AVERAGE DAlLYUNITPOWER LEVEL DOCKET NO.

DATE Oct.

4 1980 COMPLETED BY MONTH SEPTE ER 1

8 DAY AVERAGE DAILYPOWER LEVEL

{MWe.Net)

I 653 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 654 17 10 13 14 16 INSTRUCTIONS 662 661 659 654 652 651 651 653 661 663 658 657 659 659 661 18 19 20 2]

22 24 26 27 28 29 30 NOTE:

642 607 656 658 657 653 651 654 623 619 633 632 Average daily power level greater than 646 MWe due to cooler condenser cooling water.

On this format. !ist the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megavvat t.

lo(771

OPERATING DATAREPORT DOCKET NO.

DATE ~4~180 COMPLETED BY ~Mhgaon TELEPHONE CZQ.QZi? -3824 OPERATING STATUS Notes - Unit No. 3 operated at approximately 100K R.P.,

ex):ept.for outage of'Sept.26, and load reduction of Sept.

18-19, 1980.

No 3

1. Unit Name:
2. Reporting period:

Se tember 1980

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

7 ble Ca c't et We:

2200 760 693 680 646

. Max)mum D penda pa t y(N M

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level To Which Restricted, lfAny (Nct MWe):
10. Reasons For Restrictions, IfAny:

TMs Month Yr:to.Date 5 698.9

11. Hours In Reporting Period 720.0 6 575.0
12. Number Of Hours Reactor Was Critical 716.4
13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours !89.
18. Net Electrical Energy Generated (hIWH) 464 674 3 568 952
19. Unit Service Factor 99.7 84.1
20. Unit AvailabilityFactor 84.1
21. Unit Capacity Factor (Using h(DC Net) 99.9 84.0
22. Unit Capacity Factor (Using DER Net) 93.1 78.3

'3.

Unit Forced Outage Rate 0.3 1.2

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

r to Tube Ins ection Pro ram - Oct.

6 - Nov. 1 1980 Cumulative 68 576.6 52 968.4 213.4 274 121.8 4 7 32 845 700 31 091 046 74.7 74.9 70.5 65.4'.5 a

e nd ins ections

>> Mar.

1 1981 - Kx 10 1981

25. IfShut Down At End Of Report Period. Esthnated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

~

~

(L}/77)

UNITSHUTDOWNS ANDPOWER REDUCTIONS nit No.3 REPORT hlONTll SEPTEMBER 1980 COMPLETED Bg V

T. Chilson Nlh.

Dale L

BEhK A

rh Tj El N<<J Q

~V) $

Licenscc Evcnt-Rcport rRE El Eh Epr Ct 8

C Q Qtr Cause 4, Corrective Action lo Prcvcnt Recurrence 17 80-09-18

>>0-N/A VALVEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.

(Non-nuclear system) 18 80-09-26 2.2 A

3 XA ELECON Unit No. 3 was tripped by reactor protection system due to spurious signal from nuclear instrumentation system channel N-41 while channel N-43 was in tripped mode.

(Nuclear system)

I F: Forced S: Scheduled Iht177)

Reason:

A.Equipment Failure (Explain)

B.hlaintenance oi Test.

C Refueling D.Regulatory Restriction E-Operator Training h, Liccnsc Examination F.Administrative GZperatlonal L'rror (Explain)

IW)ther (Explairr) 3 hlethod:

I.hlanual 2.hlanual Scram.

3-Automatic Scrant.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for'Licensee Event Report (LER) File (NUREG-OI6 I )

Exhibtt I Satnh. Shhura,E

0 AVERAGE DAILYUNITPOWER LEVEL DOCKET NO.

50 251 Turkey Point Oct.

