ML17208A624
| ML17208A624 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 04/07/1979 |
| From: | Chilson V FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17208A623 | List: |
| References | |
| NUDOCS 8005200698 | |
| Download: ML17208A624 (13) | |
Text
OPERATING DATAREPORT SDOS20O6 (S DOCKET NO. ~7(}
DATE A~ril 7 1979 COMPLETED BY LZ~hi3son TELEPHONE ('~~-3824 OPERATING STATUS Turkey Point Unit No.
3 2200 760 693 700 666
- 1. Unit Name'.
Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximuin Dependable Capacity (Net 19(We):
Notes Unit No.
3 scheduled refueling, maintenance, and inspections continued during month.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny'ONE Yr:to-Date This Month 744.0 2 160.0 1 8 1.4 707 175 5 275 2 084 0.1 0.1 -0>> Type. Date, and Duration of Each):
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MlVH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (
Cumulative 55 401.6 42 574.2 194. 6 41 178.7
- 97. 3 81 767 655 26 034 605 24 641 902 74.3 74.5 67.4
'64.2
'.6
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
('t/77)
UNITSHUTDONNS AND POlUER REDUCTIONS REPORT MONTH MARCH 1979 N<<.
Date ri OVirr CL I
~- ntr
~ V)
QO Lkcnscc Event Report e C
() V
~'O E c3 0
Cr Cause Ec Corre<twe Action to Prevent Rccurrcncc 79-01-01 S
744.0 C
4 N/A RC FUELXX Unit No.
3 was removed from service for scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear system)
F: F<<reed S: Scheduled Reason:
A-Equipmcnt Failure (Explain)
B.hlalntenance or Test C'-Refuel!ng D.!<et,ulatory Restriction E-Operator Trainingh Ucensc Exantination F Aun'iltllsi.a LYe G-Operational Error (Explain}
!3-Other (Explain) 3:
Method:
I.Manual
~ 2 Manual Scram.
3-Auton>atic Scram.
4-Ot Itcr (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Shccts for Liccnsec Event Rcport (LER) File (NUREG.
OI 6I }
5 Exhibit I - Satnc Source
AVERAGE DAILYUillTPOWER LEVEL DOCKET NO.
50 251 Turkey Point COMPLETED BY TELEPHONE MONTH MARCH 19 79 DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) 1 5
5 DAY AVERAGE DAlLYPOWER LEVEL (MWc-Nct) 17 6
10 12 13 15 16 588 587 2
528 584 568 607 601 0
0 18 19 20 21 22 23 25 27 28 29 30 31 607 607 586 20 620 24 622 1NSTRUCT10NS On this format, list the average daily unit power level in Mac.Nct for each day in the rcporlinglnonth. Compute to thc nearest whole megawatt.
V>l77)
OPERATING STATUS OPERATING DATAREPORT DOCKET NO. 50 251 PgTE April 7 1979 COhIPLETED BY V '~ljJ son TELEPHONE (Z}53 Q2-3824 Unit Name Turke Point Unit No.
4
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):.
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
- 6. hfaximum Dependable Capacity (Gross hIWe):
- 7. hIaximum Dependable Capacity (Net MWe):
Notes-Unit-No. 4 operated a't approximately 93% R.P. to extend operation of Core Cycle V except for outages of March 10-12, March 17, and March 22-23, 1979.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9 ~ Power Level To which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, lfAny:
Cumulative 49 129.0 This Month 744.0 Yr:to Date 2 160.0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours I4. Hours Generator On-Line IS. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (hkWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (hIWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 hIonths(Type, Scheduled refuelin maintenance 36 440.0 676.3 2 092.3 138.8 34 903'.1 2 086.0 670.0 3 866 943 1 204 955' 364 505 417 440 72 006 810 23 040 680 21 820 455 393 054 1 135 750 71.0 96.6 90.1 71.0 96.6 90.1 67.1 79.0 79.3
'64.1
'5.9 76.2 2.7 3.7 1.2 Date,and Duration of Each):
'nd ins ections - A ril 5 June 5
1979 S. IfShut Dowrt At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMhtERCIAL OPERATION
('t/77 )
UNITSIIUTDOWNS AND PO)YER REDUCTIONS DOCKET NO. ~
REPORT hlOiVfll Page 1 of 2 No.
