Responds to NRC Re Violations Noted in IE Insp Repts 50-454/79-16 & 50-455/79-16.Corrective Actions: Subassembly RC-11 Has Been Disposed of & Branch Connection Weld RC-216 No Longer in Sys Installation
ML19296B191
Person / Time
Site: Byron  Constellation icon.png
Issue date: 01/15/1980
From: Peoples D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19296B186 List:
References
NUDOCS 8002200234
Download: ML19296B191 (1)


Text

~.

Commonwecith Edison one First National Plaza. Chicago. Illinois Address Reply to: Post Office Box 767 Chicago, lihnois 60690 January 15, 1980 Mr. James G.

Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Station Units 1 and 2 Additional Response to IE Inspection Report Nos. 50-454/79-16 and 50-455/79-16 NRC Docket Nos. 50-454 and 50-455 Reference (a) :

December 19, 19~<9 letter from G.

Fiorelli C.

Reed

Dear Mr. Keppler:

Reference (a) requested Commonwealth Edison Company to provide additional information with regard to "the actions taken or planned to assure that the weld in question is sound."

The actions taken are as follows:

Due to subsequent nonconforming conditions found with the material in the piping Section of subassembly RC-1-1, subassembly RC-1-1 has been disposed of by Nonconformance Report (NCR) 070 (Hunter Corporatica) as "Not For Use".

Therefore, the weld in question, branch connection weld RC-216, is no longer in the system installation and requires no further evaluation.

Please address any additional questions that you might have concerning this matter to this office.

Very truly yours, f.

hlz 7. D1 D.

Peoples Director of JClear Licensing WFN: rap jAN111980 80022oo521]*>