L-85-189, Monthly Operating Repts for Apr 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1985
ML20129G414
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 04/30/1985
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CON-L-85-189 L-85-198, NUDOCS 8507180048
Download: ML20129G414 (18)


Text

{{#Wiki_filter:' + , AVLl; AGE is All) UNil P(iwi F. Li vi t DOCKET NO. 50 94n UNil Turkey Point 3 DATE May 15, 1985 N.W. Grant COMPLETED BY TELEPilONE (3051562-3675 April, 1985 MONTH DAY AVERACE DAILY POWER LEVEL (MWe Net) 1/ !!S5 -12 1/ 2/85 -4 1/ 3/25 - 1/ i/85 4' 1/ 5/95 4 1/ 6/*5 5 1/ 7/25 -2 4/ S/85 -2 1/ ?/95 ' 1/10!'5 4 1/11/*5 4 1/12/*5 5 1/13/*5 4 1/14/85 4 i!!!/85 -2, ill6/n 1/17/25 I 1/1'/85 I 4/19/85 -i i/20/25 -1 i/21/95 -1 1/22/25 i 1/23/25 4/21/'5

                                      -i i 1/25/85        -i 1/26/85        -9 1/27/25        -i 4/28/95        -*

1/29/** -{ 4/30/55 -1

   $f1S$0c$

a NN J,. [ d ,/ 7

OPERATING DATA REPORT DOCKET NO 5_0-250 DATE . 5-15-85 COMPLETED BY N.W. Grant TELEPHONL (305) 552-3675 Oe'ERATING STATUS TURKEY POINT UNIT #3 Notes April 1985 Unit 3 Remained out of

2. Reporting Period:

2200 service for refueling and

3. Licensed Thermal Power (MWI):

760 scheduled maintenance. 7 4. Nesnepiste Rating (Gross MWe): S. Design Electrical Reting (Net MWe): 700

6. Maximum Dependable Capacity (Gross MWe):

666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report Give Reasone
9. Power Level To Which Restricted lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to Date Onnulative II. Hours in Reporting Period 719 2879 108728.6

12. Number Of Hours Reactor Was Critical 0 2057.1 75729.9
13. Reactor Reserve Shutdown Hours 0 . Oy 844.4
14. Hours Generator On.Line 0 2011.6 75190.7 0 O_ 121.8
15. Unit Reserve Shutdown Qours 0 4308366
16. Gross Thermal Energy Generated (MWH) 155437877
17. Gross Electrical Energy Generated (MWH) 0._. 1421925 49677620
                                                                    -2076              1348962                  47046168
18. Net Electrical Energy Generated (MWH)"

O 69.9 69.2

19. Unit Service Factor
20. Unit Availability Factor O 69.9_ 69.3
21. Unit Capacity Factor (Using MDC Net)
                                                   .                     o                          70.4               66.7
22. Unit Cepecity Factor (Using DER Net) 0 67.6 62.4
23. Unit Forced Outage Rate 0 5.7 6.4
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date. sod Duration of Each):
                                                                                       ~ ""*'
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior io Commercial Operatiun): Forecast Arliioed INITIAL CRITICALITY --

INITI AL ELECTRICITY COMMERCIAL OPER ATION _

                                                                                        - _ _ , ,      _._m___

50-250 UNIT SHUTDOWNS AND POWER REDUCMONS DOCKET NO. UNIT NAME Turkey Point Unit #3-DATE s-Is-ss CORWLETED BY N. W_ r:ran t-REPORTMONDg April,1985 TELEPHONE (305) ss2-3675

                                                            -     E                             E 3g                "h j E~       Licensee     !*,          **,               Cause & Corrective

. N. . . Date c. "E E 4 255 Event *? g*1 6- Actism to

                                                                                                                                                           ^

4 j@ $ jgg Report

  • NC U Prevent Recurrence -

6 . 05 850330 S 719.0 C 1 R

                                                                                   ,C        FUELXX     Unit #3 remainded shutdown for refueling and scheduled maintenance.

