DOCKET NO.
'ATE March 7
1981 COMPLETED BY V. T. Chilson TELEPHONE
~
0
~ 552 3824 MONTH FEBRUARY, 1981 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net)
I 678 DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) 655 17 10 12 13 14 15 16 INSTRUCTIONS 677 679 686 685 684 681 677 677 675 674 679 680 680 680 680 18 19 20 21 22 24 25 26 27 28 NOTE:
586 674 675 674 67 676 671 656 651 592 Average daily power level greater than 646 MWe due to cooler condenser cooling water.
On this format. list the average daily unit power le~i! in M~Ve.Net for each day i>> the reporting tnonth. Contpute to the nearest whole megawat t.
(ot771
OPERATING DATAREPORT OPERATING STATUS Turke Point Unit No.
3 6
3 680
- 1. Unit Name
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):-
DOCKET NO.
DATE Ear~~81 COMPLETED BY V.T. Chilson TELEPHONE
~305 552-3324 Notes - Unit No.
3 operated at approximately 100% R.P.,
util Feb.
28, 1981; when the unit was removed from service for scheduled re-fueling, maintenance, and i spections, except for the
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
1981.
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month 672.0 Yr.-to-Date 1 416.0 1 392.0 671. 6 '
385.6 3 025 277 671.4
-0>>
1 464 865 472 180 980 415 449 559 933 158 99.9 97.9 99.9 97.9 102.0 103.6 95.1 96.5 ype. Date. and Duration of Each):
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Ge'nerated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (T Cumulative 72 201.6 55 692.8 213.4 53 891.0 121.8 109 197 555 34 693 625 32 842 643 74.6 74.8 70.7
'5.6 2.4
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (4>/77 )
UNlTSHUTDOWNS ANDPOWER REDUC110NS DOCKET NO.
50 250 COMPLETED BY it Nb.3 j
REPORT MONTH 981 Vo.
Date J)
~Jr5
~ M Llccllscc Event Report >
Cause A. Corrective Action to Prevent Recurrence
. ~
02 81-02-17 N/A HA VALVEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.
(Non-nuclear system) 03 81-02-28 0.6 N/A RC PUELXX Unit No.
3 was removed from service for scheduled refueling, maintenance, and inspections.
(Nuclear and Non-nuclear systems) l': Forced S: Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test
~
C-Refueling D.Regulatory Restriction E-Operator Training 8c Uccnsc Examination F-Administrative G-Operational Error (Explain)
Il.O(hcr (Explairt)
Method:
l-Manual 2-Manual Scram.
3-Autonlatlc Scraln.
4~46ttplrH'n>Continuing 5-Load Reduction 9-Other (Explain)
Exlribit G - Instructions for Prepzratton of Data Entry Sheets I'or Licensee Event Report (LER) File (NUREG-OI6I )
5 Exhibit I - Same Source
0 AVERAGE DAlLYUNITPOWER LEVEL COMPLETED BY March 7, 1981 son MONTH FEBRUARY 1 98 1 DAY AVERAGE DAILYPOWER LEVEL IMWe-Net)
~
I 681 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 682 l7 10 12 l3 l5 l6 INSTRUCTIONS 680 682 686 687 687 683 683 680 676 681 680 684 679 681 683 IS I9 20 2l 22 23
'>5 26 27 2S NOTE:
681 683 678 677 678 676 680 678 627 Average daily power level greater than 646 MWe due to cooler condenser cooling water.
On this fortnat. list the average daily unit pi>wer Ie>el in iVllVe Net for each day in the rept>rting >ni>nth. Ci>n>putu to the nearest whole megawatt.
(')l77 l
OPERATING DATAREPORT OPERATING STATUS DOCKET NO.
DATE &~~181 COMPLETED BY QLZ~hilson TELEPHONE ~i~t2.-3824 Notes Unit No.
4 operated at, approximately 100% R.P.,
except for load reduction of Feb.
27-28, 1981.
Turke Point Unit No.
4
- 1. Unit Name:
- 2. Reporting Period:
- 3. I.icensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum De endable Ca acit Net MWe:
2200 760 693 680 646 p
p y(
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9: Power Level Tn Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr:to-Date
- 11. Hours In Reporting Period 672.0 1 416.0
- 12. Number Of Hours Reactor Was Critical 672.0 1 140.5
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 672.0 1 086.0
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Ge'nerated (MWH) 1 470 887 2 334 070
- 17. Gross Electrical Energy Generated (MWH) 478 220 757 820
- 18. Net Electrical Energy Generated (MWH) 455 714 718 894
- 19. Unit Service Factor 100.0 76.7
- 20. Unit AvailabilityFactor 100.0 76.7
- 21. Unit Capacity Factor (Using MDC Net) 105.0 78.6
- 22. Unit Capacity Factor (Using DER Net) 97.9 73 ~ 3
- 23. Unit Forced Outage Rate 0.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Steam Generator Tube Ins ection Pro ram Jul 5 -=-Au ust 8, 1981 Cumulative 65 929.0 48 153.3 166.6 46 365.0 1.2 96 715 425 30 730 993 29 102 914 70.3 70.4 68.5 "63.7'.9
- 25. IfShut Down At End Of Report Period, Estimated Date ofStartup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('>/77 )
0
UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.
