L-85-189, Monthly Operating Repts for Apr 1985
ML20129G414 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point, 05000000 |
Issue date: | 04/30/1985 |
From: | Grant N, Williams J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
References | |
CON-L-85-189 L-85-198, NUDOCS 8507180048 | |
Download: ML20129G414 (18) | |
Text
{{#Wiki_filter:' + , AVLl; AGE is All) UNil P(iwi F. Li vi t DOCKET NO. 50 94n UNil Turkey Point 3 DATE May 15, 1985 N.W. Grant COMPLETED BY TELEPilONE (3051562-3675 April, 1985 MONTH DAY AVERACE DAILY POWER LEVEL (MWe Net) 1/ !!S5 -12 1/ 2/85 -4 1/ 3/25 - 1/ i/85 4' 1/ 5/95 4 1/ 6/*5 5 1/ 7/25 -2 4/ S/85 -2 1/ ?/95 ' 1/10!'5 4 1/11/*5 4 1/12/*5 5 1/13/*5 4 1/14/85 4 i!!!/85 -2, ill6/n 1/17/25 I 1/1'/85 I 4/19/85 -i i/20/25 -1 i/21/95 -1 1/22/25 i 1/23/25 4/21/'5
-i i 1/25/85 -i 1/26/85 -9 1/27/25 -i 4/28/95 -*
1/29/** -{ 4/30/55 -1
$f1S$0c$
a NN J,. [ d ,/ 7
OPERATING DATA REPORT DOCKET NO 5_0-250 DATE . 5-15-85 COMPLETED BY N.W. Grant TELEPHONL (305) 552-3675 Oe'ERATING STATUS TURKEY POINT UNIT #3 Notes April 1985 Unit 3 Remained out of
- 2. Reporting Period:
2200 service for refueling and
- 3. Licensed Thermal Power (MWI):
760 scheduled maintenance. 7 4. Nesnepiste Rating (Gross MWe): S. Design Electrical Reting (Net MWe): 700
- 6. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report Give Reasone
- 9. Power Level To Which Restricted lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to Date Onnulative II. Hours in Reporting Period 719 2879 108728.6
- 12. Number Of Hours Reactor Was Critical 0 2057.1 75729.9
- 13. Reactor Reserve Shutdown Hours 0 . Oy 844.4
- 14. Hours Generator On.Line 0 2011.6 75190.7 0 O_ 121.8
- 15. Unit Reserve Shutdown Qours 0 4308366
- 16. Gross Thermal Energy Generated (MWH) 155437877
- 17. Gross Electrical Energy Generated (MWH) 0._. 1421925 49677620
-2076 1348962 47046168
- 18. Net Electrical Energy Generated (MWH)"
O 69.9 69.2
- 19. Unit Service Factor
- 20. Unit Availability Factor O 69.9_ 69.3
- 21. Unit Capacity Factor (Using MDC Net)
. o 70.4 66.7
- 22. Unit Cepecity Factor (Using DER Net) 0 67.6 62.4
- 23. Unit Forced Outage Rate 0 5.7 6.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date. sod Duration of Each):
~ ""*'
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior io Commercial Operatiun): Forecast Arliioed INITIAL CRITICALITY --
INITI AL ELECTRICITY COMMERCIAL OPER ATION _
- _ _ , , _._m___
50-250 UNIT SHUTDOWNS AND POWER REDUCMONS DOCKET NO. UNIT NAME Turkey Point Unit #3-DATE s-Is-ss CORWLETED BY N. W_ r:ran t-REPORTMONDg April,1985 TELEPHONE (305) ss2-3675
- E E 3g "h j E~ Licensee !*, **, Cause & Corrective
. N. . . Date c. "E E 4 255 Event *? g*1 6- Actism to
^
4 j@ $ jgg Report
- NC U Prevent Recurrence -
6 . 05 850330 S 719.0 C 1 R
,C FUELXX Unit #3 remainded shutdown for refueling and scheduled maintenance.
