MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
DATE Oct. 4 1980 COMPLETED BY MONTH SEPTE ER 1 8 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL
{MWe.Net) (MWe-Net)
I 653 17 654 662 18 642 661 19 607 659 20 656 654 2] 658 652 22 657 651 653 651 24 651 653 654 10 661 26 663 27 623 658 28 619 13 657 29 633 14 659 30 632 659 16 661 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling water.
INSTRUCTIONS On this format. !ist the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megavvat t.
lo(771
OPERATING DATA REPORT DOCKET NO.
DATE ~4~180 COMPLETED BY ~Mhgaon TELEPHONE CZQ.QZi? -3824 OPERATING STATUS
- 1. Unit Name: No 3 Notes - Unit No. 3 operated Se tember 1980 at approximately 100K R.P.,
- 2. Reporting period: ex):ept.for outage of'Sept.26,
- 3. Licensed Thermal Power (MWt): 2200 760 and load reduction of Sept.
- 4. Nameplate Rating (Gross MWe): 18-19, 1980.
- 5. Design Electrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 680
' c't 646 7 . Max)mum D penda ble Ca pa t y(Net MWe: )
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
- 9. Power Level To Which Restricted, lfAny (Nct MWe):
- 10. Reasons For Restrictions, If Any:
TMs Month Yr:to.Date Cumulative
- 11. Hours In Reporting Period 720.0 6 575.0 68 576.6
- 12. Number Of Hours Reactor Was Critical 716.4 5 698.9 52 968.4
- 13. Reactor Reserve Shutdown Hours 213.4
- 14. Hours Generator On-Line 274
- 15. Unit Reserve Shutdown Hours 121.8 4 7
!89. 32 845 700
- 18. Net Electrical Energy Generated (hIWH) 464 674 3 568 952 31 091 046
- 19. Unit Service Factor 99.7 84.1 74.7
- 20. Unit Availability Factor 84.1 74.9
- 21. Unit Capacity Factor (Using h(DC Net) 99.9 84.0 70.5
- 22. Unit Capacity Factor (Using DER Net) 93.1 78.3 65.4'.5 Unit Forced Outage Rate 0.3 1.2 '3.
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
r to Tube Ins ection Pro ram - Oct. 6 - Nov. 1 1980 a e nd ins ections >> Mar. 1 1981 - Kx 10 1981
- 25. IfShut Down At End Of Report Period. Esthnated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ~ ~
(L}/77 )
UNITSHUTDOWNS AND POWER REDUCTIONS nit No.3 COMPLETED Bg V T. Chil son REPORT hlONTll SEPTEMBER 1980 rh N<<J L Licenscc rRE El Eh 8 Cause 4, Corrective Q
Nlh. Dale BE Tj Evcnt- Action lo A
hK El
~V) $ Rcport Epr Ct C Q
Q Prcvcnt Recurrence tr 17 80-09-18 >>0- N/A VALVEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system) 18 80-09-26 2.2 A 3 XA ELECON Unit No. 3 was tripped by reactor protection system due to spurious signal from nuclear instrumentation system channel N-41 while channel N-43 was in tripped mode. (Nuclear system)
I 3 4 F: Forced Reason: hlethod: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I.hlanual for Preparation of Data B.hlaintenance oi Test . 2.hlanual Scram. Entry Sheets for'Licensee C Refueling 3-Automatic Scrant. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) OI6 I )
E-Operator Training h, Liccnsc Examination F.Administrative GZperatlonal L'rror (Explain) Exhibtt I Satnh. Shhura,E Iht177) IW)ther (Explairr)
0 AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 251 Turkey Point Oct. 4 1980 COMPLETED 8Y V. T. Chilson MONTH SEPTEMBER 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL
{MWe-Net) (MWe.Net)
I 642 17 634 650 18 637 650 19 636 646 20 638 5 640 21 638 637 634
'o 635 632 637 25 642 16 63 ll 64 632 625 28 634 l3 603 29 631 14 640 30 631 15 641 16 641 NOTE s Average daily power level greater than 646 NWe due to cooler.
condenser cooling water.
