Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20129D506 | 11 July 1985 | Informs of Decision to Replace Current Health Physics Network (HPN) Telephone Sys W/Dedicated Commercial Circuits. Priority Order,In Which Commercial HPN Svc Will Be Installed,Listed | Health Physics Network |
ML20129D573 | 12 July 1985 | Confirms Plans for 850716 Meeting W/Util in Glen Ellyn,Il to Discuss Addl Aspects of Licensee Regulating Improvement Program,Per 850703 Meeting Between D Farrar & a Madison | |
ML20129D772 | 11 July 1985 | Discusses Replacement of Health Physics Network (HPN) W/Dedicated Commercial Circuits.Replacement HPN Commercial Circuits Will Be Routed Through Exchange at Telephone Company Central Ofc | Health Physics Network |
ML20129D882 | 12 July 1985 | Forwards Safeguards Insp Rept 50-331/85-18 on 850624-27.No Noncompliance Noted | |
ML20129E395 | 28 June 1985 | Discusses Task to Update PRA Results on Five Lwrs.Site Visit by Sandia Requested on 850722-26 to Obtain Current Info on Risk Important Hardware & Procedure Mods | |
ML20129F260 | 26 June 1985 | Forwards Safety Evaluation of TMI Action Item II.K.3.30 Re Use of Westinghouse Small Break LOCA Model NOTRUMP.Plant- Specific Analyses Due within 1 Yr of Receipt of Ltr,Per TMI Item II.K.3.31 | Loop seal |
ML20129F284 | 12 April 1985 | Forwards Section III of App to SALP Repts 50-269/84-31, 50-270/84-31,50-287/84-35,50-369/84-36 & 50-370/84-34. W/O Encl | Systematic Assessment of Licensee Performance |
ML20129G124 | 18 June 1985 | Forwards Summary of 850507 Meeting in Atlanta,Ga Re Util Progress in Establishing Generic Section for Emergency Preparedness Plan.Attendance List Also Encl | |
ML20129G712 | 30 May 1985 | Discusses Insps on 850213-15 at Peach Bottom & 850204-08 & 13 at Limerick & Forwards Notices of Violation & Proposed Imposition of Civil Penalties | Systematic Assessment of Licensee Performance |
ML20129H118 | 4 April 1985 | Forwards Summary of 850320 Meeting in Region II Re Proposed 10CFR50.54(p) Changes to Guard Training & Qualification Plans.W/O Encl | |
ML20129H898 | 11 July 1985 | Forwards SER Accepting Addressing Open Items in 850515 & 17 SERs Re Generic Ltr 83-28,Item 1.1 Concerning post-trip Review for Bryon & Braidwood, Respectively | |
ML20129K082 | 22 July 1985 | Forwards Requests for Addl Info Required to Complete Review of Responses to IE Bulletin 80-11 Re Masonry Wall Design. Evaluation of Arching Theory in Unreinforced Masonry Walls in Nuclear Power Plants Encl for Ref | Earthquake |
ML20132C164 | 3 November 1975 | Discusses Qualification Review of Plants for Replication Per 741119 Request.Plant Design Acceptable for Replication | Earthquake |
ML20132E497 | 27 March 1985 | Forwards Apps to SALP Repts 50-269/84-31,50-270/84-31, 50-287/84-35,50-369/84-36 & 50-370/84-34 | Systematic Assessment of Licensee Performance |
ML20132G338 | 31 December 1984 | Forwards SALP Repts 50-269/84-31,50-270/84-31,50-287/84-35, 50-369/84-36 & 50-370/84-34 for May 1983 - Aug 1984.No Minor Weaknesses Noted for Oconee.Major Weakness in Area of Plant Operations Identified for McGuire | Systematic Assessment of Licensee Performance |
ML20132G416 | 19 April 1985 | Confirms 850423 Meeting to Discuss Matters of Mutual Interest Re Section 8 of Recently Administered Requalification Exam,Per 850416 Telcon | |
