AVERAGE DAILYUNIT POWER LEVEL DOCKET NO UNIT 50 250 Turke Point 1

COMPLETED IIY V. T. Chi1 son MONTH

JUNE, 1981 DAY AVERAGE DAlLYPOWER LEVEL (ib(We.Net)

DAY AVERAGE DAILYPOWER LEVEL (MWe.Net )

l7 30 13 IO 15 36 l3 IS l6 19 30 INSTRUCTIONS Qn this fortnat. list the average daily onit p>>wcr Ieicl in MNe Net for each day ttt the reporting tni>nth. Cotttpute to the nearest whole megawatt.

(o177) 8107130Z05 810703 PDR ADOCIt 05000250 R

PDR

OPERATING DATAREPORT OPERATING STATUS I. Unit Name:

Turke Point Unit No.

3

2. Reporting period:
June, 1981
3. Licensed Thermal Power (MWt):
4. iVameplate Rating (Gross L'iIWe):
5. Design Electrical Rating (Net &We):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (iVet MWe):

DOCKET NO.

DATE ~~1981 COMPLETED BY son TELEPHONE 305 552-3666 Notes Unit No.

3 remained out of service due to the failure of the Generator Stator Core.

(Continued from previous month)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions. IfAny:

This Month 720.0 Yr..to-Date II 4 343.0

11. Hours In Reporting Period
12. iVumber Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 17.

Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC iVet)
22. Unit Capacity Factor (Using DER iVet)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months 1 459.3 631. 0 1 385.6 o o

40 415 920 900 686 31.9 32 '

30.6 55.0 IType. Date. and Duration of Each):

Cumulative 75 128.6 55 760.1 844.4 53 891.0 121.8 0

197 555 34 693 625 32 830 385 71.7 71.9 68.0 63.

1'5.

IfShut Down At End Of Report Period. Estimated Date of Startup:

26. Units In Test Status IPrior to Commercial Operation):

A.oril 17 1982 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION.

I >177)

UNITSIIU I I)O)VNS ANI)PO'IVER REI)UCTIONS REI'ORT MONTII

-> I E l)at<<

IA I

rl

~A o

A m ~Cd qp~ III LIcc IIsc c fvent ILepofl >

u o IAm'C Cause 4 Cur feel tvc Aclioo lo I'rcvcol Rc<<urrcocc 04 81-04-21 F

744.0 A

4

'ENERA (D)

Stator core failed while preparing to synchronize generator after scheduled refueling.

(Continued from previous mont)i)

(Non-nuclear system)

I I". I.I>reed S: Schcrlu!Cd I'I/77)

Reason:

A Ego!potent Failure (Explain) l) Maintenance or Test-C-Rctuehog I) Rct,ulatory Reslri<<liun I.'.Operator 1rainhlt; Sc Lice>>sc Fxaolioalion I'-Ad Ininistrat ivc G.Operational Error (Explaio)

I I Other (I:xplaor) hlcthod:

I Manual 2 Manual Scraol.

.I-Autoolalic Scraol.

4.9rlw~wplaiII) COn tinuing 5-Load Reduction 9-Other (Explain)

Lxhibll G - Inst r u<<t ions I'or Preparation ol l)ata I:olry Sheets Ior l.l<<cos<<e Ev<<ol Report {LLR)File(NUREG-OI6I)

Exhibit I - Saul<< Sour<<<<

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.

50 251 Tuqkev Point Unz,t

'iiJo.

4 COMPLETED IIY V.

T. Chilson TEI.EPHONE (305) 552-3666 MONTH JUNE 1981 DAY AVERAGE DAILYPOWER LEVEL (iVIWe-i%et)

I 665 667 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 68 l9 20 663 665 10 l3 15 16 INSTRUCTIONS 669 664 6

4 666 66 663 667 661 661 93 95 36 30 NOTE:

661 664 o

6

'65 663 665 670 67 Average daily power level greater than 646 NWe due to cooler condenser cooling water.