Date eh Vl h
Ch 0
z ~L
~ fjh a
Licenscc Eveht Rcport F i
Ch Ch Vl cn G ghlh O
Chzj Eu O
Cause gf, Corrective Action to Prevent Rccurrcnce 79-02-01 N/A RC FUELXX.
Load reduction to approximately 90%
R.P. to extend operation of Core Cycle V.
(Continued from previous month) 79-03-09 S
47.9 B
N/A.
zz zzzzzz Unit No.
4 was removed from service to perform integrated safeguards surveillance test.
(Nuclear System) 79-03-17 1.2 H
N/A IA INSTRU Unit was tripped by the reactor pro-tection system during the performance of a periodic surveillance test when the second of two channels was placed in test mode in error.
(Nuclear system)
I F: Forced S: Scheduled (9/77)
Reason:
A-Equ!pmcnt Failure (Exphin)
B.hlaintenancc oi Test C-Refueling D.Regulatory Restriction E-Operator.raining k. License Exa'ntination F-Administ rat ivc C.Opcrationa! Error (Explain) l!-Oi!>cr(Exolain) 3 hicthod:
I manual 2.hlanual Scram.
3 Automatic Scram.
4.Other (Explain) 4 Exhibit G ~ Instructions I'or Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG.
0 I6I )
Exhibit I - Satnc Source
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 251 it No.
4 REPORT MON'fH Page 2 of 2 No.
Date I I Cl
. Woh A o
~ H Q
Licensee Event Rcport 0 CQ OP 4l cn Cr C
o ~
g7 Z$
E~
O CJ Cause &. Correct ivc Action to Prevent Recurrence 79-03-17 0.8 N/A HA VALVEX Unit was manually tripped due to the sudden closure of a turbine stop valve caused by a malfunction in the turbine control system.
Corrective actions included exercising the.
turbine stop valves.
(Non-nuclear system) 79-03-22 24.1 B
N/A CB VALVEX (H)
Unit was removed from service to re-pair miscellaneous leaks on valves located inside containment.
Cor-rective actions included adding or replacing valve stem packing.
(Nuclear system)
F: Forced S: Schcdulcd (9177)
Reason:
A-Ecuipment Failure (Explain)
B-Maintenance or Test C-Rei'ueling D.Regulatory Restriction E-Opera to. Training &, Iiccnsc Examination F-Adminis t ra tive G.Operational L'rrur (Explain)
H-0'ther (Explain)
Method:
I-Manual 2-hlanual Scram.
3 Autontatrc Scram.
4-Other(Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets lor Lice:Isec Event Report (LER) File (NUREG-OI6I) 5 Exhibit I - Satne Source
AVEI(AGEDAILYUNITPOWER LEVEL DOCKET NO.
St. Luc 3.e MONTH MARCH 1979 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 2 DAY AVERAGE DAILYPOWER LEVEL (MWe Net) 17 18 786 8
10 12 13 14 15 16 INSTRUCTIOi IS 86 784 786 72 777 20 21 22 23 24 25 26 27 28 30 31 NOTE:
785 83 783 82 784
'83 731 Average daily power level greater than 777 NWe due to cooler condenser cooling water.
On this format, list the average daily unit power level in Mme Net for each day in the reporting tnunth. Compute to tfte nearest whole ntegawatt.
(')/77 )
OPERATING DATAREPORT DOCKET NO.