ML20133A435 | 16 September 1985 | Responds to 850830 Request for Approval to Hold One Emergency Medical Assistance Drill on 851106 to Meet Criteria to Test Medical Response Capability for Emergency Plans.Proposal Acceptable | |
ML20133B240 | 2 October 1985 | Denies 850913 Application for Exemptions from 10CFR50.71(e) for Submittal of Updated Fsar.Comprehensive Exemption Request Must Be Submitted by 851011 | Exemption Request |
ML20133C155 | 12 March 1985 | Ack Time & Effort Expended on Recent Facility Visit | |
ML20133C380 | 20 October 1980 | Ack Receipt of Responding to Noncompliance Identified in .Requests Steps Taken to Assure That Proper Procedures Are Used & Followed | |
ML20133C568 | 15 June 1973 | Discusses Const Insps 50-369/73-02 & 50-370/73-03 on 730529-0601 & Forwards Notice of Violation.Areas Examined: QA Records of Containment Bldg Welding Program.Ag Staples 730625 Notice of Appearance Also Encl | |
ML20133E297 | 15 July 1985 | Requests Technical Analysis of Separation Criteria of Class 1E Cables from non-Class 1E Cables,Including Bases & Assumptions Supporting Lesser Separation Criteria Using Listed Guidelines | |
ML20133E543 | 7 May 1985 | Confirms Telcon Re Arrangements for 850517 Mgt Meeting at Util Ofcs to Review Results of SALP Program for Facilities During Sept 1983 - Feb 1985 | Systematic Assessment of Licensee Performance |
ML20133E835 | 16 April 1985 | Ack Receipt of 850220 Rev to Emergency Response Plan.Results of Review to Determine If Effectiveness of Plan Changed & Compliance W/Planning Stds in 10CFR50.47(b) Will Be Forwarded | |
ML20133E865 | 28 June 1985 | Confirms 850703 Enforcement Conference at Region II to Discuss Failure to Meet Operability Requirements for McGuire Dc Batteries & Inoperability of Oconee Unit 1 Containment Hydrogen Monitors,Per 850610 Telcon | |
ML20133F981 | 8 October 1985 | Approves Use of Revised Acceptance Criteria for Firecode CT Gypsum Fire Stops,Per 850730 Request.Gypsum & Thermafiber Fire Penetration Seals Similar in Configuration to Seals at LaSalle | Fire Barrier |
ML20133H059 | 4 October 1985 | Forwards Mgt Meeting Repts 50-295/85-35,50-304/85-37, 50-373/85-31,50-374/85-32,50-454/85-41 & 50-455/85-29 on 850920 Re Emergency Preparedness | |
ML20133H152 | 10 October 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-369/85-26 & 50-370/85-31 | |
ML20133J697 | 15 October 1985 | Notifies That Written & Oral Exams for Operator & Senior Operator Licenses Scheduled for Wk of 851104.Requirements for Administering Exams Encl.Applications Should Be Submitted 60 Days Prior to First Exam | |
ML20133K743 | 18 October 1985 | Advises That 850930 Request for Certification Exams for Instructors Cannot Be Supported at Present.Persons That May Be Allowed to Instruct Until Exams Administered Listed | |
ML20133M621 | 30 September 1977 | Forwards Order for Mod of License DPR-66,assuring Adequate Net Positive Suction Head to Recirculation Spray & Low Head Safety Injection Pumps in Recirculation Mode of Operation Following Postulated LOCA | |
ML20133P430 | 18 October 1985 | Confirms Telcon Re 851104 Mgt Meeting at Util Corporate Ofcs to Review SALP Results for Nov 1983 - June 1985.SALP Board Rept Will Be Forwarded to Util Approx 2 Wks Prior to Meeting.Proposed Agenda Encl | Systematic Assessment of Licensee Performance |
ML20133P711 | 29 July 1985 | Forwards Summary of 850606 Meeting in Atlanta,Ga Re Util Draft Generic Emergency Plan & Implementation Schedule. Attendance List Encl | |
