AVERAGE DAlLYUiVITPOWER LEVEL Turkey Point Unit No.
3 COMPLETED BY TFLEPHO>VE (305) 552-3666 MONTH Au ust 1
81 DAY AVERAGE DAILYPOWER LEVEL IMWe Net)
DAY AVERAGE DAILYPOWER LEVEL (MWe iVet) 17 IS 70 32 93 10
'35 36 13 15 16 ZS 39 30 31 INSTRUCTIONS On this format, list the average daily unit pi>wer le>el in MWe Net for each day in the repi>rting >t>>>nth. Ci>mpute to the nearest whole megawatt.
810'>>220185 810'>>14 PDR ADOCK 05000250 R
PDR (i>!77 )
OPERATING DATAREPORT DOCKET iVO.
50-250 DATE Sesi.
SV, 1981 COMPLETED BY V.T. CBL1son TELEPHONE M~~2-3666 OPERATliVG STATUS Turkey Point Unit L o.
3
- 2. Reporting Period:
Au ust 1981
- 3. Licensed Thermal Power (MWt):
- 4. 1Vameplate Rating (Gross L'PIWe):
760
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
Notes Unit Vso.
3 remained out of service due to Steam'Gen-erator Repair Program (continued from previous month)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
I I. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
"'"" e ")
- 17. Gross Electrical Energy Generated (MWH) 18.
1Vet Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, This Month 744.0 >>0-Yr.-to-Date 5 831.0 1 459.3 631.0 1 385.6
~ -1495 -0>> 980 41 917:
791 27.2 27.2 24.4
- 22. 7 49.0 Date. and Duration of Each):
Cumulative 7'6 616.6 55 760.1 844. 4 53 891.0 121.8 34 93 32 827 276 70.3 70.5 66.3 61.8 5.1
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
('t/77)
UNITSHUTDOWNS ANDPOWER REDUCTIONS REPORTMONfH August, l981 DOCKET NO 50 250 nit No.
3 COMPLETED By V.T. Chilson No.
Dale ri
~llri L
Ja
~ V)
Lii:enscc Event Report ~
Cause A. Corrective Action to Prevent Rec<<rrcnce 05 81-06-24 744.0 HB HTEXCH (F)
Vnit No.
3 Steam Generator Repair Program in progress.
(Continued from previous month)
(Nuclear System)
I F: Forced S: Scheduled
('l/77)
Reason:
A-EIIuipment Failure (Explain)
B Maintenance or Test C-Refueling D Regulatory Restriction E Operator Training 8I Liccnsc Examination F-Administ rat ive G.Operational Error (Explain)
II Other (Explai<<)
Method:
I -hIanual 2.Manual Scram.
3-Auloinalic Scrain.
4-OIII~WIIhun-) Continuing 5-Load Reduction 9-Other (Explain)
Exhibit G - Instructions filrPreparation of Data Entry Sheets lor Licensee Event Rcport (LER) File (NUREG-016 I )
Exhibit I
~ Sainc Source
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
50 25 1 Turkev Point Unit Ho.
4 TELEPHONE MONTH Augus t 1981 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
I 654 663 669 665 664 657 652 652 DAY 17 18 19 20 22 23
'>5 AVERAGE DAILYPOWER LEVEL (MWe-Net) 672 676 676 674 670 666 661 657 516 10 13 15 16 INSTRUCTIONS 651 658 661 654 656 662 669 26 7'>
28 19 30 31 NOTE:
633 651 663 661 659 659 Average daily power level greater than 646 Mi e due to cooler condenser cooling water.
On this format. list the average daily unit power le> el in MWe.>Net for each day in the reporting nn>nth. C>>ntpute to the nearest whole megawatt.
(0/77)
OPERATING DATAREPORT DOCKET NO. ~910, 1981 COMPLETED BY son TELEPHONE 305 552-3666 OPERATING STATUS Turkey Point Unit No.
4 August 1981
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
Notes Unit No.
4 operated at approximately 100% R.P.
ezcep t for outage of Aug. 25, 1981.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
None This Month Yr.-to-Date Cumulative 70 344.0 5 831.0 5 224.1 52 236.9 166.6 50 417.4 5 138.4 31.2 11 208 899 105 590 254 513 095 31 789 471 3 405 451 71.7 88.1 71.7 88.1 70.2 65.
2'4.1 3.0 4.3 1
Dec.
