AVLn AGE in Alli UNil POwlL LI VI.t DOCKETNO.

50 N UNIT Turkey Point 3 4-15-85 DATE II.W. Grant COMPLETED BY TELENIONE (3051552-3675 MONTH -

MARCH 1985 DAY AVERAGE DAILY POWER LEVEL (MWe Net) a-3/ 1/95 676 3/ 2/85 678 3/ 3/05 684 3/ 4/85 685 3/ 5/85 685 3/ 6/85 683

/ 8/

6 3/ 9/85 689 3/10/85 684 3/11/85 680 3/12/85 680 3/13/83 652 3/14/85 599 3/15/85 665 3/16/85 12 3/17/85 181 3/18/85 679 3/19/85 681 3/20/85 693 3/21/85 694 3/22/85 695 3/23/85 689 3/24/85 690 3/25/85 688 3/26/85 687 3/27/85 689 3/28/85 688 3/29/85 685 3/30/85 580 3/31/85

-17

OPERATING DATA REPORT DOCKET NO =50*250 DATE. 4-15-8S COMPLETED BY N.W. Grant TELEPHONL (305)S52-3675 OPERATING STATUS Turkey Point Unit #3 Note 5

1. U d Ne w March 1985 See the Unit Shutdowns and
2. Reporting Period:

2200 Power Reductions Report.

3. Licensed Thermal Power (MWI):

/60

4. Nenepiste Rating (Gross MWe):

693

5. Design Electrical Reting (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 666
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasone
9. Power Lavel To Which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr to Date Cumulatise 744 2,160 108,009.6

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 6R6 7 2,057.1 75.729.9 0

844.4

13. Resetor Reserve Shutdown Hours 0

681.1 2,011.5""

75,190.7

14. Hours Generator On.Line 0

0 121.8

15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 1,468,951 4,308,366 155.437.877
17. Gross Electrical Energy Genersled (MWH) 483,545,,,

1.421,925 49,677,620 459,224 1.351,038 47,048,244

18. Net Electrical Energy Generated (MWH),

91.5 93.1 69.6

19. Unit Service Factor
20. Unit Availability Factor 91.5 93.1 69.7 92.7 93.9 67.1,
21. Unit Capecity Factor (Using MDC Ne )

89.1 90.3 62.9

22. Unit Capacity Factor (Using DER Net) 5.1 5.7 6.4
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Dete.snd Duration of Each):

Mid-June 1985

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Art ined INITI AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION

WIT SWN AW N REmmS AME r

Point Unit #3' DATE 4-15-86 March 1985 COMPLETED BY "A

G"""*

REPORT MONTH TELEPHONE (305)552-3675

~

E e

jg 3

j E~

Licensee

,E

  • g*,

Cause & Corrective N..

Date E.

2 4

2s&

Event ay a.1 Action to jU 4

j@

s jgg Repor

  • iN G Prevent Reeverence 6

04 850316 F

36.4 A

1 SB HTEXCH Unit 3 was shutdown to repair the 3C containment cooler. The unit then returned to power operation.

05 850330 S

26.5 C

1 RC FUELXX Unit #3 was shutdown for refueling and scheduled mainten.ance.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S. Scheduled A-Eauipment Failure (Emplain) 1-Manust Int Preparation of Data B-Maintenance of Test 2-Manusi Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report iLER1 File (NUREG-D-Regularory Restrictiim Q-Oiher IExplain) 01611 1:-Operator Training A Ucerse Examination 9,

5 F-Administrative CrOperati. mal Feror (Fiplain) 4_ 4 4.

hw.,#

Exhibit I - Same Sourec

('8/77) 11-01her (Explain)

~

r:

I

SUMMARY

OF OPERATING EXPERIENCS

}s

-- 9 DOCKET NO.

50-250 Turkey Point Unit #3 UNIT DATE April 15, 1985

' COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT I40 NTH March 1985 See the " Unit Shutdowns and Power Reductions" report.

