AVLliAGE la Alli t; Nil pp.t 5, tg y; g DOCKET NO.
50 'Xn UNil Turkey Point 3 3-15-85 DATE H.W. Grant COMPLETED BY TELEP)lONT.
(305)552-3675 February 1985 MONTH.
DAY AYERACE DAILY POWER LEVEL (MWe Net) 2/ 1/55 692 2/ 2/85 691 2/ 3/85 693 2/ 4/85 685 2/ 5/85 684 2/ 6/85 683 2/ 7/85 445/
2/ 8/65 422 2/ 9/85 695 2/10/85 394 2/11/85 391 2/12/85 685 2/12/S5 636 2/14/85 641 2/15/S5 693 2/16/S5 695 2/17/65 690 2/18/85 691 2/19/85 687 2/20/85 686 2/21/85 6S8 2/22/85 677 2/23/85 687 2/24/85 691 2/25/85 688 2/26/85 687 2/27/85 684 2/28/55 679 i
h 8504180607 850228 T
PDR ADOCK 05000250 R
PDR l
a.
~
OPERATING DATA REPORT DOCKET NO _50*250 DATE. 3-15-85 COMPLETED BY N.W. Grant TELEPHONL (305) 55?-3675 OPERATING STATUS Notn Turkey Point Unit # 3 I. Unit Name:
February, 1985 U it #3 Operated at essential ly
- 2. % W.
Wer
??nn
- 3. Lloemed ThennelPower (MWt):
760
- 4. Namspiste Rating (Gross MWe):
i 693
- 5. Design Elecoleel Reting (Net MWe):
700
- 4. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependeble Capacity (Net MWe):
- 8. If Changes Oscar in Capacity Ratings (leems Number 3 Through 7) Since last Report, Give Reesone
- 9. Power LevelTo Which Restricted,If Any (Net MWe):
- 10. Reesens For Restrictions.lf Any:
This Month Yr. to Dete Ciemulative 672 1416 107265.6 II. MoersIn ReportingPeriod 572 1370.9 7 043.7
- 12. Musieber of Hours Reector Wes Crhical
- 13. Remeter Reserve shutdown Hours I4. Hours Generater on.Lhie 672 51330.5 74509.6 0
T0 121.8
- 15. Unit Reserve Shutdown gours 1429004 2839415 IU5M926
- 14. Cross Thennel Energy Generated (MWH) 4/m /0 UUJUU M b Ib.
- 17. Gross Electrical Energy Generated (MWH)
"M l
- 18. Net Electrieel Energy Generated (MWH),
avv.u 19.v os.a 100.0 94.0 69.6
[
- 20. Unit AveRobilley Feeter
,g
'j I
- A
- 21. Unit Cepeciay Factor (Using MDC Net) i
- 22. Unk Capacity Factor (Using DER Net) 0 6.0 6.4
- 23. Unit Forced Outege Ret,
- 34. Shutdowns Scheduled Over Next 6 Months (Type.Dete,and theretion of Eachl:
Refueling,!! arch 30, 1985, 11 weeks l
l
- 25. If Shut Down At End Of Report Period, Estimated Date of Stortup:
l
- 26. Units In Test Status (Prior to Commercial Operation):
Forecess Arleined I
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION l
~
En_9cn DOCKET NO.
UNIT SBOUTD0tWNB AND POUWER REDUCTIONS UMBT MAME T"
"y w.+ u.i t 1 3 DATE
- "=
February 1985 '
N (305 5 3675 REFORT MONTM 4
"i l
. Ei Licensee P,
Cause & Corvective
.]?
"s
)
f Acehm so n..
Dete E
42 4
25&
Event s '2 n
a p, Re, rt.
~
3
-R-6 j
l J
l 03 850207 F
0.0 H
5 EB TRANSF In accordance with an HRC conmitment, Unit 3 reduced power to approximately 50% because the start up transformer was out of service, then returned I
to full power operation.
4 i
l j
i i
i l
I 3
4
)
T: Forced Reamm Metiml:
Eshibit G. instructhms 5 Scheduled A-Eqmpenent Failwe(Emplain) 1.Meneel for Preparathm of Data i
S-Maineenance or Test 2-Menesi Scram.
Entry Sheets for IAvnsee C-Refuehng
- 3. Avtomatic Scram.
