Monthly Operating Repts for Nov 1980
ML17209A442
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 12/06/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A441 List:
References
NUDOCS 8012160468
Download: ML17209A442 (25)


Text

AVERAGE DAlLYUNITPOWER LEVEL DOCKET NO.

50 250 Turkey Point Dec.

6 1980 COMPLETEDIIY V

T. Chilson MONTH>

NOVEMBER 1980 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 361 DAY AVERAGE DAlLYPOWER LEVEL (MWe.iVet) 6'

!8 9r IO l3 I4 15 646 665-670 668 665 660 662 669 673 673 669 l9 20 24 26 27 28 79.

30 279 508 670 667 573 l6 INSTRUCTIONS NOTE.

Average daily power level greater than 646 NWe due to cooler condenser cooling water.

Qn this format. list the average daily unit pi>wer level in MWe Net for each day in the reporting irn>nth. Ci>>npute to the nearest whole megawatt.

'1

OPERATING DATAREPORT DOCKET NO. ~iQ DATE JLee6 1980 COMPLETED BY SLY ~son ONE 'i'='~

OPERATING STATUS Notes - Unit. No.

3 operated at approximately 100K R.P.

from Nov. 1 until Nov. 26, 1980, when the unit was re-moved. from service to locate and, repair leaking steam gen erator tube plug, except: for Nov.

2 19 19-20 I. Unit Name:

Turkev Point Unit No.

3

2. Reporting Period:

V 8

3; Licensed Thermal Power (MWt):

4. Nameplate Rating (Gross MWe):

0

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

680

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) SInce Last Report, Give Reasons.

21 1980 nd

9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, lf.Any:

This.Month Yr..to-Date.

Cumulative.

720.0 8 040.0 70 041.6 53 692.5 602.2 213.4 6 210.2 51 900;4 121.8 13 418 298 104 886 932 1 192. 309 4 221 250 33 302 250 3, 997 972 31 520 066 78.0 74.1 78.0 74.3'0.0 64.9'.5 II. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 6 423.0
13. Reactor Reserve Shutdown Hours 14, Hours Generator On-Line.

561. 7 15, Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 17.

Gross Electrical Energy Generated (MWH) 376 900

18. Net Electrical Energy Generated (MWH) 356 176
19. Unit Service Factor 77.2
20. Unit AvailabilityFactor 77 ~ 2 77.0
23. Unit Forced Outage Rate 6.5 1.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

ma tenance and insnections

Mi rch 1 1981 Ma 9

1981

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

ecember 1980 Forecast Achieved INITIALCRITICALITY IN ITIAL ELECTRICITY COMMERCIALOPERATION I'>/77)

UNITSIIU')DOWNS ANDPOlgEg REDUCTIONS RBBORT hiON iN'NOVBNBBR 1980 Page 1 of 5 POCKET NO.

UNITNAh(E DATE COMPLETED BY TELEPIlONE N19.

Date ri

~A L tee itscc Event Report BB Cause &Corrective Action to Prevent Recuncnce 19 80-10-06 21.6, B

N/A HB HTEXCII (F)

Unit was removed from service for scheduled Steam Cenerator Tube Inspection Program, maintenance, and inspections.

(Continued from previous month)

(Nuclear and Non-nuclear systera) 20 80-11-02 0.6 B

N/A HECFUN Unit Mas removed from seryice to perform surveillance test on turbine overspeed trip device.

(Non-nuclear system)

F: Forced S: Scheduled Reason:

A.Eituipntent Failure (Explain)

B.htaintenance oc Test

~

C-Rei'ueling D Regulatocy Restriction E.Opecator Training & Liccosc Exaiuisation F-Administrative G Opcrallollal Error (Explain)

I I Other (Explain) hlethod:

I.hlanual 2.h(anual Scrain.

3-Automatic Scraot.

90thcr (L'xplain) 4-Continuing 5-Load Reduction Exhibit G Instructions for Preparation of Data Entry Sheets for Licensee Evcot Report (LER) File (NUREG.

OI6l )

Exhibit I - Sante Source

UNITSIIU'I'DO)VQS QND I'OIVER REDUCTIONS DOCKETNO.

UNITNAME Turke Point Unit No.3 REPORT hION'PI &MIJN)III 1980 Pae2of5 No.

Dal El CL I-

= L A~

I I IAju Liceltscc Event Report >

~JC 2 ~

o Cr Cause & Corrective Action tr>

I'rcvcnl Recurrence 21 80-11-19 2.4 VALVEX Unit was tripped by steam generator No, 3A level protection system caust;d by sudden closure of feedwater control Valve No. 3A.

Corrective actions included repairing a loose electrical connection in the feed-wateg Valve control system.

Non-nuclear system)

F: Forced S: Scheduled I'J/77)

Reasolt:

A.Equipment Failure (Explain) 8 hlaintenance or Test.

