Text

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.

DATE Oct. 4 1980 COMPLETED BY MONTH SEPTE ER 1 8 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

{MWe.Net) (MWe-Net)

I 653 17 654 662 18 642 661 19 607 659 20 656 654 2] 658 652 22 657 651 653 651 24 651 653 654 10 661 26 663 27 623 658 28 619 13 657 29 633 14 659 30 632 659 16 661 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. !ist the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megavvat t.

lo(771

OPERATING DATA REPORT DOCKET NO.

DATE ~4~180 COMPLETED BY ~Mhgaon TELEPHONE CZQ.QZi? -3824 OPERATING STATUS

1. Unit Name: No 3 Notes - Unit No. 3 operated Se tember 1980 at approximately 100K R.P.,
2. Reporting period: ex):ept.for outage of'Sept.26,
3. Licensed Thermal Power (MWt): 2200 760 and load reduction of Sept.
4. Nameplate Rating (Gross MWe): 18-19, 1980.
5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 680

' c't 646 7 . Max)mum D penda ble Ca pa t y(Net MWe: )

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level To Which Restricted, lfAny (Nct MWe):
10. Reasons For Restrictions, If Any:

TMs Month Yr:to.Date Cumulative

11. Hours In Reporting Period 720.0 6 575.0 68 576.6
12. Number Of Hours Reactor Was Critical 716.4 5 698.9 52 968.4
13. Reactor Reserve Shutdown Hours 213.4
14. Hours Generator On-Line 274
15. Unit Reserve Shutdown Hours 121.8 4 7

!89. 32 845 700

18. Net Electrical Energy Generated (hIWH) 464 674 3 568 952 31 091 046
19. Unit Service Factor 99.7 84.1 74.7
20. Unit Availability Factor 84.1 74.9
21. Unit Capacity Factor (Using h(DC Net) 99.9 84.0 70.5
22. Unit Capacity Factor (Using DER Net) 93.1 78.3 65.4'.5 Unit Forced Outage Rate 0.3 1.2 '3.
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

r to Tube Ins ection Pro ram - Oct. 6 - Nov. 1 1980 a e nd ins ections >> Mar. 1 1981 - Kx 10 1981

25. IfShut Down At End Of Report Period. Esthnated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ~ ~

(L}/77 )

UNITSHUTDOWNS AND POWER REDUCTIONS nit No.3 COMPLETED Bg V T. Chil son REPORT hlONTll SEPTEMBER 1980 rh N<<J L Licenscc rRE El Eh 8 Cause 4, Corrective Q

Nlh. Dale BE Tj Evcnt- Action lo A

hK El

~V) $ Rcport Epr Ct C Q

Q Prcvcnt Recurrence tr 17 80-09-18 >>0- N/A VALVEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system) 18 80-09-26 2.2 A 3 XA ELECON Unit No. 3 was tripped by reactor protection system due to spurious signal from nuclear instrumentation system channel N-41 while channel N-43 was in tripped mode. (Nuclear system)

I 3 4 F: Forced Reason: hlethod: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I.hlanual for Preparation of Data B.hlaintenance oi Test . 2.hlanual Scram. Entry Sheets for'Licensee C Refueling 3-Automatic Scrant. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) OI6 I )

E-Operator Training h, Liccnsc Examination F.Administrative GZperatlonal L'rror (Explain) Exhibtt I Satnh. Shhura,E Iht177) IW)ther (Explairr)

0 AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 251 Turkey Point Oct. 4 1980 COMPLETED 8Y V. T. Chilson MONTH SEPTEMBER 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

{MWe-Net) (MWe.Net)

I 642 17 634 650 18 637 650 19 636 646 20 638 5 640 21 638 637 634

'o 635 632 637 25 642 16 63 ll 64 632 625 28 634 l3 603 29 631 14 640 30 631 15 641 16 641 NOTE s Average daily power level greater than 646 NWe due to cooler.

condenser cooling water.