Event ReporiILER) File INUREG-i D Regulatory Restrictiem
@OheriEmplem) 0161) l E4)perator Training & Ucenw Enanenstkm F-Administrative 5
G4)perathmal Frror IF = plain) 4. 4.8As A hwr wi Exhibit I - Same Source et/77)
II4)eher IEurlaint
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-250 UNIT Turkey Point Unit # 3 l'
DATE March 15,1985 COMPLETED BY N.W. Grant TELEPHONE (305)552-3675 REPORT HONTH February,1985 0
Unit # 3 cperated at essentially full. power except as noted on unit shutdown report.
i I
O l
AVLil AGE 18 Alli tiNil PO=t1. Li vi t DOCKET NO. 50-251 Turkey Point 4 UNIT DATE 3-15-85 N.W. Grant COMPLETED BY (305)552-3675 TELENIONE February 1985 MONTH DAY AVERACE DAILY POWER LEVEL IMWe Net) e 2/ 1/95
-2 2/ 2/85
-1 2/ 3/85
-1 2/ 4/85
-6 2/ 5/85
-18 2/ 6/85 118 2/ 7/85 168 2/ 8/85 83 2/ 9/85 677 2/10/85 632 2/11/85 687 2/12/85 686 2/13/S5 463 2/14/85 687 2/15/85 688 2/16/85 692 2/17/85 693 2/18/85 520 2/19/85 588 2/20/85 630 2/21/85 682 2/22/85 637 2/23/85 490 2/24/85 688 2/25/85 684 2/26/85 674 2/27/85 666 2/28/85 673 t
OPERATING DATA REPORT DOCKET NO; 50-251 DATL.3,g,g COMPLETED BY N W_ Grant TELEPHONL hng) g47-3675 OPERATING STATUS I. Unit Name:
T"rhy Dai n+ Ma4+ 8 a
- 2. Reporting Period:
Februa rv.1985 See the Unit shutdowns and 2200 power reductions report.
- 3. Licensed Thermal Power (MWI):
0
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrial Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
700 666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report,Give Reasom-i
- 9. Power level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to-Date Cumulative 672 1416 100997 II. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 511.1 1180.9 70899.3 166.6 0
0 067un
- 13. Reactor Reserve Shutdown Hours 499.5 11b/su l4. Hours Generator On.Line
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energv Generated (MWH) 1067341 2518465 144648571 348010 823560 46015957
- 17. Gross Electrical Energy Generated (MWH) 329411
/82351 43bbbbd4
- 18. Net Electrical Energy Generated (MWH).
O'$
SI*3 Si'i
- 19. Unit Service Factor
- 20. Unit Availability Factor 73.6 83.0 66.5
- 21. Unit Capacity Factor (Using MDC Net)
D
- 22. Unit Capacity Factor (Using DER Net) 6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachl:
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Athiacd INITI AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION
1 of 2 50-251 DOCKET NO.
Turkey Point Unit.# 4-UNIT SNU1 DOWNS AND POWER REDUCMONS UNIT NAME 3-I5-85 DATE
)
February.1985 '
COMPLETED gy N W_ Grant REPORT MONDI TER.EPHONE hasi sqp. myq l
i
=
3 I
i 3
3 Ei Licensee P,
g, cause & Corrective I
No.
Date E.
li !
4 s&
Event
- ?
- 3 Actism to fO Prewne Recurrence 4
j@
s jgg Repswt
- NU j
l 6
i l
03 850128 F
126.1 A
4 CB RELAYX Unit 4 continued its shutdown to l
repair diesel generator breaker and cubicle.
1 I
04 850206 F
10.2 A
3 251-85-003 HH VALVEX A reactor trip occurred during power ascension as a result of 4
l
. difficulties in maintaing steam j
generator level, coincident with a steam flow / feed flow mismatch.
The unit was returned to power.
05 850207 F
36.2 A
3 251-85-004 EA RELAYX' Ground fault protective relays tripped two switchyard breakers, which resulted in loss of a main feed pump resulting in a rea'ctor trip.
Following a cleaning of insulators the unit returned to power.
i I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S. Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Repin:ILER) File (NUREG-D-Regulatory Restrictiim Q-Other (Explain) 016I1 l'-Operator Training & Ucense Examination 9,,
5 F Adnunistrative G-Operatiimal Feror (Fsplain) c j.
4.
Asipwc.,..d Ethibis I Same Source (9/77) 11-01her (Esplain)
2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 951 UNIT NAME T"rbau Dai"+ " nit # 4 4-ID-U DATE REPORT MONTH Februa ry,1985 b)65 -3675 E
c
.5?
3 j Ei Licensee Eg
- L Cause & Corrective No.
Date
{
3g ij jjy Event 3,7 A'
$5 E
jgg Report
- mO EU Prevent Recurrence g
6 06 850218 F
0.0 A
5 HA GENERA Power reduced to approximately 50%
due to a generator arcing alarm,and higher than normal delta-t. Instrument s were repaired and the unit returned to full power.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S. Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regularory Restriction
@-01her (Explain) 016Ii E. Operator Training & License Fxamination p
5 F Administrairve G Operational Error (Fxplain) 6 _ /.e ao hv..e#
Eshibit I Same Sourec (9/77)
II Other (Explain t
= - -
If.
