AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
50 250 Turkey Point DATE Feb.
7 1981 COMPLETED IIY V. T. Chilson MONTH JANUARY 1 98 1 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 679 676 441 646 673 675 675 681 DAY I8 19 20 21 22 23 24 25 AVERAGE DAILYPOWER LEVEL (MWe.Net) 67 684 684 682 681 682 684 683 687 10 13 15 16 INSTRUCTIONS 684 683 684 685 684 680 678 26 28
'79 30 31 NOTE:
684 682 681 681 679 Average daily power level greater than 646 MNe due to cooler condenser cooling water.
On this format. list the average daily onit power Ie~q! in MWe-Net for each day in the rePorting Illonth. Compote to the nearest whole megawat t.
(o/77)
U
OPERATING DATAREPORT DOCKET NO.
DATE X~~1981 COMPLETED BY ~Mhilson TELEPHONE ~~-3824 OPERATING STATUS Turke Point Unit No.
3 760 693 680 646
- l. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross tgIWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
Notes - Unit No.
3 operated at approximately 100% R.P.,
except for outage of Jan.3-4, 1981..
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions. IfAny:
NONE This Month Yr.-to-Date Cumulative 71 529.6 720.4 55 021.2 213.4 21.6 121.8 107 732 690 1 560 412 34 221 445 32 393 084 483 59 74.4 96.0 74.6 96.0 70.4 65.3 2.5
- 11. Hours ln Reporting Period 744.0 744.0
- 12. Number Of Hours Reactor Was Critical
~
720.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 560 412 la. Gross Electrical Energy Generated (MWH) 508 235
- 19. Unit Service Factor 96.0
- 20. Unit Availability Factor 96.0
- 22. Unit Capacity Factor (Using DER Net) 93.8
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
n maintenance and ins ections - Harch 1, 1981 gglay 8, 1981
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICAI.ITY INITIALELECTRICITY COMMERCIALOPERATION
('>/77)
U h
n
UNITSHUTDOWNS AND.POWER REDUCTIONS REPORThIONTH JANUARY 1981 DOCKET NO 50 250 UNITNAMF Turke Point Unit No.3 COMPLETED BY No.
Dale rg
~Aj Llccllscc Eve Ill Report >
Cause A. Corrective Action to Prevent Recurrence 01 81-01-03 S
29.7 ZZ ZZZZZZ Unit No.
3 was removed from service to perform Integrated Engineered Safeguards Surveillance Test.
(Nuclear System)
F: Forced S: Schedu!cd
('t/17)
Reason.
A-Equipmenl Failure (Explain)
B-htaintenance nr Test
~
C-Refueling D-Regulatory Restriction E-Operator Trainittg8c Uccnsc Examination F-Administrative G.Operational Error (Explain)
I I-Other (Explain) 3 Method:
I -Manual 2-hlanual Scram.
3.Alllollmtlc Sera la.
4-Qtl+c (I.xplain)-Continuin 5-Load Reduction 9-Other (Explain) 4 Exhibit G - Instructions lor Preparation of Data I.'nlry Sheets I'or Licensee Evclll Report (LLR) File (NUREG.
g OI61)
Exhibit I - Satnc Source
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. Turkey Point DATE COMPLETED BY MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL IMWe.Net) lo 12 l3 41 DAY l7 l8 I9 20 2I 23
'>5 26 28 30 AVERAGE DAlLYPOWER LEVEL (MWe.Net) 662 668 664 663 666 677 682 681 684 682 682 682 682 681 IS l6 INSTRUCTIONS 299 589 31 NOTE:
679 Average daily power level greater than 646 MWe due to cooler condenser cooling water.
Qn this fortnat. list the average daily unit p>>wer le> e! in MWe Net for each day in the rept>rting >n>>nth. Ci>ntpute to the nearest whole megawat t.
Io/77 I
OPERATING DATAREPORT OPERATING STATUS Turke Point Unit No.
