Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20129D50611 July 1985Informs of Decision to Replace Current Health Physics Network (HPN) Telephone Sys W/Dedicated Commercial Circuits. Priority Order,In Which Commercial HPN Svc Will Be Installed,ListedHealth Physics Network
ML20129D57312 July 1985Confirms Plans for 850716 Meeting W/Util in Glen Ellyn,Il to Discuss Addl Aspects of Licensee Regulating Improvement Program,Per 850703 Meeting Between D Farrar & a Madison
ML20129D77211 July 1985Discusses Replacement of Health Physics Network (HPN) W/Dedicated Commercial Circuits.Replacement HPN Commercial Circuits Will Be Routed Through Exchange at Telephone Company Central OfcHealth Physics Network
ML20129D88212 July 1985Forwards Safeguards Insp Rept 50-331/85-18 on 850624-27.No Noncompliance Noted
ML20129E39528 June 1985Discusses Task to Update PRA Results on Five Lwrs.Site Visit by Sandia Requested on 850722-26 to Obtain Current Info on Risk Important Hardware & Procedure Mods
ML20129F26026 June 1985Forwards Safety Evaluation of TMI Action Item II.K.3.30 Re Use of Westinghouse Small Break LOCA Model NOTRUMP.Plant- Specific Analyses Due within 1 Yr of Receipt of Ltr,Per TMI Item II.K.3.31Loop seal
ML20129F28412 April 1985Forwards Section III of App to SALP Repts 50-269/84-31, 50-270/84-31,50-287/84-35,50-369/84-36 & 50-370/84-34. W/O EnclSystematic Assessment of Licensee Performance
ML20129G12418 June 1985Forwards Summary of 850507 Meeting in Atlanta,Ga Re Util Progress in Establishing Generic Section for Emergency Preparedness Plan.Attendance List Also Encl
ML20129G71230 May 1985Discusses Insps on 850213-15 at Peach Bottom & 850204-08 & 13 at Limerick & Forwards Notices of Violation & Proposed Imposition of Civil PenaltiesSystematic Assessment of Licensee Performance
ML20129H1184 April 1985Forwards Summary of 850320 Meeting in Region II Re Proposed 10CFR50.54(p) Changes to Guard Training & Qualification Plans.W/O Encl
ML20129H89811 July 1985Forwards SER Accepting Addressing Open Items in 850515 & 17 SERs Re Generic Ltr 83-28,Item 1.1 Concerning post-trip Review for Bryon & Braidwood, Respectively
ML20129K08222 July 1985Forwards Requests for Addl Info Required to Complete Review of Responses to IE Bulletin 80-11 Re Masonry Wall Design. Evaluation of Arching Theory in Unreinforced Masonry Walls in Nuclear Power Plants Encl for RefEarthquake
ML20132C1643 November 1975Discusses Qualification Review of Plants for Replication Per 741119 Request.Plant Design Acceptable for ReplicationEarthquake
ML20132E49727 March 1985Forwards Apps to SALP Repts 50-269/84-31,50-270/84-31, 50-287/84-35,50-369/84-36 & 50-370/84-34Systematic Assessment of Licensee Performance
ML20132G33831 December 1984Forwards SALP Repts 50-269/84-31,50-270/84-31,50-287/84-35, 50-369/84-36 & 50-370/84-34 for May 1983 - Aug 1984.No Minor Weaknesses Noted for Oconee.Major Weakness in Area of Plant Operations Identified for McGuireSystematic Assessment of Licensee Performance
ML20132G41619 April 1985Confirms 850423 Meeting to Discuss Matters of Mutual Interest Re Section 8 of Recently Administered Requalification Exam,Per 850416 Telcon
ML20133A43516 September 1985Responds to 850830 Request for Approval to Hold One Emergency Medical Assistance Drill on 851106 to Meet Criteria to Test Medical Response Capability for Emergency Plans.Proposal Acceptable
ML20133B2402 October 1985Denies 850913 Application for Exemptions from 10CFR50.71(e) for Submittal of Updated Fsar.Comprehensive Exemption Request Must Be Submitted by 851011Exemption Request
ML20133C15512 March 1985Ack Time & Effort Expended on Recent Facility Visit
ML20133C38020 October 1980Ack Receipt of Responding to Noncompliance Identified in .Requests Steps Taken to Assure That Proper Procedures Are Used & Followed
ML20133C56815 June 1973Discusses Const Insps 50-369/73-02 & 50-370/73-03 on 730529-0601 & Forwards Notice of Violation.Areas Examined: QA Records of Containment Bldg Welding Program.Ag Staples 730625 Notice of Appearance Also Encl
ML20133E29715 July 1985Requests Technical Analysis of Separation Criteria of Class 1E Cables from non-Class 1E Cables,Including Bases & Assumptions Supporting Lesser Separation Criteria Using Listed Guidelines
ML20133E5437 May 1985Confirms Telcon Re Arrangements for 850517 Mgt Meeting at Util Ofcs to Review Results of SALP Program for Facilities During Sept 1983 - Feb 1985Systematic Assessment of Licensee Performance
ML20133E83516 April 1985Ack Receipt of 850220 Rev to Emergency Response Plan.Results of Review to Determine If Effectiveness of Plan Changed & Compliance W/Planning Stds in 10CFR50.47(b) Will Be Forwarded
ML20133E86528 June 1985Confirms 850703 Enforcement Conference at Region II to Discuss Failure to Meet Operability Requirements for McGuire Dc Batteries & Inoperability of Oconee Unit 1 Containment Hydrogen Monitors,Per 850610 Telcon
