum Dependable Capacity (Net StWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted..lf Any (Net StWe):
- 10. Reasons For Restrictions,If Any:
This 31onth Yr to.Date Cumulative 744 8760 29838
- 11. Hours in Reporting Period 14 5175.6 16298
- 12. Number Of Hours Reactor Was Critical 0
8.9 2171.8
- 13..".cactor Resene Shutdown Hours 3.6 5087.4 15627.8
- 14. Hours Generator On.Line 0
0.5 1508.7
- 15. Unit Reserve Shutdown Hours 7662 16956391 48895610
- 16. Gross Thermal Energy Generated (>lWH) 1420 5534645 15985415
- 17. Gross Electrical Energy Generated (31WH)
-7489 5266720 15033319
- 18. Net Electrical Energy Generated ( AlWH) 0.5 58.1 52.4
- 19. Unit Sen' ice Factor 0.5 5R.1 57 g
- 20. Unit Availabiiity Factor 0
55.7 47.7
- 21. Unit Capacity Factor (Using 5tDC Net) 0 53.2 44.6_
- 22. Unit Capacity Factor (Using DER Net) 0 2.0 30.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Ne.st 6 Stonths (Type. Date,and Duration of Eacht:
. Refueling, April 1980: 90 days.
January 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast Achiesed
- 26. Units in Test Status (Prior to Commercial 0peration):
NA NA INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COatst ERCI AI. Ol'ER ATl m
8001150 L
APPENOlX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-344 UNIT Troian j
1 DATE 1-2-80 COMPLETED BY G. G. Bair TELEPHONE 556-3713 Ext. 234 MONTI{
December 1979 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(M We-Net)
-7 i
1
-7 17
-4
-9 2
18
-8
-7 3
gg
-9 4
-11 20
-8 5
-11 21
\\
-9
-8
)
6 22
-7
-0 7
23
-7 8
-6 24
-4
-9 9
25
-8
-16 10 26
~33 11
-9 27
-5
-32 12 28
-36 13
-6 29
-34 14
-6 30
+21 15
-5 31 16
-6 90023181 INSTRUCTIONS On this form. list the average daily unit power level in MWe Net for cach day in the reporting month. Compute to the I
nearest whole megawatt.
'Ihese figures wdl be used to plot a graph for each reporting inonth. Note that when nuxirnum dependable capacity is
)
tised for the net electrical rating of the unit. there may he occasmns when the daily average power level exceeds the j
10(G line (or the restiieted power level line). In such cases. the average d.iity unit power output sheet should be footnoted to explain the app.nent anomaly.
1.16 8
.e g
44 e-
DOCKET NO. 50-344 UNIT SI'UTDOWNS AND POWER REDUCTIONS UNIT NAME Trninn DATE 1-2-80 COMPLETED t1Y C-C-
"'i' REPORT MONT11 December 1979 TELEPIIONE 556 m 7 Ext. 234 "t
g
,$g 3
.Y Licensee 5 g, Cause & Currective u
e-1 Action to No.
Date g
Eg s
.E s &
Event
@?
ju v
. Prevent Recurrence H
$5 5
jgg
. Report,
6
~
79-13 791012 S
740.4 A,P 1
NA NA
, NA Scheduled outage occurred to permit NRC required inspection of hangers and restraints and to plug small steam gen-erator' tube leaks in.the "A" and "D"
~
steap generators. Oytage subsequently extended due to licensing hearing -
regarding the progress in resolving the Control Building seismic issue.
79-14 791231 F
0 11 NA NA, NA NA Trouble with maintaining' condenser.
79-15 791231 F
0 11 NA
' fiA NA NA vacuum when hoggeriair eject; ion secured; required load're'ductio.n from 57% to 30%
load and again from 90% to 30% load.
No explanation yet known.
I O
I 2
3 4-O F: Forced Reason:
Method:
Exhibit G-Instructions N
S: Scheduled A Eetuipment Failure (Explain) l-Manual for Preparation of Data DJ B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-CD D-Ref.ulatory Restriction 4-Other (Explain) 0161)
N E-Operaint Training 1 Ucense Examination F-Administrative 5
(9/77) -
11 Other (Explain)
Exhibit i-Same Source G Operational Error (Explain) m
\\
DOCKET NO:
50-344 DATE:
1-2-80 b3556-3713 ELEPHONE:
Ext. 234
)
i
SUMMARY
OF OPERATING EXPERIENCE OPERATION:
The plant began the month in cold shutdown and ended the month at power operation.
l The ASLB had rescinded its permission for interim operation while the Control Building seismic redesign was in progress. The hearing was conducted to ascertain the progress made towards resolving the issue.
Approval was received from the ASLB on 12-29-79 and from the NRC on 12-31-79 to permit operation.
The plant reattained power operation on 12-31-79.
MAJOR SAFETY-RELATED MAINTENANCE:
Work continued on improvement modifications to the Plant Security and Fire Protection Systems.
Work continued on the program of inspection and upgrading of pipe hangers and restraints for seismic loadings. Work continued with the survey and upgrading of masonry block wall seismic hangers.
Work was completed on the repair of the CCP recirculation line which was found to have cracks.
Work was completed on the Containment Isolation Valve System to prevent the automatic reopening of selected CIS valves when CIS signal is reset.
LICENSE CHANGES:
Amendment #42, LCR-79-03, LCA-55; Correction to November's license change on administrative organization, to correct typographical error on p. 6-14 and position title error on p. 6-9, paragraph 6.5.2.2.
MISCELLANEOUS:
Work completed on the subcooling monitor meter.
Work completed on the pressurizer safety valve acoustic flow sensors.
90023183