I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S Scheduled A Equipment Failure (Explain) I .Manust for Preparation of Data B-Maintenance of Test 2-Manuel Scram. Entry Sheets for I.ieensee C-Refueling 3-Automatic Scram. Event Repor ILER) FileINUREG-D-Regulatory Restriction 9-Other (Explain) 0161) . I:-Operator Training & License Examination F-Administrative 9, ,, S G-Operatiemal Feri r IFsplainI s 4 A o A E nvca..cl Exhibit I- Same Source l's/77) Il-Other IE xplain)
s .,
$UMMARY OF OPERATING EXPERIENCE DOCKET HO. 50-250 UNIT Turkey Point Unit #3 DATE May 15, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH April 1985 3 - Unit #3 remainded shutdown for refueling and scheduled maintenance.
t 6 4
A\ LI; AC,L is All) UNil PO*t L Li vil DOCKET NO. 50-251 UNg, Turkey Potnt 4 DATE tiay 15,1985 N.W. Grant COMrLETED BY IILEPilONE (305)S52-3675 MONTH Anril . 1985 DAY AVERACE DAILY POWER LEVEL iMWe Net) 4/ 1/25 671 1/ 2/95 675 il 3/25 692 1/ i/95 !!3 il 5/2 ist 4/ Ut5 677 il 7/25 669 i/ !!!5 aat 4/ 9/25 667 1/10/95 679 t/11/95 ist i!!2/95 683 1/12/95 693 1/14/95 678 i!!!/95 677 4/lu!5 673 1/17/85 675 1/1!/85 677 4/19/85 Leo 4/:0/25 679 1/21/95 679 4/22/95 del 1/23/!5 age 1/24/85 679 4/25/25 678 I 4/26/25 610 1/27/85 369 1/22/95 372 1/29/95 m l 4/30/85 595 . i l 1
OPERATING DATA REPORT DOCKET NO ._ 50 '251 DATE . 5-15-8s COMPLETED BY N . W. Grant TELEPHONL (305) 552-3675 OPERATING STATUS Notes
- 1. Unit Name: TURKEY POINT UNIT #4 April 1985 Unit #4 Operated at
- 2. Reporting Period:
2200 essentially full power.
- 3. Licensed Thennel Power (MWI):
760 ~, 4. Nemeplate Rating (Gross MWe): , 693
- 5. Design Electrical Rating (Net MWe):
700
- 6. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasone
- 9. PowerlevelTo Which Restricted.lf Any(Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to-Date Cumulatise 719 2879 102460 II. Hours la Reporting Period 719 2622.1 72340.s
- 12. Number Of Hours Reactor Was Critical 0 a 0 '_ ' 166.6
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 719 r 2600.1 69840.3 0 0 31.2
- 15. Unit Reserve Shutdown 1(ours 1514004 5566053 147696159
- 16. Gross Thermal Energy Genersted (MWH)
- 17. Gross Electrical Energv Genersted (MWH) 485140 ,,, 1812195 47004592
- 18. Net Electrical Energy Generated (MWH) 461727 1723391 44506672 100.0 90.3 68.2
- 19. Unit Service Factor
- 20. Unit Availability Factor 100.0 90.3 68.2
. 96.4 89.9 66.9
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 92.7 86.4 62.7
- 23. Unit Forced Outage Rate 0 8.8 6.2
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
Refueling January 19A6 11 en 12 wonks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior Io Commercial Operation): Forecast Aihined INITIAL CRITICALITY _ _ _ _
INITIAL ELECTRICITY COMMERCIAL OPERATION ___
DOCKETNO. 50-251 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT MAME Turkey Point Unit #4 ' DATE s-Is-as CORWLETED BY N. W. Grant REPORT MONTH April, 1985 (30s) 552-3675 TELEPHONE
-_ ~5 E jg 3 j E ~i* Licensee ,Ev,, *'. Cause & Corrective N. i . Date o. %? ( .a j e Event uT g*1 o- Actiim to f
4 j@ $ j f,, Report
- N0 Prevent Recurrence 6 .
