L-85-235, Monthly Operating Repts for May 1985
| ML20133H039 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 05/31/1985 |
| From: | Grant N, Williams J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| L-85-235, NUDOCS 8508090164 | |
| Download: ML20133H039 (17) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
A\\ Li' AGE D Alli (N1 POwll. Li vi(
DOCKET NO.
50 '>4n UNil Turkey Point 3 DATE 6-14-85 N.W. Grant COMPLETED gy TELEPilONE (305)552-3675 MONTH May 1985 DAY AVERACE DAILY POWER LEVEL (MWe Net) 5/ 1/85
-t b/ 2/85
-1 5/ 3/85
-1 5/ 4/M
-1 5/ 5/85
-1 5/ 6/85 I
5/ 7/95
+1 5/ 8/85
-1 5/ 9/85
-1 5/10/85
-1 5/11/85
-1 5/12/85
-1 5/13/85
-1 5/14/85
-1 5/15/85
-2 5/16/85
-1 5/17/85
-1 5/18/85
-1 5/19/85
-1 5/20/85
-2 5/21/85
-1 5/22/85
-1 5/23/85
-1 5/24/85
-1 5/25/85
-1 5/26/85
-1 5/27/85
-1 5/28/85
-1 5/29/85
-1 5/30/85
-1 5/31/85
-1 I
1 1
e508090164 e50531 PDR ADOCK 05000250 R
I
(
l l
OPERATING DATA RLPORT DOCKET NO 50-250 DATE 6-14-85 COMPLETED BY _L W. Grant TELEPHONL nosiss2-3675 OPERATING STATUS
- 1. Unit Name:
Turkey Point Unit #3 N"I'5
- 2. Reporting Period:
Mnv 1985 2
g g_
- 3. Licensed Thermal Power (MW ):
down for refueling and
- 4. Nameplate Rating (Gross MWe):
scheduled maintenance.
- 5. Design Electrical Rating (Net MWe):
691 700
- 6. Maximum Dependable Capacity (Gross MWe):
l
- 7. Maximum Dependable Capacity (Net MWe):
666
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasons l
-~
- 9. Power Level To Which Restrictr 1,If Any (Net MWe):
- 10. Rauns For Rettrictions,if Any: -
This Month Yr.-to-Date Cmmilatise
- 11. Hours in Reporting Period 744 3623 109472.6
- 12. Number Of Hours Reactor Was Critical 0
2057.1 75729.9
- 13. Reactor Reserve ShutdowTi Hours 0
0 844.4
- 14. Hours Generator On.Line 0
2011.6 75190.7 0
0 121.8
- 15. Unit Reserve Shutdown Qours l
- 16. Gross Thermal Energy Generated (MWH) 0 4308366 155437877
- 17. Gross Electrical Energy Generated (MWH) 0 1421925 49677620
- 18. Net Electrical Energy Generated (MWH)
-1533 1347429 47044635
- 19. Unit Service Factor 0
55.5 68.7
- 20. Unit Availability Factor 0
55.5 68.8
- 21. Unit Capacity Factor (Using MDC Net) 0 55.8 66.2
- 22. Unit Capacity Factor (Using DER Net) n 51.7 6_2.0
- 23. Unit Forced Outage Rate 0
5.7 6.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
June 22, 1985
- 26. Units in Test Status (Prior to Commercial Operation):
Forecas:
Ai-his s ed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION t
L mu n
l 50-250 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkov Pnie t' nit #3.
l D ATE _6 _l,4-8)
COMPl.ETED BY N.W. Grant I
REPORTMON1H Mav 1gg5 TEl.EPHONE (305) 5 52 'M7 5 l
i 4
.5 ?
3 Ik Licensee
,E*
b.
Cause & Corrective i
N..
Date 1
5g 4
.2 s 5 Event u?
Action to
$E E
j5g Report
- AU Prevent Recurrence 6
05 850330 S
744.0 C
I RC FUELXX Unit #3 remained shutdown for refueling and scheduled maintenance.
I 2
3 4
F: Forced Reasim:
Method:
Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) 1 -Manual for Pieparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling
- 3. Automatic Scram.
