Monthly Operating Repts for Sept 1979
ML17208A595
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 10/06/1979
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A594 List:
References
NUDOCS 8005200396
Download: ML17208A595 (15)


Text

DOCKET NO.

DATE Oct.

6 1979 COMPLETED IIY V. T. Chi1son MONTH S~PTE~ER 1979 DAY AVERAGEDAILYPOWER LEVEL (MWerNet)

'I 660 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 434 17

)0 13 l4 15 16 542 65 659 658 659 658 660 662 661 664 664 658

)8 19 20 2l 22 24 25 26 27 28 30" 498 648 655 649 549 650 645 646 646 INSTRUCTIONS On this format. list the average daily unit power level in MWe.Net for each day in the reporting ntonth. Compute to the nearest whole megawatt.

(t)/771

OPERATING DATAREPORT OPERATlNG STATUS

'r r

~

t T>

'to 0

1. Unit Name;
2. Reporting Period:
3. I.icensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWc):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross hIWe):
7. Maximum Dependable Capacity (Net MWe):

693 70 666 DOCKET NO.

DATE ~~979 COMPLETED BY 5'

~~son TELEPHONE ~~>>-3824 Notes Unit No.

3 operated at appro~tely 100X R.P.,

except for outages of Sept.

2-4, 17-18, and 24, 1979

~

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Nct MWe):
10. Reasons For Restrictions, lfAny:

NONE This Month Yr.-to.Date Cumulative 6 551.0 720.0 24 6 887 011 2 155 885 2 031 189 48.8 49.2 46.6 44.7 4.8

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 699.6
13. Reactor Reserv~ Shutdown Hours 18.7
14. Hours Generator On-Line

/65JI~

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 440 462
17. Gross Electrical Energy Generated (MWH) 451 325

'I 8. Net Electrical Energy Generated (hfWH)

19. Unit Service Factor
92. 4
20. Unit AvailabilityFactor 95.8
21. Unit Capacity Factor (Using MDC Net) 89.2
22. Unit Capacity Factor (Using DER Net)
85. 7
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 hionths (Type. Date, and Duration of Each):

Scheduled refuel'a' a

e 59 792.6 044 44 7

8 54 28 190 315 26 678 366 74.2 74.4 67,

'64.4

'.7

'7 980.

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERClALOPERATION

('t/77 )

UNITSIIVTDONNS ANDPOlVER REDUCTIONS REPORT hIONTII SEPTEtQER 1979 page 1 of 2 UNITNAhIE COhtPLETED DY it No.

3 N<<.

Dale C ~

a~K O

r<

~A

<sJ V

t$4 c

~ CA a

Licenscc Event Report Cl~

o e

Z<

C +

0 Cause &Corrective Action to Prevent Recurrence 15 79-09-02 S

45.2 N/A'z zzzzzz Unit No.

3 was removed from service as a precautionary measure due to approach of IIurricqne David.

PIPEXX (A)

Outage was extended to replace failed fitting on turbine control oil line to intercept valve.

(Non-nuclear system) 16 79-09-17 F

2.4 N/A INSTRU (c)

Unit was tripped by turbine protec-tion system due to failed diaphragm in the low vacuum trip device.

(Non-nuclear system) 17 79-09-17 F

5.7 N/A INSTRU (c)

Unit was removed from service to re-pla'ce failed diaphragm in the low vacuum trip device.

(Non-nuclear

~sstem)

F: Forced S: Scheduled Reason:

A.E<toipment Failure (Explain)

D.htaintenance or Test.

C.Ref<<cling D.Regulatory Restriction I'.-Operator Trainiog & Liccosc Examination F-Adn<ioistrative G Operational I'<ror (Explain)

II Other (Explain) hlethod:

I.Manual 2 hlanual Scram.

