Monthly Operating Repts for May 1985
ML20133H039
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 05/31/1985
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
L-85-235, NUDOCS 8508090164
Download: ML20133H039 (17)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

A\\ Li' AGE D Alli (N1 POwll. Li vi(

DOCKET NO.

50 '>4n UNil Turkey Point 3 DATE 6-14-85 N.W. Grant COMPLETED gy TELEPilONE (305)552-3675 MONTH May 1985 DAY AVERACE DAILY POWER LEVEL (MWe Net) 5/ 1/85

-t b/ 2/85

-1 5/ 3/85

-1 5/ 4/M

-1 5/ 5/85

-1 5/ 6/85 I

5/ 7/95

+1 5/ 8/85

-1 5/ 9/85

-1 5/10/85

-1 5/11/85

-1 5/12/85

-1 5/13/85

-1 5/14/85

-1 5/15/85

-2 5/16/85

-1 5/17/85

-1 5/18/85

-1 5/19/85

-1 5/20/85

-2 5/21/85

-1 5/22/85

-1 5/23/85

-1 5/24/85

-1 5/25/85

-1 5/26/85

-1 5/27/85

-1 5/28/85

-1 5/29/85

-1 5/30/85

-1 5/31/85

-1 I

1 1

e508090164 e50531 PDR ADOCK 05000250 R

PDR

I

(

l l

OPERATING DATA RLPORT DOCKET NO 50-250 DATE 6-14-85 COMPLETED BY _L W. Grant TELEPHONL nosiss2-3675 OPERATING STATUS

1. Unit Name:

Turkey Point Unit #3 N"I'5

2. Reporting Period:

Mnv 1985 2

g g_

3. Licensed Thermal Power (MW ):

down for refueling and

4. Nameplate Rating (Gross MWe):

scheduled maintenance.

5. Design Electrical Rating (Net MWe):

691 700

6. Maximum Dependable Capacity (Gross MWe):

l

7. Maximum Dependable Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasons l

-~

9. Power Level To Which Restrictr 1,If Any (Net MWe):
10. Rauns For Rettrictions,if Any: -

This Month Yr.-to-Date Cmmilatise

11. Hours in Reporting Period 744 3623 109472.6
12. Number Of Hours Reactor Was Critical 0

2057.1 75729.9

13. Reactor Reserve ShutdowTi Hours 0

0 844.4

14. Hours Generator On.Line 0

2011.6 75190.7 0

0 121.8

15. Unit Reserve Shutdown Qours l
16. Gross Thermal Energy Generated (MWH) 0 4308366 155437877
17. Gross Electrical Energy Generated (MWH) 0 1421925 49677620
18. Net Electrical Energy Generated (MWH)

-1533 1347429 47044635

19. Unit Service Factor 0

55.5 68.7

20. Unit Availability Factor 0

55.5 68.8

21. Unit Capacity Factor (Using MDC Net) 0 55.8 66.2
22. Unit Capacity Factor (Using DER Net) n 51.7 6_2.0
23. Unit Forced Outage Rate 0

5.7 6.4

24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

June 22, 1985

26. Units in Test Status (Prior to Commercial Operation):

Forecas:

Ai-his s ed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION t

L mu n

l 50-250 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkov Pnie t' nit #3.

l D ATE _6 _l,4-8)

COMPl.ETED BY N.W. Grant I

REPORTMON1H Mav 1gg5 TEl.EPHONE (305) 5 52 'M7 5 l

i 4

.5 ?

3 Ik Licensee

,E*

b.

Cause & Corrective i

N..

Date 1

5g 4

.2 s 5 Event u?

Action to

$E E

j5g Report

  • AU Prevent Recurrence 6

05 850330 S

744.0 C

I RC FUELXX Unit #3 remained shutdown for refueling and scheduled maintenance.

I 2

3 4

F: Forced Reasim:

Method:

Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) 1 -Manual for Pieparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling

3. Automatic Scram.

Event Report II.ER) File (NUREG-D Regulatory Restriction Q-Other (Explain) 016I)

E-Operator Training & License Examination F Administrative 5

G-Operatismal Feror (F xplain) x. /.e 4. Asewc_v..,#

Exhibit I Same Source 19/77)

Il-Ot her ( E xplain)

SU @1ARY OF OPERATING EXPER.TEMCE DOCKET HO.

