ML17208A619

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1979
ML17208A619
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 11/03/1979
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A618 List:
References
NUDOCS 8005200604
Download: ML17208A619 (14)


Text

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.

50 250 phTi 9ov.

3 1979 PPh1PL9iPP hy V.T. Chiloon TELEPHONE ~~~-3824 Turke Point Unit No.

3 2200 693 700 666

1. Unit Name
2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

S ~ Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net AIWe):

Notes - Unit No.

3 operated at approximately 100% R.P.

except for outages of Oct.

6-13,

1979, and load reduc-tions of Oct. 2-4, and 15-16, 1979.
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWc):
10. Reasons For Restrictions, lfAny:

NONE This Month Yr.-to-Date Cumulative 60 537.6 7 296.0 46 547.0 213.3 44 967'.8 121.8 3 974.6 18.7 3 790.5 24.5 89 897 100 28 580 210 8 130 152 2 545 780 2 400 120 27 0147 297 52.0 74.2 74.5 52.3 60.1 49.4 47.4

'7.3 2.6 4.1 2,

1979 Feb.

1, 1980.

11. Hours In Reporting Period 745.0
12. Number Of Hours Reactor Was Critical 602.4
13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours

<<0-

17. Gross Electrical Energy Generated (MWH) 389 895

<<D'"")

19. Unit Service Factor 79.8
20. Unit Availability Factor 79 '
21. Unit Capacity Factor (Using MDC Net)

'74. 4

22. Unit Capacity Factor (Using DER Net) 71.5
23. Unit Forced Outage Rate 0.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Scheduled refuelin maintenance and. ins ections Dec.

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

N A Forecast Achieved INITIALCRITICALITY IN!TIAL ELECTRICITY COMMERCIALOPERATION

('>/77)

~'

a'Da

~

UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKETNO..

UNITNAME Turke Point Unit No.3 REPORT h(ONTII 1979 hilson V>>.

nate an a

J Q

f1 a gee

~ V)

LIienscc Event Rcport ~

Cl Cl'a an

cnC, O~0 Q

Cause &Corrcctivc Action to Prevent Rccurrcnce 19 20 21 79-10-02 F 79-10-13 F

1.7 79-10-06 S

148.6 N/A N/A N/A HC HH HTEXCH (D)

HTEXCH (A) zzzzzz Load reduction to repair condenser tube leak.

(Non-nuclear system)

Unit was removed from service to re-pair tube leaks in moisture-sepa-rator-reheater and miscellaneous secondary leaks.

(Non-nuclear system)

Unit was tripped by steam generator No.

3C level protection system while increasing load after the unit was returned to service.

(Non-nuclear system) 22 79-10-15 F A N/A HC HTEXCH (D)

Load reduction to repair condenser tube leak.

(Non-nuclear system)

F: Forced S: Scheduled

(')/77)

Reason:

A.Equipment Failure (Explain)

B.hlaintcnance or Test

('-Refueling D-Regulatory Restriction E-Operator Trair,ing & Liccnsc Examination F.Administ rat ive G Operational Error (Explain)

I(.Other (Explairr) 3 h(ethod:

I Manual 2.Manual Scram.

3-Autonmtic Scram.

4-Other (Explain) 4 Exhibit G - instructions for Preparation of Data Entry Sheets for Li<<ensce Event Report (LER) File (NUREG-016I )

Exhibit I - Sante Source

AVEI(AGEDAILYUNITPOWER LEVEL

. DOCKET NO.

II Nov.

3, 1979 COMPLETED IIY ~. T. ChilSOn TELEPHONE 824 MONTH OCTOBER 19 79 DAY AVERAGE DAILYPOWER LEVEL (MWe Net)

I 649 648 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 658 17 18 626 10 13 14 IS I6 650 646 646 654 656 656 653 651 652 658 500 644 20 21 22 23 24

')5 17 28 29 30 31 630 480 654 654 652 652 615 659 61 INSTRUCTIONS On this format. list the average daily onit power le~i( in Mme Nct for each day in the reporting tnonth. Cinnpute to the nearest whole megawat t.

(it(77 I

, OPERATING DATA REPORT OPERATING STATUS 760

1. Unit Name:

Turke Point Unit No.

4

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross hIWe):
5. Design Electrical Rating (Net MWe):
7. Maximum Dependable Capacity (Net hIWe):

666 DOCKET NO ~0- 251 DATE Zm '~979

~ COh(PLETED BY ~~hilson TELEPHONE ~~2-3824 Notes-Unit No.

4 operated at approximately 100% R.P., ex-cept for load reductions of Oct. 15-16, 20-21, and 27-28, 1979.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr.-to-Date Cumulative 5 263.2 0.0 5 165.2 8.