3 Auloolatic Scram.

4 Other (Explain)

Exhibit G - Instructions for Preparation of Data L>>try Sheets for l.icensee Event Rcport (I.ER) File (NUREG-OI6l )

Exhibit I - Sante S<n<rcc

UNITSIIUTDO>VNS AND POIVER REDUCTIONS UNITNAME Turke Point Unit No.3 REPORT hiONTII SEFTEI'IER 1979 Page 2 of 2 N<l.

I)ate r l

~nrld H'a a

A gJ

~V) $

Licenscc Event Report >

cc ala 4l an C

Cl OC C ~

'G Cause & (.l>rrectivc Action tli Prevent Rccurrcncc 18 79-09-24 F

1.8 N/A IA INSTRU (c)

Unit tripped by the reactor protec-tion system, during, a periodic surveillance test, when a second pro-tection ctiannel was placed in the trip mode before the first channel was reset.

(Nuclear system)

F: Forced S: Sclieduled Reason:

A.Eiiuipntent Failure (Explain)

II hlaintenancc or Test-(.Itcfuclintl D Rct,ulalory Rcstrlcttun E.Operator Trainint, k. I.icciisc Fxainination F-Administ rat ive G Operath>>ial L'iror (Explain) il Oilier (Explain) 3 Mctl)od:

I.hlanual 2-hlarlual Scrain.

3-Autontatic Scrain.

4.Other (Explain)

Exhibit G - Instructiiins for Preparation of Data Entry Sheets for Licensee E cnt Rel i t (I.LR) File (NUREG-OI 6l )

Exliibit I - Sainc Source

'ERAGE DAILYUNITPOWER LEVEL DOCKET NO. Turkey Pox.nt Unit No;-

4 October 6

1979 COMPLETED BY >- T. Chilson MONTH

~EP>EII-'IER 1979 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

I 646 17 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net )

655 10 13 15 16 550 653 653 649 650 657 657 654 657 661 657 18 19 20 22 23 24 25 30 651 650 653 656 656 652 648 654 649 642 646 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting tnonth. Crnltpule to the nearest whole m gawat t.

(~tl77 l

OPERATING DATAREPORT DOCKET NO.

Oct.

6.

1979 COMPLETED BY ~t~~son TELEPHONE ~~'~52-3824 OPERATING STATUS

1. Unit Name:

Turkev Point Unit No.

4

2. Reporting Period:

o o~

Io o

3. Licensed Thermal Power (hiWt):
4. Nameplate Rating (Gross MWe):

760

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

693 700 666 Notes Unit No.

4 operated at approximately 100% R.P.,

ex'cept for outage of'ept.

2-3, 1979.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr:to-Date Cumulative 6 551.0 4

18.2 15.5 4 420.2

'8.9 8 908 801 2

754 138 2 599 546 67.5 67.8 59.6 57.3

11. Hours In Reporting Period 720.0
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 15.5 l4. Hours Generator On-Line 701.1
15. Unit Reserve Shutdown Hours 18.9
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 479 175
18. Net Electrical Energy Generated (hIWH) 455 283
19. Unit Service Factor 97.4
20. Unit AvailabilityFactor 100. 0
21. Unit Capacity Factor (Using MDC Net) 94.9 22, Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

'53 520.0 38 865.8 154.3 37 239;3 18.9 77 048 668 24 589 863 23 284 251 69.6 69.6 65'; 7 62.8 3.0

25. IfShut Down At End Of Report Period, Estimated Date of Startup'.
26. Units In Test Status (Prior to Commercial Operation):

N A Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('t/77 )

UNITSIIUTDOlUNS AND POWER REDUCTIONS REPORT MONTII SEPTE>SER 1979 COMPLETED IIY V. T. Cltilson lit No 4 No.

Date

~= L DK

~e E

A 'J J

~

CS

~ CA Liccnscc Event Report >

Ew Cl ID V1cn'r Cc~QOi~

0 Cause h. Corrective Action to Prevent Rccurrcncc 16 79-09-02 S

18.9 N/A zz ZZZZZZ Unit No.

4 was removed from service as a precautionary measure due to the approach of Hurricane David.

