Issue date | Title | Topic | |
---|---|---|---|
ML17208A571 | 14 May 1978 | Monthly Operating Repts for Apr 1978 | |
ML17208A595 | 6 October 1979 | Monthly Operating Repts for Sept 1979 | |
ML17208A599 | 3 March 1979 | Monthly Operating Summary Repts for Feb 1979 | |
ML17208A606 | 5 January 1980 | Monthly Operating Repts for Dec 1979 | |
ML17208A612 | 8 December 1979 | Monthly Operating Rept for Nov 1979 | |
ML17208A616 | 8 September 1979 | Monthly Operating Repts for Aug 1979 | Packing leak |
ML17208A619 | 3 November 1979 | Monthly Operating Repts for Oct 1979 | |
ML17208A624 | 7 April 1979 | Monthly Operating Repts for Mar 1979 | |
ML17208A904 | 10 August 1980 | Monthly Operating Repts for Jul 1980 | |
ML17209A002 | 3 March 1979 | Monthly Operating Status Rept for Feb 1979 | |
ML17209A245 | 4 October 1980 | Monthly Operating Repts for Sept 1980 | |
ML17209A353 | 8 November 1980 | Monthly Operating Repts for Oct 1980 | |
ML17209A442 | 6 December 1980 | Monthly Operating Repts for Nov 1980 | |
ML17209A655 | 7 February 1981 | Monthly Operating Repts for Jan 1981 | |
ML17209A798 | 7 March 1981 | Monthly Operating Repts for Feb 1981 | |
ML17209B067 | 9 May 1981 | Monthly Operating Repts for Apr 1981 | |
ML17212A324 | 3 July 1981 | Monthly Operating Repts for June 1981 | |
ML17212A769 | 10 September 1981 | Monthly Operating Summary Repts for Aug 1981 | |
ML17212A773 | 10 September 1981 | Monthly Operating Status Repts for Aug 1981 | |
ML17223A745 | 26 January 1990 | Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N | |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML17261A530 | 18 June 1987 | Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys | |
ML17264A118 | 31 July 1995 | Response to Part (1) of GL 92-01,Rev 1,Suppl 1. | |
ML17266A542 | 2 September 1980 | LER 80-011/03L-0:on 800818,during Surveillance Testing,Six Ionization Detectors in 4W Electrical Penetration Room Found Inoperable.Caused by Improper Installation of Upgrade to Fire Protection Sys | Fire Watch |
ML17279A191 | 7 April 1987 | Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl | |
ML17298B539 | 30 November 1984 | Summary Rept on Design Basis of Shutdown Cooling Sys Relief Valves for Cessar Sys 80. | Hydrostatic |
ML17298B540 | 30 November 1984 | Summary Rept on Operability of Shutdown Cooling Sys Relief Valves for Palo Verde Units 1,2 & 3. | |
ML17309A915 | 31 August 1997 | Suppl 1 to NF-TR-95-01, Nuclear Physics Methodology for Reload Design of Turkey Point & St Lucie Nuclear Plants. | |
ML17338A189 | 11 September 1978 | LER#78-008/01T-0 on 780911:Restricting Orifices Not Installed in Branch Connections from Containment Spray Headers to Emergency Containment Filter Spray Sys.Proper Orifices Will Be Installed.(Encl to 7809220126) | |
ML17338A204 | 30 September 1978 | LER#78-009/03L-0 on 780831:20 Safety Related Hydraulic Snubbers Failed Functional Tests Due to Control Block Poppet Valve & Relief Valve Malfunctions & Excessive Main Cylinder Wear.Hydraulic Type Replaced W/Mechanical Type Snubbers | |
ML17338A210 | 31 July 1978 | Fifth-yr Surveillance Rept of Containment Structure post- Tensioning Sys.Info Includes Wire Testing & Analysis of Sheath Filter | |
ML17338A218 | 11 October 1978 | LER 78-010/03L-0:on 780911,radioactively Contaminated Water Leaked to Paved Area Outside Pump Room for 30 Minutes.Caused by Mechanical Seal Failure in Spent Fuel Pit Cooling Pump | |
ML17338A221 | 11 October 1978 | LER 78-012/01T-0:on 780927,no Adverse Affect Noted from Substitution of Fuel Assembly N-07 for N-04 in Core Position F-14.Reload 5 Safety Evaluation Remains Valid | |
ML17338A226 | 13 October 1978 | LER 78-011/03L-0:on 780920,Preventive Maint Checks of MSIV Solenoid Valves Revealed Defective Coils.Caused by High Temp & Moisture in Area.Addl Preventive Maint Planned | |