I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S Scheduled A Equipment Failure (Explain) I .Manust for Preparation of Data B-Maintenance of Test 2-Manuel Scram. Entry Sheets for I.ieensee C-Refueling 3-Automatic Scram. Event Repor ILER) FileINUREG-D-Regulatory Restriction 9-Other (Explain) 0161) . I:-Operator Training & License Examination F-Administrative 9, ,, S G-Operatiemal Feri r IFsplainI s 4 A o A E nvca..cl Exhibit I- Same Source l's/77) Il-Other IE xplain)

s .,

                                   $UMMARY OF OPERATING EXPERIENCE DOCKET HO.         50-250 UNIT         Turkey Point Unit #3 DATE         May 15, 1985 COMPLETED BY           N. W. Grant TELEPHONE          (305) 552-3675 REPORT MONTH           April 1985 3
                - Unit #3 remainded shutdown for refueling and scheduled maintenance.

t 6 4

A\ LI; AC,L is All) UNil PO*t L Li vil DOCKET NO. 50-251 UNg, Turkey Potnt 4 DATE tiay 15,1985 N.W. Grant COMrLETED BY IILEPilONE (305)S52-3675 MONTH Anril . 1985 DAY AVERACE DAILY POWER LEVEL iMWe Net) 4/ 1/25 671 1/ 2/95 675 il 3/25 692 1/ i/95  !!3 il 5/2 ist 4/ Ut5 677 il 7/25 669 i/ !!!5 aat 4/ 9/25 667 1/10/95 679 t/11/95 ist i!!2/95 683 1/12/95 693 1/14/95 678 i!!!/95 677 4/lu!5 673 1/17/85 675 1/1!/85 677 4/19/85 Leo 4/:0/25 679 1/21/95 679 4/22/95 del 1/23/!5 age 1/24/85 679 4/25/25 678 I 4/26/25 610 1/27/85 369 1/22/95 372 1/29/95 m l 4/30/85 595 . i l 1

OPERATING DATA REPORT DOCKET NO ._ 50 '251 DATE . 5-15-8s COMPLETED BY N . W. Grant TELEPHONL (305) 552-3675 OPERATING STATUS Notes

1. Unit Name: TURKEY POINT UNIT #4 April 1985 Unit #4 Operated at
2. Reporting Period:

2200 essentially full power.

3. Licensed Thennel Power (MWI):

760 ~, 4. Nemeplate Rating (Gross MWe): , 693

5. Design Electrical Rating (Net MWe):

700

6. Maximum Dependable Capacity (Gross MWe):

666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasone
9. PowerlevelTo Which Restricted.lf Any(Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to-Date Cumulatise 719 2879 102460 II. Hours la Reporting Period 719 2622.1 72340.s

12. Number Of Hours Reactor Was Critical 0 a 0 '_ ' 166.6
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 719 r 2600.1 69840.3 0 0 31.2
15. Unit Reserve Shutdown 1(ours 1514004 5566053 147696159
16. Gross Thermal Energy Genersted (MWH)
17. Gross Electrical Energv Genersted (MWH) 485140 ,,, 1812195 47004592
18. Net Electrical Energy Generated (MWH) 461727 1723391 44506672 100.0 90.3 68.2
19. Unit Service Factor
20. Unit Availability Factor 100.0 90.3 68.2
                                                        .                   96.4                       89.9                 66.9
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 92.7 86.4 62.7
23. Unit Forced Outage Rate 0 8.8 6.2
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):

Refueling January 19A6 11 en 12 wonks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior Io Commercial Operation): Forecast Aihined INITIAL CRITICALITY _ _ _ _

INITIAL ELECTRICITY COMMERCIAL OPERATION ___

DOCKETNO. 50-251 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT MAME Turkey Point Unit #4 ' DATE s-Is-as CORWLETED BY N. W. Grant REPORT MONTH April, 1985 (30s) 552-3675 TELEPHONE

                                                                -_ ~5                               E jg        3       j E ~i*      Licensee     ,Ev,,      *'.                    Cause & Corrective N. i .       Date     o.     %?          (     .a j e        Event      uT          g*1 o-                           Actiim to f

4 j@ $ j f,, Report

  • N0 Prevent Recurrence 6 .