4 1980 COMPLETED 8Y V. T. Chilson MONTH SEPTEMBER 1980 DAY AVERAGE DAILYPOWER LEVEL

{MWe-Net)

I 642 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 634 17 5

'o ll l3 14 15 16 INSTRUCTIONS 650 650 646 640 637 635 637 642 64 625 603 640 641 641 18 19 20 21 25 16 28 29 30 NOTE s 637 636 638 638 634 632 63 632 634 631 631 Average daily power level greater than 646 NWe due to cooler.

condenser cooling water.

On this format, list the average daily unit power level in IvIWe.Net for each day in the reportina tnimth. Compute to the nearest whole megawat t.

(oI77)

OPERATING STATUS OPERATING DATAREPORT DOCKET NO 50-251 DATE ~~280 COMPLETED BY ~MhiLaon TELEPHONE XZKQ~824 Turke Point Unit No.

4

2. Reporting Period:

Se tember 1980

3. Licentd Thermal Power (MWt):-

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

680 646 Notes - Unit No.

4 operated at approximately 100K R.P.,

except for load reduction of Sept.

12-13, 1980.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, lfAny:

This Month Yr:to-Date Cumulative 62 304.0 46 079.9 6 575.0 5 252.1 12.3 166.6 44 347'.3 5 164.8 720.0 92 426 314 29 383 418 11 207 334 3 479 940 27 828 444 3 298 448 78.6 71.2 78.7 71.2 69.4 77.7

'4.5 72.4 2.9 0.3 January 10, 1981

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 720.0
13. Reactor Reserve Shutdown Hours

-.0-

14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
17. Gross Electrical Energy. Generated (MWH) 482 585
18. Net Electrical Energy Generated (MWH) 458 209
19. Unit Service Factor 100.0
20. Unit AvailabilityFactor 100.0
l. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 91.8
23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refuelin maintenance and ins actions

<< Nov.

9, 1980

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (LI/771

UNITSHUTDOWNS ANDPOWER REDUCTIONS REPORT IIIONIII EEPTEREER 1980 it No.4 I

I uI 9

No.

Date S ~

TEBK rE

~A PEQ

~

EP

~ Vl cj'icensee Event Report 88 L<

EI EI

~II cn G 8 VI RP C Q a

Cr Cause 4 Corrective Action to Prevent Recurrence

~:

17 80-09-12 B

N/A VALVEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.

(Non-nuclear system)

\\ ~

P PI

~

~

l II

~ ~

.I I

7 I

F: Forced S: Scheduled Reason:

A-Equipmenl Failure (Explain)

II-Maintenance or Test.

C.Refueling D Regulatory Restriction E-Opcralor Training k. Liccnsc Exantination F-Administrative G Operational Error (Explain)

II-Other (Explain)

Method:

I.Manual 2 Manual Scram.

3-Autontatic Scratn.

4-Other (Explain)

Exhibit G - Instructions for Preparation ol'ata Entry Sheets for Licensee Event Rcport (LER) File (NUREG-OI6 I )

5'xhibit I - Sante Source

AVERAGE DAlLYUNITPOWER LEVEL St. Lucie DATE Oct.

4 1980 COMPLETED 8Y V. T. Chilson MONTH SEPTEMBER 1980 DAY AVERAGE DAILYPOWER LEVEL IMWe.Net) 781 DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net I 792 l7 10 13 ls l6 INSTRUCTIONS, 783 482 778 780 660 780 781 781 782 782 782 788 787 l8 20 2I 22 23 24 25 16 27 28 29 30 NOTE:

794 790 785 783 782 785 785 780 78 780

.Average daily power level greater than 777 MWe due to cooler condenser cooling water.

On this format. list thc average daily unit power level in MWe-Nct for each day in the reporting month. Compote to the nearest whole megawat t.

V)!771

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.

DATE Q~~0 COMPLETED SY VVQ~ilson TELEPHONE ~Q Q2-3824 850 802 I. Unit Name:

St. Lucie Unit No.

1

2. Reporting period:

Se tember 1980

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

5, Design Electrical Rating (Net ldWe):

7. Maximum Dependable Capacity (Net MWe):

777 Notes Unit operated at approximately 100X R.P.,

except for outage of Sept.