4 2200 760 680 646
- 1. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameolate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
DOCKET NO.
DATE Jr~7~)1 COMPLETED BY V.T.Chilson TELEPHONE ~0 552-3824 Notes Unit No.
4 operated at approximately 100% R.P.after the unit was returned to service on Jan.
14, 1981, except for outages of Jan.
14 and 15, 1981.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE I I. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
I'7. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, This Month 744.0 468.5 414.0 863 183 279 600 263 180 55.6 55.6 54.8 51.0 0.7 Yr.-to.Date 744.0 468.5 414.0 863 183 279 600 263 180 55.6 55.6 54.8 51.0 0.7 Date, and Duration of Each):
Cumulative 65 257.0 47 481.3 166.6 45 693.0 31.2 95 244 538 30 252 773 28 647 200 70.0 70.1 68.2 63.3'.9
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
N A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
UNITSIIUTDOWNS AND POIVER REDUCTIONS DOCKET NO.
50 251 UNITNAME Turke Point Unit No. 4 REPORT MONfII JANUARY, 1981 Page 1 of 2 V>>.
Dale O
~A Llccnscc F.vent Report Cl~
O e>
O-Cause & Corrective Action t>>
Prevent Rccurrcnce 21 80-11-08 325.2.
RC FUELXX Unit No.
4 was removed from service for scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and Non-nuclear system)
'01 81-01-14 2.5 A
HH zzzzzz Unit was tripped during a transient condition by steam.-generator No. 4A level protection system while in-creasing load after the unit was returned to service.
(Non-nuclear system)
F:
I orced S: Scheduled
('I/77)
Reason:
A.Equipment Failure (Explain)
B.Maintenance or Test C-Refueling D Regulatory Restriction E-Operator Training & License Examination F-Administralivc G.Operational L'rror (Explain)
I I.Other (Explair>)
Method:
I -Manual 2-hlanual Scram.
3-Autonlatic Scrant.
Continuing 5-Load Reduction 9-Other (Explain)
Exhibit C - Instructions I'or Preparation of Data Entry Sheets Ior Licensee Event Report (LLR) File (NUREC-016I )
Exhibit I - Sa>nc Source
UNITSHUTDO'1VNS AND POIVER REDUCTIONS DOCKET NO 50 251 1 ke Po> nt Uni'o4 Page 2 of 2 NII.
Date IA I
I MI J
r
~ C/)
Llccltscc Event Report ~
Cl 'o IA cn'G Cause & C>>rrect ive Action l>>
Prevent Recurrcncc 02 81-01-15 S
HA INSTRU (G)
Unit was removed from service to test turbine overspeed protection trip device.
(Non-nuclear) 03 81-01-15 P
0.6 HH zzzzzz Unit was tripped by steam generator No.
4A level protection system while increasing load after the unit was returned to service.
(Non-nuclear system)
I: Forced S: Scltedulcd II}/77)
Reason:
A-Erluipntent Failure (Explain)
II-Maintenance or Test.
C-Refueling D Regulatory Restriction E-Operal>>r Training & License Exantinalion F-Administrative G.Operational Error (Explain)
I I.Other (Explai<<)
3 Method:
~
I-Manual 2-hIanual Scram.
3 Auto<<tat lc Scfanl.
4-Otlter+Expianr}Cont:inuing 5-Load Reduction 9-Other (Explain)
Exltibit G - Instructions for Preparation ot Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 6 I )
Exltibit I - Sante S>>urcc
0 h
l
AVERAGE DAlLYUNIT POWER LEVEL DOCKET Ng. St. Lucre Feb.
7 1981 COMPLETED IIY V
T C113.1 son TELEPHONE MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 799 797 DAY l7 l8 AVERAGE DAILYPOWER LEVEL
(>>>IWe-Net I 578 799 802 4
10 l3 IS l6 INSTRUCTIONS 798 798 798 799 796 798 801 800 800 801 801 802 614 20 2I 22 23 24
'>5 7'>
28
>9 30 3l NOTE:
802 800 797 797 796 798 799 801 799 788 786 785 Average daily power level greateX than 777 NWe due to cooler condenser cooling water.