7
SUMMARY
-OF OPERATING EXPERIENCE
+-:
4--
s,:
' DOCKET NO.
50-251 UNIT Turkey Point ~ Unit' # 4 DATE March 15,1985 N. W. Grant COMPLETED'BY TELEPHONE (305)552-3675
[
REPORT. MONTH-February,1985 0
J
~
V See the " Unit shut' downs and power reduction" report.
1
[
h f
4
)
+
~
AVLil AGE 18 A11) LN1 PO*t L Li vi t t
DOCKET NO.50-11R UNIT St. Lucie Unit 1 3-15-85 DATE ll.W. Grant COMPLETED BY (305)552-3675 11LErilONE February 1985 MONTH DAY AVERAGE DAILY POWER LEVEL
'e (MWe Net)
^
2/ 1/85 855 2/ 2/85 852 2/ 3/85 853 2/ 4/85 851 2/ 5/S5 S51 2/ 6/S5 352 2/ 7/S5 S51 2/ S/85 555 2/ 9/85 857 2/10/85 856 2/11/85
-855 2/12/85 852 2/13/25 S54 2/14/85 858 2/15/85 E57 2/16/85 857 2/17/85 857 2/18/85 854 2/19/85 853 2/20/85 854 2/21/85 853 2/22/85 852 2/23/85 853 2/24/55 852 2/25/85 851 2/26/85 851 2/27/85 851 2/28/85 848 9
l l
OPERATING DATA REPORT DOCKET NO.
50*335 DATE.-15-85
~
COMPLETED BY N.W. Grant TELEPHONL (305) 552-3675 OPERATING STATUS St. Lucie Unit #1 Notes
- 1. UntNe w February,1985 Unit #1 Operated at
- 2. Reporting rariod.
essendaW M pwer
- 3. I M Thennel Power (MWt):
).
- 4. Nassaplate Rating (Gross MWe):
830
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons-
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 30. Reasons For Restrictions. If Any:
This Month Yr.-to Date Cumulative 672 1416 71808 II. Hours in Reporting Period 672 1416 7D437.3
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
4 i
20$.3 672 1416 50149.5
- 14. Hours Generator On Line 0
0 39.3
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWH)
't 7R 1 R A1 194RA0117
- 17. Gross Electrical Energy Generated (MWH) 603390 1255360 41114015 573447 1192419 38754767
- 18. Net Electrical Energy Generated (MWH),
100.0 100.0 69.8
- 19. Unit Service Factor 100.0 100.0 69.9
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 102.8 101.5 66.4
- 22. Unit Capacity Factor (Using DER Net) 0 0
4.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eachl:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Athiard INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 69//*7 n
UNIT SffUTDOWNS AND POWER REDUCTIONS E 5 Lucie Unit #1 DATE 3-15-85 REPORT MONTy February. 1985 CORWLETED BY N W_ Grant W.LErft0NE Mns) Es9 v7s n.
-_E E
.] g 3
y E5 Licensee E*
Cause & Corrective No.
Date
{
3g i
25E Event 3,7 Eb
^ ' ' * '
H g=
jgg Report a mO Prevent Recurrence g
d Unit # 1 Had no " Shutdowns" or power reductions.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S Scheduled A Equipment Failure (Explain)
I. Manual for Preparation of Data R-Maintenance of Test 2 Manusi Scram.
Entry Sheets for Licensee C-Refueling 3 Aufomatic Scram.
Event Repor (LER) File (NUREG-D-Regulatory Restriction
@-Osher (Explain) 0161)
E-Operator Training & License Examination p
F Administrative 5
G Operational Ftror (F splain) 4-
/,e4. A s eve.,..el Exhibit I - Same Source to/77) 11-01her (Explain)
SUMMARY
OF OPERATING E.XPERIENCE DOCKET NO.
50-335 UNIT St. Lucie Unit # 1 DATE March 15,1985 COMPLETED BY N. W. Grant (305)552-3675 TELEPHONE REPOP.T MONTH February,.1985 y
Unit #1 operated at essentially full power.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report gonth.
