AVLn AGE in Alli UNil POwlL LI VI.t DOCKETNO.
50 N UNIT Turkey Point 3 4-15-85 DATE II.W. Grant COMPLETED BY TELENIONE (3051552-3675 MONTH -
MARCH 1985 DAY AVERAGE DAILY POWER LEVEL (MWe Net) a-3/ 1/95 676 3/ 2/85 678 3/ 3/05 684 3/ 4/85 685 3/ 5/85 685 3/ 6/85 683
/ 8/
6 3/ 9/85 689 3/10/85 684 3/11/85 680 3/12/85 680 3/13/83 652 3/14/85 599 3/15/85 665 3/16/85 12 3/17/85 181 3/18/85 679 3/19/85 681 3/20/85 693 3/21/85 694 3/22/85 695 3/23/85 689 3/24/85 690 3/25/85 688 3/26/85 687 3/27/85 689 3/28/85 688 3/29/85 685 3/30/85 580 3/31/85
-17
OPERATING DATA REPORT DOCKET NO =50*250 DATE. 4-15-8S COMPLETED BY N.W. Grant TELEPHONL (305)S52-3675 OPERATING STATUS Turkey Point Unit #3 Note 5
- 1. U d Ne w March 1985 See the Unit Shutdowns and
- 2. Reporting Period:
2200 Power Reductions Report.
- 3. Licensed Thermal Power (MWI):
/60
- 4. Nenepiste Rating (Gross MWe):
693
- 5. Design Electrical Reting (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasone
- 9. Power Lavel To Which Restricted,lf Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr to Date Cumulatise 744 2,160 108,009.6
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 6R6 7 2,057.1 75.729.9 0
844.4
- 13. Resetor Reserve Shutdown Hours 0
681.1 2,011.5""
75,190.7
- 14. Hours Generator On.Line 0
0 121.8
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generated (MWH) 1,468,951 4,308,366 155.437.877
- 17. Gross Electrical Energy Genersled (MWH) 483,545,,,
1.421,925 49,677,620 459,224 1.351,038 47,048,244
- 18. Net Electrical Energy Generated (MWH),
91.5 93.1 69.6
- 19. Unit Service Factor
- 20. Unit Availability Factor 91.5 93.1 69.7 92.7 93.9 67.1,
- 21. Unit Capecity Factor (Using MDC Ne )
89.1 90.3 62.9
- 22. Unit Capacity Factor (Using DER Net) 5.1 5.7 6.4
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Dete.snd Duration of Each):
Mid-June 1985
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Art ined INITI AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION
WIT SWN AW N REmmS AME r
Point Unit #3' DATE 4-15-86 March 1985 COMPLETED BY "A
G"""*
REPORT MONTH TELEPHONE (305)552-3675
~
E e
jg 3
j E~
Licensee
,E
- g*,
Cause & Corrective N..
Date E.
- 2 4
2s&
Event ay a.1 Action to jU 4
j@
s jgg Repor
- iN G Prevent Reeverence 6
04 850316 F
36.4 A
1 SB HTEXCH Unit 3 was shutdown to repair the 3C containment cooler. The unit then returned to power operation.
05 850330 S
26.5 C
1 RC FUELXX Unit #3 was shutdown for refueling and scheduled mainten.ance.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S. Scheduled A-Eauipment Failure (Emplain) 1-Manust Int Preparation of Data B-Maintenance of Test 2-Manusi Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report iLER1 File (NUREG-D-Regularory Restrictiim Q-Oiher IExplain) 01611 1:-Operator Training A Ucerse Examination 9,
5 F-Administrative CrOperati. mal Feror (Fiplain) 4_ 4 4.
hw.,#
Exhibit I - Same Sourec
('8/77) 11-01her (Explain)
~
r:
I
SUMMARY
OF OPERATING EXPERIENCS
}s
-- 9 DOCKET NO.
50-250 Turkey Point Unit #3 UNIT DATE April 15, 1985
' COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT I40 NTH March 1985 See the " Unit Shutdowns and Power Reductions" report.