50-250 UNIT Turkey Point Unit #3 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH May 1985 Unit #3 remained shutdown for refueling and scheduled maintenance.

A\\ Ll; AGE Is Alli U%il POakl. Li vil 9

DOCKE7 NO. 50-251 Turkey Point 4 UNil 6-14-85 DATE N.W. Grant CO. lPLETED BY

\\

(305)552-3675 TELEPilONE Af0 NTH May 1985 DAY AVER ACE DAILY POWER LEVEL IMWe Net) 5/ 1/S5 678 5/ 2/85 679 5/ 3/85 677 5/ 4/85 675 5/ 5/85 680 5/ 6/85 676 5/ 7/85 679 5/ 8/85 679 5/ 9/85 677 5/10/85 675 5/11/85 673 5/12/85 6P 5/13/85 669 5/14/85 671 5/15/85

59 5/16/85 635 5/17/85 325 5/18/85 648 5/19/85 67' 5/20/85 66f 5/21/85 668 5/22/85 fs.;

5/23/85 262 5/24/85 5s[

5/25/85 670 5/26/85 575 5/27/85 673 5/28/85 673 5/29/85 670 5/30/85 49; 5/31/85 532

OPER ATING DATA REPORT DOCKET NO 50-251 DATE 6-14-85 COMPLETED BY N.W. Grant TELEPHONL J305)S52-3675 OPERATING STATUS b"I'5

1. Unit Name:

Turkey Point " nit #4

2. Reporting Period:

May 1985 2200

3. Licensed Thennel Power (MWI):

and power reductions 760

4. Namepiste Rating (Gross MWe):

report.

5. Design Electrical Rating (Net MWe):

691 700

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons
9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictioru. If Any:

This Month Yr o Date Cinnulatise 744 3623 103204

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 720.3 3342.4 73060.8
13. Reactor Reserve Shutdown Hours 0

0 166.6

14. Hours Generator On.Line 712.6 3312.7 70552.9
15. Unit Reserve Shutdown Qours 0

0 31.2

16. Gross Thermal Energy Generated (MWH) 1551752 7117805 149247911
17. Gross Electrical Energy Generated (MWH) 499865 2312060 47504457 l

475496 2198887 44982168

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 95.8 91.4 68.4
20. Unit Availability Factor 95.8 91.4 68.4

]

21. Unit Capacity Factor (Using MDC Net) 96.0 91.I 67.I 92.2 87.6 62.9
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 4.2 7.9 6.2
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Each):

Refueline January 1986 11 to 12 weeks i

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior o Commercial Operatiun):

Forecast Arliimed INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-251 UNIT NAME Turkov Pn i n t-tirgit g 4,

DATE 6-14-Rs COMPLETED BY

_N.

W.

Grnne REPORT MONTH _ !!av 1985 y nsi ss'> w s E

e jg 3

y Ei Licensee g*,

Cause & Corrective N. i.

Date E.

i?

.2 3 $

Event u7 9

Acti<m to C

jj y

jg Report a NG U

Prevent Reevrrena c5 A reactor and Turbine trip occurred 10 850515 F

10.5 A

3 251-85-10

, CB RETAYX following actuation of ESF relay which was inadvertently bumped during plant modification. The unit then returned to power operation.

A reactor trip resulted from a loss 11 850517 F

11.3 H

3 251-85-11 XX xxxxxx of offsite power associated with brush fires that affected trans-mission lines. The unit returned to power operation following restoration of offsite power.

The loss of an instrument inverter 12 850530 F

9.7 A

3 251-85-12 EB GENERA resulted in a turbine runback causing a reactor trip on low steam generator level and feed flow / steam flow mismatch. The inverter was re-placed and the unit returned to power operation.

l 2

3 4

F Forced Reason:

Method:

Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) 1 M an ust for Preparation of Data B-Maintenance of Test 2-Manual Screm.