09 850426 S 0.0 H 5 'EB TRANSF Unit #4 reduced power to approximately 50% to work on auxilliary power modifications; then returned to full power operator. I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructitms S Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data R-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event ReporiILER1 File (NUREG-D Regularory Restriction @-Other (Explain) 0161) , 1: Operator Training & License Examination F Administrative M** O'****""#* 5 G Operational F rror (F splain) 6-_ 4 4. Asewc;,. .e# Exhibit I - Same Source (9/77) Il Other (Explaini

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Tufkey Point Unit #4 DATE May 15, 1985 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT I40 NTH April 1985 See the " Unit shutdowns and power reduction" report. O

AVLl5 AGE is All) LN1 POwlL Li vt 1 . DOCKET NO. 50-1M UNIT St. Lucie Unit 1 DATE May 15, 1985 COMPLETED BY N.W. Grant 11LErilONE (305)552-3675 April, 1985 MONTH DAY AVERAGE DAILY POWER LEVEL IMWe Net) 4/ 1/E5 o=4 1/ 2/95 sig 4/ 3/95 534 1/ i!!! o== 1/ 5/85 4/ L/25 fii o=3 4/ 7/85 R4 4/ */85 RT 4/ ?/95 R; 1/10/95 Ri 1/!!/25 R; 1/12/25 III 1/13/S5 Eli 4/11/95 M5 1/15/85 R4 i!!!/95 Ri i!!7/25 IE4 i!!!/25 E$ 1/2?/*5 3=1 1/20/25 Rn 1/22/95 5& 1/22/85 3}4 Ilo 1/22/85 4/2i/95 Il4 4/25/95 Els l 4/24/85 Eli l 1/27/85 Ils 1/29/25 iji 4/2?/25 ote l 1/30/95 Eig I i i I ( I l

OPERATING DATA REPORT DOCKET NO _50-335 DATE .5-15-85 COMPLETED BY N.W. Grant

  • TELEPHONL (305) 552-3675 OPERATING STATUS sT. wcIE InnT iti Notes
1. Unit Name:

April 1985 Unit #1 operated at

2. Reporting Period:

2700 essentially full power.

3. Licensed Thermal Power (MWI):

850 , 4. Nameplate Rating (Gross MWe): , 830

5. Design Electrical Rating (Net MWe):

867

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 827
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasone Item 7 revised due to increased plant efficiency.
9. Power I.svel To Which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to Date Cumulative 719 2879 73271

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 719 2875 51896.3
13. Reactor Reserve Shutdown Hours 0 .

01 205.3 719 - 2872 51605.5

14. Hours Generator On.Line 0 0 39.3
15. Unit Reserve Shutdown Qours
16. Gross Thermal Energy Generated (MWH) 1997520 7643834 129781370 644040_ 2555470 42414125
17. Gross Electrical Energy Generated (MWH) 611866 2427219 39989567
18. Net Electrical Energy Generated (MWH)'
19. Unit Service Factor 100.0 99.8 70.4
20. Unit Availability Factor 100.0 99.8 70.5
21. Unit Capacity Factor (Using MDC Net) - 102.9 102.4 68.8
22. Unit Capacity Factor (Using DER Net) 102.5 101.6 67.1
23. Unit Forced Outage Rate 0 2 4.5
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Acliined INITIAL CRITICALITY __

INITI AL ELECTRICITY COMMERCIAL OPER ATION __

DOCKET NO. 50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS st. Lucie Unit #1 UNIT NAME DATE 5-15-85 N. W. Want REPORT MM April' 1985 6 BY TEL.EPHONE (305) 552-3675

                                                     -_E                                e
                          --        .$ g        3    j E5        Licensee     Ev, g*1
                                                                                           ,               Cause & Corrective
  . No.          Date     {       3g           ji  .3 g 5       Event       y7        a.

