AVERAGE DAILYUNIT POWER LEVEL DOCKET NO UNIT 50 250 Turke Point 1
COMPLETED IIY V. T. Chi1 son MONTH
- JUNE, 1981 DAY AVERAGE DAlLYPOWER LEVEL (ib(We.Net)
DAY AVERAGE DAILYPOWER LEVEL (MWe.Net )
l7 30 13 IO 15 36 l3 IS l6 19 30 INSTRUCTIONS Qn this fortnat. list the average daily onit p>>wcr Ieicl in MNe Net for each day ttt the reporting tni>nth. Cotttpute to the nearest whole megawatt.
(o177) 8107130Z05 810703 PDR ADOCIt 05000250 R
OPERATING DATAREPORT OPERATING STATUS I. Unit Name:
Turke Point Unit No.
3
- 2. Reporting period:
- June, 1981
- 3. Licensed Thermal Power (MWt):
- 4. iVameplate Rating (Gross L'iIWe):
- 5. Design Electrical Rating (Net &We):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (iVet MWe):
DOCKET NO.
DATE ~~1981 COMPLETED BY son TELEPHONE 305 552-3666 Notes Unit No.
3 remained out of service due to the failure of the Generator Stator Core.
(Continued from previous month)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions. IfAny:
This Month 720.0 Yr..to-Date II 4 343.0
- 11. Hours In Reporting Period
- 12. iVumber Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 17.
Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC iVet)
- 22. Unit Capacity Factor (Using DER iVet)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months 1 459.3 631. 0 1 385.6 o o
40 415 920 900 686 31.9 32 '
30.6 55.0 IType. Date. and Duration of Each):
Cumulative 75 128.6 55 760.1 844.4 53 891.0 121.8 0
197 555 34 693 625 32 830 385 71.7 71.9 68.0 63.
1'5.
IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status IPrior to Commercial Operation):
A.oril 17 1982 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION.
I >177)
UNITSIIU I I)O)VNS ANI)PO'IVER REI)UCTIONS REI'ORT MONTII
-> I E l)at<<
IA I
rl
~A o
A m ~Cd qp~ III LIcc IIsc c fvent ILepofl >
u o IAm'C Cause 4 Cur feel tvc Aclioo lo I'rcvcol Rc<<urrcocc 04 81-04-21 F
744.0 A
4
'ENERA (D)
Stator core failed while preparing to synchronize generator after scheduled refueling.
(Continued from previous mont)i)
(Non-nuclear system)
I I". I.I>reed S: Schcrlu!Cd I'I/77)
Reason:
A Ego!potent Failure (Explain) l) Maintenance or Test-C-Rctuehog I) Rct,ulatory Reslri<<liun I.'.Operator 1rainhlt; Sc Lice>>sc Fxaolioalion I'-Ad Ininistrat ivc G.Operational Error (Explaio)
I I Other (I:xplaor) hlcthod:
I Manual 2 Manual Scraol.
.I-Autoolalic Scraol.
4.9rlw~wplaiII) COn tinuing 5-Load Reduction 9-Other (Explain)
Lxhibll G - Inst r u<<t ions I'or Preparation ol l)ata I:olry Sheets Ior l.l<<cos<<e Ev<<ol Report {LLR)File(NUREG-OI6I)
Exhibit I - Saul<< Sour<<<<
AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
50 251 Tuqkev Point Unz,t
'iiJo.
4 COMPLETED IIY V.
T. Chilson TEI.EPHONE (305) 552-3666 MONTH JUNE 1981 DAY AVERAGE DAILYPOWER LEVEL (iVIWe-i%et)
I 665 667 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 68 l9 20 663 665 10 l3 15 16 INSTRUCTIONS 669 664 6
4 666 66 663 667 661 661 93 95 36 30 NOTE:
661 664 o
6
'65 663 665 670 67 Average daily power level greater than 646 NWe due to cooler condenser cooling water.