C Refueling D Regulatory Restriction

. E.Operator Training &, License Fxanlinalion F.Administrative G.Operational Error (Explain)

I I Otller (Explaill) 3 hIethod:

I.Manual 2 hIanual Scra<n.

3.Autontalic Scrant.

%Other (Explain) rt-Continuing 5-Load Reductiort Exhibit G - Inslruclions for Preparation of Data Entry Sheets for Licensee Event Report ILL'R)File INUREG-016I )

5 exhibit I ~ Sante Source

UNITSIIUTDO)1tNS AND POlttER REDUCTIONS REPORT MONTII35}YEHIL1980 Page 3 of 5 DOCKET hfO 50 250 Turke Point Unit No.3 COMPLETED BY No.

Dale rr Vl f3J pre Q

u~

C

~ Cit f5 Licenscc Event Report >

re 0 0Q

~A ot G EI 0C 2 ~

Cause &, Correiltve Acllollto Prevent Recurrence 22 80-11-19 19.7.

VALQEX (P)

Unit was tripped by steam generator No.

3C level protection system while reducing load to remove the unit from service to investigate feedwater flow control problem.

(Non-nuclear system)

Hll PIPEXX (A)

Outage was extended to repair failed weld on line attached to bypass feedwater line to steam generator No. 3B.

Corrective actions included removing and plugging the attached connection on the bypass feedwater line to steam generator Nos.

3A, 3B, and 3C.

(Non-.nuclear system)

F: Forced S: Sclreduled

('I/77)

Reason:

A Equipmcnt Failure (Explain)

B-Maintenance oi Test.

C-Refueling D.Regulatory Restriction E-Operator Trainingh License Exatoioatloo F-Administrative G.Operational Error (Explain)

II.Otl>cr(Explain)

Method:

I.Manual 2.h(anual Scraot.

3.Automat tc Scram.

90ther (Explalll) 4-Continuing 5-Load Reduction Exhibit G - Instructions for Preparation of Data Entry Sheets for Liccosec Event Report (LER) File (NUREG-OI6I )

5 Exhibit I ~ Saotc Source

UNITSIIUTDOVfNSAND PO'1Y)R REl? UCTIONS BEPOgfhlONOi BOVe fggg 1900 Page 4 of' COMPLETED BY e

it No.3 Nfg.

Date ea tg 4 I PBo e

Q

~ C/l g l.iceoscc Event Repotl i'a aa eertCr 0

f C ~

Q Cause tt Corre<<live Af:liontu Ptevent Recurrence 23 80-11-20

16. 9.

HH VALVEX (p)

Unit was removed from service when feedwater flow to steam generator No.

3A could not bp transferred from the bypass feedwater control valve to the main feedwater control valve after the unit was returned to service.

Inadequate flow through feedwater control valve No.

3A was due to broken valve stem.

Correc-tive actions included installing new valve stem, plug, and cage in feed-water control valve No. 3A.

New valve internals will be installed in feedwater control valve Nos.

3B and 3C at the next outage of suf-ficient duration to accomplish this work.

(Non-nuclear system)

F: Forced S: Scheduled

( t/77)

Reason:

A.Equipmenl Failure (Explain)

B.hlaintenance or Test --

C-Refueling D.Regulatory Reslriclion E-Opetalot Training h, Liccosc Exaloiitation F-Administrative G.Opetational Ettut (Explain)

II Other (Explain) hlethod:

I.Manual 2-hlanual Scrato.

3-Autotoatic Scram.

90ther (Explain) 4-Continuing 5-Load Reduction Exhibit G - Instructions for Ptepatation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG.

OI6 I )

Exhibit I - Same Source

UNITSl(UTDO)VQS AND POIVER REDUCTIONS RgPORP gloNRi ROPRRRRR 1900 Page 5 of 5 DOCKETNO.

UNITNAME DATE COMPLETED BY TELEPIIONE Dal

. L fg ea-rg ee 7J

~.B

~n x erg' C/l g Licensee

/vent Report gf 5 eg ge ga

~0 ff5'Cr Cause & Corrcelive Action lu prevcol Recurrence 24 80-11-26 97.1.

HB HTEXCH (P)

Unit gas removed from seryice to locate and repair leaking tube plug on steam generator go.

3B.

Corredtive actions included repair-ing leakittg tube plugs by gelding.

(IIuclear system)

F: Forced S: Scheduled Reason:

A Equipmcnt Failure (Explain)

B-hlaintenance or Test.

C.Refueling D-Regulatory Restriction E-Operator Training & License Examinatlun F-Administrative G Operational Errur (Explain)

I I other (Explatrr) hlclhod:

I.Manual 2-Manual Scram.

3-Automatic Scratn.