10 510 489 3 073 495 70.8 71.1 60.8 I I. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 745. 0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 745.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Ge'nerated (MWH) 1 601 688

~67IL

18. Net Electrical Energy Generated (hIWH) 473 949
19. Unit Service Factor 100.0
20. Unit AvailabilityFactor 100.0

-22. Unit Capacity Factor (Using DER Net)

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

39 610.8 154.2 37 984;3 8.

78 650 356 23 758 200 70.0 70.0

'63.2

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status(Prior to Commercial Operation):

N/A Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COhlMER CIAL OPERATION

('>/771

"'ta.

UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKETNO.

REPORT hIONTH OCTOBER 1979 Date a

O an a

P1

~n rso

+ ~

t$

~ V)

Licenscc Event Rcport ~

CP CJ an rn Cr Cause &Corrective Action to Prevent Reiurrcn~e 17 79-10-15 N/A HC HTEXCH (D)

Load reduction to repair condenser tube leak.

(Non-nuclear system) 18 79-10-20 N/A HC HTEXCH (D)

Load reduction to repair condenser tube leak.

(Non-nuclear system) 19 79-10-27 N/A HC HTEXCH (D)

Load reduction to repair condenser tube leak.

(Non-nuclear system)

F: Forced S: Schcdu!ed

(')/77)

Reason:

A-Equipment Failure (Explain)

B-hiaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Liccnsc Examination F-Administrative G.Operational Error (Explain)

II.Other (Explain)

Method:

I-Manual 2-h(anual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI6I) 5 Exhibit I - Satnc Source

AVERAGE DAILYUNIT POWER LEVEL COMPLETED BY TELEPHONE on MONTH DAY AVERAGE DAILYPOWER LEVEL

{MWc.Net)

DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net )

594 17 7

.'8 10 406 523 774 780 782 58 771 18 19 20 22 23 24 25 26 785 786 785 783 783 785 783 783 85 13 14 IS 16 INSTRUCTIONS 542 785 662 28 29 30 31 NOTE:

787 785 Average daily power level greater than 777 MWe due to cooler

.condenser cooling water.

On this I'onnat. list the average daily unit power Icvt'.I in MWe.Net for each day in the reporting tnonth. Compute to the ncarcst whole megawatt.

(')i77)

OPERATING DATAREPORT OPERATING STATUS I. Unit Name:

St. Lucia Unit No..l

2. Reporting Period:

October 1979

3. Licensed Thermal Power (hIWt):-
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net hIWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net hIWe):

802 822 777 DOCKET NO.

DATE How ~9 79 COMPLETED BY 3LZ~hilson TELEPHONE ~05 552-3824 Notes Unit operated at ap-proximately 100/ R.P. after the unit returned to service on Oct. 2, 1979, except for outages of Oct. 3, 7, 9-14, and 16-17, 1979.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Nct MWe):
10. Reasons For Restrictions, IfAny'his Month Yr..to.Date Cumulative 745.0 25 080.0 7 296.0 12 5 006.8 46 538 035 14 184 492 68.6 77.3 72.8 70.5 5.8
11. Hours ln Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 580.4 19 366.0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH).

1 439 455 12 319 887

19. Unit Service Factor 77.9 7702
20. Unit Availability Factor 77.9 68.8
21. Unit Capacity Factor (Using hiDC Net) 75.5 66.0
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 2 ~ 7 4.0
24. Shutdowns Scheduled Over Next 6 hlonths (Type. Date. and Duration of Each):

nance and ins ections March 30 Ma 24 1980.

25. IfShut Down At End Of Report Period. Estimated Date ofStartup.
26. Units In Test. Status (Prior to Commercial Operation):

N A Forecast Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (o/771

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH OCTOBER 1979 Page 1 of 3 DOCKET NO.

UNITNAME COMPLETED BY V. T. ('hilson Vo.

Date ClO.

I gz b

A

~ C/l $

Liccnscc Event Rcport =

Cl Cl

~n cn C V

Cr Cause 8c Corrective Action to Prevent Recurrence 18 79-09-23 28.0 D

4 N/A HH PIPEXX (E)

Unit was removed from service to perform the inspections required by Bulletin Nos.

79-13 and 79-14.

(Continued from previous month)

(Nuclear system) 19 79-10-03 F

6.2 A

3 N/A HH ENSTRU (E)

Unit was tripped by the reactor pro-tection system during a transient condition resulting from the loss of condensate pump No. 1B.

Corrective actions included exercising the as-sociated ammeter selector switch to ensure the switch contacts are closed when the switch is rotated to the "off" position.