On this format. !ist the average daily onit power le~el in AWe Net for each day in the reportintt tniinth. Ciitnputc to the nearest whole tnegawat t.
(or77)
OPERATING STATUS OPERATING DATAREPORT DOCKET NO. ~291 DATE Julv 1
1981 COMPLETED BY ~wilson TELEPHONE Mkk+~52-3666 Turkev Point Unit No.
4 680 646 I. Unit Name:
- 2. Reporting Period:
81
- 3. Licensed Thermal Power (MWt):
2200
- 4. iVameplate Rating (Gross 19(We):
S.
Design Electrical Rating (Net MWe):
- 6. hfaximum Dependable Capacity (Gross iYIWe):
- 7. Maximum Dependable Capacity (Net 19(We):
Notes Unit No.
4 operated a
approximately 100% R.P.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, lfAny:
This Month Yr..to.Date 3 906.0 3 830.4 8 351 826 503 194 2 551 399 88.2 4.3 Scheduled refueline maintenance and I. Hours In Reporting Period 720. 0 4 343.0
- 12. iVumber Of Hours Reactor Was Critical 720.0
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On.Line 720.0
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 582 877 17.
Gross Electrical Energy Generated (MWH)
- 18. iVet Electrical Energy Generated (MWH) 478 894
- 19. Unit Service Factor 100. 0 88.2
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC iVet) 103.0 90.9
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Steam Generator Tube Inspection Pro ram Julv ll August 14 Cumulative 68 856 '
50 918.9 166. 6 49 109.3 31.2 102 733 181 32 658 637 30 935 419 71.3 71.4 69.8 3.0 1981 Dec.
26 1981
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup'.
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved liVITIAL CRITICALITY lillTIAL ELECTRICITY COMil(ERCIAL OPERATION
('>(77 )
VNll SIIUTDO)VNS AND POlVER REDUCTIONS COh(PLETED l)Y V<>,
DJlc r >
~A J
0 m -(>C
~ (I>
Ln.'cl>sc(.'vent Rcporl -"
Cause k. Corrective Action lo Prcvcnl Rccurrcncc I". Forced S.'cheduled RCJSon:
A E(lulpnlcnl FJlh>fc (ExplJln) ll.Maintenance or Test
( Refueling D Regulatory Restriction I:.Ot>erato( 11JIf>>ng8'lccnsc Exanl>>lallon I'.Adn>inislralivc C.Operation;d L'>ror (Explain)
I I Other (Lxt>law>)
Method:
I -M:>noJl 2 hlJO>>JI Sera>>1.
3-Aut on>a tie Sera>n.
0-Orhcrff~(aura Continuin(;
5-Load Reduct:ion 9-Otlter (Explain)
L.xl>>bit C Instructions lor Pret>aration of DJIa I!>>try Sheets I'ol l.ice>>see I!vent f(eporl (I.I!R) File (NURL'G-O I 6l )
Exhibit I
~ Sante Source
AVERAGE DAILYU<VITPOWER LEVEL DOCKET iVO.
St. Lucre 9
COMPLETED IIY V ~
T Chi 1 son MONTH DAY AVERAGE DAILYPOWER LEVEL I<MWe.Net) 792 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net )
I7 795 IP l3 l5 I6 INSTRUCTIONS 789 79 793 795 798 797 797 796 797 797 796 l9
>0 23
>5 16
>7 18 19 30 NOTE:
782 785 790 793 795 794
'61 792 795 788 787 Average daily power level greater than 777i~e due to cooler condenser cooling water.
On this fortnat. list the average daily unit p<>wer level itt MWe.Net for each day i<t the rep<>rtinp <ni>nth. (<><>>i>ut<< to the nearest whole meilawat t.
('>>77)
OPERATING DATAREPORT DOCKET NO.
DATE Julv 1
1981 COMPLETED BY ~wilson TELEPHONE ~~-3666 OPERATING STATUS I. Unit Name:
St. Lucie Unit No.