9-Other (Explain) 4-Continuing 5-Load Reduction Exhibil G - Instructions for Preparation of Data Entry Sheets fur Licensee Event Repun (LER) File INUREG-OI6I )

5 Exhibit I - Same Source

kO

~

AVERAGE DAlLYUNITPOWER LEVEL DOCKET NO.

UNIT DATE 50 - 251 Turkey Poinh 80 COMPLETED IIY

< - T. Chilson MONTH.

DAY AVERAGE DAILYPOWER LEVEL IMWe-Net) 624 622 DAY AVERAGE DAlLYPOWER LEVEL (MWe.iVet )

I 7'S 19 30'46 31 33 IP 13 IS l6 36.

'l7')S

'79 30 INSTRUCTIONS On this format. list the average daily unit power Ieve) ill MWe Net for each day in the repiirting inonth. Conipute to the nearest whole megawatt.

(o/77)

0

OPERATING STATUS OPERATING DATAREPORT OOCKET NO, ~21 DATE Jler ~L980 COMPLETED BY 2L'~~Lson TELEPHONE ~~~'i2-3824 Turke Point Unit No.

4 760 I. Unit Name

2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. Maximum Dependable Ca pacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes-Unit No. 4 operated at approximately 100X R.P.,

util Nov. 8, 1980, 'when the unit was removed from ser-vice for scheduled refueling maintenance, and inspec-tions, except for load re-t on of Nov. 6<<8 1980.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through-7) Since Last Report. Give Reasons:

9: Power Level To Which Restricted. IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:

This Month..

Yr. to-Date.

8 040.0 12.3 12.3 13 162 375 4 069 695 3 855 365 75.8 75.8 6.2 0.3

11. Hours In Reporting Period 720.0
13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line iaL1 IS. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 372 238
17. Gross Electrical Energy Generated (MWH) 108 l.35
18. Net Electrical Energy Generated (MWH) 100 462
19. Unit Service Factor 26.4
20. Unit AvailabilityFactor 26.4 H. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months {Type; Date. and Duration of Each):

Cumulative 63 76.0 166.6 1.

2'4 381 355 29 973 173 28 385 361 71.0 71.1

'64.2 2.9

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prio to Commercial Operation):

an arv 10 1 81 Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('>/77)

UNITSIIUTDOWQS AND POWER REDUCTIONS it No.4 REPORT MONTII NOVEHBER 1980 COMPLETED SY Date 0

V

~- nV x grx

~ M L lee tl sec Event Peport >

C 2 ~

0 Cause & Currcctivc Action to Prevent Recurrcncc 20 80"11"06 PIPEXX (E)

Load yeduction due to failed expan-sion )oint located inside the con-denser on the extraction steam line to feedwater heater No. 4B.

Cor-rective actions included replacing failed expansion Joints during re-fueling outage.

(Non-nuclear system) 21 80-11-08 530,0 RC Unit No.

4 was removed from service for scheduled refueling, maintenance, and inspections.

(Nuclear and Non-nuclear systems)

F: Fotced S: Scltedulerl

('t/77)

Reason:

A.Equipment Failure (Explain)

B.Maintenance or Test

~

C-Refueling D Ret,ulatory ltestriclion E-Operator Trainittt;& Liccnsc Exantination F-Administrative G-Operational Error (Explain)

II.Otl>er (Explairr) 3 Method:

I Manual 2 Manual Scratn.

3.Autuntat ic Scrant.

90ther (Explain) 4-Continuing 5-Load Reduction 4

Exhibit C

~ Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LL'R) Fil>> (NUREG.

016I )

5 Exhibit I - Satnq Source

AVERAGE DAlLYUNITPOWER LEVEL DOCKET No.

St. Lucre DATE Dec.

6',

1980 COMPLETED IIY V. T. Chilson

MONTH, NOVEMBER 1 98 0 DAY AVERAGE DAILYPOWER'LEVEL IMWe.Net)

I 787 788 DAY AVERAGE DAILYPOWER LEVEL (MWe iVet) 791 17 IS 19 IO 12 I4 IS l6 791 741 790 789 790 790 793 794 20 22 2S 99 30 NOTE:

794 796 796 793 793 792 794 795 452 Average d'aily power level greater than 777 NWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the reportinS >n>>nth. C>>>t>pote to the nearest whole megawat t.

(o/77'I

OPERATING STATUS OPERATING DATAREPORT oocKErxo. ~O- >>S DATE ~~80 COMp~ gy ~T. CMlson TELEPHONE ~~552-3824 I. Unit Name:

Lucie Unit No. 1.

2. Reporting Period:

vem er 1 80

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross, MWe):
5. Design Electrical Rating (Net MWe):
7. Maximum Dependable Capacity (Net MWe):

777 Notes-Uhit operated at ap-proximately 100X R.P.,

except for outage of Nov.

30,. 1980.