I f

k

('

ck f

a I

A\\ 1.II AGE 18 Alli UNil PObi). LI Vi t DOCKETNO. 50-251 UNil. Turkey Point 4 DATE 4-15-R6 N.W.Gran t COMPLETED BY (305)S52-3675 l

.g.ELErilONE tiarch 1985 MONTH DAY AVERAGE DAILY POWER LEVEL

^

P (MWe Net) l l

3/ 1/95 674 3/ 2/85 476 3/ 3/85 679 3/ 4/85 680 3/ 5/85 680 3/ 6/85 680 3/ 7/85 683 3/ 8/85 684 3/ 9/85 683 3/10/85 680 3/11/95 679 3/12/85 675 3/13/95 675 3/14/85 6 72 3/15/85 672 3/16/85 671 3/17/85 680 3/18/85 607 3/19/85

-22 l

3/20/85 516 L

3/21/85 683 3/22/85 687 3/23/85 683 3/24/85 682 3/25/85 633 3/26/85 522 3/27/85 635 3/28/85 685 l

3/29/85 684 3/30/85 679 3/31/85 675

OPERATING DATA REPORT DOCKET NO 50_-281 DATE 4-15-85 COMPLETED BY N.W. Grant TELEPHONL (305)S52-3675 OPERATING STATUS TURKEY POINT UNIT #4 Notes I. Unit Name:

See the Unit Shutdowns and March 1985

2. Reporting Period:

Power Reductions Report.

2

3. Licensed Thermal Power (MWI):
4. Namepiste Rating (Gross MWe):

693

5. Design Electrical Reting (Net MWe):

700

6. Maximum Dependable Capscity (Gross MWe):

666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasone
9. PowerlevelTo Which Restricted If Any(Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr.-to-Date Cinnulative 744 2,160 101.741 II. Hours in Reporting Period

12. Number Of Hours Resetor Was Critical 722.2 1,903.1 71,621.5 0

0 i

  • 166.6
13. Reactor Reserve Shutdown Hours L

I4. Hours Generator On Line 713.3 11881.1 69.121.3 0

0 31.2

15. Unit Reserve Shutdown Kours
16. Gross Thermal Energy Generated (MWH)

_ 1.533.584 4,052,049

,146,182,155

17. Gross Electrical Energy Generated (MWH) 503,495 1,327,055 46,519,452 479,313 1,261,664 44,044,945
18. Net Electrical Energy Generated (MWH)'

95.9 87.1 67.9

19. Unit Service Factor 95.9 87.1 66.0
20. Unit Availability Factor 96.7 87.7 66.7
21. Unit Capacity Factor (Using MDC Net) 93.0 62.5
22. Unit Capacity Factor (Using DER Net) 84.3 0.5 11.8 6.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.snd Duration of Each):

Refueling October 1985, 10 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiaed INITlAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Turkev Point Unit #4 DATE 4-15-85 REPORT MONTH liarch 1985 COMPLETED BY N X Gnne TELEPHONE (305)552-3675 5

c j E3 Licensee

,Eg g *"',

jg Cause & Corrective N..

Date E

2 4

2s&

Event u7 6.

Action to jS 4

j@

5 jgg Report sr iE G Prevent Reeverence c5 07 850319 S

26.8 B

1 CB INSTRU Unit 4 had a brief scheduled outage to investigate and repair RCP oil level instrumentation and to evaluate RCP vibration. The uni't was then returned to power operation.

08 850326 F

3.9 B

1 HA SUP0RT Unit 4 was shutdown to investigate high vibration on turbine exciter ductwork. The ductwork was braced and the unit returned to power operation.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructisms S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manus 1 Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Repor: ILER1 File INUREG-D Regulatory Restriction

@-Other (Explain) 0I61)

E-Operator Training & Ucense Examination p

5 F-Administrative G-Operational Feror (Fiplain) 4 4

4.

h,..,#

Eshibit I-Same Source t9/77) li-Ot her (Explain)

SUMMARY

OF OPERATING I'GERIENCE DOCKET NO.

50-251 UNIT Turkey Point Unit i 4 April 15, 1985 DATE N. W. Grant COMPLETED BY TELEPHONE (305)552-3675 REPORT ttONTH March 1985 See the " Unit shutdowns and power reduction" report.

\\

i i

)

4

AVLIE AGE is411 ) L;Ni1 PCewt p. L; vg g DOCKET NO.