26, 1981
- 11. Hours In Reporting Period 744.0
- 12. Number Of Hours Reactor Was Critical 742.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 740. 6
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Ge'nerated (MWH)
I'7, Gross Electrical Energy Generated (MWH)
)9. Unit Service Factor 99.5
- 20. Unit Availability Factor 99.5
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 4.6
- 24. Shutdowns Scheduled Over Next 6 Months(Type, Date. and Duration of Each):
Scheduled refueling maintenance and inspection Oct.
25
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION Achieved
UNITSIIUTDOWNS AND POWER REDUCTIONS REPORT MON-fll August 1981 DOCKET NO 50 251 UNITNAMF Turke Point Unit No.
4 COMPLETED BY Nrl.
Dale rl Vi J
rr, o A n
o rx' V)
Llcenscc Event Report >
4I e I/l o ~
Cause 8c Corrective Action Ill Prevent Recurrence 81-08-25 3.4" IA INSTRU Unit was tripped by reactor protection system due to inadvertent interruption of power supply to power range nuclear instrument channel N-42 while power range channel N-43 was in the trip mode for test.
(Nuclear System)
I F: FllfcCll S: Scheduled
(~>/77)
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test
~
C-Rc fueling D-Regulatory Reslriclion E-Operator Training'iccnsc Examination F-Administ rat ive G Operational Error (Explain)
I I-Other (Explain)
Method:
I.Manual 2 Manual Scram.
3-Aulol>>atlc Sera>>1.
4.0rlrer+~am) Continuing 5-Load Reduction 9-Other (Explain)
Exhibit G - Inst rue t ion s for Preparation of Data Entry Sheets lof Llccnsec Event Report (LEI'() File (NUREG-Ol 6l )
Exl>>bn I
~ Sante Source
AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
St. Lucie Unit No.
1 COMPLETED 8Y V.T. Chilson MONTH Au DAY AVERAGE DAILYPOWER LEVEL (MWe.Net)
I 726 DAY AVERAGE DAILYPOWER LEVEL
(>>>IWe-Net) l7 10 l3 IS l6 751 746 732 789 790 793 794 788 788 789 782 782 77 IS 19 30 33
'>5 3S
'>9 30 3l NOTE:
781 784 773 789 786 78 783 781 783 779 780 782 778 Average daily power, level greater than 777 I>Ie due to cooler condenser cooling water.
INSTRUCTIONS On this format. list the average daily unit p>>wer le>>el in MWe.Net for each day in the rept>rting >n>>nth. C>>nt pute to the nearest whole megawatt.
{9/77)
OPERATING DATAREPORT OPERATING STATUS St. Lucie Unit No.
1 2560 850 802
- l. Unit Name:
- 2. Reporting Period:
I
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (iNet MWe):
822 777 DOCKET NO.
DATE ~~ 10, 1981 COMPLETED BY ~t~lson TELEPHONE ~~Q2-3666 Notes Unit operated at approxi-mately 100% R.P.
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions. IfAny:
This Month Cumulative 41 159.0 Yr.-to.Date 5 831.0 5 711.7 34 137.0 129.5 33 701.3 5 710.2 39.3 14 08 8
81 757 047 26 550 630 4
740 770 25 012 645 4 485 159 81.9 97.9
- 82. 0 97.9 78 '
99.0 75.
8'5.9 4.9 0.4 11 Nov.
15, 1981
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 744,0 IS. Unit Reserve Shutdown Hours 17. Gross Electrical Energy Generated (MWH) 612 560
- 18. Net Electrical Energy Generated (MWH) 579 344
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 100. 2
- 22. Unit Capacity Factor (Using DER Net) 97.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
du ed refuelin maintenance and ins ection Se t.
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup'.
- 26. Units ln Test Status {Prior to Commercial Operation):
N/A Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
('>/77 )
UNITSIIUTDOWNS ANDPO)VER REDUCTIONS DOCKET NO.
UNITNAMF St. Lucie Unit No.
1 COMPLETED BY No.
Ltccnsec Event Rcport >
4P oC P
Q Cause k Corrective Action lu Prevent Recurrence None F: Forced S: Scheduled
('>/77)
Reason:
A.Equipment Failure (Explain)
B-hlaintenance or Test C-Ret'ueling D.Regulatory Restriction L-Operator Training Sc Liccnsc Exatninatiun F.Administ ra t ive G.Operational Error (Explain)
II Other (Explaitt)
Method:
I.Manual 2-htanuai Scfanl.
3-Autotnatic Scratn.
4-Ehherttxpla~ Continuing 5-I.oad Reduction 9-Other (Explain)
Fxhibit G - Instructions I'or Prepafallolt ol Data Entry Sltects lor Licensee Event Report (LLR) File (NUREG-OI 6I )
Exhibit I - Satttc Source