INSTRUCTIONS On this format, list the average daily unit power level in IvIWe.Net for each day in the reportina tnimth. Compute to the nearest whole megawat t.

(oI77)

OPERATING DATA REPORT DOCKET NO 50-251 DATE ~~280 COMPLETED BY ~MhiLaon TELEPHONE XZKQ~824 OPERATING STATUS Turke Point Unit No. 4 Notes - Unit No. 4 operated

2. Reporting Period: Se tember 1980 at approximately 100K R.P.,

2200 except for load reduction of

3. Licentd Thermal Power (MWt):-

Sept. 12-13, 1980.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWe): 646
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 6 575.0 62 304.0
12. Number Of Hours Reactor Was Critical 720.0 5 252.1 46 079.9
13. Reactor Reserve Shutdown Hours -.0- 12.3 166.6
14. Hours Generator On-Line 720.0 5 164.8 44 347'.3
15. Unit Reserve Shutdown Hours 11 207 334 92 426 314
17. Gross Electrical Energy. Generated (MWH) 482 585 3 479 940 29 383 418
18. Net Electrical Energy Generated (MWH) 458 209 3 298 448 27 828 444
19. Unit Service Factor 100.0 78.6 71.2
20. Unit Availability Factor 100.0 78.7 71.2
l. Unit Capacity Factor (Using MDC Net) 77.7 69.4
22. Unit Capacity Factor (Using DER Net) 91.8 72.4 '4.5
23. Unit Forced Outage Rate 0.3 2.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refuelin maintenance and ins actions << Nov. 9, 1980 January 10, 1981

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (LI/771

UNITSHUTDOWNS AND POWER REDUCTIONS it No.4 I I

REPORT IIIONIII EEPTEREER 1980 S ~ rE L< 8 VI RP Cause 4 Corrective EI EI No. Date TE

~

PE A

~

cj'icensee EP Event ~ II Q

Action to BK Q Report 88 cn G C a Prevent Recurrence

~ Vl uI 9

Cr

~:

17 80-09-12 B N/A VALVEX Load reduction to perform periodic \~

P test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)

P I

l

~ ~

I I

F: Forced Reason: Method: Exhibit G - Instructions

~~

S: Scheduled A-Equipmenl Failure (Explain) I.Manual for Preparation ol'ata II-Maintenance or Test . 2 Manual Scram. Entry Sheets for Licensee C.Refueling 3-Autontatic Scratn. Event Rcport (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) OI6 I )

E-Opcralor Training k. Liccnsc Exantination

.I F-Administrative G Operational Error (Explain) 5'xhibit I - Sante Source I I I-Other (Explain) 7 I

AVERAGE DAlLYUNIT POWER LEVEL St. Lucie DATE Oct. 4 1980 COMPLETED 8Y V. T. Chilson MONTH SEPTEMBER 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL IMWe.Net) (MWe.Net I 781 l7 792 l8 794 783 790 482 20 778 2I 785 780 22 660 23 783 780 24 782 781 25 785 10 781 16 785 782 27 782 28 780 13 782 29 78 30 780 ls 788 l6 787 NOTE: .Average daily power level greater than 777 MWe due to cooler condenser cooling water.

INSTRUCTIONS, On this format. list thc average daily unit power level in MWe-Nct for each day in the reporting month. Compote to the nearest whole megawat t.

V)!771

OPERATING DATA REPORT DOCKET NO.

DATE Q ~~0 COMPLETED SY VVQ~ilson TELEPHONE ~Q Q2-3824 OPERATING STATUS I. Unit Name: St. Lucie Unit No. 1 Notes Unit operated at Se tember 1980 approximately 100X R.P.,

2. Reporting period: except for outage of Sept.

Licensed Thermal Power (MWt):

3.