.I 6
6 6
y
\\
AVLl; AGE ls Alli UNil PO=L). Li vi t i
DOCKET NO. 50-389 UNil St. lucio Ifnit 2 DATE 3-15-85 N.W. Grant COMPLETED BY (305)5'52-3675 TELErilONt February 1985 MONTH DAY AVERAGE DAILY POWER LEVEL IMWe Net) e
~
2/ 1/B5 322 2/ 2/85 820
~
2/ 3/65 821 2/ 4/85 763 2/ 5/S5 S20 2/ 6/55 3:0 2/ 7/55 521 2/ S/65 796 2/ 9/85
-11 2/10/85 656 2/11/85 742 2/12/85 2:0 2/13/95 5:0 2/14/85 S22 2/15/35 82:
2/16/85 822 2/17/85 822 2/18/85 821 2/19/85 820 2/20/85 820 2/21/85 S:0 2/22/S5 322 2/23/65 321 2/24/85 3:0 2/25/65 E20 2/26/85 820 2/27/85 Bl?
2/ B/85 516 8
0 e
/
OPERATING DATA REPORT DOCKET NO 50-389' DATE.
3-15-85 COMPLETED BY N. W. Grant TELEPHONL (1ns) 552-367!
OPERATING STATUS Notes
- 3. Unk Nome:
St-lucie tinit # ?
Februa ry.1985 See the unit
- 2. Reyesting Period:
2560 shutdowns and power
- 3. Lassesed Therinal Power (MWt):
8 reduct[ ions report.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrieel Rating (Net MWe):
g3;
- 6. Maximum Dependable Capacity (Gross MWe):
786
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report Give Reasone 4
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to Date Cumulatise 672 1416 13705 II. HoursIn Reporting Period
- 12. Number Of Hours Reactor Was Critical 672 1416 12022.2 0
0 y
0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line s;qn n 1944_n 1150s.4 0
0 0
- 15. Unit Reserve Shutdown gours 1643012 3526748
-28885313
- 36. Geen Therrnal Energy Generated (MWH) 554120 1191130 9640830
- 17. Gross Electrical Energv Genersled (MWH) 524343 1128Ub4 90 m bb
- 18. Net Electrical Energy Generated (MWH),
so.o s6.5 64.o 96.8 98.5 84.6
- 20. Unit Availability Factor 99.3 101.4 84.4
- 21. Unit Capacity Factor (Using MDC Net) 9#'U 99*f 0*
- 22. Unk Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Sheldowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
Refueling, March 30, 1985, 11 weeks
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test status (Prior to Commercial Operation):
Forecast Arliined INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION e
,,-r-w
,-._..,_-,e
_,..,...,,,,-,_,,w-y,--------,_m-.,,y_
w-
.w,---,-~,_m,,_wn,---w-_
w-.-
Q DOCKET NO.
En m UNIT SHUTDOWNS AND POWER REDUCTIONS dr.. LUCle Unit # 2, UNIT NME J-D- #'
DATE REPORT MONTH February,1985 mg gy N. W. Grant TEUyMONE (305) 552-3675
~k 1
.! E
.hEk Licensee 3*,
Cause & Corrective Na-Date h
5?
i
.a 5 5 Event l'!
Action to
$5 5
jgg Report
- to O Prevent Recurrence 6
'P PUMPXX The unit was shutdown for the C
01 850209 F
21.2 A
1 investigation of the indication of a coolant pump leak, repairs were made and unit returned to operation i
I i
I I
2 3
4 T: Forced Reason:
Method:
Exhibit G. Instructions S Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling
- 3. Automatic Scram.
Event Report iLER1 File (NUREG.
D Regulatory Restriction
@-Other (Explain 1 01611 i:-Operator Training & License Examination p
5 F Administrative j
G Operational Frfor (Fsplain) s. /,e 4. Asewc.w.el Exhibit I. Same Source 19/77)
Il-Other (Explain) i l
i
~'
1
,.r _, -
SUMMARY
OF OPERATING EXPERIENCE i
~
' DOCKET NO.
50-389 UNIT St. Lucie Unit # 2 DATE March 15,1985 N. W.' Grant-COMPLETED BY TELEPHONE (305) 552-3675
- REPORT 140 NTH Fahrua ry.1985
- Unit '# 2 ' operated at essential 1 full power except as noted on
~
unit shutdown report.
In accordance with re.quirements of Technical specification 6.9.1.6 there were no ' challenges to PORV or safety valves during the report month.
4 p
9
\\\\
- p FLORIDA POWER & LIGHT COMPANY March 18,1985 L-85-Il6 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Attached are the February 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No.
I and 2.
This report is submitted beyond the normal due date due to an administrative problem during the review of the report.
Very truly yours,
! M44v
- 3. W. Williams, Jr.
Group Vice President Nuclear Energy 3WW/NWG/js Attachment cc:
Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-109g
[b
</,
PEOPLE.. SERVING PEOPLE
-...