09 850426 S 0.0 H 5 'EB TRANSF Unit #4 reduced power to approximately 50% to work on auxilliary power modifications; then returned to full power operator. I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructitms S Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data R-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event ReporiILER1 File (NUREG-D Regularory Restriction @-Other (Explain) 0161) , 1: Operator Training & License Examination F Administrative M** O'****""#* 5 G Operational F rror (F splain) 6-_ 4 4. Asewc;,. .e# Exhibit I - Same Source (9/77) Il Other (Explaini
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Tufkey Point Unit #4 DATE May 15, 1985 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT I40 NTH April 1985 See the " Unit shutdowns and power reduction" report. O
AVLl5 AGE is All) LN1 POwlL Li vt 1 . DOCKET NO. 50-1M UNIT St. Lucie Unit 1 DATE May 15, 1985 COMPLETED BY N.W. Grant 11LErilONE (305)552-3675 April, 1985 MONTH DAY AVERAGE DAILY POWER LEVEL IMWe Net) 4/ 1/E5 o=4 1/ 2/95 sig 4/ 3/95 534 1/ i!!! o== 1/ 5/85 4/ L/25 fii o=3 4/ 7/85 R4 4/ */85 RT 4/ ?/95 R; 1/10/95 Ri 1/!!/25 R; 1/12/25 III 1/13/S5 Eli 4/11/95 M5 1/15/85 R4 i!!!/95 Ri i!!7/25 IE4 i!!!/25 E$ 1/2?/*5 3=1 1/20/25 Rn 1/22/95 5& 1/22/85 3}4 Ilo 1/22/85 4/2i/95 Il4 4/25/95 Els l 4/24/85 Eli l 1/27/85 Ils 1/29/25 iji 4/2?/25 ote l 1/30/95 Eig I i i I ( I l
OPERATING DATA REPORT DOCKET NO _50-335 DATE .5-15-85 COMPLETED BY N.W. Grant
- TELEPHONL (305) 552-3675 OPERATING STATUS sT. wcIE InnT iti Notes
- 1. Unit Name:
April 1985 Unit #1 operated at
- 2. Reporting Period:
2700 essentially full power.
- 3. Licensed Thermal Power (MWI):
850 , 4. Nameplate Rating (Gross MWe): , 830
- 5. Design Electrical Rating (Net MWe):
867
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe): 827
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasone Item 7 revised due to increased plant efficiency.
- 9. Power I.svel To Which Restricted,lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to Date Cumulative 719 2879 73271
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 719 2875 51896.3
- 13. Reactor Reserve Shutdown Hours 0 .
01 205.3 719 - 2872 51605.5
- 14. Hours Generator On.Line 0 0 39.3
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWH) 1997520 7643834 129781370 644040_ 2555470 42414125
- 17. Gross Electrical Energy Generated (MWH) 611866 2427219 39989567
- 18. Net Electrical Energy Generated (MWH)'
- 19. Unit Service Factor 100.0 99.8 70.4
- 20. Unit Availability Factor 100.0 99.8 70.5
- 21. Unit Capacity Factor (Using MDC Net) - 102.9 102.4 68.8
- 22. Unit Capacity Factor (Using DER Net) 102.5 101.6 67.1
- 23. Unit Forced Outage Rate 0 2 4.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Acliined INITIAL CRITICALITY __
INITI AL ELECTRICITY COMMERCIAL OPER ATION __
DOCKET NO. 50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS st. Lucie Unit #1 UNIT NAME DATE 5-15-85 N. W. Want REPORT MM April' 1985 6 BY TEL.EPHONE (305) 552-3675
-_E e -- .$ g 3 j E5 Licensee Ev, g*1 , Cause & Corrective . No. Date { 3g ji .3 g 5 Event y7 a.
