Monthly Operating Repts for Jan 1981
ML17209A655
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 02/07/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A654 List:
References
NUDOCS 8102200503
Download: ML17209A655 (21)


Text

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO. 50 250 Turkey Point DATE Feb. 7 1981 COMPLETED IIY V. T . Chilson MONTH JANUARY 1 98 1 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe.Net) 679 67 676 I8 684 441 19 684 20 682 646 21 681 673 22 682 675 23 684 675 24 683 681 25 687 10 684 26 683 684 684 28 682 13 685 '79 681 684 30 681 15 680 31 679 16 678 NOTE: Average daily power level greater than 646 MNe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily onit power Ie~q! in MWe-Net for each day in the rePorting Illonth. Compote to the nearest whole megawat t.

(o/77)

U OPERATING DATA REPORT DOCKET NO.

DATE X~~1981 COMPLETED BY ~Mhilson TELEPHONE ~~-3824 OPERATING STATUS Turke Point Unit No. Notes - Unit No. 3 operated

l. Unit Name: 3 at approximately 100% R.P.,
2. Reporting Period:

except for outage of Jan.3-4,

3. Licensed Thermal Power (MWt): 1981..
4. Nameplate Rating (Gross tgIWe): 760
5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWe): 646
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe): NONE
10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cumulative

11. Hours ln Reporting Period 744.0 744.0 71 529.6
12. Number Of Hours Reactor Was Critical ~ 720.4 720.4 55 021.2
13. Reactor Reserve Shutdown Hours 213.4
14. Hours Generator On-Line 21 .6
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Generated (MWH) 1 560 412 1 560 412 107 732 690 la. Gross Electrical Energy Generated (MWH) 508 235 34 221 445 483 59 32 393 084
19. Unit Service Factor 96.0 96.0 74.4
20. Unit Availability Factor 96.0 96.0 74.6 70.4
22. Unit Capacity Factor (Using DER Net) 93.8 65.3
23. Unit Forced Outage Rate 2.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

n maintenance and ins ections - Harch 1, 1981 gglay 8, 1981

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICAI.ITY INITIALELECTRICITY COMMERCIAL OPERATION

('>/77)

U h

n

DOCKET NO 50 250 UNIT SHUTDOWNS AND.POWER REDUCTIONS Point Unit No.3 UNITNAMF Turke COMPLETED BY REPORThIONTH JANUARY 1981 rg Llccllscc Cause A. Corrective No. Dale ~ A j Eve Ill Action to .

Report > Prevent Recurrence 01 81-01-03 S 29.7 . ZZ ZZZZZZ Unit No. 3 was removed from service to perform Integrated Engineered Safeguards Surveillance Test.

(Nuclear System) 3 4 F: Forced Reason. Method: Exhibit G - Instructions S: Schedu!cd A-Equipmenl Failure (Explain) I -Manual lor Preparation of Data B-htaintenance nr Test ~

2-hlanual Scram. I.'nlry Sheets I'or Licensee C-Refueling 3.Alllollmtlc Sera la. Evclll Report (LLR) File (NUREG.

D-Regulatory Restriction 4-Qtl+c (I.xplain)-Continuin g OI61)

E-Operator Trainittg8c Uccnsc Examination 5-Load Reduction F-Administrative G.Operational Error (Explain) 9-Other (Explain) Exhibit I - Satnc Source

('t/17) I I-Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

Turkey Point DATE COMPLETED BY MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL IMWe.Net) (MWe.Net) l7 662 l8 668 I9 664 20 663 2I 666 677 23 682 681

'>5 684 lo 26 682 682 12 28 682 l3 682 41 30 681 IS 299 31 679 l6 589 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling water.

INSTRUCTIONS Qn this fortnat. list the average daily unit p>>wer le> e! in MWe Net for each day in the rept>rting >n>>nth. Ci>ntpute to the nearest whole megawat t.

Io/77 I

OPERATING DATA REPORT DOCKET NO.