Entry Sheets for Licensee C Refueling

3. Automatic Scram.

Event ReporiILER) File (NUREG-D Regulatory Restriction

%Of her (Explain 1 0161I E-Operator Training & License Fuamination F Administrative 5

G-Operational Fernt (Fiplain t c. /,e ao muc w.et Exhibit I - Same Source (9/77)

Il Other IExplain t l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-251 UNIT Turkey Point Unit #4 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305)552-3675 REPORT MONTH May 1985 See the " Unit shutdowns and power reduction" report.

~

AVLi; AC,L la All i UNil PO=t 5. Li vil DOCKET NO.50-11s UNil St. Lucie Unit 1 DATE 6-14-85 N.W. Grant COMPLETED by (305)552-3675 TELEPilONE MONTH May 1985 DAY AVERACE DAILY POWER LEVEL (MWe Net) 5/ 1/85 849 5/ 2/85 850 5/ 3/85 850 5/ 4/85 849 5/ 5/85 847 5/ 6/85 846 5/ 7/85 848 5/ 8/85 849 5/ 9/85 848 5/10/85 846 5/11/85 Ct4 5/12/85 845 5/13/S5 844 5/14/85 842 5/15/85 843 5/16/85 841 5/17/85 844 5/18/85 844 5/19/85 842 5/20/85 844 5/21/85 844 5/22/E5 844 5/23/S5 846 5/24/85 849 5/25/85 848 5/26/85 846 5/27/85 844 5/28/85 823 5/29/85 812 5/30/85 847 5/31/S5 847

OPERATING DATA REPORT DOCKET NO 50-335 DATE 6-14-85 COMPLETED BY N.W. Grant TELEPHONL (10siss2-3675 OPERATING STATUS

3. Unit Name:

St. Lucie Unit #1 Notes May 1985

2. Reporting Period:

2700 Unit #1 operated at

3. Licensed Thermal Power (MW ):
4. Nameplate Rating (Gross MWe):

850 essentially full power.

830

5. Design Electrical Rating (Net MWe):

867

6. Maximum Dependable Capacity (Gross MWe):

827

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons
9. Power level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to Date Cimmlatise 744 3623 74015

11. Hours In Reporting Period
12. Number Of Hoests Reactor Was Critical 744 3619 52640.3
13. Reactor Reserve Shutdown Hours 0

0 205.3

14. Hours Generator On Line 744 3616 52349.5 0

0 39.3

15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 1990987 9634821 131772357 661190 3216660 43075315
17. Gross Electrient Energv Generated (MWH)
18. Net Electrical Energy Generated (MWH) 627936 3055155 40617503
19. Unit Service Factor 100 n 99.8 70.7
20. Unit Availability Factor 100.0 99.8 70.8
21. Unit Capacity Factor (Using MDC Net) 102.I 102.3 69.1
22. Unit Capacity Factor (Using DER Net) 101.7 101.6 67.5
23. Unit Forced Outage Rate n

.2 4.5

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

Forecast At hined INITIA L CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION 19f:71

UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.

50-335 UNIT NAME St. Lucie Unit #1 DATE 6-14-8s COMPLETED BY N U-Cr*

REPORT MONTH May 1985 1ELEPHONE.L3.05T 552-367 s

~E E

.{g "h

jM Licensee

,E

  • g*3 Cause & Corrective No.

Date o.

ti ?

s

,2 3 &

Event

?

6-Acthm to fU 4

j@

jgg Report

  • N0 Prevent Recurrence 6

Unit #1 had no " shutdowns or significant power reductions."

I

)

i 2

3 4

f: Forced Reason:

Method:

Exhibit G. Instructions S Scheduled A Equipment Failure (Explain)

I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG.

D.Regularory Restriction 9 01her(Explain 1 016I) l'-Operator Training & License Examination F Administrative M~ O****""#*

5 G-Operational Feror IFxplain) 4

/e a. Aseve.v.c#

Exhibit I Same Source (9/77)

Il-Other (Euplain g

SUMMARY

OF OPERATING EXPER.TENCE DOCKET HO.

50-335 UNIT St. Lucie Unit #1 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT HONTH May 1985 Unit #1 operated at essentially full power and had no " Unit Shutdowns and Power Reductions."