REPORT MONTII FEBRUARY 1981 Date 1
sJ o
~-n x 5C
~ tlat Lh:cnscc Event Rcport >
C Q
Cl Q
Cause k. Corrective Action to Prevent Recurrence 04 81-02-27 B
N/A VALVEX Load reduction 'to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.
(Non-nuclear system)
F: Forced S: Schedu!Cd Reason:
A.Equipment Failure (Explain)
B.Maintenance or Test-C.Refueling D.Regulatory Restriction F.-Operator Training Ec Liccnsc Exantination F-Administ ra 1 ive G.Operational Error (Explain)
II.Other (Explain) 3 Method:
I-Manual 2.Manual Scram.
3.Autonmt tc Scrant.
4~4Ettpla!nkContinuing 5-Load Reduction 9-0 th.r (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 6 I )
Exhibit I - Same Source
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY St. Lucie 981 son TELEPHONE
~305) 552-3824 MONTH FEBRUARY 1981 DAY AVERAGE DAILYPOWER LEVEL
{MWe-Net)
I 796 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 797 17 10 12 13 14 15 16 INSTRUCTIONS 797 798 801 800 801 800 799 798 799 797 797 798 799 799 798 IS 19 20 22 24 25 26 77 2S NOTE:
786 783 796 797 798 797 796 796 797 797 Average daily power level greater than 777 MWe due to cooler condenser cooling water.
Qn this format. list the average daily unit power level in MWe.Net for each day i>> the reporting month. Compute to the nearest whole megawatt.
('>l771
OPERATING DATAREPORT DOCKET NO.
DATE Mar 2 i981 COMPLETED BY ~~hilson TELEPHONE MK(~552-3824 OPERATING STATUS Notes Unft operated at approximate1y 100% R.P.
daring the month.
I. Unit Name St
- 2. Reporting period:
Februa 1981
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum De endableCa acit NetMWe:
850 802 822 p
p y(
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date Cumulative 672.0
<<0- 672.0 1 416.0 1 717 790 3 591 515 565 310 1 181 990 535 537 1 119 429 100.0 100.0 100.0 100.0 102.6 101.7 98.6 99.4 ate, and Duration of Each):
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 20..Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, D 129.5 29 097.1 39.3 70 839 663 22 991 850 21 646 915 79.2 79.3 75.8
'73.5
'.5
- 25. IfShut Down At End Of Report Period, Estimated Date of'Startup.'6.
Units ln Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FEBRUARY 1981 DOCKET NO.
COMPLETED BY No.
nate C'
IAjJ Q ~J
~ CA Llccllscc Event Report ~
ar<
CJ Cr Cause & Corrective Action lo Prevent Recurrence
'\\
NONE I': Forced S: Scheduled Reason:
A Equipment Failure (Explain)
B.Maintenance or Test
~
C-Refueling D Regulatory Restriction E-Operator Training & Liccnsc Examination F-Administrative G.Operational Error (Explain)
II-Other (Explain)
Method:
I.Manual 2.Manual Scram.
3-Automatic Scranch.
4.0t)ter/Explain>Continuing 5-Load'Reduction 9-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets lor Licensee Event Report (LER) File (NUREG-016!)
Exhibit I - Satnc Source
FLORIOA POWER 4 LIGHT COMPANY March 7, 1981 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the February, 1981, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, Schmidt Vice President Power Resources VTC/ddc cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
SUMMARY
OF OPERATING EXPERIENCE POCKET NO.
50 250 Turkey Point UNIT Unit No.
3 DATE March 7,.1981 COMPLETED BY V. T. Chilson REPORT MONTH FEBRUARY, 1981 TELEPHONE (305) 552-.3824 Unit No.
3 operated at approximately 100% R.P., until Feb.
28,
- 1981, when the unit was removed from service for scheduled refueling, maintenance, and inspections, except for the load reduction of Feb.
17-18, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of February,
- 1981, Operating Status Report for additional information.
Major, Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power
& Light Company commitments for NUREG-0578 implementation are con'tinuing.
Refer to cOrrespondence between FPL and NRC for ad-ditional information.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50 - 251 UNIT Turkey Point Unit No.
4 DATE March 7
1981.
COMPLETED BY '. T. Chilson REPORT MONTH FEBRUARY, 1981 TELEPHONE (305) 552-3824 Unit. No.
4 operated at approximately 100% R.P.,
except for load reduction of Feb.
27-28, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of the February, 1981, Operating Status Report. for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements oS IE Bulletins and NUREG-0578 in progress.
Florida Power
& Light Company commitments for NUREG-0578 implementation are continuing.
- Refer to correspondence between FPL and NRC for additional.information.
SUMMARY
OF OPERATING EXPERIENCE POCKET NO-50 335 UNIT St. Lucie Unit No.
1 DATE March 7
1981 REPORT MONTH FEBRUARY 1981 COMPLETED BY TELEPHONE V. T. Chilson 305) 552-3824 Unit operated at approximately 100$ R.P. during the month.
Refer to "Unit Shutdowns and Power Reductions" section of the February,
- 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and recpxirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power 6 Light, Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC
'or additional information.