Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000219/1984031 | 4 March 1988 | Safety Evaluation Concluding Util Compliance W/Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1,based on Util 831114,850809,0509,1023 & 871223 Descriptions of Planned & Completed Actions & Insp Rept 50-219/84-31 on 841126-30 | Half scram |
IR 05000289/1984029 | 30 October 1985 | Evaluation of Util 850702 Justification for Not Submitting Proposed Changes to Tech Specs Re Site Fire Brigade & Fire Brigade Training,Per Insp Rept 50-289/84-29.Tech Spec Change Not Required | |
IR 05000482/1985019 | 30 September 1985 | Allegation Review Data Sheet for Case 4-85-A-050 Re Mishandling of Document Control Program.Concerns Addressed in Insp Rept 50-482/85-19.Dept of Labor & Allegation Cases Closed | |
IR 05000482/1985031 | 28 August 1985 | Allegation Review Data Sheet for Case 4-85-A-077 Re 6 Rem Exposure in Containment Bldg Due to Pipe Break.Allegation Investigated During Insp 50-482/85-31 on 850715-19 & Found Unsubstantiated | Overexposure |
L-83-479, Annual Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval from Jul 1982 - June 1983 | 30 June 1983 | Annual Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval from Jul 1982 - June 1983 | Safe Shutdown Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination Temporary Modification Emergency Lighting Earthquake Coast down |
L-84-224, Rept of Changes,Tests & Experiments Made W/O Prior Commission Approval,Jul 1983 - June 1984 | 30 June 1984 | Rept of Changes,Tests & Experiments Made W/O Prior Commission Approval,Jul 1983 - June 1984 | Safe Shutdown Boric Acid Emergency Lighting Locked High Radiation Area Design basis earthquake Earthquake Scaffolding |
L-84-379, Monthly Operating Repts for Nov 1984 | 30 November 1984 | Monthly Operating Repts for Nov 1984 | |
L-85-116, Monthly Operating Repts for Feb 1985 | 28 February 1985 | Monthly Operating Repts for Feb 1985 | |
L-85-156, Monthly Operating Repts for Mar 1985 | 31 March 1985 | Monthly Operating Repts for Mar 1985 | |
L-85-189, Monthly Operating Repts for Apr 1985 | 30 April 1985 | Monthly Operating Repts for Apr 1985 | |
L-85-235, Monthly Operating Repts for May 1985 | 31 May 1985 | Monthly Operating Repts for May 1985 | |
L-85-270, Monthly Operating Repts for June 1985 | 30 June 1985 | Monthly Operating Repts for June 1985 | |
L-85-313, Monthly Operating Repts for Jul 1985 | 31 July 1985 | Monthly Operating Repts for Jul 1985 | |
L-85-362, Monthly Operating Repts for Aug 1985 | 31 August 1985 | Monthly Operating Repts for Aug 1985 | |
L-85-395, Monthly Operating Repts for Sept 1985 | 30 September 1985 | Monthly Operating Repts for Sept 1985 | |
L-85-434, Monthly Operating Repts for Oct 1985 | 31 October 1985 | Monthly Operating Repts for Oct 1985 | |
L-85-460, Monthly Operating Repts for Nov 1985 | 30 November 1985 | Monthly Operating Repts for Nov 1985 | |
L-86-161, Monthly Operating Repts for Mar 1986 | 31 March 1986 | Monthly Operating Repts for Mar 1986 | |
L-86-252, Monthly Operating Repts for May 1986 | 31 May 1986 | Monthly Operating Repts for May 1986 | |
L-86-292, Monthly Operating Repts for June 1986 | 30 June 1986 | Monthly Operating Repts for June 1986 | |
L-86-424, Monthly Operating Repts for Sept 1986 | 30 September 1986 | Monthly Operating Repts for Sept 1986 | |
