Text
.
Septenber 3, 1985 Docket No. 50-245 LS05-85-09-005 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Coripany Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEMS 3.1.3 AND 3.2.3 (POST-MAINTENANCETESTING)
Pe:
Millstone Nuclear Power Station, Unit No. 1 You were required by Generic Letter 83-28, dated July 8, 1983, Items 3.1.3 and 3.2.3 to review the Millstone-1 Technical Specifications for post-maintenance testino requirements that may degrade rather than enhance safety. You responded by letter dated November 8, 1983. Our review of your responses as documented in the enclosed contractor's report (ES&G-EA-6918) finds that your responses to G.L. 83-28 Items 3.1.3 and 3.2.3 are acceptable.
Sincerely, Original signed by John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page DISTRIBUTION Docket File NRC PDR OBRf5 Rdg HThompson OELD EJordan RGrines JPartlow JShea
[\\
CJamerson JBasurto GHolahan JHopkins
[
fd; f
ACRS(10)
V DL:0RB#56 DL:(R1#5 DL:0RBf5 CJamerson JShea:tm JZwolinski s/y/85
%/f/85
/
9 3 /85 8509090119 85090 ADOCK O50002,45 PDR p
P
.er s
p reto
[,
[g UNITED STATES p,
NUCLEAR REGULATORY COMMISSION 5
9j WASHINGTON, D. C. 20555 e
'%,,,,. #g Septenber 3,1985 Docket No. 50-245 LS05-85-09-005 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEMS 3.1.3 AND 3.?.3 (POST-PAINTENANCE TESTING)
Re:
Millstone Nuclear Power Station, Unit No.1 You were required by Generic Letter 83-28, dated July 8, 1983, Items 3.1.3 and 3.2.3 to review the Millstone-1 Technical Specifications for post-maintenance testing requirements that may degrade rather than enhance safety. You responded by letter dated November 8, 1083. Our review of your resporses as documented in the enclosed contractor's report (EGAG-EA-6918) finds that your responses to G.L. 83-28 Items 3.1.3 and 3.2.3 are acceptable.
A l[jA, Sincerely,
~
~
~
John
. Zwolinski, Chief Opera ng Reactors Branch No. 5 Divisi n of Licensing
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page
.-=
Mr. John F. Opeke Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. I cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry 8 Feward Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0?70 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Regional Administrator, Region I U.S. Nuclear Pegulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Northeast Nuclear Energy ;!ompany ATTN: Superintendent Millstone Nuclear Power Station P. O. Box 128 Waterford, Connecticut 06385 Pesident ' Inspector t/o U.S. NRC Millstone Nuclear Pcwer Station P. O. Box 811 Niantic, Connecticut 06357 1
First Selectman of the Town i
of Peterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385