I f
k
('
ck f
a I
A\\ 1.II AGE 18 Alli UNil PObi). LI Vi t DOCKETNO. 50-251 UNil. Turkey Point 4 DATE 4-15-R6 N.W.Gran t COMPLETED BY (305)S52-3675 l
.g.ELErilONE tiarch 1985 MONTH DAY AVERAGE DAILY POWER LEVEL
^
P (MWe Net) l l
3/ 1/95 674 3/ 2/85 476 3/ 3/85 679 3/ 4/85 680 3/ 5/85 680 3/ 6/85 680 3/ 7/85 683 3/ 8/85 684 3/ 9/85 683 3/10/85 680 3/11/95 679 3/12/85 675 3/13/95 675 3/14/85 6 72 3/15/85 672 3/16/85 671 3/17/85 680 3/18/85 607 3/19/85
-22 l
3/20/85 516 L
3/21/85 683 3/22/85 687 3/23/85 683 3/24/85 682 3/25/85 633 3/26/85 522 3/27/85 635 3/28/85 685 l
3/29/85 684 3/30/85 679 3/31/85 675
OPERATING DATA REPORT DOCKET NO 50_-281 DATE 4-15-85 COMPLETED BY N.W. Grant TELEPHONL (305)S52-3675 OPERATING STATUS TURKEY POINT UNIT #4 Notes I. Unit Name:
See the Unit Shutdowns and March 1985
- 2. Reporting Period:
Power Reductions Report.
2
- 3. Licensed Thermal Power (MWI):
- 4. Namepiste Rating (Gross MWe):
693
- 5. Design Electrical Reting (Net MWe):
700
- 6. Maximum Dependable Capscity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasone
- 9. PowerlevelTo Which Restricted If Any(Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to-Date Cinnulative 744 2,160 101.741 II. Hours in Reporting Period
- 12. Number Of Hours Resetor Was Critical 722.2 1,903.1 71,621.5 0
0 i
- 166.6
- 13. Reactor Reserve Shutdown Hours L
I4. Hours Generator On Line 713.3 11881.1 69.121.3 0
0 31.2
- 15. Unit Reserve Shutdown Kours
- 16. Gross Thermal Energy Generated (MWH)
_ 1.533.584 4,052,049
,146,182,155
- 17. Gross Electrical Energy Generated (MWH) 503,495 1,327,055 46,519,452 479,313 1,261,664 44,044,945
- 18. Net Electrical Energy Generated (MWH)'
95.9 87.1 67.9
- 19. Unit Service Factor 95.9 87.1 66.0
- 20. Unit Availability Factor 96.7 87.7 66.7
- 21. Unit Capacity Factor (Using MDC Net) 93.0 62.5
- 22. Unit Capacity Factor (Using DER Net) 84.3 0.5 11.8 6.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.snd Duration of Each):
Refueling October 1985, 10 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiaed INITlAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Turkev Point Unit #4 DATE 4-15-85 REPORT MONTH liarch 1985 COMPLETED BY N X Gnne TELEPHONE (305)552-3675 5
c j E3 Licensee
,Eg g *"',
jg Cause & Corrective N..
Date E
- 2 4
2s&
Event u7 6.
Action to jS 4
j@
5 jgg Report sr iE G Prevent Reeverence c5 07 850319 S
26.8 B
1 CB INSTRU Unit 4 had a brief scheduled outage to investigate and repair RCP oil level instrumentation and to evaluate RCP vibration. The uni't was then returned to power operation.
08 850326 F
3.9 B
1 HA SUP0RT Unit 4 was shutdown to investigate high vibration on turbine exciter ductwork. The ductwork was braced and the unit returned to power operation.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructisms S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manus 1 Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repor: ILER1 File INUREG-D Regulatory Restriction
@-Other (Explain) 0I61)
E-Operator Training & Ucense Examination p
5 F-Administrative G-Operational Feror (Fiplain) 4 4
4.
h,..,#
Eshibit I-Same Source t9/77) li-Ot her (Explain)
SUMMARY
OF OPERATING I'GERIENCE DOCKET NO.
50-251 UNIT Turkey Point Unit i 4 April 15, 1985 DATE N. W. Grant COMPLETED BY TELEPHONE (305)552-3675 REPORT ttONTH March 1985 See the " Unit shutdowns and power reduction" report.