ML17338A262 | 27 October 1978 | LER 78-013/03L-0:on 780929,condensate Storage Tank Held Less than 185,000 Gallons for About 8 H.Caused by Leaks in Condenser Tubes,Necessitating Increased Steam Generator Blowdown.Flow Demand Exceeded Output of Treatment Plant | |
ML17338A270 | 2 October 1978 | LER#78-014/03L-0 on 781002:condensate Storage Tank(Cst)Fell to 182,000 Gallons Because of Water Demand Increase for Steam Generator Blowdown Resulting from Cation Resin Bed Regeneration.Cst Filled After Resin Bed Regeneration | |
ML17338A278 | 30 September 1978 | Report on Fracture Toughness & Potential for Lamellar Tearing of Steam Generator & Reactor Coolant Pump Supports, w/29 Oversize Drawings Showing Geometry of All Principal Elements Available in Central Files | Operating Basis Earthquake Design basis earthquake Liquid penetrant |
ML17338A325 | 20 November 1978 | LER#78-015/01T-0 on 781106:Boron Injection Tank(Bit)Sample Showed Low Boron Level.Exact Cause Is Unknown,But It Is Suspected the Actual Bit Concentration Was Proper & the Sample Was Diluted & Invalid | Boric Acid |
ML17338A330 | 27 November 1978 | LER#78-010/03L-1 on 780911:Spent Fuel Pit Cooling Pumps Mech Seal Failed Causing 150 Gallons of Radioactively Contaminated Water to Leak to Paved Area Outside Pump Room Caused by Inadequately Lubricated Pump Bearing | |
ML17338A400 | 15 December 1978 | LER#78-016/03L-0 on 781115:Crack in 4A Charging Pump Discharge Piping Drain Line Developed Due to Crack in a 1 Inch Nipple (Type 316 Stainless Steel),Which Was Subsequently Replaced | |
ML17338A465 | 19 April 1978 | DYNODE-P Version 2:A Nuclear Steam Supply Sys Transient Simulator for Pressurized Water Reactors-User Manual. Describes FORTRAN-IV Program Simulating NSSS of PWR, Including Component Simulation & Geometry Options | |
ML17338A469 | 26 January 1979 | Steam Generator Repair Rept,Revision 6. Provides Detailed Description of Onsite Storage Facility for Replaced Steam Generator Lower Assemblies | Safe Shutdown Boric Acid High winds Shutdown Margin High Radiation Area Hydrostatic Coatings Nondestructive Examination Emergency Lighting Fire Protection Program Fire Watch Scaffolding Coast down |
ML17338A490 | 18 January 1979 | LER 78-016/03L-0 on 781219:process Radiation Monitors R-11 & R-12 Were Out of Svc for About 18-h.Air Sampling Blower Which Monitors R-11 & R-12 Failed Due to Normal Wear | |
ML17338A537 | 23 February 1979 | LER 79-001/03L-0 on 790125:4A Boric Acid Transfer Pump Tripper on Thermal Overload Inoperable.Caused by Incomplete Reinstallation of Recirculation Line Insulation.New Recirculation Line Installed | Boric Acid |
ML17338A594 | 20 March 1979 | Annual Rept 1978. | |
ML17338A650 | 13 April 1979 | LER 79-003/03L-0 on 790315:during Normal Operation,Crack Observed in 4C Charging Pump Suction Piping.Caused by Design/Installation of Pumps Resulting in Operational Pressure Pulsation/Vibration Effects.Weld Repaired | |
ML17338A653 | 9 April 1979 | LER 79-002/03L-0 on 790310:during Cold Shutdown,Cracks Observed in 4B Charging Pump Suction Piping.Probably Caused by Design/Installation of Positive Displacement Pumps. Welds Repaired & Mods Made to Reduce Stresses | |
ML17338A655 | 13 April 1979 | LER 79-004/03L-0 on 790315:vendor Reported Main Steam Line Mechanical Snubber,Returned for Routine Testing,Was in locked-up Condition.Caused by Damaged Thrust Bearing. X-stop Adjusted | |
ML17338A690 | 20 April 1979 | LER 79-005/03L-0 on 790322:process Radiation Monitors R-11 & R-12 Were Out of Svc.Caused by Failure of Air Sampling Blower Which Supplies Monitors.Blower Replaced & Monitors Returned to Svc | |
ML17338A693 | 20 April 1979 | LER 79-006/03L-0 on 790322:packing leak-off Observed on Three Valves.Cause Undetermined for Two Valves.Leaking Packing on Third Due to Broken Bellows Seal.Unit in Reeling Shutdown;Repairs Will Be Made Before Return to Power |