Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19262C42322 January 1980Responds to ASLB Request for Progress Rept on Negotiations Between Util,Intervenors & NRC Re Contentions in OL Proceeding.Intervenors Will Issue Final Position on Contentions by 800208
ML19263C38813 February 1979Forwards Affidavit Stating That Distribution of Environ Rept,Operating License Stage,Has Been Made in Accordance W/Nrc 781020 Ltr
ML19263E2656 April 1979Requests Clarification of Procedures Necessary to Be Accepted as Petitioner at Prehearing Conference
ML19263E79218 June 1979Forwards Inryco 790309 Rept, Investigation of Buttonhead Defects, in Response to 790523 Request.W/O Encl
ML19264B9603 December 1981Forwards Comments on Facilities Des (NUREG-0848) & Tables Re Projected Reserve Margins for 1982-1990.Marked-up NUREG-0848 Encl
ML19264C27223 December 1981Comments on Des Re Operation of Facilities.Opposes Licensing of Facilities
ML19264C31528 December 1981Informs That No Comments on Facility EIS Have Been Received from State Agencies Authorized to Develop & Enforce Environ Stds
ML19264C3164 January 1982Comments on Draft Eis.Requests That 33USC 1344 Be Added to Both Entries for Permits Required from Us Army Corps of Engineers (Table B.1,page B-2)
ML19264C31911 January 1982Comments on Des.Project to Have Minimal Impact on Environ. Land Formerly Agricultural Should Be Managed in Some Way,As Woodland or Wildlife Habitat
ML19264C32818 January 1982Comments on Draft Eis,Forwarded 811125.Discrepancies in Units Given for Hydraulic Conductivities & Transmissivity Should Be Clarified
ML19264C32918 January 1982Comments on Des for Facilities.Fes Should Indicate Levels of Radiation Which Individual Could Expect to Receive to Substantiate Negligible Impact
ML19269B78430 November 1978Forwards Amend#17 to FSAR to Appl for Constr Permit & Oper Lic,W/Request for Oper at Pwr Level of 3425MWt.Also Encl 1977 Annual Rept,1977 Financial Review & Sec Form 10-Q Quarterly Rept for Quarter Ended 780930.W/o FSAR
ML19274E60514 March 1979Responds to NRC 790212 Ltr Re Violations Noted in IE Insp Repts 50-454/79-01 & 50-455/79-01.Corrective Actions: Hatfield Electric Co,Site Contractor,Will Revise Control Procedures for Design Changes by 790415
ML19275A25728 September 1979Forwards Proposed Secondary Water Chemistry Programs. Programs Include Requirements of NRC Model License Condition
ML19276F2057 March 1979Requests Copy of Proposed Operating License
ML19282B10716 January 1979Forwards Proofs of Svc for Petition to Intervene & Affidavit of Bl Galbreath
ML19282B11830 January 1979Ack Receipt of Petitions to Intervene in Operating License Proceeding & Notice of ASLB Establishment of Rule on Petitions to Intervene.Requests Response to Petitions
ML19282B5933 February 1979Forwards Proof of Svc for Intervention Petition,& Affidavit of Membership & Authorization.Certificate of Svc Encl
ML19289C9145 January 1979Forwards Interim Rept Re Containment Tendon Deficiency
ML19289D17816 February 1979Forwards Affidavit Required by 10CFR2.101(a)(4) Stating That Amend 18 to FSAR Has Been Distributed in Accordance with 781020 Ltr
ML19289F3328 May 1979Responds to IE Bulletin 79-03.Requests 90-day Extension to Review Present Use of ASME SA-312 Type 304 Pipe Spools
ML19291C22815 January 1980Forwards List of Drawings Re NRC Request for Addl Info on Fsar.Drawings Constitute Latest Revision to Fsar,Sections 1-7.List in FSAR Will Be Revised W/Next Amend.Drawings Forwarded Under Separate Cover
ML19294B14621 February 1980Forwards Wh Naughton 790221 Affidavit Re Distribution of Amend 24 to FSAR
ML19294B43011 February 1980Responds to IE Bulletin 79-28 Re Use of Namco Model EA180 Limit Switches.Cover Gasket Replacement Will Be Limited to Containment Bldg Due to Exposure to High,Continuous Ambient Temp.Gaskets Will Also Be Replaced on Stock Switches
ML19294B4436 February 1980Submits Supplemental Response to IE Bulletin 79-25 Re Use of Westinghouse Bfd Relays.Seventy Nbfd Relays Have Been Supplied But Are Not Subj to Problems Addressed in Vendor Technical BulletinsOvertravel
ML19296A1978 February 1979Forwards Amend 18 to Application for Const Permits & Operating Licenses,W/Responses to NRC Questions Raised During FSAR Acceptance Review.Lists Questions Unanswered Due to Time Limit