\\
i i
)
4
AVLIE AGE is411 ) L;Ni1 PCewt p. L; vg g DOCKET NO.
50 114 UNIT St. Lucie Unit 1 DATE 4-15-85 ll.W. Grant COMPLETED 5Y (305)S52-3675 TELENIONE flarch 1985 MONTH DAY AVERAGE DAILY POWER LEVEL.
IMWe Net) 3/ 1/85 849 3/ 2/85 849 3/ 3/85 851 3/ 4/85 850 3/ 5/85 848 3/ 6/85 848 3/ 7/85 445 3/ 8/85 831 3/ 9/85 849 3/10/85 850 3/11/85 848 3/12/85 852 3/13/85 851 3/14/85 851 3/15/85 850 3/16/85 849 3/17/85 851 3/18/85 852 3/19/85 854 3/20/85 854 3/21/85 854 3/22/85 852 3/23/85 851 3/24/85 852 3/25/85 852 3/26/85 851 3/27/85 852 3/28/85 853 3/29/85 854 3/30/85 854 3/31/95 853 1
1
OPERATING DATA REPORT DOCKET NO 5D-335 DATF 4-15-85 COMPLETED BY N.W. Grant TELEPHONL 305-552-395 OPERATING STATUS N
- 3. Unit Name:
ST. LUCIE UNIT #1 Se the Unit Shutdowns and March 1985
- 2. Reporting Period:
Power Reductions Report 2700
- 3. Licensed Thermal Power (MWt):
0 i
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
8
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasone
- 9. Power level To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr to.Date finnulative 744 2,160 72,552 II. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 740.o 2,156 51,177.3 O__
'205.3
- 13. Reactor Reserve Shutdown Hours 0
737.0 2,153 50,886.5
- 14. Hours Generator On.Line 0
0 39.3
- 15. Unit Reserve Shutdown l{ours
- 16. Gross Thermal Energy Generated (MWH) 1,964,733 5.716,314 127,853,850
- 17. Gross Electrical Energy Genersled (MWH) 6s6.070,_,
1,911,430 41,770,085 622.934 1,815,353 39,377,701
- 18. Net Electrics 1 Energy Generated (MWH)'
99.1 99.7 70.1
- 19. Unit Service Factor 99.1 99.7 70.2
- 20. Unit Availability Factor 101.9 102,2 68.4
- 21. Unit Capacity Factor (Using MDC Net) 100.9 101.3 66.8
- 22. Unit Capacity Factor (Using DER Net)
.9
.3 4.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Ai hioed O
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION
-n-r
,n,--
~
DOCKET NO. 50-1%
UNIT SHUTDOWNS AND POWER REDUCTIONS St. Lucle Unit #1 UNIT NAME
- -AD-DD DATE a.N. urant.
11 arch 1985 COMPLETED BY REPORT MONTH TELEPHONE (305)552-3675 E
E
.! ?
3 yI3 Licensee
,Eg g *,
Cause A Corrective No.
Date
{
3g
(
jgy Event u7 El Action to jO c3 5 5
j5g Report 8r NO Prevent Reentrence c5 01 850307-F 7.0 B
1 335-85-003 Z2 ZZZZZZ During performance of a routine reactor protective system logic matrix test, an operator performing the test inadvertently turned a test switch to an incorrect position thus causing the reactor to trip. The unit then returned to power operation.
I 2
3 4
f: Forced Reason:
Method:
Exhibit G. instructions 5 Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B. Maintenance or Test 2 Manus 1 Screm.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report iLER) File (NUREG.
D Regulatory Restriction
@-Other (Explain 1 0t611 1: Operator Training & License Examination 9,
5 F Administrative G-Operational Feror (F splain) 4.
4 e a o A ss w.v..,#
Eshibit I - Same Source (9/77) 11-Other i Explain)
l SU31 MARY OF OPERATING EXPERIENCE DOCKET NO.
50-335 UNIT St. Lucie Unit #1 April 15,1985 DATE N.
rant COMPLETED BY TELEPHONE (305) 552-3675 REPORT 140 NTH March 1985
- Unit #1 operated at essentially full power except as noted on " Unit Shutdowns and Power Reductions" report.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges'to PORY or safety valves during the report month.