DATE ~ril 7 1979'OMPLETED BY ~~QJ.son TELEPHONE %KB H7--3824 OPERATING STATUS St. Lucie Unit No.'1 2560 850 802 822 777
- 1. Unit Name
- 2. Reporting Period:
- 3. Licensed Thermal Power (hIIVt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (iVet MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. hlaximum Dependable Capacity (Net MWe):
Notes St. Lucie Unit No.
1 operated at approximately 100% R.P. during month.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to.Date Cumulative 19 944.0 16 797.0 2 160.0 2 009.4 118.5 16 350.8 1 991.6 21.0 39 256 995 5 038 847 12 742 450 11 987 029 1 635 500 1 544 191 82.0 92.2 92.2 82.0 92.0 77.
4'4.9 89.1 6.6 7.8 1 -.June 4, 1979
- 11. Hours In Reporting Period 744.0
- 12. Number Of Hours Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours
-0
- 14. Hours Generator On-Line 744. 0
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 891 957
- 17. Gross Electrical Energy Generated (MWH) 611 290
- 18. Net Electrical Energy Generated (h(WH) 578 332
- 19. Unit Service Factor
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 100.0
- 22. Unit Capacity Factor (Using DER Net) 96.9
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
eduled refuelin maintenance, and inspections April
- 25. IfShut Down At End Of Rcport Period, Estimated Date of Startup.'6.
Units ln Test Status(Prior to Commercial Operation):'/A Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION
('t/77 I
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. ~
REPORT MON'fH MARCH 1979 No.
Date Eh 1
a rl Cl fV~
I N J Qm ~ec
~ V)
Q Ltcenscc Event Report rr C
()
CJ Q D E(3 O
Cause &Corrective Action to Prevent Recurrence N
0 N
E I
F: Forced S: Scheduled Reason:
A.Eouipment Failure (Explain)
B.hialntcnancc or Test C-Refueling D-Regulatory Restriction F. Opira'or Training &. Liccnsc Examination F-Administrative C Operatiot!ai Error (Expl in)
Ii 0!!>cr {Explain) 3 Method:
I -hianual 2.h(anual Scram.
3.Automatic Scram.
4-Other (Exp!ain) 4 Exhibit G - Instructions for Preparation of Data Entry Shccts for Licensee Event Report (LER) File (NUREG-OI61) 5 Exhtbtt I - Satnc Source
~ OOX 529IOO, MIAMI,FL 33)52 iK<llb<
<LORIOA PO>VER h LIGHT COMPAiIY April 7, 1979 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the March, 1979, Operating Sumniary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. Schwa.dt Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire
0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
.50 250 Turkey Point UNXT 'nit No.
3 Dl'.TE April 7, 1979 COMPLETED BY V. T. Chilson REPORT MONTH MARCH, 1979 TELEPHONE (305) 552-3824 Unit scheduled refueling, maintenance, and inspections continued during month.
Refer to."Unit Shutdowns and Power Reductions" section of the
- March, 1979 operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Performed Containment Integrated Leakage Rate Surveillance Test.
Performed Integrated Engineered Safety Features and Emergency-Power Supply Surveillance Test.
0
SUMMARY
OF OPERATXNG EXPERXENCE DOCKET NO.
UNXT 50 251 Turkey Point Unit No.
4 DZ'.TE A ril 7, 1979 COMPLETED BY V. T. Chilson QEPORT MONTH MARCH 19 79 TELEPHONE (305) 552-3824 Unit operated at approximately 93% R.P. to extend operation of Core Cycle V except for outages of March 10-12, March 17, and March 22-23, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the
- March, 1979, Operating Status Report for additional information.
No Major Safety-related maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
0 335 St. Lucie UNIT Unit No.
1 Dl'.TE A ril 7 1979 COMPLETED BY V. T. Chilson REPORT MONTH MARCH 1979 TELEPHONE 305 552-3824 Unit.operated at approximately 100% R.P. during month.
Refer to "Unit Shutdowns and Power Reductions" section of March, 1979 Operating Status Report for addi tiona 1 information.
No Major Safety-related maintenance was performed during the month.