Text
9 M-;
Comm:nwn!!h Edison 8G()52 00 vqo f
[ $a ons First TJarrona: F*aza. Cpcago. lihoois
.7 Q y' Addr:sa Reply to: Post Cfhec Box 767 Chicago, Illir1ois 60690 May 15, 1980 Mr. James G. Keppler, Director Directorate of Inspection and.
Enforcement,- Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL e0137
Subject:
Byron Station Units 1 and 2 Post-Tensioning Anchornead Failure NRC Docket Nos. 50-454 and 50 455_
Reference (a): December 26, 1979 letter from V:. F.
'Naughton to J. G. Keppler (b): February 29, 1980 letter from W. F.
Naughton to J. G. Keppler
Dear Mr. Keppler:
Commonwealth Edison Company notified your office en November 29, 1979 of the failure of two (2) field anchorheads for the horizontal tendens used to post-tension the concrete (primary) containment on Byron Units 1 and 2.
That notification was made under 10 CFR 50.55(e).
References (a) and (b) contained interim reports concerning these failures, as well as two (2) additional failures.
As indicated in the attached third interim report, testing has not yet reached a point where conclusive results are available to resolve this ceficiency.
Final resolution is now scheduled for June 30, 1980.
The re fore, Commonwealth Edison requests an extension to that time for submittal of the final report.
Pl' ease address any questions you may have to this office.
Very truly yot.rs, A
W. F. Naughion Nuclear Licensing Administrator Pressurized ?later Reactors Attachment
%\\