4, and load reduction of Sept. 4, 1980.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, lfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr:to-Date Cumulative 33 119;0 720.

6 575,0 4 717.4 26 327.2 129.5 716.4 4 603.1 25 433'.1 7.3

~

39.3 11 386 317 61 645 883 585 790 3 687 280 19 981 720 553 858 3 468 894 18 796 790 76.8 76.9 70.1 73.0 67.9 65.8 70.8 6.2

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 717 ~ 3
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 810 963 I'7, Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor 99.5
21. Unit Capacity Factor (Using MDC Net) 99.0
22. Unit Capacity Factor (Using DER Net) 95.9
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
5. IfShut Down At End Of Report Period, Estimated Date ofStartup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('>/77 )

UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKETNO.

REPORT hlONflI~RIEDEL 1980 No.

Date C$

Licenscc Event Report >

Elc'+CI Q Zl Cause h Corrective Action lo Prcvcnt Recurrence 15 80-09-04 B

N/A INSTRU (p)

Load reduction to approximately 70X R.P. to continue modification of 15 volt power supply to CEA drive mechanism core power program-mer.

(Nuclear system) 16 80-09-04 F

3.6 A

335-80-50 RB INSTRU (p)

Reactor was manually tripped when second CEA dropped before CEA No. 44 could be realigned with its bank.

Corrective actions included modifi-cation of 15 volt power supply to CEAs.

(Nuclear system)

F: Forced S: Scheduled

('t/77)

I Reason:

A-Equipment Failure (Explain)

B.Maintenance or Test C-Rcfucling D.Regulatory Restriction E-Operator Training h Liccnsc Examination F Adndnistrative G.Operational Error (Explain)

II Other (Explain)

Method:

I-Manual 2.Manual Scram.

3 Automatic Scram.

4.Other (Explain)

Exhibit G - Instructions for Preparation ol'ata Entry Sheets I'or Licensee Event Report (LFR) File (NURE-GOI)

5 Exhibit I - Sante Source

>,Q, cog 339IQQ, iVIIAi'11,FI. 33I52 V

i(

".li 0 PG'Y:"P. '!GI:T OIIP'hY October 4,

1980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the September, 1980, Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit.No. 1.

Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc:

Mr. James P. O'Reilly Robert, Lowenstein, Esquire

>coPi =... SERVING PcGP

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50 - 250 Turkey Point UNIT Unit No.

3 DATE October 4

1980 COMPLETED BY V. T. Chilson REPORT MONTH SEPTEMBER'980 TELEPHONE 305 552-3824 Unit No.

3 operated at approximately 100% R.P., except for outage of September 26, and load reduction of September 18-19, 1980.

Refer to "Unit Shutdowns and Power Reductions" section of September,

1980, Operating Status Report for additional information.

Major Safety-'related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATING EXPERIENCE POCKET NO.

251 Turkey Point UNIT Unit No.

4 DATE October 4

1980 COMPLETED BY '. T. Chilson TELEPHONE (305) 552<<3824 REPORT MONTH SEPTEMBER, 1980 Unit No.

4 operated at approximately 100% R.P., except for load reduction of Sept.

12-13, 1980.

Refer to "Unit Shutdowns and Power Reductions" section of the September, 1980, Operating Status Report for additional information.

Major Safetpwelated maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

0

SUMMARY

OF OPERATING EXPERXENCE POCKET NO.

St. Lucie UNXT DATE REPORT MONTH SEPTEMBER 1980 COMPLETED BY TELEPHONE hilson 305 552-3824 Unit operated at approximately 100% R.P.,

except for outage of Sept.

4, and load reduction of Sept.

4, 1980.

Refer to "Unit Shutdowns and Power Reductions" section of the September, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NU~G-0578 are continuing.

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

A modification to provide redundant.

15 volt power supply to each Control Element Assembly drive mechanism core power programmer was completed.

o-

~

. 0