On this format.list the average daily unit p>>wer le> el in MWe-Net for each day in the rep<>rting lllonth. C>>inputc to the nearest whole megawatt.
('>/77)
a
OPERATING DATAREPORT OPERATING STATUS St. Lucie Unit No.
1 850 802 I. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross hlWe):
- 7. Maximum Dependable Capacity (Net hIWe):
DOCKET NO.
DATE +~7 1981 COMPLETED BY ~~~on TELEPHONE ~~V=3824 Notes - Unit operated at ap-proximately 100% R.P.,
except for load reduction of Jan.
16-17, 1981.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE Thls%onth Yr..to-Date
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
I7. Gross Electrical Energy Generated (MWH)
IS. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months 744:0 744.0 744. 0 '44,0 744.0 744.0 1 873 725 1 873 725 616 680 616 680 583'92 '83 892 100.0 100.0 100. 0 100.0 101.0 101.0 97.9 97.9 {Type, Date. and Duration of Each):
Cumltiative 36 072.0 29 169.3 129.5 28 425.1 39.3 69 121 873 22 426 540 21 111 378 78.8 78.9 75.3 73.0 5.6
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
N/A Forecast Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'>/77 )
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNITNAhjE St. LulIe U No.l REPORT MONfll JANUARY 1981 Nii.
Date
~A Q
n qp~ r/l Licensee Event Report =
Cause & C<lrrectivc Action lu Prevent Rccurrcnce 01 81-01-16 B
HH PUIIPXX Load reduction to repair upin-hole" size leak in the discharge nozzle of steam generator 'feedwater pump No. 1A.
Corrective actions included repair by welding.
(Non-nuclear system)
I F: Forced S: Schcdu!ed
(']/77)
Reason:
A.Equipmenl Failure (Explain)
B.Maintenance oi Test
( -Refueling D.Regulalury Restriction I'..Operator Training & Liccnsc Fxamination F-Administ rat ive G.Operational Errur (Explain)
I I.Other (Explahr)
Method:
I-Manual 2.Manual Scram.
3-Autotnatic Scraln.
4.Other<k~p4!n) Continuing 5-Load Reduction 9-Other (Explain)
Exhibit G
~ Instructions I'or Preparation of Data Entry Sheets I'or Licensee Event Report (I.I R) File (NUREG-OI6I)
Exhibit I - Scone Source
February 7,
1981 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the January, 1981, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc:
Mr. James P. O'Reilly Robert. Lowenstein, Esquire
SUMMARY
OF OPERATING EXPERiENCE DOCKET NO.
50 250 Turkey Point Unit No.
3 DATE February 7,
1981 COi41P LETE D BY V. T. Chilson REPORT MONTH JANUARY, 1981 TELEPHONE 305 552-3824 Unit No..3 operated at approximately 100% R.P.,
except for outage of January 3-4, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of January, 1981, Operating Status Report for additional infor-mation.
. Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power
& Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for ad-ditional information.
Performed Integrated Engineered Safeguards Surveillance Test.
S UMHARY OF OPERATING
- XPERIENCE DOCKET NO.
UNIT Turkey Point 4
DATE Februar 7,
1981 COi~1PLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH
. JANUARY, 1981 Unit'o.
4 operated at approximately 100% R.P. after the unit was re-turned to service on January 14,
- 1981, except for outages of January 14 and 15, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Florida Power a Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
Completed Containment Integrated Leak Rate Test (ILRT).
Performed Integrated Engineered Safeguards Surveillance Test.
i t
SUi>~DIARY OF OPERATING EXPERIENCE DOCKET NO.
50 335 UNIT St. Lucie Unit No.
1 DATE Februar 7
1981 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH JANUARYg 1 98 1 Unit operated at approximately 100% R.P.,
except for load reduction of January 16-17, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power
& Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
/