50 114 UNIT St. Lucie Unit 1 DATE 4-15-85 ll.W. Grant COMPLETED 5Y (305)S52-3675 TELENIONE flarch 1985 MONTH DAY AVERAGE DAILY POWER LEVEL.

IMWe Net) 3/ 1/85 849 3/ 2/85 849 3/ 3/85 851 3/ 4/85 850 3/ 5/85 848 3/ 6/85 848 3/ 7/85 445 3/ 8/85 831 3/ 9/85 849 3/10/85 850 3/11/85 848 3/12/85 852 3/13/85 851 3/14/85 851 3/15/85 850 3/16/85 849 3/17/85 851 3/18/85 852 3/19/85 854 3/20/85 854 3/21/85 854 3/22/85 852 3/23/85 851 3/24/85 852 3/25/85 852 3/26/85 851 3/27/85 852 3/28/85 853 3/29/85 854 3/30/85 854 3/31/95 853 1

1

OPERATING DATA REPORT DOCKET NO 5D-335 DATF 4-15-85 COMPLETED BY N.W. Grant TELEPHONL 305-552-395 OPERATING STATUS N

3. Unit Name:

ST. LUCIE UNIT #1 Se the Unit Shutdowns and March 1985

2. Reporting Period:

Power Reductions Report 2700

3. Licensed Thermal Power (MWt):

0 i

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

8

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasone
9. Power level To Which Restricted.If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr to.Date finnulative 744 2,160 72,552 II. Hours in Reporting Period

12. Number Of Hours Reactor Was Critical 740.o 2,156 51,177.3 O__

'205.3

13. Reactor Reserve Shutdown Hours 0

737.0 2,153 50,886.5

14. Hours Generator On.Line 0

0 39.3

15. Unit Reserve Shutdown l{ours
16. Gross Thermal Energy Generated (MWH) 1,964,733 5.716,314 127,853,850
17. Gross Electrical Energy Genersled (MWH) 6s6.070,_,

1,911,430 41,770,085 622.934 1,815,353 39,377,701

18. Net Electrics 1 Energy Generated (MWH)'

99.1 99.7 70.1

19. Unit Service Factor 99.1 99.7 70.2
20. Unit Availability Factor 101.9 102,2 68.4
21. Unit Capacity Factor (Using MDC Net) 100.9 101.3 66.8
22. Unit Capacity Factor (Using DER Net)

.9

.3 4.6

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior io Commercial Operation):

Forecast Ai hioed O

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION

-n-r

,n,--

~

DOCKET NO. 50-1%

UNIT SHUTDOWNS AND POWER REDUCTIONS St. Lucle Unit #1 UNIT NAME

  • -AD-DD DATE a.N. urant.

11 arch 1985 COMPLETED BY REPORT MONTH TELEPHONE (305)552-3675 E

E

.! ?

3 yI3 Licensee

,Eg g *,

Cause A Corrective No.

Date

{

3g

(

jgy Event u7 El Action to jO c3 5 5

j5g Report 8r NO Prevent Reentrence c5 01 850307-F 7.0 B

1 335-85-003 Z2 ZZZZZZ During performance of a routine reactor protective system logic matrix test, an operator performing the test inadvertently turned a test switch to an incorrect position thus causing the reactor to trip. The unit then returned to power operation.

I 2

3 4

f: Forced Reason:

Method:

Exhibit G. instructions 5 Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B. Maintenance or Test 2 Manus 1 Screm.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report iLER) File (NUREG.

D Regulatory Restriction

@-Other (Explain 1 0t611 1: Operator Training & License Examination 9,

5 F Administrative G-Operational Feror (F splain) 4.

4 e a o A ss w.v..,#

Eshibit I - Same Source (9/77) 11-Other i Explain)

l SU31 MARY OF OPERATING EXPERIENCE DOCKET NO.

50-335 UNIT St. Lucie Unit #1 April 15,1985 DATE N.

rant COMPLETED BY TELEPHONE (305) 552-3675 REPORT 140 NTH March 1985

Unit #1 operated at essentially full power except as noted on " Unit Shutdowns and Power Reductions" report.

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges'to PORY or safety valves during the report month.