(Non-nuclear system)

F: Forced S: Scheduled (9177)

Reason:

A.Equipment Failure (Explain)

B.h(aintenance oi Test

~

C.Refueling D.Regulatory Restriction E.Operator Training k, License Examination

. F-Admi nist rat ivc G.Operational Error (Explain)

II.Other (Explain) hlethod:

I -Manual 2-h(anual Scram.

3-Automatic Scrant.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets Ior Licensee Event Report (LER) File (NUREG-OI6I )

Exhibit I - Satnc Source

UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKETNO. SO 335 UNITNAMFSt. Lucie Unit No.

1 REPORThIONTH OCTOBER 1979 Page 2 of 3 Date cn t<

O~

Llccnscc Event Report ~

Cause lt<. Corrective Action to Prevent Recurrence 20 79-10-07 3.9 N/A HH VALVOP (D)

Unit was tripped by steam generator No.

1A level protection system due to loss of instrument air supply to the feedwater control valve.

Cor-rective actions included replacing the failed instrument air supply line fitting.

(Non-nuclear -system) 21 79-10-09 S

120.4 N/A CB Pl&IPXX Unit was removed from service to repair mechanical seal on reactor coolant pump No. 1B2. Corrective actions included replacing-mechanical seal.

(Nuclear system)

I F: Forced S: Schedu!ed Reason:

A.Equipment Failure (Explain)

B-h(aintenance or Test C-Refueling D.Regulatory Restriction E-Operator Training k. License Examination F-Administrative G.Operational Error (Explain)

II Other (Explain)

Method:

! -Manual 2-Manual Scram.

3-Automatic Scram.

4-O(her (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets lor Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Sante Source

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

Page 3 of 3 Date Vl O

Licenscc Fvent Rcport Cause A Corrective Action to

'revent Recurrence 22 79-10-17 F

6.2 A

N/A HA PIPEXX (A)

Unit was removed from service to repair a leak in the turbine control oil system piping.

Corrective actions included rewelding the failed section of piping.

(Non-nuclear system)

I F: Forced S: Scheduled

('>/77)

Reason:

A-Equipment Failure (Explain)

II.Maintenance or Test

~

C-Refueling D.Regulatory Restriction E-Operator Training & Liccnsc Examination F-Administrative G.Operational Error (Fxplain)

II-Other (Explain) 3 Method:

I-Manual 2.Manual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI6I )

Exhibit I - Sante Source

P.O. GOX 529100, MIAMI,FL 33152

~i'll/g~

1 t'J(i.p+%

FLORIOA PO'IVER h LIGHT CGMPAHY November 3,

1979 Office of Management Information.

and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the October, 1979, Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. 1.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire P5OPL5 ScRVINQ P OP'"

SUMMA'P OPERATING EXPERIENCE DOCKET NO-50 250 Turkey Point UNIT Unit No.

3 DATE Nov. 3, 19 79 REPORT MONTH

OCTOBER, 1979 COMPLETED 'BY '. T: Chilson TELEPHONE (305) 552-3824

. Unit No.

3 operated at approximately 100% R.P.,

except for outages of Oct. 6-13,

1979, and load reductions of Oct. 2-4, and '15-16, 1979.

Refer to "Unit, Shutdowns and Power Reductions" section of the October, 1979, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

~ Performing inspections required by IE Bulletin No. 79-14 on systems accessible'uring Unit No.

3 operation.

SUMMA OF OPERATING EXPERIENCE POCKET NO.

50 251 Turkey Point Unit, No.

4 DATE Nov.

3 1979 COMPLETED BY V. T. Chilson

, REPORT MONTH OCTOBER 1979 TELEPHONE (305) 552-3824 Unit No.

4 operated at approximately 100% R.P.,

except for load reduc-tiors of Oct. 15-16, 20-21, and 27-. 28, 1979.

Refer to "Unit Shutdowns and Power Reductions" section of the October, 1979, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Performing inspections required by IE Bulletin-No.

79-14 on systems accessible during Unit No.

4

. operation.

SUMMA'F OPERATING EXPERIENCE DOCKET NO.

50 335 St. Lucie UNIT Unit No.

1 DATE Nov.

3, 1979 COMPLETED BY '.

T. Chilson REPORT MONTH

OCTOBER, 1979 TELEPHONE (305) 552-3824 Unit operated at approximate 100% R.P. after the unit returned to service on Oct.

2, 1979, except for outages of Oct.

3, 7, 9-14, and 16-17, 1979.

Refer to "Unit Shutdowns and Power Reductions" section of the October,. 1979, Operating Status Report for additional infor-mation.

Major Safety-related maintenance activities performed during the month included:

Performing inspections required by IE Bulletin

. No. 79-13.

Performing inspections required by IE Bulletin No. 79-14.

Replaced mechanical seal on reactor coolant pump No.

1B2.