INSTRUCTIONS On this format, list the average daily unit power level in IvIWe.Net for each day in the reportina tnimth. Compute to the nearest whole megawat t.
(oI77)
OPERATING DATA REPORT DOCKET NO 50-251 DATE ~~280 COMPLETED BY ~MhiLaon TELEPHONE XZKQ~824 OPERATING STATUS Turke Point Unit No. 4 Notes - Unit No. 4 operated
- 2. Reporting Period: Se tember 1980 at approximately 100K R.P.,
2200 except for load reduction of
- 3. Licentd Thermal Power (MWt):-
Sept. 12-13, 1980.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 680
- 7. Maximum Dependable Capacity (Net MWe): 646
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, lf Any:
This Month Yr:to-Date Cumulative
- 11. Hours In Reporting Period 6 575.0 62 304.0
- 12. Number Of Hours Reactor Was Critical 720.0 5 252.1 46 079.9
- 13. Reactor Reserve Shutdown Hours -.0- 12.3 166.6
- 14. Hours Generator On-Line 720.0 5 164.8 44 347'.3
- 15. Unit Reserve Shutdown Hours 11 207 334 92 426 314
- 17. Gross Electrical Energy. Generated (MWH) 482 585 3 479 940 29 383 418
- 18. Net Electrical Energy Generated (MWH) 458 209 3 298 448 27 828 444
- 19. Unit Service Factor 100.0 78.6 71.2
- 20. Unit Availability Factor 100.0 78.7 71.2
- l. Unit Capacity Factor (Using MDC Net) 77.7 69.4
- 22. Unit Capacity Factor (Using DER Net) 91.8 72.4 '4.5
- 23. Unit Forced Outage Rate 0.3 2.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refuelin maintenance and ins actions << Nov. 9, 1980 January 10, 1981
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (LI/771
UNITSHUTDOWNS AND POWER REDUCTIONS it No.4 I I
REPORT IIIONIII EEPTEREER 1980 S ~ rE L< 8 VI RP Cause 4 Corrective EI EI No. Date TE
~
PE A
~
cj'icensee EP Event ~ II Q
Action to BK Q Report 88 cn G C a Prevent Recurrence
~ Vl uI 9
Cr
~:
17 80-09-12 B N/A VALVEX Load reduction to perform periodic \~
P test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)
P I
l
~ ~
I I
F: Forced Reason: Method: Exhibit G - Instructions
~~
S: Scheduled A-Equipmenl Failure (Explain) I.Manual for Preparation ol'ata II-Maintenance or Test . 2 Manual Scram. Entry Sheets for Licensee C.Refueling 3-Autontatic Scratn. Event Rcport (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) OI6 I )
E-Opcralor Training k. Liccnsc Exantination
.I F-Administrative G Operational Error (Explain) 5'xhibit I - Sante Source I I I-Other (Explain) 7 I
AVERAGE DAlLYUNIT POWER LEVEL St. Lucie DATE Oct. 4 1980 COMPLETED 8Y V. T. Chilson MONTH SEPTEMBER 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL IMWe.Net) (MWe.Net I 781 l7 792 l8 794 783 790 482 20 778 2I 785 780 22 660 23 783 780 24 782 781 25 785 10 781 16 785 782 27 782 28 780 13 782 29 78 30 780 ls 788 l6 787 NOTE: .Average daily power level greater than 777 MWe due to cooler condenser cooling water.
INSTRUCTIONS, On this format. list thc average daily unit power level in MWe-Nct for each day in the reporting month. Compote to the nearest whole megawat t.
V)!771
OPERATING DATA REPORT DOCKET NO.
DATE Q ~~0 COMPLETED SY VVQ~ilson TELEPHONE ~Q Q2-3824 OPERATING STATUS I. Unit Name: St. Lucie Unit No. 1 Notes Unit operated at Se tember 1980 approximately 100X R.P.,
- 2. Reporting period: except for outage of Sept.
Licensed Thermal Power (MWt):
3.
850 4, and load reduction of
- 4. Nameplate Rating (Gross MWe): Sept. 4, 1980.