1 a

,-w-v,-

AVLl5 AG[ 17411 ) (N1 POwl), ti yj g DOCKET NO. 50-389 UNIT St. I ucio sungs 2 DATE 4-15-85 N.W. Grant COMPLETED BY TELEPilONt (305)552-3676 llarch'1985 MONTH DAY AVERAGE DAILY POWER LEVEL IMWe Net) 3/ 1/85 817 3/ 2/85 836 3/ 3/85 859 3/ 4/85 854 3/ 5/85 859 3/ 6/85 859 3/ 7/85 860 3/ 8/85 861 3/ 9/85 860 3/10/85 861 3/11/85 834 3/12/85 791 3/13/85 799 3/14/85 821 3/15/85 857 3/16/85 290 3/17/85 854 3/18/85 857 3/19/85 E59 3/20/85 860 3/21/85 858 3/22/85 858 4

3/23/85 859 3/24/85 859 3/25/85 858 3/26/85 859 l

3/27/85 858 3/28/85 749 3/29/85

-15 3/30/85

-5 3/31/85

-3

A OPERATING DATA RLPORT 50-389 DOCKET NO F15-85 DATE COMPLETED BY N.W. Grant TELEPHONL (305)S52-3675 OPERATING STATUS ST. LUCIE UNIT #2 Notes

1. Unit Name:

March 1985 See the Unit Shutdowns and

2. Reporting resiod:

2560 Power Reductions Report.

3. Licensed Thermal Power (MWI):
4. Namepiste kating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I.ast Report, Give Reasone Items 5,6. and 7 being revised in accordance with recent approval of increased rated thermal power.
9. Power Level To Which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr.-to-Date Cumulatise 744 2,160 14,449

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 670.5 2,086.5 12,692.7 0

O; 0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 661.2 2,056 12,256.6.

0 0

0

15. Unit Reserve Shutdown Qours 1,740,672 5,267,420 30,625,985
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energv Generated (MWH) 584,310,_,

1,775,440 10,225,140 553,710 1,681,764 9,644,176

18. Net Electrical Energy Generated (MWH),

88.9 95.2 84.8

19. Unit Service Factor 88.9 95.2 84.8
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net).

M.(

99.1 84.9 92.6 96.8 83.0

22. Unit Capacity Factor (Using DER Net) 0 1.0 7.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

April 8, 1985 (actual)

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecas Achined INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION

50-389 N NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS dr.. Lucie Unit #2 UNIT NAME DATE 4-15-85 March 1985 COMPLEED BY N1 Pso n t REPORT MONTH gt m (305) 652-36/6

-_E e

jg 3

y EIi Licensee P,

Cause & Corrective g*d N..

Date

}.

3g ij

.655 Event y?

^ * ' * ' "

E Prevent Reeverence f=

jgg Report sr mO w

g c5 02 850316 S

9.0 A

1 CB INSTRU Unit was shutdown to investigate and repair an RCP oil level instrument.

The unit was then returned to power operation.

03 850328 S

73.8 H

1 CC HTEXCH Unit 2 went into a sc.heduled outage to inspect steam generator tubes associated with minor primary to secondary leakage indications.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S. Scheduled A Equipment Failure (Explain)

I Manual for Preparation of Data B. Maintenance or Test 2 Manual Screm.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction Q-Other (Explain) 01611 I:-Operator Training & License F.uamination p

5 F Admimstrative G-Operational Frror (Ftplain) 4 4e Ao At h we.v..,#

Eshibit I - Same Source 19/77) ll-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-389 UNIT St. Lucie Unit #2 DATE April 15, 1985

)

COMPLETED BY TELEPHONE REPORT MONTH March 1985 See the " Unit Shutdowns and Power Reductions" Report.

In accordance with requirements of Technical Specification 6.9.1.6 there were no challenges to PORV or safety valves during the report month.

is i

l l

l l

r

FLORIDA POWER & LIGHT COMPANY April 15,1985 L-85-156 Director, Office of Resource Management

' U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the March 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours, OC

/k. J. W. Willi s,Jr.

v Group V' President Nucle nergy 3WW/NWG/js Attachment cc:. Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-152g

[

I i I PEOPLE.. SERVING PEOPLE