|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
SDOS20O6 (S OPERATING DATA REPORT DOCKET NO. ~7(}
A~ril 7 1979 DATE COMPLETED BY LZ~hi3
('~~-3824 son TELEPHONE OPERATING STATUS
- 1. Unit Turkey Point Unit No. 3 Notes Unit No. 3 scheduled Name'.
Reporting Period:
refueling, maintenance, and 2200 inspections continued during
- 3. Licensed Thermal Power (MWt):
760 month.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Maximuin Dependable Capacity (Net 19(We): 666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Any'ONE
- 9. Power Level To Which Restricted.
- 10. Reasons For Restrictions, If If Any (Net MWe):
This Month Yr:to-Date Cumulative
- 11. Hours In Reporting Period 744.0 2 160.0 55 401.6
- 12. Number Of Hours Reactor Was Critical 1 8 42 574.2
- 13. Reactor Reserve Shutdown Hours 194. 6
- 14. Hours Generator On-Line 1.4 41 178.7
- 15. Unit Reserve Shutdown Hours 97. 3
- 16. Gross Thermal Energy Generated (MWH) 707 81 767 655
- 17. Gross Electrical Energy Generated (MWH) 175 26 034 605
- 18. Net Electrical Energy Generated (MlVH) 2 084 5 275 24 641 902
- 19. Unit Service Factor 0.1 74.3
- 20. Unit Availability Factor 0.1 74.5
- 21. Unit Capacity Factor (Using MDC Net) 67.4
- 22. Unit Capacity Factor (Using DER Net) -0>> '64.2
- 23. Unit Forced Outage Rate '.6
- 24. Shutdowns Scheduled Over Next 6 Months ( Type. Date, and Duration of Each):
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
('t/77)
UNIT SHUTDONNS AND POlUER REDUCTIONS REPORT MONTH MARCH 1979 I
C ri N<<. Date O
Vi
~- trn Lkcnscc Event
~'OV
()
Cause Ec Corre<twe Action to rr E c3 Report e 0 Prevent Rccurrcncc CL
~ V) Q Cr O
79-01-01 S 744.0 C 4 N/A RC FUELXX Unit No. 3 was removed from service .
for scheduled refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear system) 3: 4 F: F<<reed Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) I.Manual for Preparation of Data B.hlalntenance or Test ~
2 Manual Scram. Entry Shccts for Liccnsec C'-Refuel!ng 3-Auton>atic Scram. Event Rcport (LER) File (NUREG.
D.!<et,ulatory Restriction 4-Ot Itcr (Explain) OI 6I }
E-Operator Trainingh Ucensc Exantination F Aun'iltllsi.a LYe 5 G-Operational Error (Explain} Exhibit I - Satnc Source
!3-Other (Explain)
AVERAGE DAILYUi llT POWER LEVEL DOCKET NO. 50 251 Turkey Point COMPLETED BY TELEPHONE MONTH MARCH 19 79 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) (MWc-Nct) 1 5 5 17 588 18 607 19 607 587 20 2 21 6 528 22 23 584 586 568 25 10 27 20 12 28 13 607 29 620 601 30 24 15 0 31 622 16 0 1NSTRUCT10NS On this format, list the average daily unit power level in Mac.Nct for each day in the rcporlinglnonth. Compute to thc nearest whole megawatt.
V>l77)
OPERATING DATA REPORT 251 DOCKET NO. 50 PgTE April 7 1979 COhIPLETED BY V TELEPHONE
'~ljJ son (Z}53 Q2-3824 OPERATING STATUS Turke Point Unit No . 4 Notes- Unit-No. 4 operated Unit Name a't approximately 93% R.P. to
- 2. Reporting Period:
extend operation of Core
- 3. Licensed Thermal Power (MWt): .
Cycle V except for outages
- 4. Nameplate Rating (Gross MWe): of March 10-12, March 17, and S. Design Electrical Rating (Net MWe): March 22-23, 1979.