DATE Jr~7~)1 COMPLETED BY V.T. Chilson TELEPHONE ~0 552-3824 OPERATING STATUS Turke Point Unit No. 4 Notes Unit No. 4 operated at

1. Unit Name: approximately 100% R.P.after
2. Reporting Period:

2200 the unit was returned to

3. Licensed Thermal Power (MWt): service on Jan. 14, 1981, MWe): 760 for outages of Jan.
4. Nameolate Rating (Gross except
5. Design Electrical Rating (Net MWe): 14 and 15, 1981.
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWe): 646
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr.-to.Date Cumulative I I. Hours In Reporting Period 744.0 744.0 65 257.0

12. Number Of Hours Reactor Was Critical 468.5 468.5 47 481.3
13. Reactor Reserve Shutdown Hours 166.6
14. Hours Generator On-Line 414.0 414.0 45 693.0
15. Unit Reserve Shutdown Hours 31.2
16. Gross Thermal Energy Generated (MWH) 863 183 863 183 95 244 538 I'7. Gross Electrical Energy Generated (MWH) 279 600 279 600 30 252 773
18. Net Electrical Energy Generated (MWH) 263 180 263 180 28 647 200
19. Unit Service Factor 55.6 55.6 70.0
20. Unit Availability Factor 55.6 55.6 70.1
21. Unit Capacity Factor (Using MDC Net) 54.8 54.8 68.2
22. Unit Capacity Factor (Using DER Net) 51.0 51.0 63.3'.9
23. Unit Forced Outage Rate 0.7 0.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: N A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved I NITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50 251 UNIT SIIUTDOWNS AND POIVER REDUCTIONS Turke Point Unit No. 4 UNIT NAME REPORT MON fII JANUARY, 1981 Page 1 of 2 Cl~

Llccnscc O

Cause & Corrective V>>. Dale ~ A F.vent e> Action t>>

O Report O- Prevent Rccurrcnce 21 80-11-08 325.2. RC FUELXX Unit No. 4 was removed from service for scheduled refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and Non-nuclear system)

'01 81-01-14 2.5 A HH zzzzzz Unit was tripped during a transient condition by steam .-generator No. 4A level protection system while in-creasing load after the unit was returned to service. (Non-nuclear system)

F: I orced Reason: Method: Exhibit C - Instructions S: Scheduled A.Equipment Failure (Explain) I -Manual I'or Preparation of Data B.Maintenance or Test 2-hlanual Scram. Entry Sheets Ior Licensee C-Refueling 3-Autonlatic Scrant. Event Report (LLR) File (NUREC-D Regulatory Restriction Continuing 016I )

E-Operator Training & License Examination 5-Load Reduction F-Administralivc G.Operational L'rror (Explain) 9-Other (Explain) Exhibit I - Sa>nc Source

('I/77) I I.Other (Explair>)

DOCKET NO 50 251 UNIT SHUTDO'1VNS AND POIVER REDUCTIONS 1 ke Po> nt Uni'o 4 Page 2 of 2 r

I IA I

Llccltscc Cl Cause & C>>rrect ive NI I. Date MI Event IA

'o Action l>>

J Report ~ cn'G Prevent Recurrcncc

~ C/)

HA INSTRU Unit was removed from service to 02 81-01-15 S protection (G) test turbine overspeed trip device. (Non-nuclear) 03 81-01-15 P 0.6 HH zzzzzz Unit was tripped by steam generator No. 4A level protection system while increasing load after the unit was returned to service. (Non-nuclear system) 3 I: Forced Reason: Method: Exltibit G - Instructions S: Scltedulcd A-Erluipntent Failure (Explain) ~ I-Manual for Preparation ot Data II-Maintenance or Test . 2-hI anual Scram. Entry Sheets for Licensee C-Refueling 3 Auto<<tat lc Scfanl. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Otlter+Expianr}Cont: inu ing OI 6 I )

E-Operal>>r Training & License Exantinalion 5-Load Reduction F-Administrative 9-Other (Explain)

G.Operational Error (Explain) Exltibit I - Sante S>>urcc II}/77) I I.Other (Explai<<)

0 h

l

AVERAGE DAlLY UNIT POWER LEVEL DOCKET Ng.

St. Lucre Feb. 7 1981 COMPLETED IIY V T C113.1 son TELEPHONE MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (>>>IWe-Net I l7 578 799 l8 799 797 802 4 798 20 802 798 2I 800 798 22 797 799 23 797 796 24 796 798 '>5 798 10 801 799 800 7'> 801 800 28 799 l3 801 >9 788 801 30 786 IS 802 3l 785 l6 614 NOTE: Average daily power level greateX than 777 NWe due to cooler condenser cooling water.

