Special Rept:3 H Rated Penetration Between 69 Ft Elevation in Turbine Bldg & East Switchgear Room Intentionally Made Nonfunctional for Longer than 7 Days Because of Maint. Corrective Action Completed 850525.Barrier Made Functional
ML20127K276
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/14/1985
From: Orser W
PORTLAND GENERAL ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
WS-407-85, WS0-407-85, NUDOCS 8506270350
Download: ML20127K276 (1)


Text

,

m amme Portland General Electric Company Trojan Nuclear Plant June 14, 1985 P.O. Box 439 WS0-407-85 Rainier, Oregon 97048 (503)556-3713 Mr. John B. Martin Regional Administrator - Region V US Nuclear Regulatory Commission 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368

Dear Sir:

Subject:

Special Report Limiting conditions for operation (LC0) 3.7.9 of the Trojan Tect.nical Specifications requires that a special report be provided if certain fire barrier penetrations become nonfunctional and cannot be returned to a functional status within seven days.

As a result of performing planned maintenance, a three-hour rated pene-tration between the 69-foot elevation in the Turbine Building and the east switchgear room was intentionally made nonfunctional for a period longer than seven days. The fire detectors on one side of the nonfunctional barrier were verified to be operable and an hourly fire watch was placed on duty for the entire time the penetration fire barrier was nonfunctional.

Permanent corrective action was completed on May 25, 1985, with the restoration of the barrier to functional status.