ML20133F9818 October 1985Approves Use of Revised Acceptance Criteria for Firecode CT Gypsum Fire Stops,Per 850730 Request.Gypsum & Thermafiber Fire Penetration Seals Similar in Configuration to Seals at LaSalleFire Barrier
ML20133H0594 October 1985Forwards Mgt Meeting Repts 50-295/85-35,50-304/85-37, 50-373/85-31,50-374/85-32,50-454/85-41 & 50-455/85-29 on 850920 Re Emergency Preparedness
ML20133H15210 October 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-369/85-26 & 50-370/85-31
ML20133J69715 October 1985Notifies That Written & Oral Exams for Operator & Senior Operator Licenses Scheduled for Wk of 851104.Requirements for Administering Exams Encl.Applications Should Be Submitted 60 Days Prior to First Exam
ML20133K74318 October 1985Advises That 850930 Request for Certification Exams for Instructors Cannot Be Supported at Present.Persons That May Be Allowed to Instruct Until Exams Administered Listed
ML20133M62130 September 1977Forwards Order for Mod of License DPR-66,assuring Adequate Net Positive Suction Head to Recirculation Spray & Low Head Safety Injection Pumps in Recirculation Mode of Operation Following Postulated LOCA
ML20133P43018 October 1985Confirms Telcon Re 851104 Mgt Meeting at Util Corporate Ofcs to Review SALP Results for Nov 1983 - June 1985.SALP Board Rept Will Be Forwarded to Util Approx 2 Wks Prior to Meeting.Proposed Agenda EnclSystematic Assessment of Licensee Performance
ML20133P71129 July 1985Forwards Summary of 850606 Meeting in Atlanta,Ga Re Util Draft Generic Emergency Plan & Implementation Schedule. Attendance List Encl
ML20133P93431 July 1985Informs That Completion of Integrated Safety Assessment Scheduled for Sept 1985 for Millstone Unit 1 & Sept 1986 for Haddam Neck.Projects Listed in Encl Should Be Conducted Independent of Integrated Safety Assessment ProgramTornado Missile
Tornado Missile Protection
ML20133Q40912 September 1985Forwards Summary of 850823 Meeting W/Util in Atlanta,Ga Re Development of Scaling Factors for 10CFR61.55 Compliance on Classification of Radwaste Scheduled for Burial
ML20134B1494 April 1978Forwards CPPR-170,CPPR-171 & Fr Notice of Issuance of CPs
ML20134B2432 February 1983Confirmatory Action Ltr Re Problems Identified During 830124-28 Special Insp Concerning safety-related Electrical Work at Facilities.Discussions Lack Continuation of Stop Work Order Encompass Electrical Auxiliary Steel
ML20134B3724 April 1972Discusses 720306 Meeting W/Util Re Compliance Insp Program & QA Program for Activities to Be Conducted Under Proposed Application.Qa Manual Requested.Draft marked-up Insp Rept Encl
ML20134D49313 August 1985Discusses Review of Util Comments on Encl SALP Repts 50-213/85-99,50-245/85-99 & 50-336/85-99,per 850604 Meeting at Millstone.Decline in Performance at Haddam Neck & Need for Mgt Attention Cited.Salp Rept 50-213/85-99 Revised
ML20134E8689 August 1985Advises That 850605 Rev 7 to QA Program Topical Rept Meets Requirements of 10CFR50.54(a) & 50.55(f) & Acceptable. Proposed Rev to Millstone Unit 3 Operations Phase Also Acceptable
ML20134F97916 August 1985Expresses Appreciation for Licensee Cooperation W/Nrc at Data Gathering Trip During Wk of 850722.Possible Nov 1985 Trip to Confirm Certain Plant Design Features Discussed
ML20134K64323 August 1985Requests Listed Addl Info Re Fatigue Effects of Diesel Generator Vibration on Instrumentation,Per . Response Requested within 45 Days of Ltr Date
ML20134K87523 August 1985Grants Util 850618 Request to Use ASME Code Cases N-403 & N-413,permitting Reassembly of Nf Components & Piping & Linear Supports.Use of Code Cases Must Be Documented in Future FSAR Amend
ML20134L93429 August 1985Ack Receipt of Rev 37 to QA Topical Rept CE-1-A.Changes Meet Requirements of 10CFR50,App B & Acceptable
ML20134P9753 September 1985Forwards EG&G-EA-6918 Supporting Util 831108 Response to 830708 Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re Review of Tech Specs for post-maint Testing Requirements That May Degrade Rather than Enhance Safety
ML20134Q24730 August 1985Forwards Topical Rept Evaluation of Verification of Cecor Coefficient Methodology for Application to PWRs of Middle South Utils Sys. Methodology Acceptable
ML20135J05226 August 1985Ltr Contract NRC-05-84-153,Mod 3,revising Scope of Work,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators
ML20136B20924 June 1974Forwards Predocketing Insp Rept P-506/74-01 of Insp on 740605-07.Inconsistencies W/Aec Requirements Noted
ML20136D59226 June 1984Forwards Certification of Pollution Control Facilities as Described in Encl Exhibit A,W/Exception of Radioactive Laundry,In Response to 840606 Request.Info Provided on Radioactive Laundry Does Not Reflect Info in FSAR
ML20136D65413 November 1984Forwards Certificate of Pollution Control Facilities for Facilities Described in Attachment 2 to 841102 Request