INSTRUCTIONS On this format.list the average daily unit p>>wer le> el in MWe-Net for each day in the rep<>rting lllonth. C>>inputc to the nearest whole megawatt.

('>/77)

a OPERATING DATA REPORT DOCKET NO.

DATE +~7 1981 COMPLETED BY TELEPHONE

~~~on

~~V=3824 OPERATING STATUS St. Lucie Unit No. 1 Notes - Unit operated at ap-I. Unit Name: proximately 100% R.P.,

2. Reporting Period: except for load reduction
3. Licensed Thermal Power (MWt): of Jan. 16-17, 1981.
4. Nameplate Rating (Gross MWe): 850
5. Design Electrical Rating (Net MWe): 802
6. Maximum Dependable Capacity (Gross hlWe):
7. Maximum Dependable Capacity (Net hIWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

Thls%onth Yr..to-Date Cumltiative

11. Hours In Reporting Period 744:0 744.0 36 072.0
12. Number Of Hours Reactor Was Critical 744. 0 '44,0 29 169.3
13. Reactor Reserve Shutdown Hours 129.5
14. Hours Generator On-Line 744.0 744.0 28 425.1 IS. Unit Reserve Shutdown Hours 39.3 1 873 725 1 873 725 69 121 873

'83

16. Gross Thermal Energy Generated (MWH)

I7. Gross Electrical Energy Generated (MWH) 616 680 616 680 22 426 540 IS. Net Electrical Energy Generated (MWH) 583'92 892 21 111 378

19. Unit Service Factor 100. 0 100.0 78.8
20. Unit Availability Factor 100.0 100.0 78.9
21. Unit Capacity Factor (Using MDC Net) 101.0 101.0 75.3
22. Unit Capacity Factor (Using DER Net) 97.9 97.9 73.0
23. Unit Forced Outage Rate 5.6
24. Shutdowns Scheduled Over Next 6 Months {Type, Date. and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )

DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS St. LulIe U No.l UNIT NAhjE REPORT MON fll JANUARY 1981 n Licensee Cause & C<lrrectivc Nii. Date ~ A Event Action lu Q

~

qp r/l Report = Prevent Rccurrcnce 01 81-01-16 B HH PUIIPXX Load reduction to repair upin-hole" size leak in the discharge nozzle of steam generator 'feedwater pump No. 1A. Corrective actions included repair by welding. (Non-nuclear system)

I F: Forced Reason: Method: Exhibit G Instructions

~

S: Schcdu!ed A.Equipmenl Failure (Explain) I-Manual I'or Preparation of Data B.Maintenance oi Test 2.Manual Scram. Entry Sheets I'or Licensee

( -Refueling 3-Autotnatic Scraln. Event Report (I.I R) File (NUREG-D.Regulalury Restriction 4.Other<k~p4!n) Continuing OI6I)

I'..Operator Training & Liccnsc Fxamination 5-Load Reduction F-Administ rat ive G.Operational Errur (Explain) 9-Other (Explain) Exhibit I - Scone Source

(']/77) I I.Other (Explahr)

February 7, 1981 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the January, 1981, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert. Lowenstein, Esquire

SUMMARY

OF OPERATING EXPERiENCE DOCKET NO. 50 250 Turkey Point Unit No. 3 DATE February 7, 1981 COi41P LETE D BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH JANUARY, 1981 Unit No..3 operated at approximately 100% R.P., except for outage of January 3-4, 1981. Refer to "Unit Shutdowns and Power Reductions" section of January, 1981, Operating Status Report for additional infor-mation.

. Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

Performed Integrated Engineered Safeguards Surveillance Test.

S UMHARY OF OPERATING - XPERIENCE DOCKET NO.

Turkey Point UNIT 4 DATE Februar 7, 1981 COi~1PLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH . JANUARY, 1981 Unit'o. 4 operated at approximately 100% R.P. after the unit was re-turned to service on January 14, 1981, except for outages of January 14 and 15, 1981. Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power a Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

Completed Containment Integrated Leak Rate Test (ILRT).

Performed Integrated Engineered Safeguards Surveillance Test.

i SUi>~DIARY OF OPERATING EXPERIENCE t

DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Februar 7 1981 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH JANUARYg 1 98 1 Unit operated at approximately 100% R.P., except for load reduction of January 16-17, 1981. Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

/