L-86-465, Monthly Operating Repts for Oct 1986 | 31 October 1986 | Monthly Operating Repts for Oct 1986 | |
L-86-506, Monthly Operating Repts for Nov 1986 | 30 November 1986 | Monthly Operating Repts for Nov 1986 | |
L-87-167, Monthly Operating Repts for Mar 1987 | 31 March 1987 | Monthly Operating Repts for Mar 1987 | Boric Acid |
L-87-214, Monthly Operating Repts for Apr 1987 | 30 April 1987 | Monthly Operating Repts for Apr 1987 | |
L-87-250, Monthly Operating Rept for May 1987 | 31 May 1987 | Monthly Operating Rept for May 1987 | |
L-87-344, Monthly Operating Repts for Jul 1987 | 31 July 1987 | Monthly Operating Repts for Jul 1987 | |
L-87-382, Monthly Operating Repts for Aug 1987 | 31 August 1987 | Monthly Operating Repts for Aug 1987 | |
L-87-421, Monthly Operating Repts for Sept 1987 | 30 September 1987 | Monthly Operating Repts for Sept 1987 | |
L-87-475, Monthly Operating Repts for Oct 1987 | 31 October 1987 | Monthly Operating Repts for Oct 1987 | |
LD-84-063, Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde | 26 October 1984 | Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde | |
ML16341C650 | 25 February 1980 | TMI-2:Coal Burning Plant.Summary of Study of Converting TMI-2 to Fossil-Fueled Plant. | |
ML17053D167 | 27 May 1982 | Annual Financial Rept 1981 | High winds |
ML17053D169 | 1 March 1982 | Annual Financial Rept 1981 | |
ML17223A745 | 26 January 1990 | Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N | |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML17261A530 | 18 June 1987 | Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys | |
ML17262A262 | 30 November 1990 | Part 21 Rept Re Chilled Water Sys.Initially Reported on 901030.Evaluation of Perry Plant Will Be Sent by 901230 | |
ML17264A118 | 31 July 1995 | Response to Part (1) of GL 92-01,Rev 1,Suppl 1. | |
ML17266A359 | 31 October 1980 | Final Deficiency Rept Originally Reported on 800325 Re Defective Hydramotor Actuators for Dampers & Louvers.Caused by Mfg from Incorrect Matl.Dampers Reworked & Retested. Dampers & Louvers to Be Tested in Preoperational Program | |
ML17279A191 | 7 April 1987 | Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl | |
ML17298B539 | 30 November 1984 | Summary Rept on Design Basis of Shutdown Cooling Sys Relief Valves for Cessar Sys 80. | Hydrostatic |
ML17298B540 | 30 November 1984 | Summary Rept on Operability of Shutdown Cooling Sys Relief Valves for Palo Verde Units 1,2 & 3. | |
ML17338B268 | 15 February 1979 | LER 79-001/03L-0 on 790118:valve V-14-35 Failed to Open Completely During Routine Isolation Condenser Valve Operability Test.Caused by Dirty Torque Limit Switch Contacts,Which Were Subsequently Cleaned & Burnished | |
ML17340A985 | 4 April 1981 | Monthly Operating Repts for Mar 1981 | |
ML17341B242 | 7 May 1982 | QA Manual. | Safe Shutdown Coatings Nondestructive Examination Condition Adverse to Quality Control of Heavy Loads Backfit |
ML17342A206 | 10 June 1985 | Revised Rev 8 to Topical QA Rept. | Safe Shutdown Non-Destructive Examination Fire Barrier Coatings Nondestructive Examination Control of Heavy Loads Early Warning Fire Detection Backfit |
ML17342B046 | 30 November 1987 | Monthly Operating Repts for Nov 1987 | |
ML17342B051 | 31 October 1987 | Corrected Monthly Operating Repts for Oct 1987,consisting of Revised Outage Duration Hours | |
ML17342B089 | 30 November 1987 | Corrected Monthly Operating Rept for Nov 1987 |