OPERATING DATAREPORT OPERATING STATUS 760

l. UnitName'urke Point Unit No.

3

2. Reporting Period:
Februa, 1979
3. I.icensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross M)Ve):

700

7. Maximum Dependable Capacity (Net MWe):

666 DOCKET NO.

DATE Err.

3 1979 COMPLETED BY Y~Qhi1son

'ELEPHONE ~~-3824 Notes - Unit No.

3 scheduled refueling, maintenance, and inspections continued during month.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level,Tn )Vhich Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, lfAny:

NONE This Month

. Yr.-to-Date Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 14; Hours Generator On-Line
15. Unit Reserve Shutdown Hours 16.. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (hDVH)

- 1

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)-
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. 1.8 1.4 707 435 3 191 and Duration of Each):

O.l O.l 672.0 1 416.0 4'.6 42 574.2 194.6 41 178.7 97.3 81 767 655 2

460 24 '643 986 75.3 75.5

68. 3' 65.1 2.6
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

A ril 1 1979 Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION

('>/77)

UNITSIIUTD010NS ANDPOIUER REDUCTIONS REPORT MONfII FEBRUARY 1979 DOCKET NO.

DATF March 3

1979 COMPLETED DY Date I I 6III Q

LP 4 m

~.E 0 m ~Dc

~ V)

QO Liccnscc Event Rcport 8

~c~

o ~

QE~

0 Cause &, Corrective Action to Prcvcnt Rccurrcncc 79-01-01 S

672.0 N/A RC Unit No.

3 was removed from service for scheduled refueling, mainte-

nance, and inspections (Continued from previous mont)t)

(Nuclear and non-'nuclear systems)

F: Forced S: Scheduled (9/77)

Reason:

A-Equipment Failure (Explain)

D.Maintenance ur Test C-Refueling D-Regulatory Restriction F.-Operator Training Sr. Liccnsc ExaminatIon F.Adminis tra tive G.Opera tional Error (Explain)

II.Otltcr (i.xplain)

Method:

I -lIIanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets lor Licensee Event Report (LER) File (NUREG-OI6l)

Exhibit l - San>c Source

AVERAGE DAILYUNITPOWER LEVEL soosooo

. 5D=

Turkey Point:

DATE March 3, 1979 COMPLETED BY +.

< ~

MONTH FEBRUARY, 1979 DAY AVERAGE DAlLYPOWER LEVEL (hIWe-Net)

I 601 605 DAY AVERAGE DAILYPOWER LEVEL (MWc.Net) 591 17 18 10 12 13 14 15 16 60 601 593 595 602 05 603 599 599 598 593 I9 20 21 22 23 26 27 28 586 584 591 592 593 INSTRUCTIONS On this format, list the average daily unit power level in Mme.Net for each day in the reportittg month. Compute to the nearest whole megawatt.

(')/77)

OPERATING DATAREPORT OPERATING STATUS Turke Point Unit No.

4 2200 760 693 700 666 I, Unit Name:

2. Reporting Period:
3. I.icensed Thermal Power (hIWt):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. hlaximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net hlWe):

DOCKET NO.

50 251 DATE 8 <~K 1979 COMPLETED By V T Chxlson TELEPHONE

{'~~-3824 Notes Unit No.

4 operated at approximately 90% R.P.

to'extend operation of Core Cycle V.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr:to.Date Cumulative 11.

13.

14.

IS.

16.

17.

'i-'8.

19.

20 21.

23.

24.

48 385.0 672.0 1 416.0 672.0 1 416.0 35 763.7 138.8 34 235.1 70 642 305 672.0 1 416.0 340 771 2 502 438 422 550 787 515 22 623 240 21 427 401 400 220 742 696 100.0 100.0 70.8 70.8 100.0 100.0 89.4 78.8 66.9 85.9 75.7

'3.9 2.7 and Duration of Each):

inspections April 6 - June 1, 1979.

Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH) 1 Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type. Date, Scheduled refuelin

, maintenance, and

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status(Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'>/77 )

VNlTSHVTDONNS AND POWER REDVCTIONS DOCKETNO 50 - 251 Turke Foint Unit No.

4 REPORT MONTH FEBRUARY 1979 No.

Date C1aX a-I J

C Qm ~cd 0 C/)

~C Liccnscc Event Rcport rr c~

p Q AEo 0

Cause E; Corrcctivc Action to Prcvcnt Rccurrcncc 79&2-01 N/A RC FUELXX Load reduction to approximately 90% R.P. to extend operation of Core Cycle V.

F: Forced S: Scheduled

(')/77)

Reason:

A-Equipmcnt Failure (Explain) 8-Maintenance oi Test C-Refueling D.Regulatory Restriction E.Operator Trainlngk Uccnsc Examination F-Administrative G.Opcratio>>al Error (Explain)

Il.Other (Explain)

Method:

l-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - tnstructions for Preparation uf Data Entry Sheets for Licensee Event Report (LER) Fife (NUREG-016I )

Exhibit l - Scone Source

. BOX 529100, MIAi>ll,FL 33152

,ivlllb~

.~M!ji')j FLORIDA POPOVER 8 LIGHT COMPANY March 10, 1979 Office of Management information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the February, 1979,. Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No.

1.

Very truly yours, A.

D. Schmidt Vice President Power Resources VTC/DDC cc:

Mr., James P. O'Reilly Robert Lowenstein, Esquire

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT

.50 250 Turkey Point t No ~

3 Dl'.TE March 3.

19 79 COMPLETED BY'. T. Chilson

~PORT MONTH FEBRUARY, 1979 TELEPHONE 305) 552-3824 Unit scheduled refueling, maintenance, and inspections continued during month.

Refer to "Unit Shutdowns and Power Reductions" section of the

'ebruary, 1979, operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Installed 40 new fuel assembles for Core Cycle VI.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

. 50 251 Turkey Point UNIT Unit No.

4

~PORT MONTH FEBRUARY 19 79 Dl',TE COMPLETED BY TELEPHONE March 3, 1979 V. T. Chilson

( 305) 552-3824 Unit operated at approximately 90% R.P. to extend operation of Core Cycle V.

Refer to "Unit Shutdowns and Power Reductions'" section of the February, 1979, Operating Status Report for additional information.

'I No Major Safety-related maintenance was performed during the month.

SUMilARY OF OPERATXNG EXPERXENCE DOCKET NO.

UNXT St. Lucie 1

March 3

1979 QEPORT MONTH FEBRUARY 19 79 COMPLETED BY TELEPHONE V. T. Chilson 305 55 2-38 24 P

t Unit operated at approximately 100% R.P. except for outages on Feb.

6

'and 21, 1979.

Refer to "Unit Shutdowns and Power Reductions" section of February, 1979,'perating Status Report. for additional information.

No Major Safety-related maintenance.

was performed during the month.