Event Report II.ER) File (NUREG-D Regulatory Restriction Q-Other (Explain) 016I)
E-Operator Training & License Examination F Administrative 5
G-Operatismal Feror (F xplain) x. /.e 4. Asewc_v..,#
Exhibit I Same Source 19/77)
Il-Ot her ( E xplain)
SU @1ARY OF OPERATING EXPER.TEMCE DOCKET HO.
50-250 UNIT Turkey Point Unit #3 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH May 1985 Unit #3 remained shutdown for refueling and scheduled maintenance.
A\\ Ll; AGE Is Alli U%il POakl. Li vil 9
DOCKE7 NO. 50-251 Turkey Point 4 UNil 6-14-85 DATE N.W. Grant CO. lPLETED BY
\\
(305)552-3675 TELEPilONE Af0 NTH May 1985 DAY AVER ACE DAILY POWER LEVEL IMWe Net) 5/ 1/S5 678 5/ 2/85 679 5/ 3/85 677 5/ 4/85 675 5/ 5/85 680 5/ 6/85 676 5/ 7/85 679 5/ 8/85 679 5/ 9/85 677 5/10/85 675 5/11/85 673 5/12/85 6P 5/13/85 669 5/14/85 671 5/15/85
- 59 5/16/85 635 5/17/85 325 5/18/85 648 5/19/85 67' 5/20/85 66f 5/21/85 668 5/22/85 fs.;
5/23/85 262 5/24/85 5s[
5/25/85 670 5/26/85 575 5/27/85 673 5/28/85 673 5/29/85 670 5/30/85 49; 5/31/85 532
OPER ATING DATA REPORT DOCKET NO 50-251 DATE 6-14-85 COMPLETED BY N.W. Grant TELEPHONL J305)S52-3675 OPERATING STATUS b"I'5
- 1. Unit Name:
Turkey Point " nit #4
- 2. Reporting Period:
May 1985 2200
- 3. Licensed Thennel Power (MWI):
and power reductions 760
- 4. Namepiste Rating (Gross MWe):
report.
- 5. Design Electrical Rating (Net MWe):
691 700
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictioru. If Any:
This Month Yr o Date Cinnulatise 744 3623 103204
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 720.3 3342.4 73060.8
- 13. Reactor Reserve Shutdown Hours 0
0 166.6
- 14. Hours Generator On.Line 712.6 3312.7 70552.9
- 15. Unit Reserve Shutdown Qours 0
0 31.2
- 16. Gross Thermal Energy Generated (MWH) 1551752 7117805 149247911
- 17. Gross Electrical Energy Generated (MWH) 499865 2312060 47504457 l
475496 2198887 44982168
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 95.8 91.4 68.4
- 20. Unit Availability Factor 95.8 91.4 68.4
]
- 21. Unit Capacity Factor (Using MDC Net) 96.0 91.I 67.I 92.2 87.6 62.9
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 4.2 7.9 6.2
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Each):
Refueline January 1986 11 to 12 weeks i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior o Commercial Operatiun):
Forecast Arliimed INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-251 UNIT NAME Turkov Pn i n t-tirgit g 4,
DATE 6-14-Rs COMPLETED BY
_N.
W.
Grnne REPORT MONTH _ !!av 1985 y nsi ss'> w s E
e jg 3
y Ei Licensee g*,
Cause & Corrective N. i.
Date E.
i?
.2 3 $
Event u7 9
Acti<m to C
jj y
jg Report a NG U
Prevent Reevrrena c5 A reactor and Turbine trip occurred 10 850515 F
10.5 A
3 251-85-10
, CB RETAYX following actuation of ESF relay which was inadvertently bumped during plant modification. The unit then returned to power operation.
A reactor trip resulted from a loss 11 850517 F
11.3 H
3 251-85-11 XX xxxxxx of offsite power associated with brush fires that affected trans-mission lines. The unit returned to power operation following restoration of offsite power.
The loss of an instrument inverter 12 850530 F
9.7 A
3 251-85-12 EB GENERA resulted in a turbine runback causing a reactor trip on low steam generator level and feed flow / steam flow mismatch. The inverter was re-placed and the unit returned to power operation.
l 2
3 4
F Forced Reason:
Method:
Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) 1 M an ust for Preparation of Data B-Maintenance of Test 2-Manual Screm.