1 a
,-w-v,-
AVLl5 AG[ 17411 ) (N1 POwl), ti yj g DOCKET NO. 50-389 UNIT St. I ucio sungs 2 DATE 4-15-85 N.W. Grant COMPLETED BY TELEPilONt (305)552-3676 llarch'1985 MONTH DAY AVERAGE DAILY POWER LEVEL IMWe Net) 3/ 1/85 817 3/ 2/85 836 3/ 3/85 859 3/ 4/85 854 3/ 5/85 859 3/ 6/85 859 3/ 7/85 860 3/ 8/85 861 3/ 9/85 860 3/10/85 861 3/11/85 834 3/12/85 791 3/13/85 799 3/14/85 821 3/15/85 857 3/16/85 290 3/17/85 854 3/18/85 857 3/19/85 E59 3/20/85 860 3/21/85 858 3/22/85 858 4
3/23/85 859 3/24/85 859 3/25/85 858 3/26/85 859 l
3/27/85 858 3/28/85 749 3/29/85
-15 3/30/85
-5 3/31/85
-3
A OPERATING DATA RLPORT 50-389 DOCKET NO F15-85 DATE COMPLETED BY N.W. Grant TELEPHONL (305)S52-3675 OPERATING STATUS ST. LUCIE UNIT #2 Notes
- 1. Unit Name:
March 1985 See the Unit Shutdowns and
- 2. Reporting resiod:
2560 Power Reductions Report.
- 3. Licensed Thermal Power (MWI):
- 4. Namepiste kating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I.ast Report, Give Reasone Items 5,6. and 7 being revised in accordance with recent approval of increased rated thermal power.
- 9. Power Level To Which Restricted,lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr.-to-Date Cumulatise 744 2,160 14,449
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 670.5 2,086.5 12,692.7 0
O; 0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 661.2 2,056 12,256.6.
0 0
0
- 15. Unit Reserve Shutdown Qours 1,740,672 5,267,420 30,625,985
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energv Generated (MWH) 584,310,_,
1,775,440 10,225,140 553,710 1,681,764 9,644,176
- 18. Net Electrical Energy Generated (MWH),
88.9 95.2 84.8
- 19. Unit Service Factor 88.9 95.2 84.8
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net).
M.(
99.1 84.9 92.6 96.8 83.0
- 22. Unit Capacity Factor (Using DER Net) 0 1.0 7.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
April 8, 1985 (actual)
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecas Achined INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION
50-389 N NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS dr.. Lucie Unit #2 UNIT NAME DATE 4-15-85 March 1985 COMPLEED BY N1 Pso n t REPORT MONTH gt m (305) 652-36/6
-_E e
jg 3
y EIi Licensee P,
Cause & Corrective g*d N..
Date
}.
3g ij
.655 Event y?
^ * ' * ' "
E Prevent Reeverence f=
jgg Report sr mO w
g c5 02 850316 S
9.0 A
1 CB INSTRU Unit was shutdown to investigate and repair an RCP oil level instrument.
The unit was then returned to power operation.
03 850328 S
73.8 H
1 CC HTEXCH Unit 2 went into a sc.heduled outage to inspect steam generator tubes associated with minor primary to secondary leakage indications.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S. Scheduled A Equipment Failure (Explain)
I Manual for Preparation of Data B. Maintenance or Test 2 Manual Screm.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction Q-Other (Explain) 01611 I:-Operator Training & License F.uamination p
5 F Admimstrative G-Operational Frror (Ftplain) 4 4e Ao At h we.v..,#
Eshibit I - Same Source 19/77) ll-Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-389 UNIT St. Lucie Unit #2 DATE April 15, 1985
)
COMPLETED BY TELEPHONE REPORT MONTH March 1985 See the " Unit Shutdowns and Power Reductions" Report.
In accordance with requirements of Technical Specification 6.9.1.6 there were no challenges to PORV or safety valves during the report month.
is i
l l
l l
r
FLORIDA POWER & LIGHT COMPANY April 15,1985 L-85-156 Director, Office of Resource Management
' U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Attached are the March 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours, OC
/k. J. W. Willi s,Jr.
v Group V' President Nucle nergy 3WW/NWG/js Attachment cc:. Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-152g
[