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.

~

AVLi; AGE is All) U%il PO=t F. Li vi t DOCKE7 NO. 50-389 O

UNn St. I ocia finit 2 DATE 6-14-85 COMPLETED BY N.W. Grant TELEPilONE (305)552-3676 MONTH May_1985 DAY AVERAGE DAILY POWER LEVEL IMWe. Net) 4 f

5/ 1/85 856 5/ 2/85 857 5/ 3/85 857 5/ 4/85 857 5/ 5/85 850 5/ 6/85 856 5/ 7/85 857 5/ 8/85 815 5/ 9/85 856 5/10/85 855 5/11/85 855 5/12/85 855 5/13/85 854 5/14/85 854 5/15/85 855 5/16/85 848 5/17/85 854 5/18/85 855 5/19/85 854 5/:0/85 856 5/21/85 855 5/ 2/E5 854 5/23/85 856 5/24/85 856 5/25/85 857 5/26/85 855 5/27/85 855 5/28/85 853 5/29/85 855 5/30/85 855 5/31/85 854

OPERATING DATA RLPORT DOCKET NO 50-389 DATI'

_6-14-85 COMPLETED BY N. W. Grant TELEPHONL f 305)552-3675 OPERATING STATUS

1. Unit Name:

St. Lucie Unit #2 Notes Mav 1985 2 R* Porting Period:

3. Licensed Thermal Power (MWI):

2700 essentially full power.

850

4. Nameplate Rating (Gross MWe):

830

5. Design Electrical Rating (Net MWe):

832

6. Maximum Dependable Copacity (Gross MWe):

837

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report.Give Reasons Item 5 to be revised due to high MDC
9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr..to.Dat e Cmnnlatise 744 3623 15912

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 744 3369.6 13975.8
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On.Line 744 3323.9 13524.5 0

0 0

15. Unit Reserve Shutdown Qours
16. Gross Thermal Energy Generated (MWH) 1992158 8549347 33907912
17. Gross Electrical Energy Generated (MWH) 668960 2876010 11325710
18. Net Electrical Energy Generated (MWH) 635512 2723650 10486062 100.0 91.7 85.0
19. Unit Service Factor
20. Unit Availability Factor 100.0 91.7 85.0
21. Unit Capacity Factor (Using MDC Net) 102.1 93.2 84.9
22. Unit Capacity Factor (Using DER Net) 102.9 92.3 83.3
23. Unit Forced Outage Rate 0

1.4 7.1

24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eachl:
25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test StatusiPrior o Commercial Operation):

Forecast Ari ined INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION

-....... 19 /~ 71

50-389 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. I.ucie Unit #2 DATE 6-14-85 COhWLETED BY ME-Cr*

REPORT MONTH May 1985 TELEPHONE (10sT5J2-1675 F.

E e

y E5 Licensee

,E *

{'d jg t

Cause & Corrective N...

Date

{

g si 2s&

Event 3,?

E Prevent Recurrence y5 jig Report 8 mO H

g c5 Unit #2 had no " shutdowns or significant power reduction."

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data R. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Repor (LER) File (NUREG.

D-Regulatory Restriction Q-Other IExplain) 0161) i: Operator Training & Ucense Examination F Administrateve p-5 G-Operational Feror (F splaini 4

Ao a. Aseve.,..,J Eshibit I - Same Source 19/77)

II Other (Exrlaini

(_.

9

SUMMARY

OF OPERATING EXPER.TENCE DOCKET NO.

50-389 UNIT St. Lucie Unit #2 DATE June 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH May 1985 Unit #2 operated at essentially full power and had no " Unit Shutdowns and power reductions."

In accordance with requirements of Technical Specification 6.9.1.6 there were no challenges to PORV or safety valves during the report month.

h r

o s \\ i l ',

FLORIDA POWER & LIGHT COMPANY June 17,1985 L-85-235 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the May 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours, J. W. Williams, Jr.

Group Vice President Nuclear Energy 3WW/NWG/js Attachment cc:

Dr. J. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-239g r2z+

'\\,

PEOPLE.. SERVING PEOPLE