Entry Sheets for Licensee C Refueling
- 3. Automatic Scram.
Event ReporiILER) File (NUREG-D Regulatory Restriction
%Of her (Explain 1 0161I E-Operator Training & License Fuamination F Administrative 5
G-Operational Fernt (Fiplain t c. /,e ao muc w.et Exhibit I - Same Source (9/77)
Il Other IExplain t l
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-251 UNIT Turkey Point Unit #4 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305)552-3675 REPORT MONTH May 1985 See the " Unit shutdowns and power reduction" report.
~
AVLi; AC,L la All i UNil PO=t 5. Li vil DOCKET NO.50-11s UNil St. Lucie Unit 1 DATE 6-14-85 N.W. Grant COMPLETED by (305)552-3675 TELEPilONE MONTH May 1985 DAY AVERACE DAILY POWER LEVEL (MWe Net) 5/ 1/85 849 5/ 2/85 850 5/ 3/85 850 5/ 4/85 849 5/ 5/85 847 5/ 6/85 846 5/ 7/85 848 5/ 8/85 849 5/ 9/85 848 5/10/85 846 5/11/85 Ct4 5/12/85 845 5/13/S5 844 5/14/85 842 5/15/85 843 5/16/85 841 5/17/85 844 5/18/85 844 5/19/85 842 5/20/85 844 5/21/85 844 5/22/E5 844 5/23/S5 846 5/24/85 849 5/25/85 848 5/26/85 846 5/27/85 844 5/28/85 823 5/29/85 812 5/30/85 847 5/31/S5 847
OPERATING DATA REPORT DOCKET NO 50-335 DATE 6-14-85 COMPLETED BY N.W. Grant TELEPHONL (10siss2-3675 OPERATING STATUS
- 3. Unit Name:
St. Lucie Unit #1 Notes May 1985
- 2. Reporting Period:
2700 Unit #1 operated at
- 3. Licensed Thermal Power (MW ):
- 4. Nameplate Rating (Gross MWe):
850 essentially full power.
830
- 5. Design Electrical Rating (Net MWe):
867
- 6. Maximum Dependable Capacity (Gross MWe):
827
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons
- 9. Power level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to Date Cimmlatise 744 3623 74015
- 11. Hours In Reporting Period
- 12. Number Of Hoests Reactor Was Critical 744 3619 52640.3
- 13. Reactor Reserve Shutdown Hours 0
0 205.3
- 14. Hours Generator On Line 744 3616 52349.5 0
0 39.3
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generated (MWH) 1990987 9634821 131772357 661190 3216660 43075315
- 17. Gross Electrient Energv Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 627936 3055155 40617503
- 19. Unit Service Factor 100 n 99.8 70.7
- 20. Unit Availability Factor 100.0 99.8 70.8
- 21. Unit Capacity Factor (Using MDC Net) 102.I 102.3 69.1
- 22. Unit Capacity Factor (Using DER Net) 101.7 101.6 67.5
- 23. Unit Forced Outage Rate n
.2 4.5
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast At hined INITIA L CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION 19f:71
UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.
50-335 UNIT NAME St. Lucie Unit #1 DATE 6-14-8s COMPLETED BY N U-Cr*
REPORT MONTH May 1985 1ELEPHONE.L3.05T 552-367 s
~E E
.{g "h
jM Licensee
,E
- g*3 Cause & Corrective No.
Date o.
ti ?
s
,2 3 &
Event
- ?
6-Acthm to fU 4
j@
jgg Report
- N0 Prevent Recurrence 6
Unit #1 had no " shutdowns or significant power reductions."
I
)
i 2
3 4
f: Forced Reason:
Method:
Exhibit G. Instructions S Scheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D.Regularory Restriction 9 01her(Explain 1 016I) l'-Operator Training & License Examination F Administrative M~ O****""#*
5 G-Operational Feror IFxplain) 4
/e a. Aseve.v.c#
Exhibit I Same Source (9/77)
Il-Other (Euplain g
SUMMARY
OF OPERATING EXPER.TENCE DOCKET HO.