ML19296B19115 January 1980Responds to NRC 791219 Ltr Re Violations Noted in IE Insp Repts 50-454/79-16 & 50-455/79-16.Corrective Actions: Subassembly RC-11 Has Been Disposed of & Branch Connection Weld RC-216 No Longer in Sys Installation
ML19296B73314 February 1980Responds to Request for Addl FSAR info.MAD-73750, Method of Determinng Heat Rejection from PWR Plant to Ultimate Heat Sink,Braidwood 1 & 2, Is Being Transmitted to AnlUltimate heat sink
ML19296B74013 February 1980Notifies That Util Will Implement Revised Groundwater Monitoring Program on 800301.Program Was Forwarded to NRC on 790830.Util Has Received No Comments
ML19296D88029 February 1980Forwards Second Interim Deficiency Rept Re Failure of Two post-tensioning Field Anchorheads.Requests Extension Until 800515 for Submittal of Final Rept
ML19309C2791 April 1980Forwards Affidavit Stating That Distribution of Amend 25 to FSAR Has Been Made in Accordance W/Rs Boyd 791020 Ltr
ML19309C30612 March 1980Forwards League of Women Voters of Rockford,Il Interrogatories & Motion Seeking ASLB Authorization.W/O Interrogatories
ML19309C9415 March 1980Discusses League of Women Voters of Rockford 800213 Motion Re Admissibility of Contentions.Requests ASLB to Vacate 800221 Order & Permit Filing of Revised Contentions on 800310.Proposes Schedule for Briefing
ML19309H4476 May 1980Forwards Responses to Anl 791220 Questions Re FSAR Chapter 7,concerning Instrumentation & Controls
ML19309H94215 May 1980Forwards Interim Deficiency Rept 3 Re post-tensioning Anchorhead Failure.Requests Extension Until 800630 for Submittal of Final Rept
ML19312E12122 May 1980Requests That Er Cross of Sargent & Lundy Be Added to Distribution List
ML19318A54127 May 1980Responds to NRC 800425 Ltr Re Violations Noted in IE Insp Repts 50-454/80-05 & 50-455/80-05.Corrective actions:safety- Related Hanger & Snubber Supplier Forwarded Revised Installation InstructionsHydrostatic
ML19318B49921 May 1980Responds to NRC 800126 Ltr Re Violations Noted in IE Insp Repts 50-454/79-18 & 50-455/79-18.Corrective Actions: in Depth Analysis on Concrete Expansion Anchor Installations Accomplished.Installation Procedures Revised & Approved
ML19318C03320 June 1980Submits Update of Scheduled Commercial Svc Dates for Facilities,Reflecting Delays & Scheduled OL Fuel Load Dates.Stresses Importance of Continued Licensing Process for Byron & Braidwood.Related Correspondence
ML19318C37825 June 1980Forwards Documentation of safety-related Electrical Equipment Qualification.Addresses NRC Questions 40.01 & 40.77.Requests NRC Approval of Response Format Prior to Incorporation Into FSAR
ML19318C87727 June 1980Forwards Amend 26 to FSAR
ML19320A93830 June 1980Forwards 800630 Affidavit Certifying Distribution of FSAR Amend 26
ML19320B47511 July 1980Forwards Amend 27 to Fsar,Amending Application for CPs & OLs
ML19321A15716 July 1980Forwards Affidavit Stating That Distribution of Facility Fsar,Amend 27 Has Been Made Per Encl 1 to Rs Boyd 791029 Ltr to C Reed
ML19323A84821 April 1980Advises That First Cores for Byron & Braidwood Units Will Employ Westinghouse Mfg 17X17 Optimized Fuel Assemblies in Place of Westinghouse 17X17 Std Fuel Per Current Fsar.Fsar Amend Will Be Filed During First Quarter 1981
ML19323B02026 February 1980Responds to NRC 800126 Ltr Re Violations Noted in IE Insp Repts 50-454/79-18 & 50-455/79-18.Corrective Actions:Cable Connectors Changed & Field Change Request Engineering Review Performed W/Satisfactory Results
ML19323F79615 May 1980Provides Info for Argonne Natl Lab to Perform Confirmatory Piping Analysis Per NRC 800204 Request.Revised Support Drawings & Analyticals Encl
ML19323G06222 May 1980Responds to NRC 800310 Request for Info Re Auxiliary Feedwater Sys.Util Will Forward Amend to FSAR During First Quarter of 1981
ML19323H87530 May 1980Revises Response to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Cover Gasket Replacement Will Be Completed When Cables to Switches Are Terminated
ML19324B82331 October 1989Provides Notification That Fish Impingement & Sound Level Studies Have Been Completed W/Satisfactory Results.Plant Will Continue to Respond to Any Citizen Noise Complaints & Rept Complaints in Annual Environ Operating Rept