EO A*'N" '" fE a jgg Report 8 mV g Prevent Reeverence - i 6 Unit #1 hac} no " Shutdowns or Pc 'er Reductions." 1 1 4 1 4 1 2 3 4 1: Forced Reason: Method: Exhibit G-Instructions S Scheduled A Equipment Failure (Emplain) 1-Manual for Preparation of Data R. Maintenance of Test 2 Manu 1 Scram. Entry Sheets for Liansee C Refueling 3 Automatic Scram. Event Report ILER) File (NUREG-D Regularory Restriction 3-01her (Explain) 01611 , I: Operator Training & Ucense Examination F. Administrative M~ O*d"""#" 5 G-Operational Frror ( F splain t s 4 4. Asewe.v..et Exhibit I - Same Source (9/77) Il-Ot her (E xplain t
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT st. Lucie Unit #1 DATE May 15, 1985 l COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH April 1985 Unit #1 operated at essentially full power and had no " Unit Shutdowns and Power Reductions." In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month. l l l I i l - l l l 4
l
\
AVLi' AC,[ (# All i tiNil POmi). LI vii 1 DOCKET NO. 50-389 UNil St. I ncio finit 2 May 15, 1985 DATE COMPLETED BY N.W. Grant 1TLErilONg (305)552-3676 MONTH April, 1985 DAY AVERAGE DAILY POWER LEVEL tMWe Net) 4/ 1/95 .2 il 2/85 .5 il ?./95 .i
'! 4/85 ." "J 5/85 .5 1/ US5 ." 'l 7/25 * .37 '/ . */'5 9%i */ '/25 Bi" 1/10/85 si; i!!!/85 '
56 1/12/.5 EIk 4/17./85 EIT i/1*/*5 BIA
'/15/25 BIA i!!USS BIA 4/1?/85 Mj 1/!'/25 ija 1/18/85 ed 4/20/25 64; i/21/25 Bih 1/22/95 55" i/27./es Eib
( 4/21/*5 EE1 l 4/25/85 EEE 1/2U95 "Go 1/2?/25 j% i/2*./.*5 ag'X A/90ict
.'i .14..'iBE M
gg7 t
9 OPERATING DATA REPORT DOCKET NO 50-389 DATE . 5-15-85 COMPLETED BY N . W. Grant TELEPHONL (305) 552-3675 OPERATING STATUS ST. LucII: Unit #2 Note 5
- 1. Unit Name; April 1985 See the unit shutdowns and
- 2. Reporting Period:
2700 power reductions report.
- 3. Licensed Thennal Power (MWI):
850
- 4. Nameplate Rating (Gross MWe): ,
830
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
832 837
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I.ast Report, Give Reasone Items 5 and 7 revised due to increase in Licensed Thermal Power Item 5 to be revised further due to hich MDC.
- 9. Power Level To which Restricted,lf Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr to.Date Omnularise
- 11. Hours In Reporting Period 719 2879 15168
- 12. Number Of Hours Reactor Was Critical 539.1 2625.6 13231,8
- 13. Reactor Reserve Shutdown Hours 0 0 ,,,,,,,
o
- 14. Hours Generator On.Line 523.9 2579.9 __
12780.5 0 0 0
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Genersted (MWH) 1289769 6557189 31915754
- 17. Gross Electrical Energy Generated (MWH) 431610 ,
2207050 10656750
- 18. Net Electrical Energy Generated (MWH),
406374 2088138 10050550
- 19. Unit Service Factor 72.9 89.6 84.3
- 20. Unit Availability Factor 72.9 89.6 84.3
- 21. Unit Capacity Factor (Using MDC Net) . 67.5 90.8 84.0
- 22. Unit Capacity Factor (Using DER Net) 68.1 89.5 82.3
- 23. Unit Forced Outage Rate 4.5 1.8 7.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status lPrior to Commercial Operation): Forecast Arliined INITIAL CRITICALITY _
INITI AL ELECTRICITY COMMERCIAL OPER ATION __
Sheet 1 of 2 , DOCKET NO. 50-3R9 UNIT SHUTDOWNS AND POWER REDUCTIONS st- I.ucie trn it #2 UNIT N AME . DATE 5-15-85 COMPLETED By N. W. Gran t-REPORT MONTy April, 1985 TELEPHONE (305) 552-1675