- 6. hfaximum Dependable Capacity (Gross hIWe):
- 7. hIaximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9 ~ Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, lf Any:
This Month Yr:to Date Cumulative
- 11. Hours In Reporting Period 744.0 2 160.0 49 129.0
- 12. Number Of Hours Reactor Was Critical 676.3 2 092.3 36 440.0
- 13. Reactor Reserve Shutdown Hours 138.8 I4. Hours Generator On-Line 670.0 2 086.0 34 903'.1 IS. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (hkWH) 364 505 3 866 943 72 006 810
- 17. Gross Electrical Energy Generated (MWH) 417 440 1 204 955' 23 040 680
- 18. Net Electrical Energy Generated (hIWH) 393 054 1 135 750 21 820 455
- 19. Unit Service Factor 90.1 96.6 71.0
- 20. Unit Availability Factor 90.1 96.6 71.0
- 21. Unit Capacity Factor (Using MDC Net) 79.3 79.0 67.1
- 22. Unit Capacity Factor (Using DER Net) 76.2 '64.1 '5.9
- 23. Unit Forced Outage Rate 3.7 1.2 2.7
- 24. Shutdowns Scheduled Over Next 6 hIonths(Type, Date,and Duration of Each):
Scheduled refuelin maintenance ins ections -A ril 5
'nd June 5 1979 S. If Shut Dowrt At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMht ERCIA L OPERATION
('t/77 )
DOCKET NO. ~
UNIT SIIUTDOWNS AND PO)YER REDUCTIONS REPORT hlOiVfll Page 1 of 2 eh 0 Lice nscc i ghlh Cause gf, Corrective Ch Ch O Ch zj No. Date Vl h
Ch z ~L Eveht Vl G Eu Action to Prevent Rccurrcnce Rcport F cn O
~ fjh a
79-02-01 N/A RC FUELXX . Load reduction to approximately 90%
R.P. to extend operation of Core .
Cycle V. (Continued from previous month) 79-03-09 S 47.9 B N/A. zz zzzzzz Unit No. 4 was removed from service to perform integrated safeguards surveillance test. (Nuclear System) 79-03-17 1.2 H N/A IA INSTRU Unit was tripped by the reactor pro-tection system during the performance of a periodic surveillance test when .
the second of two channels was placed in test mode in error. (Nuclear system)
I 3 4 F: Forced Reason: hicthod: Exhibit G ~ Instructions S: Scheduled A-Equ!pmcnt Failure (Exphin) I manual I'or Preparation of Data B.hlaintenancc oi Test 2.hlanual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Rcport (LER) File (NUREG.
D.Regulatory Restriction 4.Other (Explain) 0 I 6I )
E-Operator .raining k. License Exa'ntination F-Administ rat ivc C.Opcrationa! Error (Explain) Exhibit I - Satnc Source (9/77) l!-Oi!>cr (Exolain)
DOCKET NO. 50 251 UNIT SHUTDOWNS AND POWER REDUCTIONS it No. 4 REPORT MON'fH Page 2 of 2
. Wo h
C I I Ao CQ4l Cause &. Correct ivc Licensee OP
~
og7 Z$
No. Date Event Action to Cl Rcport 0 cn Cr E~ Prevent Recurrence
~H Q O
CJ 79-03-17 0.8 N/A HA VALVEX Unit was manually tripped due to the sudden closure of a turbine stop valve caused by a malfunction in the turbine control system. Corrective actions included exercising the.
turbine stop valves. (Non-nuclear system) 79-03-22 24.1 B N/A CB VALVEX Unit was removed from service to re-(H) pair miscellaneous leaks on valves located inside containment. Cor-rective actions included adding or replacing valve stem packing.
(Nuclear system)
F: Forced Reason: Method: Exhibit G - Instructions S: Schcdulcd A-Ecuipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-hlanual Scram. Entry Sheets lor Lice:Isec C-Rei'ueling 3 Autontatrc Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other(Explain) OI6I)
E-Opera to. Training &, Iiccnsc Examination F-Ad minis t ra tive 5 G.Operational L'rrur (Explain) Exhibit I - Satne Source (9177) H-0'ther (Explain)
AVEI(AGE DAILYUNIT POWER LEVEL DOCKET NO.
S t. Luc 3.e MONTH MARCH 1979 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe Net) 17 2 18 786 86 20 785 784 21 22 786 23 83 8 24 783 25 82 10 26 72 27 784 12 28 13
'83 14 30 15 777 31 731 16 NOTE: Average daily power level greater than 777 NWe due to cooler condenser cooling water.
INSTRUCTIOi IS On this format, list the average daily unit power level in Mme Net for each day in the reporting tnunth. Compute to tfte nearest whole ntegawatt.