(Non-nuclear system)

F: Forced

. S: Scheduled

{'J/77)

Reason:

A.Equipmcnt Failure (Explain)

D.h{atntenance or Test

~

C-Refoelirtg D Rct,ulatory Restriction I'.-Operator Trainint,h License Exatnioalion F-Administ ra t ive G-Operational E n r {Explain)

II.Ollrcr(Lxplain)

Method:

I -hlaoual 2.Manual Scram.

3 Aololnatic Scrato.

4-Other (Explain)

Exltibit C - Instructions for Preparation of Data Entry Sltecls lor Licensee Evcttt Rep rt (LER) File {NUREC-OI 6I )

5 Exhibit I - Satnc Source

0 AVERAGE DAlLYUNITPOWER LEVEL DATE Octobe 6

1979 COMPLETED IIY V T

Chi1son MONTH SEPTEMBER, 197 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net)

I 783 647 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net )

782 17 I8 7

10 13 14 15 16 INSTRUCTIONS 728 781 762 650 785 786 787 88 785 I9 20 22 23 24

)5 26 27 28

'>9 30 NOTE:

782 780 782 752 Average daily power level greater than 777 HNe due to cooler condenser cooling water.

On this format. list the average daily unit power level in MWe.Net for each day in the reporting >n>>nth. C>>ntputc to the nearest whole megawat t.

(o!77)

OPERATING DATAREPORT OPERATING STATUS I. Unit Name:

St.

u 'e Unit N

2. Reporting Period:

Seotember 1979

3. Licensed Thermal Power (MWt):

2560

4. Nameplate Rating (Gross MWe):

8S

5. Design Electrical Rating (Net MWe):

o

6. Maximum Dependable Capacity (Gross MWc):

822

7. Maximum Dependable Capacity (Net MWe):

777

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through DOCKET NO.

COMPLETED BY ~>~~son TELEPHONE M~~~~-3824 Notes Unit operated at ap-proz~tely 100K R.P. until Sept.

23, 1979, when'the unit was removed from ser-vice to perform the inspec-tions required by IE Bulleti Nos.

79-13 and 79-14,.except O

ent.

2-6 1

7

7) S and goad Irtedgtion oz,Sept.

-10

7) Since st
eport,

>ve casons:

1979.

9. Power Level Tn Which Restricted. IfAny (Net MWe):

IO. Reasons For Restrictions, lfAny:

Yr:to Date This Month 720.0 6 551.0 II. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical l3. Reactor Reserve Shutdown Hours l4. Hours Generator On-Line l5. Unit Reserve Shutdown Hours I6. Gross Thermal Energy Generated (MWH) l 7. Gross EIectricai Energy Generated (MWH)

I8. Net Eiectrical Energy Generated (MWH)

19. Unit Service Factor
20. Unit AvailabilityFactor 2I. Unit Capacity Factor (Using hIDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate.
24. Shutdowns Scheduled Over Next 6 Months 11.0 11 '

434. 5 11.0 11.0 1 082 095 349 470 328 262 10 880 432 3 514 590 3 304 546 60.3

.6 67.7 61.9 58.7 64.0 56.8 62.9 (Type, Date,and Dur tion of Each):

4.2 Cumulative 24 335.0 lo 44 4

129.5 1

32.0 45 098 580 14 621 40 13 747 384 77.3 2.7

'70.4 5.9

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Oct.

2 1979.

Forecast lt Achieved

(<~/77 )

UNITSIIUTDOWNS AND POPOVER REDUCTIONS REPORT hfONTII Page 1 of 2

D UNITNAME No.

1 DATE QLI~~19 COMPLETED IIY V. T. Chilson Nis.

Date Pl Vl rsQ 0~- 00 4I

'C Vl Liccnscc Event Rcporl >

Cause Ec Correclivc Action to Prcvcnl Recuncnce 16 79-09-02 S

94.8, N/A zz zzzzzz Unit was removed from service as a

precautionary measure due to the approach of Ilurricane David.