- E a -- .] g 3 y E5 Licensee {w, , Cause & Corrective
. No. Date i 3g i 2s& Event 3,7 mO g*d E
^ '"
H f5 5 jig Report a g Prevent Recurrence d . 03 850328 S 170.3 A 1 CB INSTRU Unit 2 went into a scheduled outage to inspect steam generator tubes associated with minor primary to secondary leakage indications. 04 850408 F 5.6 A 1 389-85-01 EB RELAYX A reactor trip occurred as a result of steam generator water level control during start up. All system functioned normally and the unit returned to power. 05 850408 F 6.8 A 1 389-85-02 EB RELAYX A reactor trip occurred when the 2A main feedwater block valve was opened which precipitated an equipment protective turbine trip on'high steam generator level. I 2 3 4 F: Forced Reason: . Method: Exhibit G. Instructions S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data R. Maintenance of Test 2 Manual 5 cram. Entry Sheets for Licensee C Refueling 3 Automatic Scram- Event Repor:1LER) File (NUREG-D Regulatory Restriction 9-Other (Explair.i 01611 , I: Operator Training & Ucense Examination F Administrative M ~ O * ** ** ""#" 5 G Operational Frror (Fsplain) c . 4 o Asewc.w.cf Exhibit I . Same Source (9/77) Il-Ot her ( Exp!aini
Sheet 2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS T O. t eie Unit #2 , DATE 5-15-85 COMPLETED BY N. W. Grant REPORT MONTH April, 1985 TELEPff0NE (305) 552-3675
":.: c -- jg 3 *I5 Licensee E*, Evt Cause & Corrective E.
2s& T E Action to
}l . No. Date ;2 Q Event -
4 j@ @ jgg Report a N0 O Prevent Recurrence - 6 , 06 950417 F 8.8 A 2 389-85-03 HA VALVEX Operators manually tripped the reactor following the closure of two turbine intercept valves. The valves were returned to service and the unit came back on line. 07 850417 F 3.4 A 3 389-85-04 CH _INSTRU Soon after coming on .line from the above outage a reactor trip occurred due to high steam generator level. The unit then returned to full operation. 08 850426 F 0.0 B 5 CH PUMPXX Power reduced to 50% for modification of condensate pumps. I 2 3 4 F: Forced Reason: . Method: Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) l-Manual Inr Preparation of Data R-Maintenance of Test 2-Manual Sctsm. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Repor ILER) FileINUREG. D. Regulatory Restriction 9-Oiher (Explain) 01611 , I.~-Operator Training & Ucense Examination F-Administrative b O*** *
- 5 G-Operational Frror IFxplain) 4- . /..a Asevca..,# Exhibit I Same Source 19/77) Il Other IExplain)
sus @lARY OF OPERATING EXPERIEMCE DOCKET NO. 50-389 , UNIT St. Lucie Unit'#2 DATE May 15, 1985 COMPLETED BY N. W.: Grant TELEPHONE (305) 552-3675 REPORT tiONTH April 1985 See the " Unit Shutdowns and Power Reductions" Report. In accordance with requirements of Technical Specification 6.9.1.6 there t were no challenges to PORV'or safety valves during the report month, i i w t t
~
FLORIDA POWER & LIGHT COMPANY May 15,1985 L-85-198 Director, Office of Resource Management U. S. Nuclear Regulatorf Commission Washington, D. C. 20555
Dear Sir:
Attached are the April 1985 Operating Status Reports and Operating Summary , Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2. Very truly yours, g 3. W. Williams, Jr. Group Vice President Nuclear Energy 3WW/NWG/js Attachment cc: Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-203g l l> ffb i I t PEOPLE. . SERVING PEOPLE l .- .. .
. -}}