5, Design Electrical Rating (Net ldWe): 802
- 7. Maximum Dependable Capacity (Net MWe): 777
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, lfAny (Net MWe): NONE
- 10. Reasons For Restrictions, IfAny:
This Month Yr:to-Date Cumulative
- 11. Hours In Reporting Period 720. 6 575,0 33 119;0
- 12. Number Of Hours Reactor Was Critical 717 ~ 3 4 717.4 26 327.2
- 13. Reactor Reserve Shutdown Hours 129.5
- 14. Hours Generator On-Line 716.4 . 4 603.1 25 433'.1
- 15. Unit Reserve Shutdown Hours 7.3 ~
39.3
- 16. Gross Thermal Energy Generated (MWH) 1 810 963 11 386 317 61 645 883 I'7, Gross Electrical Energy Generated (MWH) 585 790 3 687 280 19 981 720
- 18. Net Electrical Energy Generated (MWH) 553 858 3 468 894 18 796 790
- 19. Unit Service Factor 76.8
- 20. Unit Availability Factor 99.5 70.1 76.9
- 21. Unit Capacity Factor (Using MDC Net) 99.0 67.9 73.0
- 22. Unit Capacity Factor (Using DER Net) 95.9 65.8 70.8
- 23. Unit Forced Outage Rate 6.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
- 5. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('>/77 )
DOCKET NO.
UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT hlON flI ~RIEDEL 1980 C$ El Licenscc c'+CI Cause h Corrective No. Date Event Q Zl Action lo Report > Prcvcnt Recurrence 15 80-09-04 B N/A INSTRU Load reduction to approximately (p) 70X R.P. to continue modification of 15 volt power supply to CEA drive mechanism core power program-mer. (Nuclear system) 16 80-09-04 F 3.6 A 335-80-50 RB INSTRU Reactor was manually tripped when (p) second CEA dropped before CEA No. 44 could be realigned with its bank.
Corrective actions included modifi-cation of 15 volt power supply to CEAs. (Nuclear system)
F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation ol'ata B.Maintenance or Test . 2.Manual Scram. Entry Sheets I'or Licensee C-Rcfucling 3 Automatic Scram. Event Report (LFR) File (NURE-D.Regulatory Restriction 4.Other (Explain) GOI )
E-Operator Training h Liccnsc Examination F Adndnistrative 5 G.Operational Error (Explain) Exhibit I - Sante Source
('t/77) II Other (Explain)
I
>,Q, cog 339IQQ, iVIIAi'11, FI. 33I52 V i(
".li 0 PG'Y:"P. '!GI:T OIIP'hY October 4, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the September, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit.No. 1.
Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert, Lowenstein, Esquire
>coPi =... SERVING PcGP
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE October 4 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH SEPTEMBER'980 Unit No. 3 operated at approximately 100% R.P., except for outage of September 26, and load reduction of September 18-19, 1980. Refer to "Unit Shutdowns and Power Reductions" section of September, 1980, Operating Status Report for additional information.
Major Safety-'related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
SUMMARY
OF OPERATING EXPERIENCE POCKET NO. 251 Turkey Point UNIT Unit No. 4 DATE October 1980 4
COMPLETED BY T. Chilson TELEPHONE (305) 552<<3824 REPORT MONTH SEPTEMBER, 1980 Unit No. 4 operated at approximately 100% R.P., except forReductions" load reduction of Sept. 12-13, 1980. Refer to "Unit Shutdowns and Power section of the September, 1980, Operating Status Report for additional information.
Major Safetpwelated maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
0
SUMMARY
OF OPERATING EXPERXENCE POCKET NO.
St. Lucie UNXT DATE COMPLETED BY hilson TELEPHONE 305 552-3824 REPORT MONTH SEPTEMBER 1980 Unit operated at approximately 100% R.P., except for outage of Sept.Power 4, and load reduction of Sept. 4, 1980. Refer to "Unit Shutdowns and Reductions" section of the September, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NU~G-0578 are continuing.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
A modification to provide redundant. 15 volt power supply to each Control Element Assembly drive mechanism core power programmer was completed.
o- ~ . 0