On this format. !ist the average daily onit power le~el in AWe Net for each day in the reportintt tniinth. Ciitnputc to the nearest whole tnegawat t.

(or77)

OPERATING STATUS OPERATING DATAREPORT DOCKET NO. ~291 DATE Julv 1

1981 COMPLETED BY ~wilson TELEPHONE Mkk+~52-3666 Turkev Point Unit No.

4 680 646 I. Unit Name:

2. Reporting Period:

81

3. Licensed Thermal Power (MWt):

2200

4. iVameplate Rating (Gross 19(We):

S.

Design Electrical Rating (Net MWe):

6. hfaximum Dependable Capacity (Gross iYIWe):
7. Maximum Dependable Capacity (Net 19(We):

Notes Unit No.

4 operated a

approximately 100% R.P.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, lfAny:

This Month Yr..to.Date 3 906.0 3 830.4 8 351 826 503 194 2 551 399 88.2 4.3 Scheduled refueline maintenance and I. Hours In Reporting Period 720. 0 4 343.0

12. iVumber Of Hours Reactor Was Critical 720.0
13. Reactor Reserve Shutdown Hours 14. Hours Generator On.Line 720.0
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 582 877 17.

Gross Electrical Energy Generated (MWH)

18. iVet Electrical Energy Generated (MWH) 478 894
19. Unit Service Factor 100. 0 88.2
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC iVet) 103.0 90.9
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Steam Generator Tube Inspection Pro ram Julv ll August 14 Cumulative 68 856 '

50 918.9 166. 6 49 109.3 31.2 102 733 181 32 658 637 30 935 419 71.3 71.4 69.8 3.0 1981 Dec.

26 1981

25. IfShut Down At End Of Report Period, Estimated Date of Startup'.
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved liVITIAL CRITICALITY lillTIAL ELECTRICITY COMil(ERCIAL OPERATION

('>(77 )

VNll SIIUTDO)VNS AND POlVER REDUCTIONS COh(PLETED l)Y V<>,

DJlc r >

~A J

0 m -(>C

~ (I>

Ln.'cl>sc(.'vent Rcporl -"

Cause k. Corrective Action lo Prcvcnl Rccurrcncc I". Forced S.'cheduled RCJSon:

A E(lulpnlcnl FJlh>fc (ExplJln) ll.Maintenance or Test

( Refueling D Regulatory Restriction I:.Ot>erato( 11JIf>>ng8'lccnsc Exanl>>lallon I'.Adn>inislralivc C.Operation;d L'>ror (Explain)

I I Other (Lxt>law>)

Method:

I -M:>noJl 2 hlJO>>JI Sera>>1.

3-Aut on>a tie Sera>n.

0-Orhcrff~(aura Continuin(;

5-Load Reduct:ion 9-Otlter (Explain)

L.xl>>bit C Instructions lor Pret>aration of DJIa I!>>try Sheets I'ol l.ice>>see I!vent f(eporl (I.I!R) File (NURL'G-O I 6l )

Exhibit I

~ Sante Source

AVERAGE DAILYU<VITPOWER LEVEL DOCKET iVO.

St. Lucre 9

COMPLETED IIY V ~

T Chi 1 son MONTH DAY AVERAGE DAILYPOWER LEVEL I<MWe.Net) 792 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net )

I7 795 IP l3 l5 I6 INSTRUCTIONS 789 79 793 795 798 797 797 796 797 797 796 l9

>0 23

>5 16

>7 18 19 30 NOTE:

782 785 790 793 795 794

'61 792 795 788 787 Average daily power level greater than 777i~e due to cooler condenser cooling water.

On this fortnat. list the average daily unit p<>wer level itt MWe.Net for each day i<t the rep<>rtinp <ni>nth. (<><>>i>ut<< to the nearest whole meilawat t.

('>>77)

OPERATING DATAREPORT DOCKET NO.

DATE Julv 1

1981 COMPLETED BY ~wilson TELEPHONE ~~-3666 OPERATING STATUS I. Unit Name:

St. Lucie Unit No.