EO A*'N" '" fE a jgg Report 8 mV g Prevent Reeverence - i 6 Unit #1 hac} no " Shutdowns or Pc 'er Reductions." 1 1 4 1 4 1 2 3 4 1: Forced Reason: Method: Exhibit G-Instructions S Scheduled A Equipment Failure (Emplain) 1-Manual for Preparation of Data R. Maintenance of Test 2 Manu 1 Scram. Entry Sheets for Liansee C Refueling 3 Automatic Scram. Event Report ILER) File (NUREG-D Regularory Restriction 3-01her (Explain) 01611 , I: Operator Training & Ucense Examination F. Administrative M~ O*d"""#" 5 G-Operational Frror ( F splain t s 4 4. Asewe.v..et Exhibit I - Same Source (9/77) Il-Ot her (E xplain t

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT st. Lucie Unit #1 DATE May 15, 1985 l COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH April 1985 Unit #1 operated at essentially full power and had no " Unit Shutdowns and Power Reductions." In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month. l l l I i l - l l l 4

l

                                                                                  \

AVLi' AC,[ (# All i tiNil POmi). LI vii 1 DOCKET NO. 50-389 UNil St. I ncio finit 2 May 15, 1985 DATE COMPLETED BY N.W. Grant 1TLErilONg (305)552-3676 MONTH April, 1985 DAY AVERAGE DAILY POWER LEVEL tMWe Net) 4/ 1/95 .2 il 2/85 .5 il ?./95 .i

                           '! 4/85           ."
                          "J 5/85            .5 1/ US5             ."
                          'l 7/25    *
                                           .37
                          '/
                           .   */'5        9%i
                         */ '/25           Bi" 1/10/85           si; i!!!/85 '

56 1/12/.5 EIk 4/17./85 EIT i/1*/*5 BIA

                        '/15/25           BIA i!!USS             BIA 4/1?/85            Mj 1/!'/25             ija 1/18/85             ed 4/20/25             64; i/21/25              Bih 1/22/95              55" i/27./es            Eib

( 4/21/*5 EE1 l 4/25/85 EEE 1/2U95 "Go 1/2?/25 j% i/2*./.*5 ag'X A/90ict

                      .'i .14..'iBE M

gg7 t

9 OPERATING DATA REPORT DOCKET NO 50-389 DATE . 5-15-85 COMPLETED BY N . W. Grant TELEPHONL (305) 552-3675 OPERATING STATUS ST. LucII: Unit #2 Note 5

1. Unit Name; April 1985 See the unit shutdowns and
2. Reporting Period:

2700 power reductions report.

3. Licensed Thennal Power (MWI):

850

4. Nameplate Rating (Gross MWe): ,

830

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

832 837

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I.ast Report, Give Reasone Items 5 and 7 revised due to increase in Licensed Thermal Power Item 5 to be revised further due to hich MDC.
9. Power Level To which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr to.Date Omnularise

11. Hours In Reporting Period 719 2879 15168
12. Number Of Hours Reactor Was Critical 539.1 2625.6 13231,8
13. Reactor Reserve Shutdown Hours 0 0 ,,,,,,,

o

14. Hours Generator On.Line 523.9 2579.9 __

12780.5 0 0 0

15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Genersted (MWH) 1289769 6557189 31915754
17. Gross Electrical Energy Generated (MWH) 431610 ,

2207050 10656750

18. Net Electrical Energy Generated (MWH),

406374 2088138 10050550

19. Unit Service Factor 72.9 89.6 84.3
20. Unit Availability Factor 72.9 89.6 84.3
21. Unit Capacity Factor (Using MDC Net) . 67.5 90.8 84.0
22. Unit Capacity Factor (Using DER Net) 68.1 89.5 82.3
23. Unit Forced Outage Rate 4.5 1.8 7.5
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status lPrior to Commercial Operation): Forecast Arliined INITIAL CRITICALITY _

INITI AL ELECTRICITY COMMERCIAL OPER ATION __

Sheet 1 of 2 , DOCKET NO. 50-3R9 UNIT SHUTDOWNS AND POWER REDUCTIONS st- I.ucie trn it #2 UNIT N AME . DATE 5-15-85 COMPLETED By N. W. Gran t-REPORT MONTy April, 1985 TELEPHONE (305) 552-1675