1
- 2. Reporting period:
June 1981
- 3. Licensed Thermal Power (MWt):
2560
- 4. iVameolate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
822 777 Notes
- Unit operated at approximately 100% R.P.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 1) Since Last Report, Give Reasons:
- 9. Power Level Tn Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, lfAny:
This Month Yr. to-Date Cumulative 39 71;0 4 343.0 720. 0 4 223.7 720.0 31 853.3 23 85 40 80.3 80.4 77.4
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 720.0 32 649.0
- 13. Reactor Reserve Shutdown Hours 129. 5
- 14. Hours Generator On-Line 4 222.2
- 15. Unit Reserve Shutdown Hours ~lf
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
'00.0 97.2
- 20. Unit Availability Factor 100.0 97.2
- 21. Unit Capacity Factor (Using MDC iVet) 101. 9 98.6
- 22. Unit Capacity Factor (Using DER 1Vet) 23, Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Scheduled refueling, maintenance, and insaections
- October 4 - December 5,
1981
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
N A Forecast Achieved INITlAL CRITICALITY INITIAL ELECTRICITY COiilMERCIALOPERATION
(')/77 )
UNITSIIUTI)OlVNSAND PO1VER REDUCTIONS UNITNAME REPORl hlONTII 3UNE 1981 No.
Date
~A
(=
<<<~ C/)
Lice( lscc Event Rcport ((
C usc 4 C rrecti c Aclion to Prevent Recurrence N
0 N
E I. I
~((cell S: Sclle(lu!e(l Reason:
A-E(lulpnlcnl Fall<<re (Explain) ll.hlaintcllance or Test
(.Rct'uclinI, D.Ret,ulatory Reslrtcllon E-Operator Traininl,k I.iccnsc Exanlination I"A(lullnlst ra IIV('
Opcratlonal I:Ifor (Explain)
II Otller (Explai<<)
hlethod:
I -h Ianual 2 hlanual Scram.
I.A<<lonlallc Scfanl 0.8tkeM~yhu<<-) Continuing 5-Load 1(eduction 9-Other (Explain)
I:xhlblt G - Instructions lor Preparation ot Data Elllry Sllccts lol I.ice<<see Event Report (I.I:1() File (NUREG.
Ol 6I )
5 Exhibit I - Sanlc Source
SUi41HARY OF OPERATING EXPERIENCE DOCKET NO.
50 250 Turkey Point Unit No.
3 DATE ul 1
1981 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3666 REPORT i4IONTH UNE 1981 Unit No.
3 remained out of service due to the failure of the Generator Stator Cor'e.
(Continued from previous month)
Refer to "Unit Shut-downs and Power Reductions" section of June, 1981, Operating Status Report for additional information.
major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power
& Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for 'ad-ditional information.
Completed removal of reactor vessel closure head and upper internals assembly.
Transferred 157 fuel assemblies f om reactor vessel to spent fuel storage area.
Removed reactor vessel lower internals assembly.
In-Service Inspections of reactor vessel in progress.
0 SUMbQ,RY OF OPERATING EXPERIENCE DOCKET NO.
UNIT 50 - 251 Turkey Point Unit No.
4 DATE Jul 1,
1981 COMPLETED BY V. T. Chilson REPORT MONTH JUNE 1981 TELEPHONE (305) 552-3666 Unit No.
4 operated at approximately 100% R.P.
Refer to "Unit Shut-downs and Power Reductions" section of June, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IZ Bulletins and NUREG-0578 in progress.
Florida Power G Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
SUi&1ARY OP OPERATING EXPERIENCE DOCKET NO.
50 - 335 St. Lucie UNIT DATE v
COMPLETED BY V. T. Chilson REPORT MONTH
- JUNE, 1981 TELEPHONE 05 552-666 Unit operated at approximately 100% R.P.
Refer to "Unit Shutdowns and Power Reductions" section of June, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and reauirements of IE Bulletins and NUREG-0578 are continuing.'lorida Power
& Light Company commitments for NUREG-0578 implementat'on are continuing.
Refer to correspondence between PPL and NRC for additional information.