335-79-28 EA TRANSF

.Outage was extended to isolate and inspect startup transformer No. 18 and the associated pull-off towers.

(Non-nuclear system) 17 79-09-09 F N/A FILTER Load reduction to approximately 50% R.P.

to clean condensate pump suction strainers.

(Non-nuclear system)

F: Forced S: Scheduled Reason:

A.Equlplnent Failure (Explain)

O.hfainlermnce or Test

~

C.Rcfuelini, D Itciiulatory Restriction I'..Operator Trainioti k Liccnsc Exatnirtation F.Arlntinislralive G.Operational L't ror (Explain)

II Otltcr (Explainl Method:

I hfanual 2-Manual Scram.

3-Autotnatic Scraot.

4.0IILcf(Explallt)

Exldbit G - Instructions for Preparation of Data Entry Sltccts for I.icensee Evcttt Report (I.ER) File (NUREG-016I I Exhibit I - Satnc Source

UNITSllUTDOWNS AND POWER REDUCTIONS REPORT hfONTII SEP~ENBI'-R 1979 Pae2of 2

DOCKET NO.

COMPLETED ItY.

Date C

.= L P o DK a-rl Vl C3 gp g CC

~ Cil g f5 Licenscc Event Rcport EI 0

Q r

Q Cause &Cllrrective Action to Prcvcnt Recurrcncc 18 79-09-23 S

190. 7.

PIPEXX (E)

Unit was removed from service to perform the inspections required by Bulletin Nos.

79-13 and 79-14.

(Nuclear system)

F: Forced S: Scheduled (I)/77 )

Reason:

A.Equipmcnt Failure (Explain) 8 hlaintenancc or Test

~

( -Refueling D.Regulatory Restriction l'. Operator Training & Uccnsc Exanllnatlun F.Adminis t 1 a Iivc G.Operational Error (Explain)

II.Other (Explain) hfcthod:

I hfanual 2-hlanual Scram.

3-Autolnatic Scfanl.

4.Other (Explain)

Exhibit G - Instructions r>>r Preparathnl or Data Entry Sheets Ior l.iccnsee Event Report (LLR) File (NUREG-016I )

5 Exhibit l - Sanl<<Source

. SOX 529100, MIAMI,FL 33I52 2 S

~

~

5

.4sa;hast~Q

~ -='!-'-+lb r4~+

F'RIANA POWEA & LIGHT COMPANY October 6,

1979 Office of Management Information and Program Controls U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the September,

1979, Operating Summary Reports fo" Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. 1.

Very truly yours, A. D.

cnmidt Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire

SUMMA O'PERATlNG EMERiENCE DOCKET NO.

Turkey Point UNlT Unit No.

3 DATE Oct.

6, 1979

'I CO&L>LETED 'BY V. T. Chilson REPORT MONTH SEPTEYDER, 1979 TELEPHONE

'(305) 552-3824 Unit No.

3 operated at app oximately 100% R.P.,

except for outages of Sept.

2-4, 17-18, and 24, 1979.

Re er to "Unit Shutdowns and Power Reductions" section of the September, 1979, Operating Sta us Report for additional information.

Major Safety-related maintenance activities performed du ing the month i1c3.uded:

Performing inspections required by ZE 'Bulletin No. 79-14 on svstems accessible dur'g Unit No.3 operation.

SUMMA F OPERATING EXPERIENCE DOCKET NO.

50 251 Turkey Point UNIT Unxt No.

4 DATE Oct.

6, 1979 COMPLETED BY '. T. Chilson REPORT MONTH SEPTEMBER ~

1 9 79 TELEPHONE (305) 552-3824 Unit No.

4 operated at approximately 100% R.P.,

except for outage of Sept.

2-3, 1979.

Refer to."Unit Shutdowns and Power Reductions" section of the September,

1979, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Performing inspections required by IE Bulletin No. 79-14 on systems accessible during Uni" No.

4 operation.

'l