                                                 -    E                                a
                      --        .] g       3     y E5          Licensee     {w,          ,                Cause & Corrective

. No. Date i 3g i 2s& Event 3,7 mO g*d E

                                                                                                                ^    '"

H f5 5 jig Report a g Prevent Recurrence d . 03 850328 S 170.3 A 1 CB INSTRU Unit 2 went into a scheduled outage to inspect steam generator tubes associated with minor primary to secondary leakage indications. 04 850408 F 5.6 A 1 389-85-01 EB RELAYX A reactor trip occurred as a result of steam generator water level control during start up. All system functioned normally and the unit returned to power. 05 850408 F 6.8 A 1 389-85-02 EB RELAYX A reactor trip occurred when the 2A main feedwater block valve was opened which precipitated an equipment protective turbine trip on'high steam generator level. I 2 3 4 F: Forced Reason: . Method: Exhibit G. Instructions S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data R. Maintenance of Test 2 Manual 5 cram. Entry Sheets for Licensee C Refueling 3 Automatic Scram- Event Repor:1LER) File (NUREG-D Regulatory Restriction 9-Other (Explair.i 01611 , I: Operator Training & Ucense Examination F Administrative M ~ O * ** ** ""#" 5 G Operational Frror (Fsplain) c . 4 o Asewc.w.cf Exhibit I . Same Source (9/77) Il-Ot her ( Exp!aini

Sheet 2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS T O. t eie Unit #2 , DATE 5-15-85 COMPLETED BY N. W. Grant REPORT MONTH April, 1985 TELEPff0NE (305) 552-3675

                                                                                                                                                     ":.:                              c
                                                                                                                 --        jg        3         *I5           Licensee       E*,        Evt                  Cause & Corrective E.

2s& T E Action to

                                                                                                                                                                                      }l
   .                                                                            No.                       Date              ;2         Q                      Event                                                                                                           -

4 j@ @ jgg Report a N0 O Prevent Recurrence - 6 , 06 950417 F 8.8 A 2 389-85-03 HA VALVEX Operators manually tripped the reactor following the closure of two turbine intercept valves. The valves were returned to service and the unit came back on line. 07 850417 F 3.4 A 3 389-85-04 CH _INSTRU Soon after coming on .line from the above outage a reactor trip occurred due to high steam generator level. The unit then returned to full operation. 08 850426 F 0.0 B 5 CH PUMPXX Power reduced to 50% for modification of condensate pumps. I 2 3 4 F: Forced Reason: . Method: Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) l-Manual Inr Preparation of Data R-Maintenance of Test 2-Manual Sctsm. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Repor ILER) FileINUREG. D. Regulatory Restriction 9-Oiher (Explain) 01611 , I.~-Operator Training & Ucense Examination F-Administrative b O*** *

  • 5 G-Operational Frror IFxplain) 4- . /..a Asevca..,# Exhibit I Same Source 19/77) Il Other IExplain)

sus @lARY OF OPERATING EXPERIEMCE DOCKET NO. 50-389 , UNIT St. Lucie Unit'#2 DATE May 15, 1985 COMPLETED BY N. W.: Grant TELEPHONE (305) 552-3675 REPORT tiONTH April 1985 See the " Unit Shutdowns and Power Reductions" Report. In accordance with requirements of Technical Specification 6.9.1.6 there t were no challenges to PORV'or safety valves during the report month, i i w t t

                                                                         ~

FLORIDA POWER & LIGHT COMPANY May 15,1985 L-85-198 Director, Office of Resource Management U. S. Nuclear Regulatorf Commission Washington, D. C. 20555

Dear Sir:

Attached are the April 1985 Operating Status Reports and Operating Summary , Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2. Very truly yours, g 3. W. Williams, Jr. Group Vice President Nuclear Energy 3WW/NWG/js Attachment cc: Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-203g l l> ffb i I t PEOPLE. . SERVING PEOPLE l .- .. .

                                                                                                            . -}}