(') /77 )
OPERATING DATA REPORT DOCKET NO.
DATE BY
~ril
~~QJ.son 7
1979'OMPLETED TELEPHONE %KB H7--3824 OPERATING STATUS
- 1. Unit Name St. Lucie Unit No.'1 Notes St. Lucie Unit No. 1
- 2. Reporting Period:
operated at approximately 2560 100% R.P. during month.
- 3. Licensed Thermal Power (hIIVt):
- 4. Nameplate Rating (Gross MWe): 850
- 5. Design Electrical Rating (iVet MWe): 802
- 6. Maximum Dependable Capacity (Gross MWe): 822
- 7. hlaximum Dependable Capacity (Net MWe): 777
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to.Date Cumulative
- 11. Hours In Reporting Period 744.0 2 160.0 19 944.0
- 12. Number Of Hours Reactor Was Critical 744.0 2 009.4 16 797.0
- 13. Reactor Reserve Shutdown Hours -0 118.5
- 14. Hours Generator On-Line 744. 0 1 991.6 16 350.8
- 15. Unit Reserve Shutdown Hours 21.0
- 16. Gross Thermal Energy Generated (MWH) 1 891 957 5 038 847 39 256 995
- 17. Gross Electrical Energy Generated (MWH) 611 290 1 635 500 12 742 450
- 18. Net Electrical Energy Generated (h(WH) 578 332 1 544 191 11 987 029
- 19. Unit Service Factor 92.2 82.0
- 20. Unit Availability Factor 100.0 92.2 82.0
- 21. Unit Capacity Factor (Using MDC Net) 100.0 92.0 77.
- 22. Unit Capacity Factor (Using DER Net) 96.9 89.1 4'4.9
- 23. Unit Forced Outage Rate 7.8 6.6
'/A
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
eduled refuelin maintenance, and inspections April 1 - .June 4, 1979
- 25. If Shut Down At End Of Rcport Period, Estimated Date of Startup.'6.
Units ln Test Status(Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION
('t/77 I
DOCKET NO. ~
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MON'fH MARCH 1979 fV~
I Eh rl NJ Ltcenscc C
Cause & Corrective 1 () CJ No. Date a Q Event Q D Action to Cl m ~ec E(3 Report rr O Prevent Recurrence
~ V)
Q N 0 N E I 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A.Eouipment Failure (Explain) I -hi anual for Preparation of Data B.hialntcnancc or Test 2.h(anual Scram. Entry Shccts for Licensee C-Refueling 3.Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Exp! ain) OI61)
F. Opira'or Training &. Liccnsc Examination F-Administrative 5 C Operatiot!ai Error (Expl in) Exhtbtt I - Satnc Source Ii 0!!>cr {Explain)
~ OOX 529IOO, MIAMI, FL 33)52 iK<llb<
<LORIOA PO>VER h LIGHT COMPAiIY April 7, 1979 Of fice of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the March, 1979, Operating Sumniary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. Schwa.dt Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire
0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. .50 250 UNXT 'nit Turkey Point No. 3 Dl'.TE April 7, 1979 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH MARCH, 1979 Unit scheduled refueling, maintenance, and inspections continued during month. Refer to ."Unit Shutdowns and Power Reductions" section of the March, 1979 operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Performed Containment Integrated Leakage Rate Surveillance Test.
Performed Integrated Engineered Safety Features and Emergency-Power Supply Surveillance Test.
0
SUMMARY
OF OPERATXNG EXPERXENCE DOCKET NO. 50 251 Turkey Point UNXT Unit No. 4 DZ'.TE A ril 7, 1979 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 QEPORT MONTH MARCH 19 79 Unit operated at approximately 93% R.P. to extend operation of Core Cycle V except for outages of March 10-12, March 17, and March 22-23, 1979. Refer to "Unit Shutdowns and Power Reductions" section of the March, 1979, Operating Status Report for additional information.
No Major Safety-related maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 0 335 St. Lucie UNIT Unit No. 1 Dl'.TE A ril 7 1979 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH MARCH 1979 "Unit Unit. operated at approximately 100% R.P. during month. Refer to Status Shutdowns and Power Reductions" section of March, 1979 Operating Report for addi tiona 1 information.
No Major Safety-related maintenance was performed during the month.