ML20133E835
| ML20133E835 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna, 05000000 |
| Issue date: | 04/16/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| References | |
| NUDOCS 8508080033 | |
| Download: ML20133E835 (1) | |
Text
-
Ct d pg 16 #
Virginia Electric and Power Company ATTN:
Mr. W. L. Stewart, Vice President Nuclear Operations P. O. Box 26666 Richmond, VA 23261 Gentlemen:
SUBJECT:
VIRGINIA POWER CORPORATE EMERGENCY RESPONSE PLAN, REVISION DATED 2/20/85 This letter acknowledges receipt of the subject plan revision. We shall review the plan revision to determine whether the effectiveness of the plan has been changed as a result of your revision. As part of the review, we will make a determination concerning compliance with the planning standards in 10 CFR 50.47(b).
Results of our review will be forwarded to you via separate transmittal.
If you have any questions on this matter, please let us know.
Sincerely, Vir911 L. Brownlee, Chief Reactor P- >.sts. Branch 2 04"' '. h. c. n.: actor Projects cc:
R. J. Hardwick, Manager Special Projects J. W. Martin, Director Emergency Preparedness J. H. Ferguson, Chief Operating Officer W. S. Mistr, Manager-Security E. W. Harrell, Station Manager North Anna Power Station CO'3E0 R. F. Saunders, Station Manager 3 -3g(
Surry Power Station
-3 3g i
~$39 V
bcc: Commonweath of Virginia Document Control Desk FRC Resident Inspector RII I
RII RII RII -
f QQ' l
Sh4L f)VO (f Y
[ Cine DCollins KJeni son SElrod WSartor 4/f/85 4/ /85 4/f/85 4/g/85 4/)f/85 8508080033 B50416 PDR ADOCK 05000280 F
PDR l
ZE35 ifo
_-