ML20133P934 | 31 July 1985 | Informs That Completion of Integrated Safety Assessment Scheduled for Sept 1985 for Millstone Unit 1 & Sept 1986 for Haddam Neck.Projects Listed in Encl Should Be Conducted Independent of Integrated Safety Assessment Program | Tornado Missile Tornado Missile Protection |
ML20133Q409 | 12 September 1985 | Forwards Summary of 850823 Meeting W/Util in Atlanta,Ga Re Development of Scaling Factors for 10CFR61.55 Compliance on Classification of Radwaste Scheduled for Burial | |
ML20134B149 | 4 April 1978 | Forwards CPPR-170,CPPR-171 & Fr Notice of Issuance of CPs | |
ML20134B243 | 2 February 1983 | Confirmatory Action Ltr Re Problems Identified During 830124-28 Special Insp Concerning safety-related Electrical Work at Facilities.Discussions Lack Continuation of Stop Work Order Encompass Electrical Auxiliary Steel | |
ML20134B372 | 4 April 1972 | Discusses 720306 Meeting W/Util Re Compliance Insp Program & QA Program for Activities to Be Conducted Under Proposed Application.Qa Manual Requested.Draft marked-up Insp Rept Encl | |
ML20134D493 | 13 August 1985 | Discusses Review of Util Comments on Encl SALP Repts 50-213/85-99,50-245/85-99 & 50-336/85-99,per 850604 Meeting at Millstone.Decline in Performance at Haddam Neck & Need for Mgt Attention Cited.Salp Rept 50-213/85-99 Revised | |
ML20134E868 | 9 August 1985 | Advises That 850605 Rev 7 to QA Program Topical Rept Meets Requirements of 10CFR50.54(a) & 50.55(f) & Acceptable. Proposed Rev to Millstone Unit 3 Operations Phase Also Acceptable | |
ML20134F979 | 16 August 1985 | Expresses Appreciation for Licensee Cooperation W/Nrc at Data Gathering Trip During Wk of 850722.Possible Nov 1985 Trip to Confirm Certain Plant Design Features Discussed | |
ML20134K643 | 23 August 1985 | Requests Listed Addl Info Re Fatigue Effects of Diesel Generator Vibration on Instrumentation,Per . Response Requested within 45 Days of Ltr Date | |
ML20134K875 | 23 August 1985 | Grants Util 850618 Request to Use ASME Code Cases N-403 & N-413,permitting Reassembly of Nf Components & Piping & Linear Supports.Use of Code Cases Must Be Documented in Future FSAR Amend | |
ML20134L934 | 29 August 1985 | Ack Receipt of Rev 37 to QA Topical Rept CE-1-A.Changes Meet Requirements of 10CFR50,App B & Acceptable | |
ML20134P975 | 3 September 1985 | Forwards EG&G-EA-6918 Supporting Util 831108 Response to 830708 Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re Review of Tech Specs for post-maint Testing Requirements That May Degrade Rather than Enhance Safety | |
ML20134Q247 | 30 August 1985 | Forwards Topical Rept Evaluation of Verification of Cecor Coefficient Methodology for Application to PWRs of Middle South Utils Sys. Methodology Acceptable | |
ML20135J052 | 26 August 1985 | Ltr Contract NRC-05-84-153,Mod 3,revising Scope of Work,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20136B209 | 24 June 1974 | Forwards Predocketing Insp Rept P-506/74-01 of Insp on 740605-07.Inconsistencies W/Aec Requirements Noted | |
ML20136D592 | 26 June 1984 | Forwards Certification of Pollution Control Facilities as Described in Encl Exhibit A,W/Exception of Radioactive Laundry,In Response to 840606 Request.Info Provided on Radioactive Laundry Does Not Reflect Info in FSAR | |
ML20136D654 | 13 November 1984 | Forwards Certificate of Pollution Control Facilities for Facilities Described in Attachment 2 to 841102 Request |