8. IfChanges Occur in Capacity Ratings (Items, Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):

IO. Reasons For Restrictions, IfAny:

This Month Yr:to-Date 720.0 8 040.0 6 171.5 711.8

'6 057.1 T.3 1 814 05 1

086 0

2 592 380 4

560 714 4

892 080 609 064 75.3 8.9 75.4 8.

73.8 100.2 71.5 97.1 7.6 s (Type, Date. and Duration of Each):

I I. Hours In Reporting Period

- 12. Number Of Hours Reactor Was Critical l3. Reactor Reserve Shutdown Houts.

l4. Hours Generator On-Line.

l5. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Ge'nerated (MWH)

I7. Gross Electrical Energy Generated (MWH) lg. Net Electrical Energy Generated (MWH) l9. Unit Service Factor

20. Unit Availability Factor 2l. Unit Capacity Factor (Using MDC Net)

"". Unit Capacity Factor (Using DER Net)

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Month Cumulative 34 584.0 27 681.3 129.5 26 887;1 39.3 65 345 618 21 186 580 19 936 960 77.7 77.9
74. 2 71.9'.9
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (o/77)

I/

UNITS!lUfDOlYQS AND POIVER REDUCTIONS UNITNAME REEORTEIQNlll ROVEllEER 1980 Nl>.

Date

~- L aK r>

7J rr, 1

Q c J

~ Ul Licensee Event Rcport EE c~

~> Vo Ei> G c0c c C 0

Cause 8> Corrective Aclion I>>

Prevent Recurrcncc 1&

80-11-30 INSTRU Unit was tripped due to loss of power supply to the control element drive mechanism control system when the output breaker of the second of two motor-generator (H-. G) sets tripped open.

51-G No.

1A was removed from service while performing DC ground isolation investigation.

(Nuclear system) 19 80-11-30 2.1 zzzzzz Unit was tripped by the steam genera tor level protection system during a transient condition while in-creasing load after the unit was returned to service.

(Non-nuclear system)

I F: Forced S: Scheih>led Reason:

A.E>Iuipment Failure (Explain)

II Maintenance ni Test

~

C Refueling D.Regulatory Restriction F..Operator Training &, License Exan>inalion F-Administrative G.Operational Error (Explain)

II-Otl>er (Explain)

Method:

I Manual 2 Manual Scram.

3.Autos>atic Scran>.

90ther (Explain) 4-Continuing 5-Load Reduction Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG.

OI 6I )

Exhibit I - Same Source

rLORIOA POVIER 4 LIGHT COMPANY December 6,

1980 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the November, 1980, Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, g/2 A. D. Schmidt Vice President Power Resources, VTC/ddc cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE

SUMMARY

'F OPERATING EXPERIENCE POCKET NO.

50 - 250 Turkey Point UNIT Unit No.

3 DATE December 6

1980 COMPLETED BY '. T. Chilson TELEPHONE'305) 552-3824 REPORT MONTH NOVEMBER 1980 Unit No.

3 operated at approximately 100% RH. from November 1 until November 26,

1980, when the unit was removed from, service to locate and repair leaking steam genrator tube plug, except for outages of November 2, 19, 19-20, and 20-21, 1980.

Refer to "Unit Shutdowns and Power Reductions" section of November, 1980,. Operating Status Report for ad-ditional information.

Major Safety-related maintenance activities performed. during the month included:

Inspections arid requirements of IE. Bulletins and NUREG-0578 are continuing Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

Repair of leaking tube plugs in steam generator 3B in progress.,

Inspection of reactor coolant pump.No.

3B shaft seals in progress.

I>>

'P

SUMMARY

OF OPERATZNG EXPERZENCE DOCKET NO.

50 - 251 UNZT Turkey Point Unzt No.

4 DATE December 6,

1980 REPORT MOi4TH COMPLETED BY TELEPHONE.

Chilson 2-3824 Unit No.

4 operated at approximately 100% R.P

, until Nov. 8, 1980, when the unit was removed from service for scheduled refueling, main-

tenance, and inspections, except for load reduction of November 6-8, 1980.

Refer to "Unit Shutdowns. and Power Reductions" section of the

November, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Znspections and. requirements of ZE Bulletins and NUREG-0578 in progress.

Florida Power S Light Company commitments for NUREG-0578 implementation'axe continuing.

Refer to correspondence between FPL and NRC for additional information.

Steam Generator Tube Znspection Program in.

progress.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT 335 St. Lucie Unit No.

1 DATE cember 8

1980 REPORT MONTH COMPLETED BY TELEPHONE V.. T. Chilson 305 552-3824 Unit operated at approximately 100% R.P., except for outage of November 30, 1980.

Refer to "Unit Shutdowns and Power Reductions" section of the November, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed. during the month included:

Inspections and requirements of IE, Bulletins and NUREG-0578 are continuing.

Florida. Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and, NRC for ad-ditional information

I