50-335 UNIT St. Lucie Unit #1 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT HONTH May 1985 Unit #1 operated at essentially full power and had no " Unit Shutdowns and Power Reductions."
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
~
AVLi; AGE is All) U%il PO=t F. Li vi t DOCKE7 NO. 50-389 O
UNn St. I ocia finit 2 DATE 6-14-85 COMPLETED BY N.W. Grant TELEPilONE (305)552-3676 MONTH May_1985 DAY AVERAGE DAILY POWER LEVEL IMWe. Net) 4 f
5/ 1/85 856 5/ 2/85 857 5/ 3/85 857 5/ 4/85 857 5/ 5/85 850 5/ 6/85 856 5/ 7/85 857 5/ 8/85 815 5/ 9/85 856 5/10/85 855 5/11/85 855 5/12/85 855 5/13/85 854 5/14/85 854 5/15/85 855 5/16/85 848 5/17/85 854 5/18/85 855 5/19/85 854 5/:0/85 856 5/21/85 855 5/ 2/E5 854 5/23/85 856 5/24/85 856 5/25/85 857 5/26/85 855 5/27/85 855 5/28/85 853 5/29/85 855 5/30/85 855 5/31/85 854
OPERATING DATA RLPORT DOCKET NO 50-389 DATI'
_6-14-85 COMPLETED BY N. W. Grant TELEPHONL f 305)552-3675 OPERATING STATUS
- 1. Unit Name:
St. Lucie Unit #2 Notes Mav 1985 2 R* Porting Period:
- 3. Licensed Thermal Power (MWI):
2700 essentially full power.
850
- 4. Nameplate Rating (Gross MWe):
830
- 5. Design Electrical Rating (Net MWe):
832
- 6. Maximum Dependable Copacity (Gross MWe):
837
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report.Give Reasons Item 5 to be revised due to high MDC
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr..to.Dat e Cmnnlatise 744 3623 15912
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 744 3369.6 13975.8
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On.Line 744 3323.9 13524.5 0
0 0
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWH) 1992158 8549347 33907912
- 17. Gross Electrical Energy Generated (MWH) 668960 2876010 11325710
- 18. Net Electrical Energy Generated (MWH) 635512 2723650 10486062 100.0 91.7 85.0
- 19. Unit Service Factor
- 20. Unit Availability Factor 100.0 91.7 85.0
- 21. Unit Capacity Factor (Using MDC Net) 102.1 93.2 84.9
- 22. Unit Capacity Factor (Using DER Net) 102.9 92.3 83.3
- 23. Unit Forced Outage Rate 0
1.4 7.1
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eachl:
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test StatusiPrior o Commercial Operation):
Forecast Ari ined INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION
-....... 19 /~ 71
50-389 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. I.ucie Unit #2 DATE 6-14-85 COhWLETED BY ME-Cr*
REPORT MONTH May 1985 TELEPHONE (10sT5J2-1675 F.
E e
y E5 Licensee
,E *
{'d jg t
Cause & Corrective N...
Date
{
g si 2s&
Event 3,?
E Prevent Recurrence y5 jig Report 8 mO H
g c5 Unit #2 had no " shutdowns or significant power reduction."
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data R. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Repor (LER) File (NUREG.
D-Regulatory Restriction Q-Other IExplain) 0161) i: Operator Training & Ucense Examination F Administrateve p-5 G-Operational Feror (F splaini 4
Ao a. Aseve.,..,J Eshibit I - Same Source 19/77)
II Other (Exrlaini
(_.
9
SUMMARY
OF OPERATING EXPER.TENCE DOCKET NO.
50-389 UNIT St. Lucie Unit #2 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH May 1985 Unit #2 operated at essentially full power and had no " Unit Shutdowns and power reductions."
In accordance with requirements of Technical Specification 6.9.1.6 there were no challenges to PORV or safety valves during the report month.
h r
o s \\ i l ',
FLORIDA POWER & LIGHT COMPANY June 17,1985 L-85-235 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Attached are the May 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours, J. W. Williams, Jr.
Group Vice President Nuclear Energy 3WW/NWG/js Attachment cc:
Dr. J. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-239g r2z+
'\\,
PEOPLE.. SERVING PEOPLE