1

2. Reporting period:

June 1981

3. Licensed Thermal Power (MWt):

2560

4. iVameolate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

822 777 Notes

- Unit operated at approximately 100% R.P.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 1) Since Last Report, Give Reasons:
9. Power Level Tn Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, lfAny:

This Month Yr. to-Date Cumulative 39 71;0 4 343.0 720. 0 4 223.7 720.0 31 853.3 23 85 40 80.3 80.4 77.4

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 720.0 32 649.0
13. Reactor Reserve Shutdown Hours 129. 5
14. Hours Generator On-Line 4 222.2
15. Unit Reserve Shutdown Hours ~lf
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor

'00.0 97.2

20. Unit Availability Factor 100.0 97.2
21. Unit Capacity Factor (Using MDC iVet) 101. 9 98.6
22. Unit Capacity Factor (Using DER 1Vet) 23, Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Scheduled refueling, maintenance, and insaections

- October 4 - December 5,

1981

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

N A Forecast Achieved INITlAL CRITICALITY INITIAL ELECTRICITY COiilMERCIALOPERATION

(')/77 )

UNITSIIUTI)OlVNSAND PO1VER REDUCTIONS UNITNAME REPORl hlONTII 3UNE 1981 No.

Date

~A

(=

<<<~ C/)

Lice( lscc Event Rcport ((

C usc 4 C rrecti c Aclion to Prevent Recurrence N

0 N

E I. I

~((cell S: Sclle(lu!e(l Reason:

A-E(lulpnlcnl Fall<<re (Explain) ll.hlaintcllance or Test

(.Rct'uclinI, D.Ret,ulatory Reslrtcllon E-Operator Traininl,k I.iccnsc Exanlination I"A(lullnlst ra IIV('

Opcratlonal I:Ifor (Explain)

II Otller (Explai<<)

hlethod:

I -h Ianual 2 hlanual Scram.

I.A<<lonlallc Scfanl 0.8tkeM~yhu<<-) Continuing 5-Load 1(eduction 9-Other (Explain)

I:xhlblt G - Instructions lor Preparation ot Data Elllry Sllccts lol I.ice<<see Event Report (I.I:1() File (NUREG.

Ol 6I )

5 Exhibit I - Sanlc Source

SUi41HARY OF OPERATING EXPERIENCE DOCKET NO.

50 250 Turkey Point Unit No.

3 DATE ul 1

1981 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3666 REPORT i4IONTH UNE 1981 Unit No.

3 remained out of service due to the failure of the Generator Stator Cor'e.

(Continued from previous month)

Refer to "Unit Shut-downs and Power Reductions" section of June, 1981, Operating Status Report for additional information.

major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for 'ad-ditional information.

Completed removal of reactor vessel closure head and upper internals assembly.

Transferred 157 fuel assemblies f om reactor vessel to spent fuel storage area.

Removed reactor vessel lower internals assembly.

In-Service Inspections of reactor vessel in progress.

0 SUMbQ,RY OF OPERATING EXPERIENCE DOCKET NO.

UNIT 50 - 251 Turkey Point Unit No.

4 DATE Jul 1,

1981 COMPLETED BY V. T. Chilson REPORT MONTH JUNE 1981 TELEPHONE (305) 552-3666 Unit No.

4 operated at approximately 100% R.P.

Refer to "Unit Shut-downs and Power Reductions" section of June, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IZ Bulletins and NUREG-0578 in progress.

Florida Power G Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

SUi&1ARY OP OPERATING EXPERIENCE DOCKET NO.

50 - 335 St. Lucie UNIT DATE v

COMPLETED BY V. T. Chilson REPORT MONTH

JUNE, 1981 TELEPHONE 05 552-666 Unit operated at approximately 100% R.P.

Refer to "Unit Shutdowns and Power Reductions" section of June, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and reauirements of IE Bulletins and NUREG-0578 are continuing.'lorida Power

& Light Company commitments for NUREG-0578 implementat'on are continuing.

Refer to correspondence between PPL and NRC for additional information.