850 4, and load reduction of

4. Nameplate Rating (Gross MWe): Sept. 4, 1980.

5, Design Electrical Rating (Net ldWe): 802

7. Maximum Dependable Capacity (Net MWe): 777
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, lfAny (Net MWe): NONE
10. Reasons For Restrictions, IfAny:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 720. 6 575,0 33 119;0
12. Number Of Hours Reactor Was Critical 717 ~ 3 4 717.4 26 327.2
13. Reactor Reserve Shutdown Hours 129.5
14. Hours Generator On-Line 716.4 . 4 603.1 25 433'.1
15. Unit Reserve Shutdown Hours 7.3 ~

39.3

16. Gross Thermal Energy Generated (MWH) 1 810 963 11 386 317 61 645 883 I'7, Gross Electrical Energy Generated (MWH) 585 790 3 687 280 19 981 720
18. Net Electrical Energy Generated (MWH) 553 858 3 468 894 18 796 790
19. Unit Service Factor 76.8
20. Unit Availability Factor 99.5 70.1 76.9
21. Unit Capacity Factor (Using MDC Net) 99.0 67.9 73.0
22. Unit Capacity Factor (Using DER Net) 95.9 65.8 70.8
23. Unit Forced Outage Rate 6.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
5. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

('>/77 )

DOCKET NO.

UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT hlON flI ~RIEDEL 1980 C$ El Licenscc c'+CI Cause h Corrective No. Date Event Q Zl Action lo Report > Prcvcnt Recurrence 15 80-09-04 B N/A INSTRU Load reduction to approximately (p) 70X R.P. to continue modification of 15 volt power supply to CEA drive mechanism core power program-mer. (Nuclear system) 16 80-09-04 F 3.6 A 335-80-50 RB INSTRU Reactor was manually tripped when (p) second CEA dropped before CEA No. 44 could be realigned with its bank.

Corrective actions included modifi-cation of 15 volt power supply to CEAs. (Nuclear system)

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation ol'ata B.Maintenance or Test . 2.Manual Scram. Entry Sheets I'or Licensee C-Rcfucling 3 Automatic Scram. Event Report (LFR) File (NURE-D.Regulatory Restriction 4.Other (Explain) GOI )

E-Operator Training h Liccnsc Examination F Adndnistrative 5 G.Operational Error (Explain) Exhibit I - Sante Source

('t/77) II Other (Explain)

I

>,Q, cog 339IQQ, iVIIAi'11, FI. 33I52 V i(

".li 0 PG'Y:"P. '!GI:T OIIP'hY October 4, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the September, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit.No. 1.

Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert, Lowenstein, Esquire

>coPi =... SERVING PcGP

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE October 4 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH SEPTEMBER'980 Unit No. 3 operated at approximately 100% R.P., except for outage of September 26, and load reduction of September 18-19, 1980. Refer to "Unit Shutdowns and Power Reductions" section of September, 1980, Operating Status Report for additional information.

Major Safety-'related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATING EXPERIENCE POCKET NO. 251 Turkey Point UNIT Unit No. 4 DATE October 1980 4

COMPLETED BY T. Chilson TELEPHONE (305) 552<<3824 REPORT MONTH SEPTEMBER, 1980 Unit No. 4 operated at approximately 100% R.P., except forReductions" load reduction of Sept. 12-13, 1980. Refer to "Unit Shutdowns and Power section of the September, 1980, Operating Status Report for additional information.

Major Safetpwelated maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

0

SUMMARY

OF OPERATING EXPERXENCE POCKET NO.

St. Lucie UNXT DATE COMPLETED BY hilson TELEPHONE 305 552-3824 REPORT MONTH SEPTEMBER 1980 Unit operated at approximately 100% R.P., except for outage of Sept.Power 4, and load reduction of Sept. 4, 1980. Refer to "Unit Shutdowns and Reductions" section of the September, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NU~G-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

A modification to provide redundant. 15 volt power supply to each Control Element Assembly drive mechanism core power programmer was completed.

o- ~ . 0